MC-5198 Preliminary Bid Results.pdf
PDF 417 KB Posted
- Attached to
- Alley Main Conversion Pacific Avenue (MC-5198)
- Solicitation number
- UD-26-355
- Issued by
- Los Angeles County, California
About this file
This document is a preliminary bid results report issued by the Long Beach Public Utilities Department for Bid Solicitation No. UD-26-355, concerning an Alley Water Main Conversion project on Pacific Avenue in Long Beach, California. The bid opening occurred on August 31, 2026, at 1:00 p.m. The project is identified by Specification No. WD-56-22 and Drawing No. MC-5198. The document presents initial bidding results pending formal review and approval.
Two vendors submitted bids for the contract: Stephen Doreck Equipment Rentals, Inc., submitted the lower bid at $7,663,260.00, while Dominguez General Engineering, Inc., submitted a corrected bid totaling $9,307,750.00. The bid results are noted as preliminary and subject to review before final award determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans MC-5198 Pacific Ave Signed.pdf | ||
| MC-5198 Addendum 1.pdf | ||
| UD-26-355_T_ItemExport.csv | CSV file | |
| Specification MC-5198 Signed.pdf | ||
| MC-5198 Construction-NOI to Award.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 1, 2026
Long Beach Public Utilities Department Long Beach, California Specification No. WD-56-22 Drawing No. MC-5198 Bid Solicitation No. UD-26-355 Alley Water Main Conversion Pacifc Avenue Bid Opening: August 31, 2026 at 1:00pm
PRELIMINARY BID RESULTS
Vendor Bid Total Stephen Doreck Equipment Rentals, Inc. $7,663,260.00 Dominguez General Engineering, Inc. $9,307,750.00*
Note: These bid results are preliminary and pending review.
*corrected