Vendor_Submitted_Questions.pdf

PDF 78 KB Posted

Attached to
Telecommunications Switch System Federal contract opportunity
Solicitation number
M00146-16-T-9014
Issued by
United States Marine Corps

About this file

Attachment 04

View the file

Other files for this federal contract opportunity

Other files attached to Telecommunications Switch System, newest first.
File Type Posted
M00146-16-T-9014_0004.docx DOCX document
M00146-16-T-9014_0002.docx DOCX document
M00146-16-T-9014_0001.docx DOCX document
Vendor_Submitted_Questions.pdf PDF
M00146-16-T-9014.docx DOCX document
Attachment_01_Westbrooke_Telecom_Room_Locations.pdf PDF
16-9014_JA_Switch_Redacted.pdf PDF
Attachment_02_MCAS_Cherry_Point_Signed_CO_Letter_12.01.15.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M00146-16-T-9014 Attachment 04

GOVERNMENT RESPONSES TO VENDOR SUBMITTED QUESTIONS 10.19.2016

1. When accounting for equipment lead times (approximately 4 - 6 weeks), upcoming end-of-year holidays, and the logistics effort required to ensure quality training, information assurance (IA) and project execution, would the

Government consider extending the period of performance?

Government Response: According to the required Project Master Schedule located in Paragraph 7.2.1 of the product description, the Government requires all installation and testing to be complete no later than 1 February 2017. As required by Addenda to 52.212-1 3) a) (ii), vendor’s shall provide milestones for completion in accordance with the required schedule (1 February 2017). The Government has considered the timeline for execution, and is not able to waiver from the required schedule. It is critical to the mission of the FRC East that this project be completed no later than 1 February 2017.

Questions 2 through 6 are all in reference to paragraph 5.18 of the specification: “The contractor shall extended fiber connectivity from the DMARC location room 149 to the telecommunications room 128 for the telephone/data equipment. The fiber connectivity shall be installed utilizing contractor provided wire management systems and ran above the ceiling.”

2. Multimode or Single-mode?

Government Response: Single-mode.

3. How many fiber strands?

Government Response: 12 strand fiber.

4. Type of fiber connectors desired? (SC,ST?)

Government Response: SC.

5. Purpose of fiber? Extend PRI/T-1’s? Without electronics or media converters of some type we will not be able to extend PRI/T-1’s. Is this for carrier use?

Government Response: The purpose of the fiber is to extend the T1’s from the entrance facility to the telecommunications room where the telephone switch will be located.

6. Is there a plan to have a copper feed from room 149 to room 128?

Government Response: At this time the Government’s position is that there is not a need for a copper feed between the two rooms.

7. Addenda to FAR 52.212-1, Page 8, subpara 5.4 & 5.5 of Gov’t Solicitation – what are the technical support requirements for the UPS? i.e. how hours or minutes of support time is required for the systems?

Government Response: The UPS shall have an up time of at least one (1) hour.

8. How much backup time is required for the UPS design?

Government Response: The backup time for the UPS design shall be at least one (1) hour.