M00146-16-T-9014_0001.docx

DOCX document 58 KB Posted

Attached to
Telecommunications Switch System Federal contract opportunity
Solicitation number
M00146-16-T-9014
Issued by
United States Marine Corps

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Telecommunications Switch System, newest first.
File Type Posted
M00146-16-T-9014_0004.docx DOCX document
Vendor_Submitted_Questions.pdf PDF
M00146-16-T-9014_0002.docx DOCX document
Vendor_Submitted_Questions.pdf PDF
M00146-16-T-9014.docx DOCX document
Attachment_01_Westbrooke_Telecom_Room_Locations.pdf PDF
16-9014_JA_Switch_Redacted.pdf PDF
Attachment_02_MCAS_Cherry_Point_Signed_CO_Letter_12.01.15.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M00146-16-T-9014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 21-Oct-2016 03:00 PM to 31-Oct-2016 09:00 AM.

TABLE OF CONTENTS

The below Table of Contents has been added

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 1
Westbrooke Telecom Room Locations
1
Attachment 2
MCAS Cherry Point_Signed CO Letter_12.01.15
5
Attachment 3
Vendor Submitted Questions
5

The following have been modified:

ADDENDA TO 52.212-1

1) NOTE REGARDING TERMS: The terms “solicitation” and “offer” are used throughout this document, including in the clauses and provisions incorporated by reference. When encountered, those terms have the same force and effect that the term “quote” incurs. The term “offeror(s)” is also used throughout and shall have the same meaning as the term “vendor.” This document is a Request for Quotes (RFQ) and as such, does not create an obligation on the part of the vendor simply by government acceptance. Both parties must sign a final contract document to create a binding contract.

2) ADDRESS FOR SUBMISSION OF QUOTES.

a) The vendor is responsible for ensuring that quotes are received in the Contracting Office no later than 9:00 A.M. (EST) on 31 October 2016 as indicated on page one (1) of this solicitation. Failure of vendor’s quote to be received prior to the hour and date specified will result in rejection of the quote.

b) Quotes may be submitted by FedEx, UPS, etc. and shall be addressed for delivery to the following physical location:

Cherry Point Satellite Contracting Office Attn: Nicholas R. VonBargen Cunningham Street Bldg. 159, Door T1 MCAS Cherry Point, NC 28533

c) RFQ Number M00146-16-T-9014 must be clearly marked on the outside of your quote.

d) Deliveries via the United States Postal Services (USPS) are not authorized as the Postal Services does not deliver to the physical location of the Contracting Office.

e) Facsimile submission of quotes is not authorized.

f) Electronic submission of quotes is authorized, however document submission size shall be less than 2Mb. The vendor must request/receive a confirmation email to ensure receipt of quote.

3) INSTRUCTIONS FOR THE PREPARATION OF QUOTES. The vendors quote shall include Technical Capability Information, Past Performance Information, a Price Quote, and completed Representations and Certifications in accordance with the solicitation and the following instructions:

a) Technical Capability. For this procurement, vendors must provide information that demonstrates how the offered product meets the requirements of the Purchase Description, including, but not limited to, the following:

(i) The vendor shall provide a detailed response to each paragraph of Section 3.0 and 5.0 of the Specification that clearly demonstrates how the proposed solution meets the minimum requirements of the specification. Vendor shall quote AVAYA brand name only products. A statement that the vendor “will meet the Government’s requirement” or restating the requirement is not sufficient. The vendor must demonstrate how that will be accomplished.

(ii) The vendor shall provide proposed milestones for completion in accordance with the required schedule (01 February 2017).

(iii) The vendor shall provide proof of at least five (5) years of relevant corporate experience. Relevant Corporate Experience is defined as esperience in the design and installation of telecommunications sytems similar in size and technical complexity to this requirement. Vendors may include the experience of their subcontractors, or their own performance as a sub-contractor, if the work was similar to that being solicited for in this procurement.

(a) The vendor shall provide details of relevant projects the company has completed to include:

i. Customer / Company Name and Address;

ii. Brief Description of the project / contract to include a relevancy statement;

iii. Total contract value;

iv. Period of performance; and customer POC (name, phone, address).

(iv) This portion of the quote must be separate from the past performance and price portions of the quote.

b) Past Performance Information Instructions

i) Vendors shall submit past performance information requested below as part of their quotation.

ii) Vendors shall submit at least three (3) relevant past performance references. Relevant past performance is defined as performance of contracts of similar technical complexity to this requirement completed within the past three (3) years. Include the following information for each contract listed:

(a) Agency or company name.

(b) Contract number (if applicable).

(c) Point of Contact name, phone number and fax number.

(e) Brief description of contract and relevance to this requirement.

(f) Total contract value.

(g) Period of performance.

iii) If a vendor has no relevant past performance history, a vendor must affirmatively state that it possesses no relevant past performance history. Vendors will neither be evaluated favorably or unfavorably on past performance in the event that there is no relevant past performance history available.

c) Price Quote Instructions. The price quote shall be submitted separately from all other quotation documents. The vendor shall prepare and submit one (1) copy of the price quote for this requirement. The vendor’s price quote shall include:

1. The vendor’s proposed firm-fixed price for completion of all requirements of the purchase description.

1. The government requires FOB Destination pricing.

d) Representations and Certifications Instructions. Vendors are to include completed copies of the following Representations and Certifications:

FAR 52.204-20

FAR 52.212-3 (Note that vendor is only required to complete paragraph (b) if they have completed annual representations and certifications via the System for Award Management (SAM) website.)

DFARS 252.209-7998

DFARS 252.209-7999

4) QUESTIONS RELATING TO THE SOLICITATION

Vendors may submit questions concerning, or request clarification of, any aspect of this solicitation. All questions must be submitted electronically via e-mail to nicholas.vonbargen@usmc.mil no later than 3:00 p.m. EST. on the 19 October 2016. No questions will be accepted after this cutoff date/time. Comments and questions must reference solicitation number M00146-16-T-9014.

SPECIFICATION

Purchase Description/ Specification for AVAYA (Brand Name Only) Telecommunications Switch System Westbrooke Leased Facility, Fleet Readiness Center - East

1.0 GENERAL. This specification is intended to provide instructions and guidance for the installation of the Fleet Readiness Center - East’s (FRCE) Joint Interoperability Test Command JITC approved AVAYA (Brand Name Only) certified, single vendor, telecommunications system and voice messaging system switched voice services network and computer network. This is a new site that will be utilizing a JITC approved, single vendor for the telecommunications system and voice messaging system VOIP, conference bridge solution and Computer Technology data product connectivity. The required system is an Avaya switched voice services network and computer network utilizing Avaya VOIP and Computer Technology across all Avaya Data Products.

2.0 SCOPE. The Westbrooke site shall be provided a standalone dual processor Avaya Aura CM solution and Avaya Communications Manager Messaging Federal Markets solution utilizing JITC certified materials and manufacturer approved implementation processes. The system will not be directly connected to the voice switching systems at the main side FRCE site, but will be capable of such connection. Integrated Services Digital Network Primary Rate Interface (ISDN PRI) services will provide connectivity to the main side voice switching systems. The Aura system shall be version 6.3, or the most current JITC allowable software level. The Avaya Communications Manager Messaging Federal Markets solution shall be version 6.3, or the most current JITC allowable software level.

3.0 FRCE WESTBROOKE REQUIREMENTS

3.1.1 Two Processors shall be programmed as the Core Processor and a Backup Processor for this site with redundant power supplies and a UPS. To support connectivity between the VOIP Phones a dedicated IP network will be provided by the contractor using nine Avaya 4850GTS-PWR+ or newer JTIC approved AVAYA network switches to aggregate the phone to the Avaya Communication Manager. The Avaya 4850GTS-PWR+ or newer JTIC approved AVAYA switches on the Aura Voice Network will serve a singular purpose for connection of the phones to the dedicated Voice LAN.

3.1.2 An additional nine Avaya 4850GTS or newer JTIC approved switches shall also be provided by the contractor to support LAN connections for any servers the customer provides and desktop connectivity.

3.1.3 LAN connectivity to all devices and servers shall be dual-connected for survivability in accordance with JITC requirements.

3.1.4 The latest JITC version of all software shall be provided for all applications. The current JITC version of software for the Avaya Aura is 6.3, or the most current JITC allowable software level, for the main application. All systems shall be TAA compliant.

3.1.5 One Thirty two (32) port audio conference bridge with unique meeting numbers and unique meeting authorization codes.

3.1.6 Peripherals:

3.1.6.1 Computer: The Contractor shall provide and install a new interface computer with appropriate monitoring software and required peripheral devices to include keyboard and mouse. The computer shall be manufactured by a nationally recognized computer manufacturer. The computer shall include, as a minimum, the following features:

3.1.6.1.1 Central Processing Unit (CPU). CPU shall be the latest technology Intel available at the time of Contractor's quote.

3.1.6.1.2 Memory. Computer shall have sufficient memory capacity to perform all processing functions without degradation of performance but not less than two gigabytes.

3.1.6.1.3 Hard Disk Drives. The primary hard disk drive shall have a minimum of 250 Gigabytes with a formatted capacity of 200 or better. After initial installation of the operating system and all Contractor delivered software, the hard disk drive shall have a minimum of 65 percent capacity remaining.

3.1.6.1.4 DVD-RW drive. DVD-RW shall have read and write capability and shall be able to backup and restore software and stored images.

3.1.6.1.5 Operating System. The operating system shall be the latest version of Microsoft Windows 7 available at time of manufacture.

3.1.6.1.6 Software. The computer shall be loaded with all software necessary to configure and monitor the system.

3.6.1.2 Printer: The contractor shall provide a LaserJet printer for the computer interface station. The printer shall be a LaserJet type. The printer shall have a print speed of 15 pages per minute. The printer shall have a resolution of 1,200 dots per inch (dpi).

3.2 Pre-Installation Planning.

3.2.1 The contractor shall provide detailed engineering; design and on-site coordination to ensure the systems are installed, programmed and tested for full integration between their operating systems, applications and other applications.

3.2.2 The contractor shall be responsible for all pre-installation planning; including coordination with the FRCE and assisting the FRCE with related service providers.

3.3 Information Assurance.

3.3.1 The implementation will include a degree of Information Assurance verification by the FRCE Cyber-Security Team. The Contractor should expect to provide FRCE’s Cyber-Security Team technical documentation they may require on the systems being provided; including technical documents, definitions and detailed diagrams that depict the system’s design and interoperability with other systems. Information concerning protocols and ports being used at specific interfaces and links will also be requested in chart or diagram form.

3.3.2 The Contractor shall provide assistance with mitigation of vulnerabilities identified by the FRCE scanning activities.

3.3.3 The Contractor shall be responsible for the installation of all Avaya Media Gateways and their peripherals once the facility modernization project is completed. This site will be a standalone site supporting 350 users to include 330 VOIP phones and 20 analog lines for fax machines, conference rooms, and other analog devices.

3.3.4 The Contractor shall be responsible for the configuration of the software requirements needed to implement an Avaya Aura Communication Server.

3.3.5 The Contractor shall be responsible for the installation of the Voice Network equipment and the configuration therein.

3.3.6 The Contractor shall be responsible for the installation and configuration of the Computer Network equipment and the configuration therein.

3.4 Aura Installation.

3.4.1 The work for this program will require a new installation of single physical network to support the Aura IP telephony. An Avaya Aura voice switching system will:

3.4.2 Develop the solution data base, user telephone templates, network addressing and related programming requirements.

3.4.3 Assist the FRCE Cyber-Security team for approval to attach the designed solution to the FRCE network.

3.4.4 Prepare a new IP Scheme for the Aura Systems.

3.4.5 Prepare a new FRCE LAN IP for VOIP connectivity.

3.4.6 Install, configure and test the new Aura System, and their peripheral applications in a static mode to ensure their interoperability and preparedness for go live before first days business.

3.5 Computer network Installation

3.5.1 The work for this program will require a new installation of single physical network to support computer connectivity. The Avaya LAN switching system will:

3.5.1.1 Assist the FRCE Cyber-Security team for approval to attach the designed solution to the FRCE network.

3.5.1.2 Prepare a new IP Scheme for the Avaya LAN switching system.

3.5.1.3 Prepare a new FRCE LAN IP for Computer connectivity.

3.5.1.4 Install, configure and test the new Avaya LAN switching system, and their peripheral applications in a static mode to ensure their interoperability and preparedness for go live before first days business.

3.6 Aura Voice Network

3.6.1 The below list of Aura equipment shall be included, at a minimum:

QtyDescription
1SA-5600-SAL Secure Access Link appliance
3DL360PG8 Servers
3MM711, 8 Port Analog Station Module
2MM710B, E1/T1 Media Module
2G450, MP160 Media Gateways
3309611G IP phone
9ERS-4850GTS –PW+

3.7 Avaya Computer Network

3.7.1 The below list of Aura equipment shall be included, at a minimum:

QtyDescription
9ERS-4850GTS –PW+

3.8 32 Port Conference Audio Bridge configuration and hardware

3.8.1 Provide and configure a 32 Port Audio Conference Bridge and provide required hardware and software. The system shall include unique telephone numbers and unique meeting identification numbers for each conference initiated.

Qty Description 1 32 Port Audio Conference Bridge

3.9 User & Station Licensing

QtyDescription
330Aura Core Licenses

3.10 Training

3.10.1 The end user training shall be provided during normal working hours using ‘live’ system using the training the trainer method for a maximum of 20 end users. Live web-based training is anticipated for user training; FRCE will provide support with training rooms, presentation displays, etc. Contractor is responsible for providing handouts and short cut sheets for the live web based training.

3.10.2 The contractor shall provide a training proposal for Operations, Administration, and Management (OA&M) training for a maximum of four (4) telecommunications technicians. The contractor may recommend a mix of Computer Based Training (CBT)/Web Based Training (WBT), on-site or off-site courses at a training facility to satisfy the requirement. The contractor shall fully train at least one technician prior to cutover. Should it be impossible to train one technician prior to cutover, the contractor shall offer an alternative solution such as a technician on-site, until a Government technician can be trained. The training will include but not be limited to: functionality, authentication protocols and procedures; i.e. courses necessary to certify the personnel on the new switch system. The contractor shall provide a list containing the course number, title, length, location, cost and descriptions. The training shall be completed 30 days prior to equipment installation and syllabi will be provided for FRCE review 15 days prior to training.

3.11 Testing and Acceptance

3.11.1 Successful completion of testing in all phases will be a primary factor for acceptance of the project by FRCE. No testing shall be conducted without the oversight of an FRCE representative.

3.11.2 All test results will be recorded and provided to the FRCE. Tests that experience difficulties will be rescheduled and performed to the extent necessary to ensure ‘without failure’ performance.

3.11.3 The below minimum test periods will be conducted. The contractor shall provide a written test plan for each test period no later than 30 days prior to testing.

3.11.3.1 Pre-activation Testing shall be performed on the Core and insure inbound and outbound calling is available.

3.11.3.2 Acceptance Testing will be conducted after all cutovers are completed and the system is ready to be turned over to the FRCE. Testing will include DSN MLPP and PSTN local, long distance and international calling functionality. Acceptance testing may be conducted in phases that will be reflected in the Master Schedule as milestones.

3.11.3.3 The contractor shall provide a 7 day burn in period in which they will be present for normal operations. Baring and major system malfunctions or failures, the system will be accepted and the warranty period will begin.

4.0 FRCE Responsibilities

4.1 FRCE will provide the below support activities, systems and information to support this program.

4.1.1 Clearance by Cyber-Security for the installation of the systems and connection to the FRCE LAN (NIPRNET).

4.1.2 Approval from DISA for interface to DSN services on the new Avaya Data system.

4.1.3 Preparation of the Telecommunications closet: wire management and all patch cables required.

4.1.4 Provide electrical connections for all UPS devices at all racks with dedicated circuits.

4.1.5 User Outlet connections for all user locations

4.1.6 T1/E1 ordering and coordination for turn up.

4.1.7 Network Storage locations for systems and data base backups

4.1.8 Assignment of Static IP addresses and Dynamic IP addresses for the Computer LAN

4.1.9 Assignment of DNS addressing

4.1.10 DHCP Services (Included with Router Provided by Vendor)

4.1.11 DNS services

4.1.12 Active Directory services (or equivalent)

4.1.13 Network Timing Protocol services;

4.1.14 Data Bases for existing users

4.1.15 Building floor plan diagrams identifying telephone set placement locations

4.1.16 Rack diagrams providing space for rack requirements to the contractor.

4.1.17 Applications and hardware will meet the DoD Information Assurance requirements for systems hardening.

5.0 CONTRACTOR DELIVERABLES. The contractor shall:

5.1 Provide, install, configure, program, test and activate – Avaya Aura Voice Platform

5.2 Provide, install, configure, program, test and activate – Avaya Computer Network Platform

5.3 Provide, install, configure, program, test and activate - 32 Port Audio Conference Bridge Platform

5.4 Provide, install, test and cutover bottom-of-rack UPS systems at all racks and cabinets supporting the Aura and Computer Network solutions. The UPS shall have an up time of at least four (4) hours.

5.5 Provide Uninterrupted Power Supply (UPS) systems for all racks. The UPS shall have an up time of at least four (4) hours.

5.6 Provide Commercial Deliverables and Documentation - The contractor shall provide standard commercial deliverables and documentation depicting the installation and final configuration of the entire project. The deliverables shall be provided in electronic format where possible. Copies of any items reviewed on site shall be provided in hard copy as well. The contractor shall provide, as part of the proposal response, a list of recommended deliverables and their anticipated due dates to include any site prep deliverables. Deliverables shall include, but not be limited to, the following:

5.6.1 Project schedule (in MS-Project format) to include all installation/delivery activities and non-switch efforts (e.g., training schedules, drawings, etc.);

5.6.2 Maintenance Practices/System Manuals;

5.6.3 Warranty/Life Cycle Support Information;

5.6.4 Project Status Review Meeting Minutes;

5.6.5 Minimum Essential Spare Parts List.

5.7 Place, enable and test IP telephone sets associated with the FRCE Westbrooke.

5.8 Provide user and administrative manuals for each application being provided (Electronic Media)

5.9 Provide seven (7) days of onsite support for the operations of the program. (Burn in Period) The contractor shall provide a 7 day burn in period in which they will be present for normal operations. Baring and major system malfunctions or failures, the system will be accepted and the warranty period will begin.

5.10 Provide Post Installation As-built diagrams in Visio format within 30 days of program completion.

5.11 Provide Training Plans & Syllabus’s for Users, Administrators and Supervisors for the applications identified in paragraph 3.4.

5.12 Provide one (1) year of Technical Assistance Center (TAC), Tier 3 and higher, Help Desk support to the FRCE for the Aura systems. The contractor’s TAC shall be available 24 hours per day, 365 days per year. Service requests shall be received via telephone, email and web-based access; with service ticket tracking. TAC initial response to non-emergency requests shall be provided within 8 hours of the next business day. Emergency service requests for incidents that result in the loss of services to more than 50% of the users shall be provided by TAC within two (2) hours for remote support and within four (4) hours from the time an onsite presence is determined by the FRCE to be required.

5.13 Provide one (1) year of Manufacturer’s support on all products provided under this contract; including non-Avaya products and applications.

5.14 Provide one (1) year of Avaya Upgrade Advantage (UA) and Support Advantage Preferred (SA Preferred); including NBD parts for hardware.

5.16 Provide Warranty- The contractor shall provide, at a minimum, a full/unlimited one-year warranty for all contractor provided hardware/software, materials, and workmanship including non-Avaya applications and products. The warranty period shall not begin until final Government acceptance. The warranty shall include emergency off-site technical assistance as required via a modem connection from the contractor’s/manufacturer’s facility. The contractor shall track and resolve the problem(s) in accordance with standard commercial practices.

5.17 Provide and install, and configure Hubbell, or equivalent, 19 inch racks to include grounding bars and power distribution strips. The contractor shall provide the correct quantity of racks required to meet all requirements set forth in this specification.

5.18 The contractor shall extended fiber connectivity from the DMARC location room 149 to the telecommunications room 128 for the telephone/data equipment. The fiber connectivity shall be installed utilizing contractor provided wire management systems and ran above the ceiling.

5.19 The contractor shall provide, install, and configure remote access and telephone management system.

6.0 PROJECT SECURITY

6.1 Team Member Access Controls

6.2 Personnel Security clearances are not required for this contract.

6.3 All persons that will be required to be on-site at any time will be submitted to the FRCE security offices to receive escorted access to site locations where work will be performed.

6.4 All project team members will be US Citizens by birth or naturalization. This includes onsite and external (back office) personnel working on any portion of the project in a fashion that reveals or exposes them to the FRCE’s site, technical documents (drawings, bills of material, PM related documents), solution design or implementation information.

6.5 All project team members must be full time or part time employees of the contractor or subcontractors. Subcontractors must be fully identified in the response to this RFP.

6.6 Team Member Materials Handling

6.6.1 The FRCE team will have the authority to scan any devices brought into the site for security and virus protection.

6.6.2 All equipment taken into the FRCE is subject to scanning for wireless devices.

6.7 Maintenance & Service Support

6.7.1 Maintenance and service support must be provided from US citizens that are located within the US; i.e. telephone support from within CONUS. The use of non-US based call centers, Help Desks or engineering support is not allowed.

6.8 Remote Access

6.8.1 Remote access will be allowed through a pre-arranged, secure VPN or web-based application that is pre-approved in writing by the FRCE. On site team members will need to bring all software and information documents into the site on portable media. FRCE will have the authority to perform security scans any electronic or digital media brought onto the FRCE property.

6.9 Release of Information

6.9.1 No release of information to foreign nationals or external US entities; including drawings, sketches or installation criteria is allowed. There can be no public relations releases without advance, written approval of FRCE (press coverage). No reference to the project or use of this project for past performance is allowed without written approval from FRCE.

7.0 PROGRAM MANAGEMENT

7.1 Project Management

7.1.1 The formal kickoff meeting shall be conducted within 15 days of contract award at FRCE.

7.1.2 Additional meetings will include weekly PM meetings with all team members, pre-cutover meetings and post-cutover review meetings. Scheduled and ad-hoc technical meetings will be held as needed.

7.2 Project Master Schedule

7.2.1 An MS Project Master schedule shall be developed within 15 days of the kickoff meeting that shows the overall modernization program implementation forecast from receipt of contracts through cutover and acceptance by FRCE. Major tasks & milestones will be reflected in the schedule and shall confirm that all installation and testing shall be completed not later than 1 February 2017.

7.3 Project Manuals

7.3.1 Project Manuals will be prepared and distributed to all internal and external team members, either before or at the Project Kickoff Meeting. The manuals shall include the current system configurations, product specification sheets, the Stakeholders identification.

7.4 As-Built Documentation

7.4.1 All As-Built documentation will be delivered in electronic format; either by file transfer or on CD/DVD media.

7.4.2 A set of As-Built diagrams will be provided 30 days of project closure. The diagrams shall be Visio or PowerPoint files that can be edited. The diagrams shall include Over-all Systems Diagrams showing relationships to adjacent systems and facilities, trunk routes and capacities, rack elevations for the core and remote sites.

7.4.3 An Excel spreadsheet will be provided that contains all network IP and DNS programming information, initial administrator and supervisor assigned accounts, and a listing of assigned maintenance and service access names and passwords. This data file will have limited distribution to only the FRCE project manager.

7.4.4 Spare Parts. A recommended spare parts list shall be provided as part of the proposal with pricing. The contractor shall provide quantities and pricing for one year’s worth of spare parts and consumable items for the equipment provisioned. Only the minimum essential parts should be provided.

8.0 LABOR HOUR REPORTING

In accordance with the Navy Marine Corps Acquisition Regulation Supplement (NMCARS) Part 5237.102-90 relating to Enterprise-wide Contractor Manpower Reporting Application (ECMRA):

8.1 The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract the Fleet Readiness Center East, MCAS Cherry Point, NC 28533 via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) S, Utilities ONLY;

(5) V, Freight and Shipping ONLY.

8.2 The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.

8.3 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

9.0 CONTRACTOR'S UNAUTHORIZED WORK PERFORMANCE. The Contractor shall not perform work that deviates from contract requirements and statement of work. If the Contractor deviates from contract requirements and statement of work without approval of the CONTRACT ADMINISTRATOR/CONTRACTING OFFICER, such deviation shall be at the risk of the Contractor and any cost related thereto shall be borne by the Contractor.

SUMMARY INFO

SUMMARY INFORMATION FOR VENDORS

1. Point of Contact:

Nicholas VonBargen/Contract Specialist Phone: 252.466.2786 E-mail: nicholas.vonbargen@usmc.mil

1. Quotation due date/time: Quotations submitted in response to this requirement must be received at the location specified in paragraph 2 of Addendum to FAR 52.212-1 no later than 9:00 a.m. (EST) on 31 October 2016.

1. Address for submission of Vendor’s quote: Quotations submitted in response to this requirement must be submitted to the location specified in paragraph 2 of Addendum to FAR 52.212-1.

1. Advice to Vendors: Vendors are advised to read this document in its entirety, paying particular attention to the information provided in Purchase Description/Specification, Addendum to FAR 52.212-1, Instructions, Conditions and Notices to Vendors, and 52.212-2 Evaluation Factors for Award.

1. Content of Vendor’s Quote: At a minimum, the vendor’s quote must includeall of the information requested in paragraph 3 of the Addendum to FAR 52.212-1. It is recommended, but not required, that the information be presented in the same order as listed in the instructions.

1. Evaluation of Quotes: Quotes received in response to this requirement will be evaluated in accordance with the information provided in 52.212-2 Evaluation Factors for Award.

The following have been deleted:

ATTACHMENTS

(End of Summary of Changes) image1.wmf