This document is a preliminary bid results report issued by the Long Beach Public Utilities Department for Bid Solicitation No. UD-26-355, concerning an Alley Water Main Conversion project on Pacific Avenue in Long Beach, California. The bid opening occurred on August 31, 2026, at 1:00 p.m. The project is identified by Specification No. WD-56-22 and Drawing No. MC-5198. The document presents initial bidding results pending formal review and approval.

Two vendors submitted bids for the contract: Stephen Doreck Equipment Rentals, Inc., submitted the lower bid at $7,663,260.00, while Dominguez General Engineering, Inc., submitted a corrected bid totaling $9,307,750.00. The bid results are noted as preliminary and subject to review before final award determination.

View the file

Other files

File Type Posted
Plans MC-5198 Pacific Ave Signed.pdf PDF
MC-5198 Addendum 1.pdf PDF
UD-26-355_T_ItemExport.csv CSV file
Specification MC-5198 Signed.pdf PDF
MC-5198 Construction-NOI to Award.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

September 1, 2026

Long Beach Public Utilities Department Long Beach, California Specification No. WD-56-22 Drawing No. MC-5198 Bid Solicitation No. UD-26-355 Alley Water Main Conversion Pacifc Avenue Bid Opening: August 31, 2026 at 1:00pm

PRELIMINARY BID RESULTS

Vendor Bid Total Stephen Doreck Equipment Rentals, Inc. $7,663,260.00 Dominguez General Engineering, Inc. $9,307,750.00*

Note: These bid results are preliminary and pending review.