This document is a set of construction drawings and specifications for the Moss Avenue Pump Station Rehabilitation Project (SP2767-CT) prepared by Woodard & Curran for the City of Santa Monica, California. The project involves the comprehensive rehabilitation of an existing wastewater pump station located at 1623 Appian Way, Santa Monica. The scope of work includes structural repairs and reinforcement, mechanical and electrical system upgrades, instrumentation and SCADA panel installations, site grading and utility modifications, and associated demolition and site restoration. The construction drawings were released for construction in June 2026 and include detailed civil, structural, mechanical, electrical, and instrumentation plans across multiple sheets with specifications for materials, finishes, and construction methodology. Electronic bids for the project are due by 3:00 pm on Thursday, September 17, 2026, through the City's online vendor portal at OpenGov, with public bid opening occurring electronically immediately after the deadline.
The project requires the contractor to maintain ongoing pump station operations throughout the construction duration and coordinate work across multiple disciplines including civil, structural, mechanical, electrical, and instrumentation systems. Key requirements include obtaining all necessary permits from the City of Santa Monica and jurisdictional agencies, verifying existing field conditions prior to construction commencement, protecting existing utilities and trees, managing traffic control in accordance with California standards, and providing dust control and noise compliance with Santa Monica Municipal Code Chapter 4.12. The contractor bears responsibility for utility relocation costs, site safety and security, temporary shoring design and installation, and as-built documentation. All work shall comply with the City of Santa Monica's Standard Specifications for Public Works Construction, the 2025 California Building Code, and specific geotechnical requirements outlined in the Ninyo & Moore geotechnical report dated June 2025. The project is designed for seismic design category E (existing structures) and F (new construction) with allowable bearing capacity of 2,000 PSF and modulus of subgrade reaction of 150 PCI.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S a n t a M o n i c a
Woodard & Curran
SITE LOCATION
PROJECT LOCATION MAP SITE LOCATION MAP
CITY OF SANTA MONICA PWD
SOURCE: USGS TOPOGRAPHIC MAP
N
S
EW
N
S
EW
OWNER PROJECT NO. SP2767
JUNE 2026
RELEASED FOR CONSTRUCTION
PROJECT LOCATION
MOSS AVENUE PUMP STATION
REHABILITATION PROJECT
w oo da rd cu rra n.
ne t\ sh ar ed \P ro je ct s\
5.
S an ta
M on ic a
M
AP
S
SM
UR
RF
\w ip
\D ra w in gs \G en er al \G
-0
.d w g, M ay
3,
- 1 2:
pm
C
SB
RO
W
N
SHEET INDEX
DWG NO DWG NAME
GENERAL
G-000 COVER SHEET
G-001 GENERAL NOTES
CIVIL
C-101 EXISTING SITE PLAN
C-102 PROPOSED SITE PLAN
C-103 GRADING PLAN
STRUCTURAL
S-001 STRUCTURAL ABBREVIATIONS & GENERAL NOTES
S-002 STRUCTURAL REPAIR NOTES, SCHEDULE & DETAILS
S-003 SPECIAL INSPECTIONS
S-101 STRUCTURAL LOWER LEVEL PLAN
S-102 STRUCTURAL UPPER LEVEL PLAN
S-103 PUMP STATION GROUND LEVEL SLAB PLAN
S-104 CONTROL ROOM PLAN, ELEVATIONS, AND NOTES
S-105 ELECTRICAL ROOM HATCH REPLACEMENT PLANS
S-301 STRUCTURAL SECTIONS 1
S-302 STRUCTURAL SECTIONS 2
S-901 STRUCTURAL DETAILS
S-902 RAILING, LADDER, & CONCRETE DETAILS
MECHANICAL
M-001 MECHANICAL NOTES, LEGEND, AND ABBREVIATIONS
M-101 LOWER FLOOR - MECHANICAL PLAN
M-102 MECHANICAL SECTION A
M-103 MECHANICAL SECTION B
M-104 FUEL PIPE ROUTING AID
M-901 MECHANICAL DETAIL
ELECTRICAL
E-001 LEGENDS, ABBREVIATIONS, AND GENERAL NOTES
ES-011 SITE DEMOLITION, POWER, CONTROLS, AND GROUNDING PLANS
ED-051 DEMOLITION ONE-LINE DIAGRAM
E-051 ONE-LINE DIAGRAM SHEET 1
E-052 ONE-LINE DIAGRAM SHEET 2
ED-101 PUMP STATION DEMOLITION PLANS, PANEL SCHEDULE, AND WIRING DIAGRAM
E-101 PUMP STATION PLANS, SECTION, PANEL SCHEDULE, AND WIRING DIAGRAM
E-701 SUPPLY AND EXHAUST FAN WIRING DIAGRAMS
E-901 DETAILS - SHEET 1
E-902 DETAILS - SHEET 2
INSTRUMENTATION
I-001 INSTRUMENTATION LEGEND & NOTES
I-002 EXISTING NETWORK ARCHITECTURE
I-003 PROPOSED NETWORK ARCHITECTURE
I-101 MAPS SCADA PANEL CP-1 BILL OF MATERIALS
I-102 MAPS SCADA PANEL CP-1 EQUIPMENT LAYOUT
I-103 MAPS SCADA PANEL CP-1 TERMINAL BLOCK LAYOUT (1 OF 2)
I-104 MAPS SCADA PANEL CP-1 TERMINAL BLOCK LAYOUT (2 OF 2)
I-105 MAPS SCADA PANEL CP-1 POWER DISTRIBUTION (1 OF 3)
I-106 MAPS SCADA PANEL CP-1 POWER DISTRIBUTION (2 OF 3)
I-107 MAPS SCADA PANEL CP-1 POWER DISTRIBUTION (3 OF 3)
I-108 MAPS SCADA PANEL CP-1 COMMUNICATIONS
I-109 MAPS SCADA PANEL CP-1 PLC DIGITAL INPUTS (1 OF 3)
I-110 MAPS SCADA PANEL CP-1 PLC DIGITAL INPUTS (2 OF 3)
I-111 MAPS SCADA PANEL CP-1 PLC DIGITAL INPUTS (3 OF 3)
I-112 MAPS SCADA PANEL CP-1 PLC DIGITAL OUTPUTS
I-113 MAPS SCADA PANEL CP-1 PLC SPARE SLOT 6
I-114 MAPS SCADA PANEL CP-1 PLC ANALOG INPUTS
I-115 MAPS SCADA PANEL CP-1 PLC ANALOG OUTPUTS
I-116 MAPS INTRINSIC BARRIER PANEL COMPONENT LAYOUT & WIRING DIAGRAM
I-117 MAPS CP-1 & EP-160 WET WELL LEVEL CONTROL RELAY WIRING DIAGRAMS
I-201 LCP-100 SCADA PANEL BILL OF MATERIALS
I-202 LCP-100 SCADA PANEL EQUIPMENT LAYOUT
I-203 LCP-100 SCADA PANEL TERMINAL BLOCK LAYOUT (SHEET 1 OF 3)
I-204 LCP-100 SCADA PANEL TERMINAL BLOCK LAYOUT (SHEET 2 OF 3)
I-205 LCP-100 SCADA PANEL TERMINAL BLOCK LAYOUT (SHEET 3 OF 3)
I-206 LCP-100 SCADA PANEL POWER DISTRIBUTION (SHEET 1 OF 2)
I-207 LCP-100 SCADA PANEL POWER DISTRIBUTION (SHEET 2 OF 2)
I-208 LCP-100 SCADA PANEL COMMUNICATIONS
I-209 LCP-100 SCADA PANEL PLC ANALOG INPUTS (SHEET 1 OF 2)
I-210 LCP-100 SCADA PANEL PLC ANALOG INPUTS (SHEET 2 OF 2)
I-211 LCP-100 SCADA PANEL PLC ANALOG OUTPUTS
I-212 LCP-100 SCADA PANEL PLC SPARE SLOT 6
I-213 LCP-100 SCADA PANEL PLC DIGITAL INPUTS (SHEET 1 OF 4)
I-214 LCP-100 SCADA PANEL PLC DIGITAL INPUTS (SHEET 2 OF 4)
I-215 LCP-100 SCADA PANEL PLC DIGITAL INPUTS (SHEET 3 OF 4)
I-216 LCP-100 SCADA PANEL PLC DIGITAL INPUTS (SHEET 4 OF 4)
I-217 LCP-100 SCADA PANEL PLC DIGITAL OUTPUTS
PK
1 70
M
AP
S
RE
H
AB
IL
IT
AT
IO
N P
RO
JE
CT
G-000
DM/ME
MC
SP2767
David Moering
Digitally signed by David Moering DN: CN=David Moering, OU=WCTestUsers, OU=WCUsers, DC=woodardcurran, DC=net Date: 2026.05.14 14:22:26-07'00'
JasonH Typewritten Text 6/29
JasonH Stamp
JasonH Typewritten Text
JASON HOANG, PE
PRINCIPAL CIVIL ENGINEER
JasonH Typewritten Text
Joshua.Carvalho Stamp
Joshua.Carvalho Typewritten Text 6/29
Joshua.Carvalho Typewritten Text robert.zak Typewritten Text 6/30/2026 robert.zak Stamp
1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE "STANDARD SPECIFICATIONS FOR
PUBLIC WORKS CONSTRUCTION", LATEST EDITION, CITY OF SANTA MONICA STANDARDS AND
THIS PLAN.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM THE
CITY OF SANTA MONICA AND ANY OTHER APPROPRIATE JURISDICTIONAL AGENCIES THAT
MAYBE REQUIRED TO ACCOMPLISH ALL WORK WITHIN THE PUBLIC RIGHT-OF WAY. NO WORK
SHALL START UNTIL ALL NECESSARY PERMITS ARE OBTAINED.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW OF PROJECT DRAWINGS AND
SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT MAY
OCCUR, SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO START OF
CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED.
4. PRIOR TO COMMENCING CONSTRUCTION THE CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS IN THE FIELD. IF THE FIELD CONDITIONS DIFFER FROM THOSE SHOWN ON THE
PLANS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER AND SHALL NOT BEGIN
CONSTRUCTION UNTIL THE CHANGED CONDITIONS HAVE BEEN EVALUATED AND ADDRESSED.
ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY APPLICABLE
CODE REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR OWN EXPENSE AND
AT NO EXPENSE TO THE OWNER OR THE ENGINEER.
5. THE ENGINEER WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO
OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE
APPROVED BY THE ENGINEER.
6. NOTES AND DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND
TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN CONSTRUCTION SHALL BE AS SHOWN FOR
SIMILAR WORK.
7. THE CONTRACTOR SHALL CONTACT THE PUBLIC WORKS INSPECTOR 72 HOURS PRIOR TO START OF CONSTRUCTION TO ENSURE THAT ALL PERMITS AND TRAFFIC CONTROLS ARE IN PLACE. (424) 744-0825.
EXISTING & PROPOSED UTILITIES
8. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT (800) 227-2600 AT LEAST
72 HOURS PRIOR TO EXCAVATION.
9. EXISTING UTILITIES AND STRUCTURES (UNDERGROUND, SURFACE, OR OVERHEAD) ARE
INDICATED ONLY TO THE EXTENT THAT SUCH INFORMATION WAS KNOWN, OR MADE
AVAILABLE TO, OR DISCOVERED BY THE ENGINEER IN PREPARING THE DRAWINGS. THE
LOCATIONS, CONFIGURATIONS, AND ELEVATIONS OF SUBSURFACE FACILITIES AND UTILITIES ARE APPROXIMATE AND NOT ALL UTILITIES AND FACILITIES MAY BE INDICATED. OVERHEAD UTILITIES
ARE NOT INDICATED IN ELEVATIONS, PROFILE OR SECTION DRAWINGS.
a. THE CONTRACTOR IS TO SUPPLY THE CITY WITH A SET OF COLOR CODED AS-BUILT
DRAWINGS SHOWING ALL UTILITIES THAT OCCUPY THE AREAS SHOWN ON THE
DEMOLITION AND NEW WORK CONSTRUCTION DOCUMENTS IN THIS PACKAGE.
b. CONTRACTOR TO POT HOLE FOR EX. UNDERGROUND UTILITIES AND INDICATE DEPTH
AND SIZE OF UTILITY DISCOVERED.
c. BACKFILL POT HOLES, COMPACT TO 95% RELATIVE COMPACTION AND RESTORE TO
MATCH EXISTING SURFACE.
10. INFORMATION ON LOCATION, SIZES AND DEPTH OF THE EXISTING UTILITIES WAS TAKEN FROM
EXISTING DRAWINGS AND DATA, AND IS FOR REFERENCE ONLY. THE CONTRACTOR SHALL
BECOME FAMILIAR WITH THE PLANS AND SHALL VERIFY SITE CONDITIONS PRIOR TO THE
ORDERING OF MATERIALS AND COMMENCING WORK.
11. ANY UTILITY INVESTIGATION DONE BY POT HOLING EXCAVATION SHALL USE VACUUM
EXTRACTION METHOD ONLY.
12. BEFORE CONSTRUCTION IS STARTED, CONTRACTOR SHALL COORDINATE WITH THE OWNER OF
EACH UTILITY AND DEFINE THE REQUIREMENTS AND METHODS TO ACCOMMODATE THE
PROTECTION, TEMPORARY SUPPORT, ADJUSTMENT, OR RELOCATION OF ANY UTILITIES
AFFECTED BY THE PROPOSED WORK. THE CONTRACTOR SHALL BEAR ALL COST FOR RELOCATING
AND PROTECTING ALL EXISTING UTILITIES INTERFERING WITH THE WORK.
13. IT WILL BE CONTRACTOR’S RESPONSIBILITY TO ADJUST TO FINISHED GRADE EXISTING SEWER
AND STORM DRAIN MAINTENANCE HOLES AND ANY OTHER UTILITY BOX COVERS AND INSTALL
CONCRETE COLLAR TO MATCH PROPOSED PAVEMENT.
14. THE CONTRACTOR TO BE AWARE OF ALL OVERHEAD LINES AT ALL TIMES, SO AS NOT DISTURB
THEM.
15. ALL FIRE HYDRANTS, WATER CONTROL VALVES, AND MAINTENANCE HOLES SHALL BE KEPT FREE
FROM OBSTRUCTIONS AND AVAILABLE FOR USE AT ALL TIMES.
JOB SITE
16. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE
CONDITIONS, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, DURING THE COURSE OF
CONSTRUCTION AND UNTIL THE WORK IS FORMALLY ACCEPTED BY THE CITY. THIS
REQUIREMENT SHALL APPLY CONTINUOUSLY, AND SHALL NOT BE LIMITED TO NORMAL
WORKING HOURS.
17. IN CASE OF SUSPENSION OF WORK FROM ANY CAUSE WHATEVER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS AND SHALL PROPERLY STORE THEM IF NECESSARY AND SHALL
ERECT TEMPORARY STRUCTURE WHERE NECESSARY. CITY WILL NOT BE HELD RESPONSIBLE FOR
THE CARE OR PROTECTION OF ANY MATERIAL OR PARTS OF THE WORK PRIOR TO FINAL
ACCEPTANCE, UNLESS OTHERWISE SPECIFIED.
18. THE CONTRACTOR SHALL MAINTAIN AND CLEAN, IF NECESSARY, ALL EXISTING ONSITE AND/OR
ADJACENT STORM DRAIN INLETS AFFECTED BY CONSTRUCTION DURING THE COURSE OF
CONSTRUCTION AND UNTIL THE WORK IS FORMALLY ACCEPTED BY THE CITY.
19. ALL DEBRIS AND FOREIGN MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OFF AT
APPROVED DISPOSAL SITE. THE CONTRACTOR SHALL OBTAIN NECESSARY PERMITS FOR THE
TRANSPORTATION OF MATERIAL TO AND FROM THE SITE.
20. THE CONTRACTOR IS RESPONSIBLE TO KEEP THE CONSTRUCTION AREA INCLUDING ADJACENT STREETS AND PROPERTIES CLEAN AT ALL TIMES. ANY SWEEPING PERFORMED BY CITY CREWS TO
ENFORCE THIS REQUIREMENT SHALL BE CHARGED TO THE CONTRACTOR AT OVERTIME RATES.
21. THE CONTRACTOR SHALL BE RESPONSIBLE DURING ALL PHASES OF WORK TO PROVIDE FOR
PUBLIC SAFETY AND CONVENIENCE. THE CONTRACTOR SHALL ESTABLISH ADEQUATE ACCESS TO
DRIVEWAYS AT THE END OF EACH WORKING DAY TO THE SATISFACTION OF THE ENGINEER.
22. PEDESTRIAN ACCESS TO RESIDENTS AND BUSINESSES SHALL BE PROVIDED AND MAINTAINED BY
THE CONTRACTOR AT ALL TIMES.
23. THE CONTRACTOR IS ADVISED THAT ALL EXCAVATED MATERIAL AND DEBRIS CREATED BY
REMOVAL OPERATIONS AND SHALL BE USED AS BACKFILL MATERIAL SUBJECT TO APPROVAL.
SALVAGE ALL EXISTING MANHOLE COVERS AND FRAMES, HYDRANTS AND BLOW-OFFS AND
DELIVER THEM TO THE CITY YARD.
SURVEY & LAYOUT
24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL PROPERTY
CORNER MARKERS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REPLACING ANY
SURVEY MONUMENTS THAT ARE DISTURBED DURING CONSTRUCTION. PROPERTY CORNER
MARKERS AND SURVEY MONUMENTS DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE
RE-ESTABLISHED BY A PROFESSIONAL SURVEYOR LICENSED IN THE STATE OF CALIFORNIA.
25. THE PROPOSED GRADE IS THE FINAL GRADE AND NOT THE ROUGH GRADE. THE
CONTRACTOR SHALL SUBTRACT THE THICKNESS OF THE PAVED SECTION AND/OR
LANDSCAPE TOPSOIL SECTION TO ARRIVE AT THE ROUGH GRADE ELEVATION.
26. STRAIGHT GRADE SHALL BE MAINTAINED BETWEEN CONTOUR LINES AND SPOT
ELEVATIONS UNLESS OTHERWISE SHOWN ON THE PLANS.
27. CONSTRUCTION STAKING FOR IMPROVEMENTS SHOWN ON THIS PLANS SHALL BE
PERFORMED BY A PROFESSIONAL SURVEYOR LICENSED IN THE STATE OF CALIFORNIA
PUBLIC HEALTH, SAFETY & WELFARE
28. TRAFFIC CONTROL DEVICES AND METHODS SHALL CONFORM TO THE REQUIREMENTS OF
THE “STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROL” (SAF-T) AND “WORK AREA
TRAFFIC CONTROL HANDBOOK” (WATCH MANUAL) LATEST EDITION.
29. DURING NON-CONSTRUCTION HOURS, ALL EXCAVATIONS IN THE STREET OR ALLEY MUST
BE PLATED OR BACKFILLED WITH TEMPORARY ASPHALT CONCRETE. ALL PLATES NEED TO BE
SECURED IN PLACE TO THE SATISFACTION OF THE ENGINEER. AT THE END OF EACH
WORKING DAY, ROADS SHALL BE OPEN TO VEHICLE TRAFFIC UNLESS OTHERWISE
APPROVED BY THE ENGINEER.
30. CONTRACTOR SHALL PROVIDE NECESSARY TRENCH PLATING. ALL PLATING SHALL BE
FIRMLY SUPPORTED BY ADJACENT PAVEMENT OR BEAMS. ALL PLATES IN A.C. PAVEMENT
SHALL BE STUDDED INTO PAVEMENT WITH TOP PLATES FLUSH WITH PAVEMENT SURFACE.
THERE SHALL BE NO OPENINGS BETWEEN PLATES. PLATES SUPPORTED ON BEAMS SHALL BE
BOLTED TO OR WELDED TO BEAMS BY TACK WELDING. TACK WELDING SHALL BE REQUIRED
OF CONTIGUOUS PLATES. PLATES SHALL BE SECURED SO AS NOT TO MOVE, SLIP OR SLIDE
AND CAPABLE OF CARRYING H-20 WHEEL LOADING. STEEL PLATES SHALL BE STEEL OF
MINIMUM A36 GRADE DESIGNED FOR H520-44 TRUCK LOADING PER CALTRANS BRIDGE
DESIGN SPECIFICATION MANUAL. ALL PLATE SURFACES SHALL BE ROUGHENED OR RAISED
WITH MINIMUM COEFFICIENT OF FRICTION EQUIVALENT TO 0.35 PER CALIFORNIA TEST
METHOD 342, TO MINIMIZE TIRE SLIPPAGE. FOR CONCRETE SECTION OF STREETS, THE
PLATES MAY BE PLACED ON SURFACE AND HELD IN PLACE WITH ASPHALT CONCRETE EDGE
BERMS AND STUDS INTO DRILLED HOLES.
31. TRAFFIC PLATES ON EXCAVATED AREAS SHALL BE SKID RESISTANT, WITH MINIMUM
COEFFICIENT OF FRICTION EQUIVALENT TO 0.35 PER CALIFORNIA TEST METHOD 342. STEEL
PLATES BRIDGING SHALL BE STEEL OF MINIMUM A36 GRADE DESIGNED FOR H520-44
TRUCK LOADING PER CALTRANS BRIDGE DESIGN SPECIFICATION MANUAL.
32. WATER SHALL BE PROVIDED ON SITE AND USED TO CONTROL DUST DURING
CONSTRUCTION OPERATIONS. IT’S CONTRACTOR’S RESPONSIBILITY TO APPLY AND PAY FOR
EDDY VALVE FROM WATER RESOURCES DIVISION AT 2500 MICHIGAN AVENUE, BUILDING 1,
CITY OF SANTA MONICA, CA 90404.
33. ATTENTION IS DIRECTED TO THE SOUND CONTROL REQUIREMENTS AND RESTRICTIONS IN
THE PROJECT GENERAL CONDITIONS. SPECIFICALLY, CONTRACTOR SHALL COMPLY WILL
ALL LOCAL SOUND CONTROL AND NOISE LEVEL RULES, REGULATIONS AND ORDINANCES,
INCLUDING BUT NOT LIMITED TO ALL APPLICABLE PROVISIONS OF CHAPTER 4.12 OF THE
SANTA MONICA MUNICIPAL CODE.
34. THE MOST RESTRICTIVE SECTIONS OF THE SANTA MONICA MUNICIPAL CODE GENERALLY
REQUIRE THAT CONSTRUCTION NOISE NOT EXCEED 85 DBA MEASURED AT A DISTANCE OF
50 FEET DURING NORMAL WORKING HOURS, WHICH ARE 8 A.M. TO 6 P.M. MONDAY
THROUGH FRIDAY, AND 9 A.M. TO 5 P.M. SATURDAY. ANY CONSTRUCTION ACTIVITY, SUCH
AS JACK HAMMERING, THAT IS EXPECTED TO GENERATE NOISE LEVELS IN EXCESS OF THE
PREVIOUSLY INDICATED RESTRICTIONS SHALL ONLY OCCUR BETWEEN THE HOURS OF 10
A.M. AND 3 P.M. MONDAY THROUGH FRIDAY.
35. PRIOR TO COMMENCING THE EXCAVATION OF A TRENCH 5-FEET IN DEPTH AND GREATER
INTO WHICH A PERSON WILL BE REQUIRED TO DESCEND, THE CONTRACTOR SHALL FIRST
OBTAIN A PERMIT TO DO SO FROM THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF
CALIFORNIA (CAL OSHA) PURSUANT TO 7-10.4.1. THE CONTRACTOR SHALL SUBMIT A COPY
OF THE SHORING PLAN AND PERMIT TO THE ENGINEER PRIOR TO EXCAVATION. SAFETY IS
STRESSED. ANY OPERATION OR SITUATION THAT THREATENS THE SAFETY OF WORKERS OR
PUBLIC, INCLUDING IMPROPER TRAFFIC CONTROL, SHALL CAUSE THE SUSPENSION OF
WORK.
36. HARD HATS AND HIGH VISIBILITY ORANGE VESTS SHALL BE WORN AT ALL TIMES WHEN
WORKING ON THE PROJECT OR WITHIN THE PROJECT VICINITY.
TREE PROTECTION
37. THE CONTRACTOR SHALL CONTACT COMMUNITY FORESTER AT (310) 458-5182 48-HOURS
PRIOR TO TRIMMING ANY INTERFERING TREES OR TRENCHING NEAR THE TREES WHICH
CAN DISTURB THE TREE ROOTS.
38. CONTRACTOR SHALL BE FAMILIAR WITH AND HAVE CLEAR UNDERSTANDING OF THE CITY'S
PRUNING GUIDELINES AND PRUNING STANDARDS AS ADOPTED BY THE INTERNATIONAL
SOCIETY OF ARBORICULTURE.
39. CONTRACTOR SHALL FOLLOW ALL GUIDELINES AS DETAILED IN THE MOST CURRENT ANSI
A300 STANDARDS FOR TREE CARE OPERATIONS.
· ANSI A300 PART 1-2008 VERSION ON THE STANDARDS FOR TREE
PRUNING.
· ANSI STANDARD Z133.1-2006 SAFETY REQUIREMENTS
41. TREES WITHIN THE PUBLIC RIGHT-OF-WAY MAY NOT BE REMOVED FOR ANY REASON AND
ARE TO BE PROTECTED FROM INJURY OR DAMAGE DURING CONSTRUCTION. QUESTIONS
REGARDING STREET TREES MAY BE DIRECTED TO THE COMMUNITY FORESTER AT (310)
458-5182.
42. THE TYPICAL TREE PROTECTION ZONE (TPZ) SHOULD ENCOMPASS THE CANOPY PLUS AN
ADDITIONAL RADIAL WIDTH OF TEN FEET (10').
43. REMOVAL OF HARDSCAPE AND/OR EXCAVATION WITHIN THE TPZ SHALL BE DONE
MANUALLY.
44. IN THE EVENT ROOT PRUNING IS REQUIRED TO ACCOMMODATE GRADE CHANGES OR THE
INSTALLATION OF HARDSCAPE FEATURES, THE ROOT PRUNING PROCEDURES SHALL BE
DIRECTED BY A CERTIFIED ARBORIST.
GENERAL NOTES: GENERAL NOTES (CONT.): JOB ADDRESS
1623 APPIAN WAY, SANTA MONICA, CA 90401
ITEM AGENCY/UTILITY COMPANY CONTACT PERSON PHONE NO.
EMERGENCY & FIRST RESPONDERS SANTA MONICA POLICE & FIRE DISPATCH 911
UNDERGROUND SERVICE ALERT DIGALERT (800) 227-2600 811
UTILITY LOCATOR FOR CITY OF SANTA MONICA SANTA MONICA PUBLIC WORKS PUBLIC WORKS INSPECTOR (310) 458-2240 CITY FACILITIES/SERVICES - AFTER HOURS PHONE NO. SANTA MONICA PUBLIC WORKS ARCADIA WATER TREAT. PLANT (310) 434-2672
NON-EMERGENCY POLICE & FIRE:
POLICE SANTA MONICA POLICE FRONT DESK (310) 458-8491
FIRE PREVENTION SANTA MONICA FIRE JOE CAVIN (310) 434-8663
CITY OF SANTA MONICA OWNED/MANAGED FACILITIES:
STREET LIGHTING ELECTRICAL ERNESTO TORRES (310) 458-8529
WATER, SEWER & STORM DRAIN WATER RESOURCES RALPH VALENCIA (310) 458-8508
TRASH PICKUP & TRASH ENCLOSURES RESOURCE RECOVERY & RECYCLING YVONNE YEUNG (310) 458-8552
TRAFFIC SIGNALS TRAFFIC SIGNALS EDWARD ESCARCEGA (310) 458-8522
TRAFFIC SIGNAGE, STRIPING, LOOPS, CAMERAS & SPEED HUMPS TRANSPORTATION MANAGEMENT JOE CONROY (310) 458-8963
MUNICIPAL BUS SYSTEM BIG BLUE BUS ALFREDO TORALES (310) 458-5233
TREE & ROOT PROTECTION URBAN FOREST MATTHEW WELLS (310) 458-5182
PUBLIC LANDSCAPE PUBLIC LANDSCAPE (PARKS/MEDIAN) RACHEL YOUNG (310) 458-8974
NEWSPAPER RACKS PUBLIC WORKS JOSHUA CARVALHO (310) 458-8737
PARKING ENFORCEMENT POLICE (TRAFFIC SERVICES DIVISION) MARGARITA VERDUZCO (310) 458-2226
CITY PARKING FACILITIES PARKING SERVICES ZACH POLLARD (310) 458-8955
BEACH FACILITIES BEACH MAINTENANCE ROBERT DORSEY (310) 458-8974
MUNICIPAL AIRPORT AIRPORT ADMINISTRATION STELIOS MAKRIDES (310) 458-8591
MUNICIPAL PIER PIER MANAGEMENT ELANA BUEGOFF (310) 458-8216
MUNICIPAL FIBER NETWORK (MFN) INFORMATION SYSTEMS DIVISION SARKIS METSPAKYAN (310) 458-5251
BIKE RACKS MOBILITY DIVISION KYLE KOZAR (310) 458-5769
PRIVATELY OWNED/MANAGED UTILITIES:
ELECTRICAL SO. CAL. EDISON (SCE) DIANE FORTE (310) 310-5262
NATURAL GAS SO. CAL. GAS COMPANY (SCG) MIKE GRIMM (310) 901-4241
TELEPHONE VERIZON MATTHEW MILLER (949) 417-7485
CABLE TV SPECTRUM RICK SABATINO (818) 612-8192
TELECOMMUNICATION/FIBER OPTIC CABLE ABOVE NET KEVIN SULLIVAN (714) 236-8502
TELECOMMUNICATION/FIBER OPTIC CABLE METRO ACCESS DESTRY HIPPEN (949) 622-3506
TELECOMMUNICATION/FIBER OPTIC CABLE NEXT "G" NETWORKS RAFAEL NUNEZ (909) 593-9700 TELECOMMUNICATION/FIBER OPTIC CABLE LEVEL 3 COMMUNICATIONS ROBERT THOMPSON (213) 291-6204
TELECOMMUNICATION/FIBER OPTIC CABLE MCI WORLDCOM CRAIG ROBERTSON (714) 591-4614
TELECOMMUNICATION/FIBER OPTIC CABLE QWEST COMMUNICATIONS MICHAEL GARRISON
TELECOMMUNICATION/FIBER OPTIC CABLE FRONTIER CORRY RIGGS (310) 264-5123
OTHER AGENCIES/DISTRICTS:
METROPOLITIAN TRANSPORTATION AUTHORITY (METRO) SPECIAL EVENTS NOTIFICATION (213) 922-4632 SANTA MONICA MALIBU UNIFIED SCHOOL DISTRICT (SMMUSD) FACILITIES MANAGEMENT (310) 450-8338
SANTA MONICA COLLEGE - ADMINISTRATION SMC ADMINISTRATION (310) 434-4000
SANTA MONICA COLLEGE - POLICE SMC CAMPUS POLICE (310) 434-4300
CALTRANS - EMERGENCY & PLANNED CLOSURES CALTRANS DISPATCH (323) 259-2352
CALTRANS - MAINTENANCE WESTDALE MAINTENANCE STATION (310) 479-0728
CALTRANS - INSPECTOR FOR WESTSIDE KEN PAHLEVANI (OR PER CALTRANS PERMIT) (310) 837-8351 CITY OF LOS ANGELES TRAFFIC MANAGEMENT BUREAU OF TRAFFIC MANAGEMENT - WESTERN DISTRICT OFFICE (310) 575-8138
UNITED STATES POSTAL SERVICE (USPS) SANTA MONICA MAIN OFFICE (310) 576-6786
N O T I F I C A T I O N S
GENERAL NOTES (CONT.):
MISCELLANEOUS
45. AT LEAST 72 HOURS SHALL ELAPSE FROM THE TIME CONCRETE IS PLACED BEFORE
VEHICULAR TRAFFIC IS PERMITED TO TRAVEL ON IT, UNLESS OTHERWISE APPROVED BY
THE ENGINEER.
46. WHERE EXISTING PAVEMENT OR SUBGRADE IS FOUND TO BE UNSTABLE, THE
CONTRACTOR SHALL REMOVE AND REPLACE THE TOP 3 FEET OF SUBGRADE WITH
CRUSHED MISCELLANEOUS BASE (CMB) AND COMPACT TO 90% OF MAX. DRY DENSITY
OBTAINABLE AS MEASURED BY ASTM D-1157. IF SHALLOW UTILITIES PREVENT REMOVAL
OF 3 FEET OF SUBGRADE SOIL, A WOVEN GEOFABRIC SHALL BE USED TO PROVIDE
STRENGTH TO THE SUBGRADE.
47. THE EXACT LOCATION AND DEPTH OF UTILITIES HAVE NOT BEEN INDICATED ON THE
PLANS. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL UTILITIES AND
UNDERGROUND FACILITIES PRIOR TO DOING WORK THAT MAY DAMAGE SUCH FACILITIES,
IMPACT OR INTERFERE WITH THEIR SERVICES.
48. EXPANSION JOINTS PERPENDICULAR TO THE CURB SHALL BE INSTALLED IN COMBINED
CURB AND GUTTER AT THE BCR, ECR, BC, EC AND AT LOCATIONS WHERE THE CURB JOINS
EXISTING STRUCTURES. LONGITUDINAL EXPANSION JOINTS SHALL BE INSTALLED WHERE
THE CURB BUTTS AGAINST ANY EXISTING STRUCTURE.
49. SAWING OF JOINTS SHALL BEGIN AS SOON AS THE CONCRETE HAS SUFFICIENTLY
HARDENED TO PERMIT SAWING WITHOUT RAVELING, BUT NOT EXCEEDING TWELVE (12)
HOURS AFTER PLACEMENT OF CONCRETE. PLACEMENT OF CONCRETE SHALL BE
SCHEDULED TO BEGIN AND FINISH TO ALLOW SAWING OF JOINTS AS PREVIOUSLY
STATED.
50. SAWING OF JOINTS IN NEWLY PLACED CONCRETE PAVEMENT SHALL BE ACCOMPLISHED
BY “SOFF-CUT” OR OTHER EQUIVALENT EARLY-ENTRY SAW CUTTING METHOD ONLY.
51. THE EXACT LOCATIONS AND LIMITS FOR THE REMOVAL AND CONSTRUCTION OF
CONCRETE AND RUBBER SIDEWALKS SHALL BE DETERMINED IN THE FIELD BY THE
CONSTRUCTION MANAGER, INSPECTOR OR ENGINEER.
52. ALL FILL SOILS OR SOILS DISTURBED OR OVER-EXCAVATED DURING CONSTRUCTION
SHALL BE COMPACTED TO 90% MAXIMUM DENSITY AS DETERMINED BY A.S.T.M. SOIL
COMPACTION TEST D-1157.
53. THE CONTRACTOR SHALL REPLACE ALL EXISTING IMPROVEMENTS DAMAGED DURING
CONSTRUCTION TO THE SAME OR BETTER CONDITION.
54. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN THEIR OWN STAGING AREA (LAY DOWN
AREA) FOR ALL THEIR TOOLS, EQUIPMENT, MATERIAL AND PARKING. AT THE END OF EACH
DAY, CONTRACTOR SHALL REMOVE ALL MATERIALS, DEBRIS AND FOREIGN MATERIAL,
AND EQUIPMENT FROM THE JOB SITE UNLESS OTHERWISE APPROVED BY THE ENGINEER.
55. THE CONTRACTOR SHALL CONTACT THE CITY TRAFFIC OPERATION MANAGER FOR
TURNING OVER REMOVED EXISTING SIGNAGE TO THE CITY. FOR THE REMOVAL AND
REPLACEMENT OF PARKING METERS, CONTACT THE METER SHOP AT (310) 458-8521.
56. THIS PROJECT MAY BE CONSTRUCTED IN PHASES. EXACT PHASING OF THE PROJECT WILL
BE DETERMINED AFTER THE AWARD OF CONTRACT WITH THE CITY.
57. THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH MARKED UP RECORD DRAWINGS
AT THE COMPLETION OF THE PROJECT.
58. THE CONTRACTOR SHALL PROVIDE THE FOLLOWING PUBLIC NOTICES PRIOR TO
BEGINNING CONSTRUCTION ON THE PROJECT:
A. A NOTICE OF PROPOSED WORK SHALL BE MAILED AND HAND DELIVERED TO THE
BUSINESS AND RESIDENTS OF THE GENERAL AREA THAT WILL BE AFFECTED BY THIS
PROJECT PRIOR TO WORK ON THE SITE.
B. A TWO-WEEK NOTICE OF PROPOSED WORK SHALL BE MAILED AND HAND
DELIVERED TO THE BUSINESS AND RESIDENTS OF THE SITE SPECIFIC AREA THAT
WILL BE AFFECTED BY THIS PROJECT, INCLUDING STREET CLOSURES, LANE
CLOSURES, AND PARKING CLOSURES, TO BE RECEIVED AT LEAST TWO WEEKS OR 14
DAYS PRIOR TO WORK ON THE SITE.
C. IF A PROJECT LOCATION INTERFERES WITH BUS SERVICES, THE CONTRACTOR SHALL
NOTIFY THE SANTA MONICA MUNICIPAL BUS SYSTEM (BIG BLUE BUS) AT (310)
428-8647, AND/OR THE METROPOLITAN TRANSIT AUTHORITY AT (213) 972-6007 AT
LEAST FOUR (4) CALENDAR DAYS PRIOR TO WORK ON THE SITE.
59. ENGINEER IS RESPONSIBLE FOR COORDINATION OF ON-SITE BUILDING GRADES WITH
OFF-SITE IMPROVEMENTS/GRADES.
SIGNATURE
LEGAL DESCRIPTION:
MOSS TRACT LOT COM AT MOST W COR OF LOT 15 TH S 41¢11' E 64.86 FT TH N 45¢38' E
67.50 FT TH NW TO A PT IN NW LINE OF LOT 13 NE THEREON 57 FT FROM MOST W COR
OF SD LOT 13 TH NW TO A PT IN NW LINE OF LOT 14 NE THEREON 41 FT FROM MOST W
COR OF SD LOT 14 TH NW TO NW LINE OF SD LOT 15 TH SW THEREON 26 FT TO BEG
PART OF LOTS 13,14 AND LOT 15
BENCHMARK:
BASIS OF BEARING
THE BASIS OF HORIZONTAL CONTROL FOR THIS PROJECT IS THE CALIFORNIA
COORDINATE SYSTEM NAD83 ZONE 5, (2010.00) DETERMINED LOCALLY BY THE
FOLLOWING N.G.S. CONTINUOUS OPERATING REFERENCE STATIONS (C.O.R.S):
N.G.S. C.O.R.S. TORP:
NORTHING = 1748960.10' EASTING = 6461222.47'
N.G.S. C.O.R.S. VDCY:
NORTHING = 1887437.08' EASTING = 6495130.70'
THE COMBINATION FACTOR FOR THIS PROJECT WAS APPLIED AT THE FOLLOWING POINT:
NORTHING = 1826505.55' EASTING = 6411700.23'
DESCRIPTION:
P.K. NAIL IN LEAD IN NORTHWEST CURB OF ARCADIA TERRACE 5.2
FT. SOUTHWEST OF SOUTHWEST CURB OF APPIAN WAY.
ELEVATIONS SHOWN HEREON ARE BASED UPON CITY OF SANTA
MONICA BENCHMARK ID 39, ELEVATION 24.26 FEET (NGVD 29).
S a n t a M o n i c a
Woodard & Curran w oo da rd cu rra n.
ne t\ sh ar ed \P ro je ct s\
5.
S an ta
M on ic a
M
AP
S
SM
UR
RF
\w ip
\D ra w in gs \G en er al \G
-0
.d w g, M ay
3,
- 1 2:
pm
C
SB
RO
W
N
David Moering
Digitally signed by David Moering DN: CN=David Moering, OU=WCTestUsers, OU=WCUsers, DC=woodardcurran, DC=net Date: 2026.05.14 14:23:23-07'00'
JasonH Stamp
JasonH Typewritten Text 6/29
JasonH Typewritten Text
JasonH Typewritten Text
JASON HOANG, PE
PRINCIPAL CIVIL ENGINEER
Joshua.Carvalho Stamp
Joshua.Carvalho Typewritten Text 6/29
Joshua.Carvalho Typewritten Text robert.zak Typewritten Text 6/30/2026
INFLUENT SEWER MH
RIM = 27.90
RETAINING WALL
TREES AND
BUSHES
S
EYEWASH/SHOWER-STATION
CP4
CP1000
A
PPIA
N W
A Y
BIKE RACK(TYP)
CONCRETE BASE(TYP)
CONCRETE BASE
CONCRETE
BASE
EP
PYRAMID
DOME
TREV
CONCRETE
PAD
HANDRAIL
PLANTER
CONCRETEPAD
4"X4"
RISER
EB
4" CONDUIT
SD CLEAN-OUT
CONDUIT
E-BOX
E-RISER
SLIDING GATE
GARDEN LIGHT
(TYP)
VENT RISER
TRASH
CAN
2 CONDUITS
(ABOVE GROUND)
VENT RISER
RAMP
GARDEN
LIGHT
CONTAINER
VENTRISER
2 CONDUITS
(ABOVE GROUND)CONDUITS
(ABOVE GROUND)
CONCRETEPAD
EP
ICV
2 CONDUITS
EP
METAL STAIRS
DIRT/PLANTER
DIRT/PLANTER
FDC RISER
VENT RISER
RAMP
2"ø WALL DRAIN
(TYP)
EP
EP
E-RISER
E-BOX
E-BOX
CONCRETEPADS
CONCRETEPAD
PULL-BOX
DIRT/PLANTER
CANOPY
SCREEN-WALL
CANOPY
SET S/X
27.29
EXISTING 2" WATER
SERVICE
EXISTING 2" WATER
SERVICE
Legend
S
EXISTING SITE PLAN
SCALE: 1" = 5'
S a n t a M o n i c a
Woodard & Curran w oo da rd cu rra n.
ne t\ sh ar ed \P ro je ct s\
5.
S an ta
M on ic a
M
AP
S
SM
UR
RF
\w ip
\D ra w in gs \C iv il\
0- C-
1.
dw g, M ay
2,
- 1
2:
pm C
SB
RO
W N
BAR SCALE
1" = 5'
CHECK GRAPHIC SCALE BEFORE USING
05' 5 10'
CONTROL POINTS
CP# NORTHING EASTING ELEVATION DESCRIPTION
CP4 1826505.55' 6411700.23' 27.92' SET SCRIBED X
CP1000 1826551.00' 6411684.55' 28.43' SET SCRIBED X
David Moering
Digitally signed by David Moering DN: CN=David Moering, OU=WCTestUsers, OU=WCUsers, DC=woodardcurran, DC=net Date: 2026.05.14 14:23:47-07'00'
JasonH Stamp
JasonH Typewritten Text 6/29
JasonH Typewritten Text
JasonH Typewritten Text
JASON HOANG, PE
PRINCIPAL CIVIL ENGINEER
Joshua.Carvalho Stamp
Joshua.Carvalho Typewritten Text 6/29
Joshua.Carvalho Typewritten Text robert.zak Typewritten Text 6/30/2026
INFLUENT SEWER MH
RIM = 27.90
RETAINING WALL
TREES AND
BUSHES
S
EYEWASH/SHOWER-STATION
CP4
CP1000
A
PPIA
N W
A Y
BIKE RACK(TYP)
CONCRETE BASE(TYP)
CONCRETE BASE
CONCRETE
BASE
EP
PYRAMID
DOME
TREV
CONCRETE
PAD
HANDRAIL
PLANTER
CONCRETEPAD
4"X4"
RISER
EB
4" CONDUIT
SD CLEAN-OUT
CONDUIT
E-BOX
E-RISER
SLIDING GATE
GARDEN LIGHT
(TYP)
VENT RISER
TRASH
CAN
2 CONDUITS
(ABOVE GROUND)
VENT RISER
RAMP
GARDEN
LIGHT
CONTAINER
VENTRISER
2 CONDUITS
(ABOVE GROUND)CONDUITS
(ABOVE GROUND)
CONCRETEPAD
EP
ICV
2 CONDUITS
EP
METAL STAIRS
DIRT/PLANTER
DIRT/PLANTER
FDC RISER
VENT RISER
RAMP
2"ø WALL DRAIN
(TYP)
EP
EP
E-RISER
E-BOX
E-BOX
CONCRETEPADS
CONCRETEPAD
PULL-BOX
DIRT/PLANTER
CANOPY
SCREEN-WALL
CANOPY
SET S/X
27.29
EXISTING 2" WATER
SERVICE
EXISTING 2" WATER
SERVICE
S a n t a M o n i c a
Woodard & Curran w oo da rd cu rra n.
ne t\ sh ar ed \P ro je ct s\
5.
S an ta
M on ic a
M
AP
S
SM
UR
RF
\w ip
\D ra w in gs \C iv il\
0- C-
1.
dw g, M ay
2,
- 1
2:
pm C
SB
RO
W N
BAR SCALE
1" = 5'
CHECK GRAPHIC SCALE BEFORE USING
05' 5 10'
D2
D2 D2
D1
D3
3 2
PROPOSED SITE PLAN
SCALE: 1" = 5'
1. PUMP STATION OPERATIONS SHALL BE MAINTAINED THROUGHOUT
DURATION OF CONSTRUCTION. REFER TO SPECIFICATION SECTION 01 10
00 FOR SUMMARY OF WORK. REFER TO SECTION 01 10 00A - APPENDIX A
FOR SEQUENCE OF WORK REQUIREMENTS.
2. CONTRACTOR SHALL COORDINATE WORK WITH OTHER DISCIPLINES -
REFER TO OTHER DISCIPLINE DRAWINGS FOR ADDITIONAL RELATED
WORK NOT SHOWN.
3. DEMOLISH (DEMO) SHALL BE DEFINED AS REMOVING EACH ITEM IN ITS
ENTIRETY AND LEGALLY DISPOSING OF IT AT AN APPROVED OFF-SITE
LOCATION.
4. ALL EARTHWORK AND GROUND IMPROVEMENTS, INCLUDING BACKFILL,
SHALL BE IN ACCORDANCE WITH THE GEOTECHNICAL REPORT AND
PROJECT SPECIFICATIONS.
5. ONLY DEMOLITION KEYNOTE AND SHEET KEYNOTE NUMBERS SHOWN
ON THIS SHEET ARE LISTED IN THE KEYNOTES BELOW. NUMBERS MAY
NOT BE SEQUENTIAL AND WILL HAVE GAPS FOR KEYNOTES WHICH DO
NOT APPLY TO THIS SHEET.
SHEET GENERAL NOTES
SHEET KEYNOTES
1. PROVIDE MODIFICATION TO ABOVE-GRADE FORCE MAIN BYPASS
CONNECTION PER DETAIL 1 ON SHEET M-901.
2. PROVIDE CONCRETE EQUIPMENT PAD PER DETAIL S350 ON SHEET S-902
AND PROVIDE DIESEL FUEL STORAGE TANK. REFER TO SPECIFICATION
SECTION 43 41 13 FOR TANK REQUIREMENTS. CONTRACTOR SHALL FIELD
ROUTE FUEL SUPPLY AND RETURN PIPING TO BACKUP PUMP AND ENGINE
SHOWN ON SHEET M-101.
3. PROVIDE HATCH ENLARGEMENT PER DETAILS ON SHEET S-105.
4. CONTRACTOR AND/OR FIRE SYSTEM DESIGN ENGINEER SHALL CONFIRM
EXISTING FIRE DEPARTMENT CONNECTION CAN BE USED TO TEE OFF FOR
NEW FIRE SPRINKLER SYSTEM. PROVIDE DETAILS OF THE FOLLOWING
ITEMS, OR APPROVED EQUALS: ASSE1024 APPROVED INLINE DUAL CHECK
VALVE SHALL BE INSTALLED AHEAD OF THE BACKFLOW DEVICE; A
SHUTOFF VALVE IS REQUIRED TO BE INSTALLED AHEAD OF THE TEE; FIRE
SERVICE LINE TO THE CONTROL ROOM SHALL BE CPVC OR COPPER.
5. PROVIDE PRECAST EXHAUST CHASE PER DETAILS ON SHEET S-103.
CONTRACTOR SHALL FURNISH AND INSTALL ENGINE EXHAUST PIPE AS
SHOWN ON SHEETS M-101 AND M-102. REFER TO STRUCTURAL SHEETS
FOR ADDITIONAL DETAILS.
XX
DEMOLITION KEYNOTES
1. DEMO CURVED REINFORCED CONC PLANTER WALL AND FOOTING IN ITS
ENTIRETY. APPROX DIMENSIONS (FIELD VERIFY): WALL FOOTING IS 2'-0"
WIDE X 1'-0" HIGH WITH BOTTOM OF FOOTING 2'-0" BELOW GRADE NEAR
EL. 26.00; WALL IS 3'-0" HIGH X 8" THICK WITH 2'-0" ABOVE GRADE;
APPROX WALL LENGTH IS 30'-0".
2. DEMO EXISTING REINFORCED CONC PLANTER CURBS IN THEIR ENTIRETY;
DIMENSIONS APPROX 6" WIDE X 24" DEEP (FV); SEE PLAN FOR CURB
LENGTH; DEMO ALL IRRIGATION LINES AND REMOVE EXISTING FILL SOIL.
3. DEMO AND REMOVE EXISTING TREES AND BUSHES SURROUNDING THE
CONC PLANTER WALL IN THEIR ENTIRETY. CLEAR AND GRUB ALL EXISTING
STUMPS.
4. DEMO, REMOVE, AND PROPERLY DISPOSE OF EXISTING SCREEN-WALL
CANOPY IN ITS ENTIRETY.
5. DEMO AND REMOVE ALL EXISTING IRRIGATION CONTROL VALVES, BOXES,
AND CONTROL WIRES.
DX
D4
D5
David Moering
Digitally signed by David Moering DN: CN=David Moering, OU=WCTestUsers, OU=WCUsers, DC=woodardcurran, DC=net Date: 2026.05.14 14:23:59-07'00'
JasonH Stamp
JasonH Typewritten Text 6/29
JasonH Typewritten Text
JasonH Typewritten Text
JASON HOANG, PE
PRINCIPAL CIVIL ENGINEER
Joshua.Carvalho Stamp
Joshua.Carvalho Typewritten Text 6/29
Joshua.Carvalho Typewritten Text robert.zak Typewritten Text 6/30/2026
CP1000
A
PPIA
N W
A Y
-1.1%
FS:28.45
FS:28.55
FS:28.74
FS:28.73
FS:27.99
1.1%
S a n t a M o n i c a
Woodard & Curran w oo da rd cu rra n.
ne t\ sh ar ed \P ro je ct s\
5.
S an ta
M on ic a
M
AP
S
SM
UR
RF
\w ip
\D ra w in gs \C iv il\
0- C-
1.
dw g, M ay
2,
- 1
:1 1p m C
SB
RO
W N
BAR SCALE
1" = 5'
CHECK GRAPHIC SCALE BEFORE USING
05' 5 10'
GRADING SITE PLAN
SCALE: 1" = 5'
1. PUMP STATION OPERATIONS SHALL BE MAINTAINED THROUGHOUT
DURATION OF CONSTRUCTION. REFER TO SPECIFICATION SECTION 01 10
00 FOR SUMMARY OF WORK. REFER TO APPENDIX A FOR DRAFT
SEQUENCE OF WORK PLAN.
2. CONTRACTOR SHALL COORDINATE WORK WITH OTHER DISCIPLINES -
REFER TO OTHER DISCIPLINE DRAWINGS FOR ADDITIONAL NEW RELATED
WORK NOT SHOWN.
3. ALL EARTHWORK AND GROUND IMPROVEMENTS, INCLUDING BACKFILL,
SHALL BE IN ACCORDANCE WITH THE GEOTECHNICAL REPORT AND
PROJECT SPECIFICATIONS.
SHEET GENERAL NOTES
SHEET KEYNOTES
1. CONSTRUCT BUILDING PAD PER DETAIL S350 SHEET S-902.
2. INSTALL CRUSHED STONE RECEIVING TRENCH IN BETWEEN PROPOSED
BUILDING SLAB AND EXISTING WALL.
3. PROTECT AND DO NOT DISTURB EXISTING ELECTRICAL AND
COMMUNICATIONS LINES. REFER TO APPENDIX D - POTHOLE REPORT FOR
EXISTING UTILITY INFORMATION. CONTRACTOR SHALL LOCATE UTILITIES
PRIOR TO BEGINNING WORK.
4. REMOVE EXISTING VEGETATION AND A MINIMUM OF 3" OF EXISTING SOIL
AND BACKFILL WITH CRUSHED STONE TO MATCH EXISTING ELEVATIONS
UNLESS OTHERWISE SPECIFIED PER DETAIL 1, THIS SHEET. CONTRACTOR
TO DOCUMENT EXISTING ELEVATIONS PRIOR TO EXCAVATION.
XX
CRUSHED STONE
BUILDING PAD
LEGEND
CRUSHED STONE FINISH TYPICAL SECTION
SCALE: NTS
3/4" CRUSHED STONE
FINISHED GRADE
(SURFACE VARIES)
EXG
TRANSFORMER
EXG SMURRF
CHEMICAL STORAGE
CONTAINER
PROPOSED CONTROL ROOM
SEE SHEET S-104 FOR
BUILDING PAD ELEVATIONS
ELEC M
SB
SEE ELEC DW
GS
NON-WOVEN GEOTEXTILE FABRIC
MIRAFI 180N OR APPROVED EQUAL
DEPTH VARIES
WITH FINISHED GRADE
3" MIN
EXG RETAINING WALLS
SCARIFY AND RECOMPACT 6" OF EXISTING
SUBGRADE TO 90% MAX DRY DENSITY
David Moering
Digitally signed by David Moering DN: CN=David Moering, OU=WCTestUsers, OU=WCUsers, DC=woodardcurran, DC=net Date: 2026.05.14 14:24:13-07'00'
JasonH Stamp
JasonH Typewritten Text 6/29
JasonH Typewritten Text
JasonH Typewritten Text
JASON HOANG, PE
PRINCIPAL CIVIL ENGINEER
Joshua.Carvalho Stamp
Joshua.Carvalho Typewritten Text 6/29
Joshua.Carvalho Typewritten Text robert.zak Typewritten Text 6/30/2026
6"
STRUCTURAL MAT SLAB FOUNDATION
2' -0
MIN 2'-0"
N O
TE
M
IN
STRUCTURAL MAT SLAB FOUNDATION
ADJACENT TO EXISTING CONCRETE SLABS
NOTES:
1. SEE "EARTHWORK GENERAL NOTES" ON THIS SHEET FOR ADDITIONAL REQUIREMENTS.
2. PREPARE AND COMPACT STRUCTURAL FILL AND EXISTING SUBGRADE PER EARTHWORK
GENERAL NOTES, THIS SHEET.
3. SOIL UNDER MAT SLAB FOUNDATIONS SHALL BE OVER-EXCAVATED 2-FEET FROM BELOW
PROPOSED FOUNDATION.
4. EXCAVATE NATIVE SOIL AT A 1:1 SLOPE AWAY FROM EXISTING SLAB. EXISTING SLABS SHALL
NOT BE UNDERMINED.
EXG FILL NEW FILL
2' -0
N
O
TE
SEE CIVIL DWGS FOR GRADE
AND SURFACE TREATMENT.
SLOPE FINAL GRADE AWAY
FROM BLDG OR STRUCTURE
STRUCTURAL
SLAB-ON-GRADE - SEE
STRUCTURAL PLANS
COMPACTED
STRUCTURAL FILL
EXPOSED NATIVE SOIL
(EXCAVATION BOTTOM)
- NOTE 2
NATIVE SOIL - NOTE 2
EXG FILL
LINE OF
EXCAVATION OF
EXISTING FILL
EXG CONC
SLAB
STRUCTURAL
SLAB-ON-GRADE - SEE
STRUCTURAL PLANS
COMPACTED
STRUCTURAL FILL
EXPOSED NATIVE SOIL
(EXCAVATION BOTTOM)
- NOTE 2
NATIVE SOIL - NOTE 2
NOTE 4
ABBREVIATIONS STRUCTURAL GENERAL NOTES
S a n t a M o n i c a
Woodard & Curran
& AND
L ANGLE
@ CHANNEL
# NUMBER
ACI AMERICAN CONCRETE INSTITUTE
ADD'L ADDITIONAL
AFF ABOVE FINISHED FLOOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE/ALTERNATING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERING
ASTM ASTM INTERNATIONAL
BLDG BUILDING
BM BEAM
BOC BOTTOM OF CONCRETE
BOF BOTTOM OF FOOTING
BOP BOTTOM OF PIPE
BOT BOTTOM
BRG BEARING
C/C CENTER TO CENTER
C&C COMPONENT & CLADDING
CBC CALIFORNIA BUILDING CODE
CEBC CALIFORNIA EXISTING BUILDING CODE
CF COLUMN FOOTING
CIRC CIRCULAR/CIRCUMFERENCE
CJ CONSTRUCTION JOINT
CL CENTERLINE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS/CONTINUE
COR CORNER
D DEEP
DBS/DI DOWEL BAR SPLICES AND DOWEL INSERTS
DEG DEGREE
DET DETAIL
DI DUCTILE IRON
DIA DIAMETER
DIA DIAGONAL
DIR DIRECTION
DN DOWN
DWG(S) DRAWING(S)
E-W EAST-WEST
EA EACH
EF EACH FACE
EL ELEVATION
ELEC ELECTRICAL
EMBED EMBEDDED
EQ EQUAL(LY)
EQUIP EQUIPMENT
EW EACH WAY
EXG EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR
FD FLOOR DRAIN
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FL FLOOR, FEET
FND FOUNDATION
FRP FIBERGLASS REINFORCED POLYESTER
FT FOOT, FEET
FTG FOOTING
FV FIELD VERIFY
GA GAGE
GALV HOT-DIP GALVANIZED
GC GENERAL CONTRACTOR
GRTG GRATING
GWB GYPSUM WALLBOARD
HM HOLLOW METAL
HOR HORIZONTAL
HP HIGH POINT
ID INTERIOR DIAMETER
IJ ISOLATION JOINT
IN INCH(ES)
INT INTERIOR
INV INVERT
JT JOINT
L LONG
LB(S) POUNDS
LF LINEAR FOOT/FEET
LG LONG
LLV LONG LEG VERTICAL
LP LOW POINT
MATL MATERIAL
MAX MAXIMUM
MCJ MASONRY CONTROL JOINT
MECH MECHANICAL
MFR MANUFACTURER
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MSB MAIN SWITCH BOARD
NIC NOT IN CONTRACT
N-S NORTH-SOUTH
NO NUMBER
NTS NOT-TO-SCALE
OC ON-CENTER
OCEF ON-CENTER EACH FACE
OCEW ON-CENTER EACH WAY
OD OUTSIDE DIAMETER
OE OPEN END
OH OVERHEAD
OPNG OPENING
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
P CONCRETE PEDESTAL
PAF POWDER ACTUATED FASTENER
PE PLAIN END
PED PEDESTAL
PEN PENETRATION
PL PLATE
PLF POUNDS PER LINEAR FOOT
PROJ PROJECTION
PS PIPE SUPPORT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAINTED
R RISERS
RAD RADIUS
REF REFERENCE
REINF REINFORCE, REINFORCING
REQD REQUIRED
RO ROUGH OPENING
RW RETAINING WALL
SCH SCHEDULE
SF SQUARE FOOT/FEET
SHT SHEET
SJ SAWED JOINT
SLR SEALER
SPC SPACE, SPACING
SPEC SPECIFICATION, SPECIFIED
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STRU STRUCTURAL
T TREADS
T&B TOP AND BOTTOM
TOA TOP OF ALUMINUM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOG TOP OF GRATING
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
W WIDTH, WIDE
W/ WITH
WCJ WALL CONSTRUCTION JOINT
WP WORK POINT
1. GENERAL STRUCTURAL NOTES:
A. DESIGN IS IN ACCORDANCE WITH THE 2025 CALIFORNIA BUILDING CODE AND 2025 CALIFORNIA EXISTING
BUILDING CODE.
B. THESE NOTES SHALL APPLY TO ALL WORK, EXCEPT AS NOTED OTHERWISE.
C. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE DRAWINGS AND SPECIFICATIONS OF ALL DISCIPLINES WHICH SHALL BE REFERRED TO FOR SIZES AND LOCATIONS OF ALL OPENINGS, PENETRATIONS, DRAINS, PADS, CONDUIT, EQUIPMENT, AND PIPE SUPPORTS, ETC.
D. GEOTECHNICAL CONDITIONS AND DESIGN PARAMETERS ARE BASED ON OBSERVATIONS AND
RECOMMENDATIONS FOUND IN GEOTECHNICAL INVESTIGATION REPORT BY NINYO & MOORE, DATED JUNE 2025.
SEE GENERAL EARTHWORK NOTES, THIS SHEET, FOR GEOTECHNICAL DESIGN CRITERIA AND NOTES.
E. PLANS AND ELEVATIONS ARE BASED ON RECORD DRAWINGS TITLED "CITY OF SANTA MONICA - APPIAN WAY SEWERS AND FORCE MAINS AT MOSS AVENUE PUMP STATION, PHASE 1 (CONCRETE STRUCTURES)" BY
MONTGOMERY WATSON HAZRA, DATED SEPTEMBER 09, 2022.
2. EMBEDDED CONDUITS AND PIPES:
A. ALL ELECTRICAL AND INSTRUMENTATION CONDUIT EMBEDDED IN CONCRETE SHALL BE INSTALLED, ARRANGED, AND SPACED PER THE REQUIREMENTS OF SPECIFICATION 03 11 00 AND AS FOLLOWS:
B. OUTSIDE DIAMETER OF CONDUIT SHALL NOT EXCEED 1/3 OF CONCRETE THICKNESS.
C. CONDUITS SHALL NOT BE PLACED CLOSER THAN 3 OUTSIDE DIAMETERS ON CENTER.
D. CONDUITS SHALL NOT BE EMBEDDED IN CONCRETE SLABS LASS THAN 4 INCHES THICK.
E. ONLY 2 CONDUITS MAY CROSS AT ANY POINT AND THE SUM OF THE OUTSIDE DIAMETER OF THE CROSSING
CONDUITS SHALL NOT EXCEED 1/3 OF THE CONCRETE THICKNESS.
F. PROVIDE A MINIMUM 1-1/2 INCH CONCRETE COVER OVER CONDUITS.
G. CONDUITS SHALL NOT BE LOCATED BETWEEN BOTTOM OF REINFORCING STEEL AND BOTTOM OF SLAB.
H. ALUMINUM CONDUIT SHALL NOT BE EMBEDDED IN CONCRETE AND NO CONDUIT IS PERMITTED IN BEAMS, COLUMNS, OR GIRDERS.
6. GENERAL REINFORCED CONCRETE REQUIREMENTS:
A. UNLESS NOTED OTHERWISE, COMPRESSIVE STRENGTH OF CONCRETE AT 28-DAYS = 4,500 PSI.
B. REINFORCEMENT: ASTM A615, GRADE 60.
C. CONCRETE DESIGN IS PER ACI 318-19 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE".
D. REINFORCEMENT SHALL BE DETAILED, FABRICATED, AND PLACED AS PER ACI 315 DETAILING MANUAL.
E. MECHANICAL SPLICES SHALL BE TYPE 2, UNO
F. PROVIDE 3/4-INCH, 45 DEGREE CHAMFER ON EXPOSED EDGES OF CONCRETE, UNLESS NOTED OTHERWISE.
G. PROVIDE SACK-RUBBED FINISH PER SPECIFICATION 03 30 20 WHERE SPECIFICALLY INDICATED IN SPECIFICATIONS
OR AS NOTED ON DRAWINGS (TYPICAL FOR ALL NEW CONCRETE THAT IS EXPOSED TO VIEW).
H. ALL CONCRETE TESTING FOR TEMPERATURE, ENTRAINED AIR, SLUMP, AND COMPRESSIVE STRENGTH TEST CYLINDERS SHALL BE PAID FOR BY CONTRACTOR. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL CONCRETE PLACEMENTS WITH TESTING AGENCY AS REQUIRED TO PROVIDE FIELD TESTING SERVICES FOR EVERY
CONCRETE PLACEMENT AND IN FULL COMPLIANCE WITH PROJECT SPECIFICATIONS.
7. ALUMINUM CONSTRUCTION:
A. PROVIDE ALUMINUM LADDERS, RAILINGS, GRATING, AND SUPPORTS AS INDICATED ON THE DRAWINGS.
B. MATERIAL: ALUMINUM TYPE 6061-T6, UNLESS NOTED OTHERWISE.
C. ALUMINUM CONNECTIONS: 316 SS BOLTS, NUTS, AND WASHERS. PROVIDE 316 SS WASHERS UNDER ALL BOLTS
HEADS AND NUTS. MINIMUM BOLT SIZE IS 5/8-INCH DIAMETER, UNLESS NOTED OTHERWISE.
D. GRATING: LIGHT-DUTY, 19-SGI-4 EXTRUDED I-BAR GRATING WITH STRIATED TOP AND BOTTOM FLANGES FOR BUILT-IN SLIP RESISTANCE. DEPTH PER DRAWINGS. FACTORY BANDED ALL SIDES AND ALL PENETRATIONS.
MAXIMUM GAP BETWEEN PANELS AND ABUTTING SURFACES IS 1/4-INCH. GRATING SPAN DIRECTION AS
INDICATED ON PLANS.
E. GRATING ATTACHMENT: PER SPECIFICATION 05 50 00.
F. HATCHES: PER SPECIFICATION 05 50 00.
G. RAILINGS: PER SPECIFICATION 05 50 00.
H. ALL ALUMINUM ITEMS EMBEDDED OR IN CONTACT WITH CONCRETE SHALL BE COATED WITH BITUMASTIC PAINT
PER SPECIFICATIONS.
8. EXISTING CONDITIONS:
A. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AS THEY RELATE TO NEW CONSTRUCTION. VERIFY ALL FIELD DIMENSIONS, LOCATIONS, AND GEOMETRY OF EXISTING STRUCTURES PRIOR TO CONSTRUCTION. ALL EXISTING DIMENSIONS ARE APPROXIMATE. REPORT TO THE ENGINEER OF RECORD ALL OBSERVATIONS AND ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK.
B. WHERE DETAILS FOR SPECIFIC CONDITIONS ARE NOT SHOWN ON THESE PLANS, USE DETAILS FOR THE MOST NEARLY SIMILAR CONDITIONS SHOWN ON THE STRUCTURAL DRAWINGS AS DETERMINED BY THE ENGINEER.
REPORT ANY COORDINATION ISSUES IMMEDIATELY TO THE ENGINEER.
C. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE FOR A SAFE AND EFFICIENT METHOD OF SHORING AND/OR BRACING THE STRUCTURE DURING ALL CONSTRUCTION PHASES. SUBMIT AN OUTLINE OF PROPOSED
PROCEDURES BEFORE CONSTRUCTION COMMENCES.
D. STRUCTURAL MEMBERS SHALL NOT BE MODIFIED IN THE FIELD WITHOUT WRITTEN APPROVAL FROM THE ENGINEER. IN THE EVENT OF A CONSTRUCTION OR FABRICATION ERROR, THE CONTRACTOR SHALL PREPARE A SKETCH WITH A PROPOSED REPAIR, AND SUBMIT IT TO THE ENGINEER FOR APPROVAL PRIOR TO PERFORMING
ANY CORRECTIVE WORK.
E. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT THE EXISTING BUILDING ELEMENTS TO REMAIN DURING DEMOLITION. DO NOT CUT OR ALTER ANY OF THE EXISTING STRUCTURAL OR ARCHITECTURAL ELEMENTS TO REMAIN WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. PROVIDE PROTECTION FOR EXISTING WALLS, COLUMNS, BRACES, AND OTHER BUILDING ELEMENTS TO REMAIN FROM FALLING DEBRIS. ANY DAMAGE TO EXISTING ELEMENTS TO REMAIN SHALL BE REPAIRED BY THE CONTRACTOR AT THEIR OWN EXPENSE.
9. DESIGN LOADS AND BUILDING CODES:
A. DESIGN LOADS ARE PER THE 2025 CALIFORNIA STATE BUILDING CODE (CBC) AND ASCE 7-22.
B. SITE COORDINATES (LAT/LONG): 34.010376, -118.494974
RISK CATEGORY OF BUILDING: III - EXISTING MAPS STRUCTURE (PER 2025 CEBC, LEVEL II ALTERATION)
IV - NEW CONSTRUCTION (CONTROL BUILDING, ALUMINUM PLATFORM)
TERRAIN CATEGORY: C
WIND-BORNE DEBRIS REGION NO
C. LIVE LOADS :
CONTROL ROOM 50 PSF
ALUMINUM LANDING PLATFORM 500 PSF
D. WIND LOADS:
DESIGN WIND SPEED (V) = 105 MPH
EXPOSURE CATEGORY C
HURRICANE PRONE REGION = NO
EXPOSURE COEFFICIENT Kz = 0.85 TOPOGRAPHIC FACTOR Kzt = 1.0 DIRECTIONALITY FACTOR Kd = 0.85 VELOCITY PRESSURE qz = 22.50 PSF
E. FLOOD LOADS:
FEMA COASTAL ZONE X (OUTSIDE 100-YR FLOOD PLAIN)
F. SEISMIC LOAD:
PEAK GROUND ACCELERATION, PGAm 0.85 SHORT SPECTRAL RESP ACC (Ss) = 2.18
1-SEC SPECTRAL RESP ACC (S1) = 0.79
SITE CLASS D (ASSUMED)
SPECTRAL RESP COEF (Sds) = 1.49 SPECTRAL RESP COEF (Sd1) = 1.11 SEISMIC IMPORTANCE FACTOR (Ie) = 1.5 SEISMIC DESIGN CATEGORY (SDC) = E - EXISTING MAPS STRUCTURE (PER 2025 CEBC, LEVEL II ALTERATION)
F - NEW CONSTRUCTION (CONTROL BUILDING, ALUMINUM PLATFORM,
GENERATOR EXHAUST CONCRETE CHASE)
EARTHWORK GENERAL NOTES
1. GENERAL GEOTECHNICAL NOTES:
A. GEOTECHNICAL REPORT: REFER TO GEOTECHNICAL REPORT PREPARED BY NINYO & MOORE, DATED JUNE 2025, LOCATED IN THE PROJECT SPECIFICATIONS.
B. SOIL LIQUEFACTION POTENTIAL: SITE LOCATED OUTSIDE OF POTENTIAL LIQUEFACTION ZONE. THE PUMP STATION SITE IS UNDERLAIN BY OLD ALLUVIAL FAN DEPOSITS WHICH ARE RELATIVELY DENSE AND GENERALLY
NOT SUSCEPTIBLE TO LIQUEFACTION.
C. FROST DEPTH: NO FROST DEPTH
D. MINIMUM EMBEDMENT (UNLESS NOTED OTHERWISE):
E. MAT FOUNDATIONS 6" MINIMUM
F. SOIL CORROSIVITY: PROVIDE TYPE II/V CEMENT TO RESIST NEGLIGIBLE TO INTERMITTENT SOLUBLE SOIL OR
WATER SULFATE CONCENTRATIONS.
G. DESIGN GROUNDWATER ELEVATION: NO GROUNDWATER ENCOUNTERED DURING DRILLING TO EXPLORED
DEPTH OF APPROXIMATELY 10 FEET.
H. SOIL LATERAL LOADS: MAT FOUNDATIONS MAY BE DESIGNED USING A PASSIVE RESISTANCE OF 350 PSF PER
FOOT OF DEPTH OF LEVEL GROUND CONDITION UP TO A VALUE OF 3,500 PSF.
I. MODULUS OF SUBGRADE REACTION, K: 150 PCI
J. COEFFICIENT OF FRICTION: FOR SLIDING RESISTANCE OVERALL STABILITY CHECKS: 0.35
K. NET ALLOWABLE BEARING CAPACITIES: 2,000 PSF*
*NET BEARING CAPACITY MAY BE INCREASED BY 1/3 FOR SHORT-TERM LOADS (WIND & SEISMIC).
L. SEISMIC LOADING: SEE SEISMIC DESIGN LOAD VALUE NOTES, THIS SHEET, FOR INFORMATION.
2. SITE SUBGRADE CONDITIONS:
A. EXISTING CONDITIONS: MATERIALS ENCOUNTERED CONSIST OF ARTIFICIAL FILL UNDERLAIN BY OLD ALLUVIAL FAN DEPOSITS TO THE EXPLORED DEPTH OF UP TO APPROXIMATELY 10 FEET. THE ARTIFICIAL FILL WAS ENCOUNTERED UP TO A DEPTH OF APPROXIMATELY 8 FEET BELOW THE GROUND SURFACE AND CONSISTED OF MOIST, MEDIUM DENSE TO DENSE SILTY SAND WITH GRAVEL AND SILT WITH SAND. THE OLD ALLUVIAL FAN DEPOSITS CONSISTED OF MOIST, VERY DENSE, CLAYEY SAND WITH GRAVEL. DEEPER FILL ASSOCIATED WITH THE BACKFILL OF THE PUMP STATION STRUCTURE THAT EXTENDED TO AN ELEVATION OF APPROXIMATELY 14
FEET BELOW THE MEAN SEA LEVEL IS ANTICIPATED AT THE SITE.
B. OBSTRUCTIONS: SEVERAL HAND AUGER BORINGS ENCOUNTERED REFUSAL ON CONSTRUCTION DEBRIS WITHIN THE FILL. REFUSAL WAS ENCOUNTERED ON COBBLES OR POSSIBLE BOULDERS AT APPROXIMATELY 10 FEET.
MORE DETAILED DESCRIPTIONS OF THE EARTH MATERIALS ENCOUNTERED DURING SUBSURFACE EXPLORATION
ARE PRESENTED ON THE BORING LOG IN APPENDIX A OF THE GEOTECHNICAL REPORT.
C. BEDROCK: NOT ENCOUNTERED.
D. GROUNDWATER: NO GROUNDWATER ENCOUNTERED DURING DRILLING TO EXPLORED DEPTH OF
APPROXIMATELY 10 FEET.
3. SITE PREPARATION AND EXCAVATION:
A. PRIOR TO PERFORMING EXCAVATIONS OR OTHER EARTHWORK, THE AREA SHOULD BE CLEARED OF EXISTING STRUCTURES, PIPING UNDER AND ABOVE THE GROUND, ABANDONED UTILITIES, RUBBLE AND DEBRIS, SURFACE OBSTRUCTIONS, AND OTHER DELETERIOUS MATERIALS. EXISTING UTILITIES WITHIN THE PROJECT LIMITS SHOULD BE RE-ROUTED OR PROTECTED FROM DAMAGE BY CONSTRUCTION ACTIVITIES. MATERIALS GENERATED FROM THE CLEARING OPERATIONS SHOULD BE REMOVED FROM THE PROJECT SITE AND DISPOSED
OF AT A LEGAL DUMPSITE.
B. GROUNDWATER: GROUNDWATER IS NOT EXPECTED TO BE ENCOUNTERED DURING EXCAVATIONS. IF GROUNDWATER IS ENCOUNTERED, GROUNDWATER CONTROL, SUCH AS DEWATERING, SHALL BE REQUIRED TO LIMIT INSTABILITY OF THE EXCAVATION BOTTOM, SIDE AND FACE, AND AID FOUNDATION CONSTRUCTION AND SOIL BACKFILL. GROUNDWATER DUE TO PERCHED SATURATED CONDITIONS CAN BE DEWATERED UTILIZING SUMP-PUMPS. DEWATERING OR ANY OTHER SUITABLE METHOD FOR STABILIZING EXCAVATION
BOTTOM MAY BE SELECTED BY THE CONTRACTOR BASED ON ACTUAL GROUNDWATER CONDITIONS
ENCOUNTERED AND BASED ON THE CONTRACTOR'S CHOSEN MEANS-AND-METHODS OF CONSTRUCTION.
THE SELECTED METHOD BY THE CONTRACTOR SHOULD BE ABLE TO EFFECTIVELY MITIGATE FOR BOTTOM HEAVE
OR STABILIZE SUBGRADE SOILS DURING CONSTRUCTION/ BACKFILLING.
C. SHORING: IF SHORING IS REQUIRED FOR EXCAVATIONS, ASSUME TYPE C SOIL CLASSIFICATION. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE DESIGN, INSTALLATION, AND REMOVAL OF TEMPORARY SHORING. TEMPORARY SHORING SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN CALIFORNIA. MINIMUM DESIGN LOADS AND REQUIREMENTS FOR SHORING SHALL BE AS INDICATED IN GEOTECHNICAL REPORT AND SHALL
ACCOUNT FOR GROUNDWATER.
D. OPEN CUT EXCAVATIONS: TEMPORARY EXCAVATIONS MAY BE SLOPED BACK AT 1V:1H TO A MAXIMUM DEPTH OF 20-FEET BELOW GRADE AS PERMITTED BY SITE CONSTRAINTS INCLUDING NEARBY STRUCTURES, PROPERTY LINES, AND ADJACENT CONSTRUCTION. FOR STEEPER TEMPORARY SLOPES, DEEPER EXCAVATIONS, AND/OR WHERE SLOPES TERRAIN EXISTS WITHIN CLOSE PROXIMITY TO EXCAVATION (<1.5 X DEPTH), APPROPRIATE SHORING METHODS OR FLATTER SLOPES MAY BE REQUIRED TO PROTECT THE WORKERS IN THE EXCAVATION AND ADJACENT IMPROVEMENTS. SUCH METHODS SHALL BE IMPLEMENTED BY THE CONTRACTOR AND
APPROVED BY THE GEOTECHNICAL CONSULTANT.
4. BACKFILL MATERIALS AND COMPACTION:
A. STRUCTURAL FILL MATERIAL:
a. IMPORTED FILL: IMPORTED SOILS SHALL BE EVALUATED BY NINYO & MOORE PRIOR TO IMPORT.
IMPORTED SOILS SHALL CONSIST OF CLEAN, NON-EXPANSIVE GRANULAR MATERIALS THAT CONFORM TO THE "GREENBOOK" STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (PUBLIC WORKS STANDARD, INC., 2024). IMPORTED MATERIAL SHALL ALSO MEET THE CALTRANS (2021) CRITERIA FOR NON-CORROSIVE SOILS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE UNIFORMITY OF IMPORTED
MATERIALS BROUGHT TO THE SITE.
b. REUSE OF NATIVE SOIL: REUSE OF NATIVE SOILS IS PERMITTED FOR GENERAL FILL AND TRENCH BACKFILL MATERIAL PROVIDED NATIVE SOILS ARE FREE OF ROCKS OR LUMPS OF MATERIAL IN EXCESS OF 4 INCHES IN DIAMETER. ON-SITE MATERIALS USED AS GENERAL FILL AND/OR TRENCH BACKFILL WILL INVOLVE
MOISTURE-CONDITIONING TO ACHIEVE APPROPRIATE MOISTURE CONTENT FOR COMPACTION.
c. EXISTING PLANTER BOX SOIL: SOILS FOUND WITHIN THE EXISTING PLANTER BOXES (NORTH OF THE MAPS STRUCTURE SKYLIGHT, AND WEST OF THE MAPS STRUCTURE BOTTOM LEVEL ACCESS HATCH) CONSISTS OF LOAM AND SHALL NOT BE USED AS FILL MATERIAL. REMOVE ALL PLANTER SOIL DOWN TO TOP OF MAPS ROOF SLAB AND REPLACE WITH STRUCTURAL FILL AND CONCRETE SLAB AS SHOWN IN THESE DRAWINGS.
B. COMPACTION: ALL STRUCTURAL FILL SHALL BE PLACED IN MAXIMUM 8-INCH THICK LOOSE LIFTS, MECHANICALLY COMPACTED TO 90% OR MORE OF THE MATERIAL'S MAXIMUM DRY DENSITY PER ASTM D1557 MODIFIED PROCTOR, AND SHALL BE NEAR OR ABOVE OPTIMUM MOISTURE CONTENT. CARE SHALL BE TAKEN TO PROTECT BURIED UTILITIES WHEN COMPACTING SOILS ABOVE UTILITIES. IN ADDITION TO THE MINIMUM DENSITY REQUIREMENTS, THE SOIL MUST BE STABLE, NOT "PUMPING" OR RUTTING EXCESSIVELY UNDER CONSTRUCTION TRAFFIC. IF THESE CONDITIONS OCCUR, CONTRACTOR SHALL REMEDIATE CONDITIONS PER
THE DIRECTION AND APPROVAL OF THE GEOTECHNICAL ENGINEER.
TYPICAL FOUNDATION
SUBGRADE PREPARATION
NOT TO SCALE
Caleb S. Brown
Digitally signed by Caleb S.
Brown DN: CN=Caleb S. Brown, OU=WCTestUsers, OU=WCUsers, DC=woodardcurran, DC=net Date: 2026.05.14 15:32:16-06'00'
JasonH Stamp
JasonH Typewritten Text 6/29
JasonH Typewritten Text
JasonH Typewritten Text
JASON HOANG, PE
PRINCIPAL CIVIL ENGINEER
Joshua.Carvalho Stamp
Joshua.Carvalho Typewritten Text 6/29
Joshua.Carvalho Typewritten Text robert.zak Typewritten Text 6/30/2026
EXG REBAR
EXG CONC WALL,
SLAB, OR BEAM
PROVIDE CLASS 'B' SPLICE FOR
NEW REBAR (TYP BOTH SIDES OF
EXG COMPROMISED REBAR)
NEW REBAR
LENGTH OF CORRODED/COMPROMISED EXG
REBAR WITH GREATER THAN 20% CROSS-
SECTIONAL LOSS.
CORROSION INHIBITOR
(FOR ANY EXPOSED REBAR) EXG REINFORCING
STEEL (REPLACE IF
COMPROMISED)
REPAIR MORTAR
(UP TO 2" DEPTH)
EXG CONC
(ORIENTATION VARIES)
SAW-CUT (TYP @ REPAIR
AREA PERIMETERS)
REPAIR FLUSH W/
ADJACENT SURFACE
MIN 1/4" SAW-CUT DEPTH
MIN 1/2" CLR
SOUND, FULLY PREPARED
CONC SUBSTRATE
CORROSION INHIBITOR
REPAIR MORTAR
SAW-CUT (TYP @ REPAIR AREA
PERIMETERS)
REPAIR FLUSH W/ ADJACENT
SURFACE
MIN 1/4" SAW-CUT DEPTH
EXG REINFORCING
STEEL (REPLACE IF
COMPROMISED)
SOUND, FULLY PREPARED CONC
SUBSTRATE
MIN 1/2" CLR
TYPE 'C' - REBAR REPLACEMENT REPAIR
1.
2.
3.
4.
REPAIR TYPE 'C' = REBAR REPLACEMENT - REFER TO REPAIR TYPE SPECIFICATIONS
NOTE 1-F, THIS SHEET.
NEW REBAR SHALL MATCH SIZE, TYPE, GRADE, AND SPACING OF EXG REBAR & SHALL
BE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .