MidChannelClearing_(RTA)_BidSchedule.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
W912P521B0010 - Middlesboro Channel Clearing Project
Solicitation number
W912P521B0010
Issued by

About this file

This document contains a bid schedule and technical specifications for a federal construction contract solicitation. The U.S. Army Corps of Engineers Nashville District is seeking a firm-fixed price bid to clear approximately 1.5 miles of vegetation and sediment from the Middlesboro Channel in Bell County, Kentucky. The base scope includes channel clearing, grubbing, stripping and excavation. There are also six options involving articulated concrete block revetment systems at various locations along the channel. Bids are due by July 27th, 2021 and a mandatory pre-bid site visit will be held on that date to review the project details and hazards. The work must be completed per the final plans and specifications. This is a 100% small business set-aside contract within NAICS code 237990.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

BID SCHEDULE
Solicitation No. W912P521B0010 MIDDLESBORO CHANNEL CLEARING
ITEM
NO.DESCRIPTION (Technical Section)EST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

Base Contract (STATION 14+20 TO 35+40 & 42+60 TO 79+60)
0001Mobilization and Demobilization (01 22 00)1JOB$$
0002Performance and Payment Bonds (01 22 00)1JOB$$
0003Temporary Fencing1JOB$$
0004Erosion Control - Channel Excavation (01 57 19)1JOB$$
0005Erosion Control - Burn Site (01 57 19)1JOB$$
0006Erosion Control - Disposal Area (31 23 00)1JOB$$
0007Temporary Levee Access Ramps (31 23 00)1JOB$$
0008Channel Clearing, Grubbing, and Stripping (31 11 00)110,830SY$$
0009Burn Site Stripping (31 11 00)9,740SY$$
0010Herbicide Spraying, Mowing, and Vine Treatment (32 92 19)79,920SY$$
0011Unclassified Excavation (31 23 00)77,300CY$$
0012Riparian Seeding (32 92 19)28,790SY$$
0013Upland Seeding (32 92 19)96,220SY$$
0014Disposal Area Seeding (31 23 00)46,380SY$$
0015Temporary Stream Crossings (31 23 00)12EA$$
TOTAL ESTIMATED PRICE - BASE$
Option 1 - Channel Excavation (STATION 0+00 TO 14+20, 35+40 TO 42+40 & 47+50 TO 51+00 (Right Bank))
1001Performance and Payment Bonds (01 22 00)1JOB$$
1002Erosion Control - Channel Excavation (01 57 19)1JOB$$
1003Erosion Control - Burn Site (01 57 19)1JOB$$
1004Erosion Control - Disposal Area (31 23 00)1JOB$$
1005Unclassified Excavation (31 23 00)25,800CY$$
1006Riparian Seeding (32 92 19)4,520SY$$
1007Disposal Area Seeding (31 23 00)15,480SY$$
1008Temporary Stream Crossings (31 23 00)6EA$$
TOTAL ESTIMATED PRICE - OPTION 1$
Option 2 - (Upstream Articulated Concrete Block Revetment System (STATION 17+48 TO 21+96))
2001Performance and Payment Bonds (01 22 00)1JOB$$
2002Unclassified Excavation (35 31 19.20)140CY$$
2003Levee Stripping (35 31 19.20)3,140SY$$
2004Geotextiles (35 31 19.20)3,510SY$$
2005Aggregate Void Filler/Drainage Layer (35 31 19.20)550CY$$
2006Geogrid (35 31 19.20)3,140SY$$
2007Erosion Control Blankets (32 92 19)2,400SY$$
2008Levee Seeding (32 92 19)2,400SY$$
2009Articulated Concrete Block Installation (35 31 19.20)3510SY$$
20104000 psi Concrete (35 31 19.20)140CY$$
TOTAL ESTIMATED PRICE - OPTION 2$
Option 3 - (Upstream Articulated Concrete Block Revetment System (STATION 13+00 TO 17+48))
3001Performance and Payment Bonds (01 22 00)1JOB$$
3002Unclassified Excavation (35 31 19.20)140CY$$
3003Levee Stripping (35 31 19.20)3,480SY$$
3004Geotextiles (35 31 19.20)3,850SY$$
3005Aggregate Void Filler/Drainage Layer (35 31 19.20)600CY$$
3006Geogrid (35 31 19.20)3,480SY$$
3007Erosion Control Blankets (32 92 19)2,770SY$$
3008Levee Seeding (32 92 19)2,770SY$$
3009Articulated Concrete Block Installation (35 31 19.20)3850SY$$
30104000 psi Concrete (35 31 19.20)140CY$$
TOTAL ESTIMATED PRICE - OPTION 3$
Option 4 - (Downstream Articulated Concrete Block Revetment System (STATION 39+03 TO 43+67))
4001Performance and Payment Bonds (01 22 00)1JOB$$
4002Unclassified Excavation (35 31 19.20)150CY$$
4003Levee Stripping (35 31 19.20)3,840SY$$
4004Geotextiles (35 31 19.20)4,220SY$$
4005Aggregate Void Filler/Drainage Layer (35 31 19.20)660CY$$
4006Geogrid (35 31 19.20)3,840SY$$
4007Erosion Control Blankets (32 92 19)3,190SY$$
4008Levee Seeding (32 92 19)3,190SY$$
4009Articulated Concrete Block Installation (35 31 19.20)4220SY$
40104000 psi Concrete (35 31 19.20)150CY$
TOTAL ESTIMATED PRICE - OPTION 4$
Option 5 - (Downstream Articulated Concrete Block Revetment System (STATION 43+67 TO 48+31))
5001Performance and Payment Bonds (01 22 00)1JOB$
5002Unclassified Excavation (35 31 19.20)150CY$
5003Levee Stripping (35 31 19.20)4,030SY$
5004Geotextiles (35 31 19.20)4,380SY$
5005Aggregate Void Filler/Drainage Layer (35 31 19.20)700CY$
5006Geogrid (35 31 19.20)4,030SY$
5007Erosion Control Blankets (32 92 19)3,270SY$
5008Levee Seeding (32 92 19)3,270SY$
5009Articulated Concrete Block Installation (35 31 19.20)4380SY$
50104000 psi Concrete (35 31 19.20)150CY$
TOTAL ESTIMATED PRICE - OPTION 5$
Option 6 - (Downstream Articulated Concrete Block Revetment System (STATION 48+31 TO 52+95)
6001Performance and Payment Bonds (01 22 00)1JOB$$
6002Unclassified Excavation (35 31 19.20)150CY$$
6003Levee Stripping (35 31 19.20)4,250SY$$
6004Geotextiles (35 31 19.20)4,620SY$$
6005Aggregate Void Filler/Drainage Layer (35 31 19.20)730CY$$
6006Geogrid (35 31 19.20)4,250SY$$
6007Erosion Control Blankets (32 92 19)3,460SY$$
6008Levee Seeding (32 92 19)3,460SY$$
6009Articulated Concrete Block Installation (35 31 19.20)4620SY$$
60104000 psi Concrete (35 31 19.20)150CY$$
TOTAL ESTIMATED PRICE - OPTION 6$
TOTAL ESTIMATED PROJECT COST$
Key: CY – Cubic Yard, SY – Square Yard