Additional_Questions_and_Answers.docx
DOCX document 12 KB Posted
- Attached to
- 4MCDHQ / RS HAR Rewire and RS COL Rewire
- Solicitation number
- M0026318Q1016
- Issued by
-
United States Marine Corps
About this file
Additional Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| M0026318Q1016_AMEND_3.docx | DOCX document | |
| M0026318Q1016_AMEND_2.docx | DOCX document | |
| Floorplan_1_-_Corrected.jpg | JPG image | |
| M0026318Q1016_MOD_1.docx | DOCX document | |
| Floorplan__3.pdf | ||
| M0026318Q1016.docx | DOCX document | |
| FLOORPLAN_RS_COL.pdf | ||
| FLOORPLAN_4MCDHQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12. Q: What is the distance from demark to MDF?
A: The distance from the demark of the Bricker Federal Building to the MDF in B134 is less than 300', may vary based on telco vender's preferred path. The Telco vendor will be establishing services to the building and extending them from the demark to the MDF. To on the TIA/EIA-569 compliant 1 hour fire-rated, painted ¾” or thicker plywood installed by vendor, which will also house equipment racks and MDF.
13. Q: How many actual lines are we running?
A: The Bricker Federal Building will be servicing 2 suites. Suite B134 which houses the MDF will be serviced by 9 Quads of CAT6, for a total of 54 CAT 6 lines. Suite 207 which houses an IDF will be serviced by 10 Quads of CAT 6 for a total of 60 CAT6 lines. The MDF and the IDF are to be connected with no less than 2 strands of Singlemode and 2 strands of Multimode fiber, this could be accomplished by separate fibers or a hybrid bundle.
14. Q: Are we setting up a IDF?
A: An MDF is to be established in Suite 207. The IDF is to be located in the room on the floor plan marked "RI - 1 Marine" against the wall separating the Suite from the hallway.
15. Q: Are there any other established spec requirements for the fiber cables?
A: LC termination preferred. OM2 preferred for the MM. The fiber will run through the buildings COM chase.
File details come from the government source that posted it.