Draft_EXHIBIT_A_-_E-MMPS_CDRLS.docx
DOCX document 568 KB Posted
- Attached to
- Enhanced-Multi Mission Parachute System (E-MMPS)
- Solicitation number
- M67854-17-R-1200
- Issued by
-
United States Marine Corps
About this file
Exhibit A - CDRLs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_-_E-MMPS_-_M67854-17-R-1200-0002.pdf | ||
| M67854-17-R-1200-0002.docx | DOCX document | |
| M67854-17-R-1200-0001.docx | DOCX document | |
| Answers_to_Industry_-_E-MMPS_-_M67854-17-R-1200.pdf | ||
| Attachment_2_-_Past_Performance_Questionnaire.doc | DOC document | |
| Attachment_2_-_Past_Performance_Questionnaire.doc | DOC document | |
| M67854-17-R-1200.pdf | ||
| EXHIBIT_A_-_E-MMPS_CDRLS.docx | DOCX document | |
| Attachment_1_-_E-MMPS-PRF-0001V3.0.pdf | ||
| Attachment_1_-__E-MMPS_Performance_Specification.docx | DOCX document | |
| Attachment_2_-_Past_Performance_Questionnaire.doc | DOC document | |
| Draft_RFP_M67854-17-R-1200.docx | DOCX document | |
| PSPEC_Questions_and_Answers.pdf | ||
| EMMPS-_SOW.pdf | ||
| M67854-17-R-1200_E-MMPS_PreSolicitation_Notice.pdf | ||
| Attachment_01_-__E-MMPS_Performance_Specification_(DRAFT).pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
17. PRICE GROUP
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Contractor’s Progress, Status and Management Report
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) DI-MGMT-80368A |
| 5. CONTRACT REFERENCE |
SOW para 3.1.1
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 - This report is due within 30 days of contract award.
BLK 14 - Copies shall be delivered electronically in compatible Microsoft Office® or Portable Document format.
MCSC:
PdM-RAR
| peggy.l.smith1@usmc.mil |
| 1 |
| 1 |
lucas.kinkade@usmc.mil
| 1 |
| 1 |
| steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _1_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Integrated Master Schedule
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81650
5. CONTRACT REFERENCE
SOW para 3.1.3.1 & 3.3.2
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 - This report is due within 30 days of contract award.
BLK 14 - Copies shall be delivered electronically in compatible Microsoft Office® or Portable Document format.
MCSC:
PdM-RAR
| peggy.l.smith1@usmc.mil |
| 1 |
| 1 |
| lucas.kinkade@usmc.mil |
| 1 |
| 1 |
| steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _2_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
DELIVERY STATUS AND TRACKING SPREADSHEET
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
NOT AVAILABLE – REFER TO SOW
5. CONTRACT REFERENCE
SOW para 3.1.3.2
6. REQUIRING OFFICE
MARCORSYSCOM PdM ICE18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
AS REQ
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION AS REQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 – Contractor shall comply with requirement in SOW paragraph 3.1.3.2. Government retains right to ask questions and make comments on submissions, requiring contractor to make subsequent changes and re-submit, as necessary.
BLK 14 – Copies shall be delivered electronically in compatible MS Office format or Portable Document Format (PDF).
MCSC:
PdM-ICE steven.b.pope@usmc.mil lucas.kinkade@usmc.mil
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _3_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
CONFERENCE AGENDA
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249B
5. CONTRACT REFERENCE
SOW para 3.3.1 & 3.3.2
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
9. DIST
STATEMENT
A
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
BLK 12/13 – Submit 20 calendar days prior to each conference, meeting, audit, or review. The Government requires 5 calendar days to review. The contractor shall submit final 5 calendar days after receipt of Government comments.
calendar days after receipt of Government comments.
BLK 14 – Submit electronically in compatible Microsoft Office format
MCSC:
PdM-RAR
| peggy.l.smith1@usmc.mil |
| 1 |
| 1 |
lucas.kinkade@usmc.mil
| 1 |
| 1 |
| steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 4_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250B
5. CONTRACT REFERENCE
SOW para 3.3.1 & 3.3.2 & 3.3.3
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 – Submit 10 calendar days after each conference, meeting, audit or review. The Government requires 5 calendar days to review. The contractor shall submit final 5 calendar days after receipt of Government comments.
BLK 14 – Submit electronically in compatible Microsoft Office format to distribution list in BLK 14, plus include one copy to each conference attendee
MCSC:
PdM-RAR
| peggy.l.smith1@usmc.mil |
| 1 |
| 1 |
lucas.kinkade@usmc.mil
| 1 |
| 1 |
| steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _5_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Provisioning Performace Schedule
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81713
5. CONTRACT REFERENCE
SOW para 3.3.3
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 - This report is due within 10 days after post award conference.
BLK 14 - Copies shall be delivered electronically in compatible Microsoft Office® or Portable Document format.
MCSC:
PdM-RAR
| steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _6_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Work Schedule
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81382
5. CONTRACT REFERENCE
SOW para 3.3.3
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 - This report is due within 10 days after post award conference.
BLK 14 - Copies shall be delivered electronically in compatible Microsoft Office® or Portable Document format.
MCSC:
PdM-RAR
| peggy.l.smith1@usmc.mil |
| 1 |
| 1 |
lucas.kinkade@usmc.mil
| 1 |
| 1 |
| steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _7_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Provisioning Parts Lists (PPLs)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81715
5. CONTRACT REFERENCE
SOW para 3.3.4
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 11 – Provide a draft copy at the Provisioning Guidance Conference.
BLK 12/13 - Submit report within 10 calendar days of any revision or upon Government request.
BLK 14 – Copies shall be delivered electronically in MS Office format.
MCSC:
PdM-RAR
| Steve.b.pope@usmc.mil |
| 1 |
| 1 |
| Gary.j.golston@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _8_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Provisioning Parts List Index (PPLI)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81712
5. CONTRACT REFERENCE
SOW para 3.3.4
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
QRTLY
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 11 - The reporting period is from the first to last business day of each quarter.
BLK 12/13 - Submit report within 10 calendar days of the end of the reporting period (as appicable) or upon Government request.
MCSC:
PdM-RAR
| Steve.b.pope@usmc.mil |
| 1 |
| 1 |
| Gary.j.golston@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _9_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Engineering Data for Provisioning (EDEP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81874
5. CONTRACT REFERENCE
SOW para 3.3.4
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 - Provide a draft copy at the Provisioning Guidance Conference.
BLK 13 - Submit package at the Physical Configuration Audit (PCA).
MCSC:
PdM-RAR
| steven.b.pope@usmc.mil |
| 1 |
| 1 |
| gary.j.golston@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _10_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Configuration Audit Plan (Physical)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81646
5. CONTRACT REFERENCE
SOW para 3.4.1.3
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ONCE
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 - Submit report within at least 30 calendar days prior to the PCA. Government has 10 days to review. Contractor has 5 days submit final report after receipt of Government comments.
MCSC:
PdM-RAR
| Scott.mcintire@usmc.mil |
| 1 |
| 1 |
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _11_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Configuration Audit Summary Report (Physical)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-81022D
5. CONTRACT REFERENCE
SOW para 3.4.1.3
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ONCE
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 – Draft report shall be submitted 20 calendar days after the PCA. The Government requires 15 calendar days to review. The contractor shall submit final 10 calendar days after receipt of Government comments.
MCSC:
PdM-RAR
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| Scott.mcintire@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _12_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
FAILURE SUMMARY AND ANALYSIS REPORT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-RELI-80255
5. CONTRACT REFERENCE
SOW para 3.4.2.1
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 - First submission due 15 calendar days after production of the FAT quantities.
BLK 13 - Subsequent reports are required monthly after submission of initial report.
MCSC:
PdM-RAR
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| Gary.j.golston@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _13_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Quality Assessment Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81187
5. CONTRACT REFERENCE
SOW para 3.4.3.2.1
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 - Submit Category II response 20 working days after receipt of Government Product Quality Deficiency Report (PQDR). Category I PQDR's still require a response in 10 working days
BLK 14 – Copies shall be delivered in MS Office format or Portable Document Format (PDF)
MCSC:
PdM-RAR
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| Gary.j.golston@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _14_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
Safety Assessment Report (SAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80102C
5. CONTRACT REFERENCE
SOW para 3.5.1.2
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
D
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION AS REQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and DoD contractors only; Information on systems; 01 DEC 2016. Other requests for this document shall be referred to MARCORSYSCOM ATTN: Command Safety 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 - Submit 60 calendar days prior to first item delivery. The Government requires 45 calendar days for review. The contractor shall submit final 30 calendar days after receipt of Government comments.
MCSC:
PdM-RAR
| Scott.mcintire@usmc.mil |
| 1 |
| 1 |
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _15_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Technical Report, Study/Services (Environmental Considerations)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW para 3.5.2
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION AS REQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 - Submit 60 calendar days prior to first item delivery. The Government requires 30 calendar days for review. The contractor shall submit final 30 calendar days after receipt of Government comments.
MCSC:
PdM-RAR
| Scott.mcintire@usmc.mil |
| 1 |
| 1 |
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _16_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
Contractor’s Configuration Management Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80858B
5. CONTRACT REFERENCE
SOW para 3.6
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ONCE
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12/13 - Government requires 15 days for review. Contractor shall submit final 10 calendar days after receipt of Government comments.
MCSC:
PdM-RAR
| Scott.mcintire@usmc.mil |
| 1 |
| 1 |
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _17_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A018
2. TITLE OF DATA ITEM
Technical Report – Study/Services (Change Control)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
SOW para 3.7.4.1
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION AS REQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 - The contractor shall submit a Change Notice to the Government 25 calendar days before implementing any Class 2 Engineering Change Proposals (ECP). The Government will have 25 calendar days to review and approve/disapprove the class designation of the ECP. Notifications shall be submitted for all changes which affect Government established baselines. The opportunity to submit notifications shall extend through contract finalization. In addition, notifications shall be submitted at the request of the Government.
MCSC:
PdM-RAR
| Scott.mcintire@usmc.mil |
| 1 |
| 1 |
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _18_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A019
2. TITLE OF DATA ITEM
REQUEST FOR VARIANCE
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81883
5. CONTRACT REFERENCE
SOW para 3.7.4.3
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION AS REQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 - Government requires 15 days for review. Contractor shall submit final 10 calendar days after receipt of Government comments.
MCSC:
PdM-RAR
| Scott.mcintire@usmc.mil |
| 1 |
| 1 |
| lucas.kinkade@usmc.mil |
| 1 |
| 1 |
Steven.b.pope@usmc.mil
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _19_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A020
2. TITLE OF DATA ITEM
Technical Report – Study/Services (Change Notice)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
SOW para 3.7.5
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION AS REQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 - Government requires 15 days for review. Contractor shall submit final 10 calendar days after receipt of Government comments.
MCSC:
PdM-RAR
| Scott.mcintire@usmc.mil |
| 1 |
| 1 |
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _20_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-17-R-1200
F. CONTRACTOR
1. DATA ITEM NO.
A021
2. TITLE OF DATA ITEM
Configuration Status Accounting Information
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-81253C
5. CONTRACT REFERENCE
SOW para 3.7.6
6. REQUIRING OFFICE
MARCORSYSCOM PdM RAR
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A/D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION AS REQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use , 10 MAY 2017. Other U.S. requests for this document shall be referred to Commander, MARCORSYSCOM (PM IWS/RAR), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 - The Government requires 20 calendar days to review. The contractor shall submit final 10 calendar days after receipt of Government comments.
BLK 13 - Subsequent submissions shall be due quarterly starting with the first full quarter after the first submission.
MCSC:
PdM-RAR
| Scott.mcintire@usmc.mil |
| 1 |
| 1 |
| Steven.b.pope@usmc.mil |
| 1 |
| 1 |
| 15. TOTAL --------- |
| 4 |
| 4 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _21_ of _28_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
E-MMPS
E. CONTRACT/PR NO.
M67854-…