LGB Transition Plan and Drawings.pdf

PDF 9 MB Posted

Attached to
Console modernization at Long Beach Airport, CA Federal contract opportunity
Solicitation number
697DCK-22-R-00432
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document includes a scope of work for a federal contract opportunity to modernize air traffic control consoles at Long Beach Airport in California. Key requirements of the scope of work include designing new slat wall console systems through 45%, 70%, and 100% design submittals; developing an installation and transition plan to minimize impacts to air traffic operations; demolishing existing perimeter consoles; fabricating and installing new perimeter slat wall consoles, mounts, and accessories; replacing ESD carpet and millwork; temporarily relocating outlets and installing new power strips; replacing light switches; and providing electronic drawings and plans. The solicitation is being conducted by the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files for this federal contract opportunity

Other files attached to Console modernization at Long Beach Airport, CA, newest first.
File Type Posted
Update_LGB Console Modernization SOW and Specifications.pdf PDF
697DCK-22-R-00432 Amendment 01.pdf PDF
Hazmat Plan.pdf PDF
RFI Questions 7-18-22.xlsx XLSX spreadsheet
IM Pei Standard Tower.pdf PDF
LGB Cab and Junction Plans.pdf PDF
LGB Console Modernization SOW and Specifications.pdf PDF
697DCK-22-R-00432.pdf PDF
ATCT Equipment List.pdf PDF
Existing Electrical Drawings.pdf PDF
LGB Sketch Up Model.pdf PDF
Past Performance Questionnaire.pdf PDF
Davis Bacon Wage Determination.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Transportation FAA – Western-Pacific Regional Office Terminal Engineering Center, Los Angeles –A & B 777 South Aviation Boulevard, Suite 150 El Segundo, CA 90245

Parsons 880 Apollo Street, Suite 155 El Segundo, CA 90245

LONG BEACH AIRPORT

LONG BEACH, CA

ATCT CAB CONSOLES REPLACEMENT PROJECT

TRANSITION PLAN

100%

Revision Original

November 19, 2021

DRAFT

LGB ATCT Console Replacement Project Page 2 Transition Plan 100% Rev Orig

TABLE OF CONTENTS

Page

Table of Contents 2

Drawing List 3

Signature Sheet 4

Points of Contact 5

Transition Plan 6

1.0 Project Scope of Work 6

1.1 Assumptions 6

1.2 Items Not Finalized 7

1.3 Pre-installation Activities 7

2.0 Transition Phases 8

2.1 Phase 1 9

2.2 Phase 2 13

2.3 Phase 3 17

2.4 Phase 4 21

2.5 Phase 5 25

2.6 Phase 6 28

2.7 Phase 7 31

LGB ATCT Console Replacement Project Page 3

Drawing List

DRAWING NUMBERS DRAWING TITLE

LGB-D-ATCT-G023 COVER SHEET, DRAWING INDEX AND VICINITY MAP

LGB-D-ATCT-Q045 CAB EQUIPMENT LAYOUT

LGB-D-ATCT-Q046 CAB EQUIPMENT LAYOUT PHASE 1

LGB-D-ATCT-Q047 CAB EQUIPMENT LAYOUT PHASE 2

LGB-D-ATCT-Q048 CAB EQUIPMENT LAYOUT PHASE 3

LGB-D-ATCT-Q049 CAB EQUIPMENT LAYOUT PHASE 4

LGB-D-ATCT-Q050 CAB EQUIPMENT LAYOUT PHASE 5

LGB-D-ATCT-Q051 CAB EQUIPMENT LAYOUT PHASE 6

SK-AE-2935-001 NEW CAB CONSOLE LAYOUT

REFERENCE DRAWINGS

LGB-D-ATCT-E032 CAB ELECTRICAL PLAN

LGB-D-ATCT-Q012 DALR RECORDER FLOW DIAGRAM

LGB-D-ATCT-Q038 AUTOMATIC TERMINAL INFORMATION SERVICE

(ATIS)

LGB-D-ATCT-Q039 NIDS WS RACK SIGNAL ROUTING 1 OF 2

LGB-D-ATCT-Q040 NIDS WS RACK SIGNAL ROUTING 2 OF 2

LGB-D-ATCT-Q041 NIDS PERIPHERAL INTERFACE CONNECTIVITY

LGB-D-ATCT-Q042 NIDS TOWER CAB

LGB-D-ATCT-Q700 LCU, RCSU AND RSIU INTERCONNECTION WIRING

DIAGRAM

LGB-D-STARS Q001 REMOTE TOWER BLOCK DIAGRAM

LGB-D-STARS Q008 TDW1 TOWER CAB DISPLAY EQUIPMENT

LGB-D-STARS Q012 TDW1 TOWER CAB EQUIPMENT

LGB-D-STARS Q014 TDW1 TOWER CAB POWER

WP-D-601-41127-13B-3 CAB EQUIPMENT LAYOUT

WP-D-601-41127-13B-4 CAB CONSOLE TYPICAL DETAILS AND GENERAL

NOTES

WP-D-601-41127-13B-5 SECTIONS 1 AND 2 CAB CONSOLE DETAILS

WP-D-601-41127-13B-6 SECTIONS 3 AND 5 CAB CONSOLE DETAILS

WP-D-601-41127-13B-7 SECTION 4 CAB CONSOLE DETAILS

WP-D-601-41127-13B-8 SECTION 6 CAB CONSOLE DETAILS

WP-D-601-41127-13B-9 SECTION 7 CAB CONSOLE DETAILS

WP-D-601-41127-13B-10 SECTION 8 CAB CONSOLE DETAILS

WP-D-601-41127-13B-11 SECTION 9 CAB CONSOLE DETAILS

WP-D-601-41127-13B-12 SECTION 10 CAB CONSOLE DETAILS

WP-D-601-41127-13B-14 RECEPTACLE PLAN

WP-D-601-41127-17E2 APOLLO, FDIO, AWIS SIGNAL FLOW DIAGRAM

WP-D-601-41127-5 RVR SIGNAL FLOW DIAGRAM

LGB ATCT Console Replacement Project Page 4

SIGNATURE SHEET

Transition Plan Authorization

APPROVED:

Western Pacific Regional Office:

Engineering Services: Date:

LGB N/C/E SSC:

AF Representative: Date:

LGB Tower Manager:

AT Representative: Date:

LGB ATCT Console Replacement Project Page 5

POINTS OF CONTACT

LGB System Support Center (SSC):

Jasper Spence

Manager

LGB SSC

Office: 562-596-4623

Cell: 310-420-6856

LGB Air Traffic

Tom Monahan

Manager

LGB Air Traffic

Office: 562-712-8424x220

Western-Pacific Region Terminal

Engineering Services:

Vance Whitesel

Manager

Terminal Engineering Center - Los Angeles A

Office: 424-405-7488

Cell:

Steve Yang

Manager

Terminal Engineering Center - Los Angeles B

Office: 424-405-7468

Cell: 310-919-7465

Lyndon Lawyer

System Engineer

Terminal Engineering Center- Los Angeles A

Office: 424-405-7486

Cell: 310-919-7274

Jennifer Nguyen

Project Engineer, Terminal Engineering Center - Los Angeles B

Office: 424-405-7493

Cell:

John Taing

Terminal Installation Center - WSA

Office: 424-405-7470

Cell: 310-919-9727

Parsons TSSC:

Roderick Hudson

Project Engineer, Parsons

Office: 310-414-4056

Cell: 310-944-4734

LGB ATCT Console Replacement Project Page 6

TRANSITION PLAN

1.0 PROJECT SCOPE OF WORK

This Transition Plan involves the replacement of existing consoles with new consoles in the

LGB ATCT. The approach in accomplishing this task, the project will be performed in seven (7) phases. The estimated total project duration will take seven (7) to ten (10) weeks.

1.1. ASSUMPTIONS

• Engineering Service (ES) will perform pre-site work one (1) months prior to the start of the consoles replacement.

• Engineering Services and LGB SSC will identify cab access floor holes and unused cables under the consoles.

• Air Traffic will approve drawings identifying the cab console final layout prior to the start of the consoles being replaced by the console manufacturer.

• Drawings showing typical equipment connectivity will be reviewed and approved.

• Any equipment requiring panel cutouts will be performed by the console manufacturer prior to consoles arriving on site.

• All equipment requiring mounting will be provided by the console manufacturer.

• Engineering Service will provide all equipment replacement cables prior to start of consoles removal.

• All console replacement work will be performed during low activity hours (12:01 am to 5:00 am), with the possibility of expanding non-invasive type work beyond the noted work hours.

• Work will be conducted five (5) days a week. If work for the phase is not completed within five (5) day, the FAA TOR and associated stakeholders will make a determination to extend the work into the weekend.

• Any issues that might result in a delay will be reported to the FAA TOR and Project

Engineer (PE).

• A hand-off meeting involving all stakeholders will be held around 6:00 a.m. - 6:30 a.m. each morning, to discuss work completed overnight and work planned for the following night.

• Power tools will be used with discretion to minimize impact on air traffic control operations. Air Traffic should notify the FAA TOR if power tools are disruptive.

Power tools will intern be “OFF”. The project schedule will be impacted if disruptions are frequent and the cost of the project will increase.

• When existing consoles are removed, folding tables will be procured to serve as temporary supports for equipment being moved or relocated during the console change-out.

• Local FAA Technical Service Operations representatives will disconnect/reconnect all cables from/to all operational equipment. Engineering Services installation crew will reroute cables, remove, and install equipment with the exception of specified equipment for others to remove and install.

LGB ATCT Console Replacement Project Page 7

Rev Orig

• A NOTAM will be sent through the SOC unit before the ILS monitoring panel will be taken out-of-service. The NOTAM must be published 24 hours prior to shut down of equipment.

• Each phase will consist of approximately three to five days.

1.2 Items not finalized

• Dimmer switches final installation location not finalized.

1.3 Pre-installation Activities

• Remove unused equipment and cables.

• Label all cables connected to equipment.

• Perform site prep work for installing essential power.

• Run new cables for relocated equipment.

• Reroute cables as required to facilitate console replacement.

• Run cables for computer and phone jacks.

• Install new circuit breakers in power panel.

• Install power cables from circuit breakers to junction box in tower cab.

• Construct dimmer switches support structure.

LGB ATCT Console Replacement Project Page 8

2.0. TRANSITION PHASES

INFORMATON

Each phase will consist of approximately three (3) to five (5) days.

NAS equipment removal is not part of Phase 6. With the exception of phase 6, each phase will consist of the following sequence of operation:

Night 1

• Remove NAS equipment,

• Remove existing consoles

• Install power & grounding

• Install folding table or temporary support structure for NAS equipment

• Install NAS equipment onto folding table or temporary support structure

Night 2

• Remove NAS equipment

• Continue installation of consoles

• Install power & grounding

Night 3

• Continue installation of consoles

• Continue to install power & grounding

Night 4

• Continue installation of consoles

• Continue to install power & grounding

• Install writing surface

• Finalize installation details

• Install NAS equipment onto slat wall, folding table or temporary support structure

Night 5 (if required)

• Finalize installation details

• Install NAS equipment on slat wall in final location/position

LGB ATCT Console Replacement Project Page 9 Transition Plan 90% Phase 1

2.1 Phase 1

This phase involves the removal of existing consoles C1 thru C5, the present Local Control 1 (LC1) position and NAS equipment, and cab

HVAC control panel, and airport lighting panel, Fire Alarm and associated equipment. New consoles CM1 thru CM7 will be installed and designated as LC1, HVAC, Fire Alarm, and Airport Lighting area. See drawing LGB-D-ATCT-Q045, -Q046 and SK-AE-2935-

001.

This phase will require approximately three (3) to five (5) nights of installation work.

NOTE: AT will operate from position TBD during construction of this phase.

Existing Console C1 thru C4

New Consoles CM1 thru CM7

LC #1 Position

SYNOPSIS

• Verify proper coordination has been conducted with Air

Traffic, Tech Ops and Southern California TRACON (SCT)

SOC for all equipment being removed.

• Remove equipment from existing consoles C1 thru C4.

• Remove existing consoles C1 thru C4.

• Install new consoles CM1 thru CM7, power, and grounding.

• In temporary location, setup NAS equipment on folding table.

• Restore and certify equipment for daytime operations (4:30 am – 5:00 am).

Following nights

• Remove turret with equipment or folding table with equipment.

• Continue installation of consoles CM1 thru CM7, power and grounding.

• In temporary location, setup NAS equipment on folding table or temporary support structure with equipment.

• If acceptable for use, install NAS equipment onto new slat wall.

• Restore equipment for daytime operations (4:30 am – 5:00 am).

Equipment to be removed

Return equipment for next day operation

Return equipment to operation at end of phase

ETVS TED ETVS TED Foot Switch

ETVS Jack Box ETVS Jack Box Admin Phone

ETVS POT Module ETVS POT Module Clock

ETVS Speaker Module ETVS Speaker Module

ETVS PIP ETVS PIP

LGB ATCT Console Replacement Project Page 10

Phase 1

VSBP JB VSBP JB

Clock ILS Remote Status &

Interlock Unit

ILS Remote Status &

Interlock Unit

RVR

RVR RRCS

RRCS Airport Lighting Panel

Airport Lighting Panel Fire Alarm Panel

Fire Alarm Panel Fire Alarm Pull Box

Fire Alarm Pull Box Fan Switch

Admin Phone UHF & VHF Radios

Dimmer Switches Air Condition Control

Panel

Fan Switch Phone (Fire Department)

UHF & VHF Radios

DALR Alarm

Flight Strip

Foot Switch

Air Condition Control

Panel

Phone (Fire

Department)

Table 1

CRITICAL FACTORS

• Do not disconnect the environmental related items (power outlets) before coordinating with LGB Tech Ops Environmental unit.

SAFETY MOMENT

• Conduct tool box meeting

• Identify risk of work to be done

• Identify PPE required to perform task

• Review emergency plan in case of injury or illness

• Stop work if injury occurs

2.1.1 Equipment Site Prep

NOTE: Engineering Services is requesting LGB SSC Airway

Transportation System Specialists (ATSS) who is familiar with all systems affected by the console replacement to be present when the equipment is being disconnected and reinstalled to ensure that the equipment is not damaged and the disconnect/reinstall process does not interfere with other operational equipment.

LGB ATCT Console Replacement Project Page 11

Phase 1

2.1.1.1 Attach labels to all equipment and cables to aid in the restoration of the affected equipment before disconnecting any cables.

NOTE: Protect equipment from dust when removed from consoles.

2.1.1.2 Disconnect and remove the Fire Alarm Panel, Fire Alarm Pull Box, phone (Fire Department), Airport Lighting Panel, ILS Status &

Interlock unit, RRCS panel, RVR Panel, DALR Alarm, and Air

Condition Control Panel from consoles C1 thru C4 and place on folding table. NOTE: This equipment will return to operations for daytime air traffic operations.

2.1.1.3 Disconnect and remove the ETVS TED, Jack Box, POT & Speaker

Modules, and PIP from console C4 and place on folding table. NOTE:

This equipment will return to operations for daytime air traffic operations.

2.1.1.4 Disconnect and remove the VSBP JB from console C4 and place on folding table. NOTE: This equipment will return to operations for daytime air traffic operations.

2.1.1.5 Disconnect foot switch, admin phone, and clock from console and place in storage.

2.1.1.6 Disconnect and remove the dimmer switches from console C2 thru C4 and place in storage until this Phase is completed.

2.1.2 Existing Consoles Removal & New Consoles Installation

2.1.2.1 At this time, the console manufacturer will remove existing consoles

C1 thru C4, and install new consoles CM1 thru CM7, grounding, and power. Air Traffic should contact the FAA TOR when noise level is too high for controlling air traffic.

NOTE: Around 4:30 AM, stop console installation work and prepare for installation of NAS operational equipment for daytime operation.

2.1.3 Equipment Restoration For Day Operations

2.1.3.1 If slat wall consoles are secure enough to mount equipment on consoles using manufacturer mounting arms, relocate equipment from folding table onto slat wall consoles in front of the position. Secure equipment to slat wall and equipment cable.

LGB ATCT Console Replacement Project Page 12

Phase 1

2.1.3.2 If the folding table will be used for daytime operation, move folding table in front of new consoles CM3 thru CM6. Mount and secure equipment onto folding table. Connect equipment cables to equipment.

Secure equipment and equipment cable.

2.1.3.3 Notify SSC for installation and connectivity of all the equipment listed in Table 1 for daytime operation.

2.1.3.4 Certification of equipment/systems is required by Tech Ops before returning to operations.

2.1.3.5 Engineering Services will conduct a hand-off meeting with AT and the

SCC to discuss the work done the previous night and what work will be done the following night.

2.1.3.6 Repeat the above steps as necessary each night until the new consoles are permanently installed.

2.1.4 Final Day Phase 1 Equipment Restoration

2.1.4.1 On the last morning of this phase, retrieve equipment stored in storage and notify SSC for installation and connectivity. Mount equipment in location as shown on console manufacturer drawings.

2.1.4.2 Relocate equipment from folding table and mount equipment in location as shown on console manufacturer drawings. Connect cables to equipment. Secure equipment and equipment cables.

2.1.4.3 Certification of equipment/systems is required by Tech Ops before

END OF PHASE 1

LGB ATCT Console Replacement Project Page 13

Phase 2

2.2 Phase 2

This phase involves the removal of existing consoles C5 thru C8, the present Local

Assist 1 (LA1), Local Assist 2 (LA2), Local Control 2 (LC2) positions. New consoles

CM8 thru CM17 will be installed and designated LA1, LA2, and LC2. See drawing

LGB-D-ATCT-Q045, -Q047 and SK-AE-2935-001.

This phase will require approximately five (5) nights of installation work.

Existing Consoles C5 thru C8

New Consoles CM8 thru CM16

LA1, LA2, & LC2 Positions

• Verify proper coordination has been conducted with Air Traffic, Tech Ops and

Southern California TRACON (SCT) SOC for all equipment being removed.

• Remove equipment from existing consoles C5 thru C8.

• Remove existing consoles C5 thru C8.

• Install new consoles CM8 thru CM16, power, and grounding.

• In temporary location, setup NAS equipment on folding table.

• Remove folding table with equipment.

• Continue installation of consoles CM8 thru CM16, power, and grounding.

• In temporary location, setup NAS equipment on folding table.

• If acceptable for use, install NAS equipment onto new slat wall.

Equipment to be removed Return equipment for next day operation

Return equipment to operation at end of phase

ETVS TED (QTY 3) ETVS TEDs Foot Switch

ETVS Jack Box (QTY 3) ETVS Jack Boxes Clock

ETVS POT Module (QTY 3) ETVS POT Modules Dimmer Switches

ETVS Speaker Module (QTY 3) ETVS Speaker Modules

ETVS PIP (QTY 3) ETVS PIPs

Foot Switches STARS TDM

STARS TDM STARS DCP

STARS DCP STARS TAAU

STARS TAAU STARS KB & TB

STARS KB & TB (QTY 2) NIDS Monitor

LGB ATCT Console Replacement Project Page 14

Phase 2

NIDS Monitor NIDS KB/TB, & Mouse

NIDS KB/TB, & Mouse NIDS CPU

NIDS CPU SAWS Monitors

Clock

SAWS Monitor (QTY 2)

Dimmer Switches (QTY 4)

Flight Strip Holder (QTY 2)

Table 2

• Identify risk of work to be done

• Identify PPE required to perform task

2.2.1 Equipment Site Prep

systems affected by the console replacement to be present when the equipment is being disconnected and reinstalled to ensure that the equipment is not damaged and the disconnect/reinstall process does not interfere with other operational equipment.

2.2.1.1 Set up folding table adjacent to new console CM7 & CM8.

2.2.1.2 Attach labels to all equipment and cables to aid in the restoration of the

2.2.1.3 Disconnect and remove the ETVS TEDs, Jack Boxes, POT & Speaker

Modules, and PIPs from console C6 thru C8 and place on folding table.

NOTE: This equipment will return to operations for daytime air traffic operations.

2.2.1.4 Disconnect and remove the NIDS monitor, TB, and CPU form console

C5 and place on folding table. NOTE: This equipment will return to operations for daytime air traffic operations. This equipment will

LGB ATCT Console Replacement Project Page 15

Phase 2 remain on the folding table until the new consoles CM8 thru CM17 are installed or the temporary console is installed.

2.2.1.5 Disconnect and remove the STARS TDM, DCP, TAAU, and KB/TB and place on folding table. NOTE: This equipment will return to operations for daytime air traffic operations.

2.2.1.6 Disconnect and remove the SAWS monitors and place on folding table.

2.2.1.7 Disconnect and remove the Clocks, Foot Switches, and Dimmer

Switches and place in storage until end of phase.

2.2.2 Existing Consoles Removal & New Consoles Installation

2.2.2.1 At this time the console manufacturer will remove existing consoles C5 thru C8, and install new consoles CM8 thru CM16, grounding, and prepare for installation of NAS operational equipment.

2.2.3 Equipment Restoration For Day Operations

2.2.3.1 If slat wall consoles are secure enough to mount equipment on consoles and equipment cable.

2.2.3.2 If folding table will be used for daytime operation, move folding table in front of new consoles CM12 thru CM17. Mount and secure

Secure equipment and equipment cables.

2.2.3.3 Notify SSC for installation and connectivity of all the equipment listed in Table 2 for daytime operation.

2.2.3.4 Certification of equipment/systems is required by Tech Ops before

2.2.3.5 Engineering Services will conduct a hand-off meeting with AT and the

LGB ATCT Console Replacement Project Page 16

Phase 2

2.2.3.6 Repeat the above steps as necessary each night until the new consoles

2.2.4 Final Day Phase 2 Equipment Restoration

2.2.4.1 On the last morning of this phase, retrieve equipment stored in storage

2.2.4.2 Relocate equipment from folding table and mount equipment in

2.2.4.3 Certification of equipment/systems is required by Tech Ops before

END OF PHASE 2

LGB ATCT Console Replacement Project Page 17

Phase 3

2.3 Phase 3

This phase involves the removal of existing consoles C10 thru C13, the present Ground

Control 1 (GC1), Ground Control 2 (GC2), and Clearance Delivery (CD) positions.

New consoles CM17 thru CM26 will be installed and designated GC1, GC2, and CD.

See drawing LGB-D-ATCT-Q045, -Q048 and SK-AE-2935-001.

Existing Console C9 thru C12

New Consoles CM17 thru CM26

CD #1 Position

• Verify proper coordination has been conducted with Air Traffic, Tech Ops and

Southern California TRACON (SCT) SOC for all equipment being removed.

• Remove equipment from existing consoles C9 thru C12

• Remove existing consoles C9 thru C12

• Install new consoles CM17 thru CM26, power, and grounding

• In temporary location, setup NAS equipment on folding table

• Restore and certify equipment for daytime operations (4:30 am – 5:00 am)

• Remove turret with equipment or folding table with equipment

• Continue installation of consoles CM17 thru CM26, power, and grounding

• In temporary location, setup NAS equipment on folding table

• If acceptable for use, install NAS equipment onto new slat wall

• Restore equipment for daytime operations (4:30 am – 5:00 am)

Equipment to be removed Return equipment for next day operation

Return equipment to operation at end of phase

ETVS TED (QTY 3) ETVS TED Foot Switches

ETVS Jack Box (QTY 3) ETVS Jack Box Clocks

ETVS POT Module (QTY

3)

ETVS POT Module Dimmer Switches

ETVS Speaker Module

(QTY 3)

ETVS Speaker Module

ETVS PIP (QTY 3) ETVS PIP

VSBP JB (QTY 2) VSBP JB (QTY

Foot Switches (3) STARS TDM

NIDS Monitor NIDS Monitor

NIDS KB NIDS KB

LGB ATCT Console Replacement Project Page 18

Phase 3

NIDS TB NIDS TB

STARS TDM SAWS Monitor

Clocks (QTY 2)

SAWS Monitor

Dimmer Switch

Flight Strip Houlder

Table 3

• Identify risk of work to be done

• Identify PPE required to perform task

2.3.1 Equipment Site Prep

systems affected by the console replacement to be present when the equipment is being disconnected and reinstalled to ensure that

2.3.1.1 Set up folding table adjacent to new console CM11 thru CM16.

2.3.1.2 Attach labels to all equipment and cables to aid in the restoration of the

2.3.1.3 Disconnect and remove the ETVS TEDs, Jack Boxes, POT & Speaker

Modules, and PIPs from console C10 thru C12 and place on folding table. NOTE: This equipment will return to operations for

2.3.1.4 Disconnect and remove the NIDS monitor, KB, TB, and CPU from console C9 and place on folding table. NOTE: This equipment will return to operations for daytime air traffic operations.

LGB ATCT Console Replacement Project Page 19

Phase 3

2.3.1.5 Disconnect and remove the STARS TDM, and KB/TB and place on folding table. NOTE: This equipment will return to operations for

2.3.1.6 Disconnect and remove the SAWS monitors and place on folding table.

2.3.1.7 Disconnect and remove the clocks, foot switches, and place in storage until end of phase.

2.3.2 Existing Consoles Removal & New Consoles Installation

2.3.2.1 At this time the console manufacturer will remove existing consoles C9 thru C12, and install new consoles CM17 thru M26, grounding, and

NOTE: Around 4:30 AM, stop console installation work and prepare for installation of NAS operational equipment.

2.3.3 Equipment Restoration For Day Operation

2.3.3.1 If slat wall consoles are secure enough to mount equipment on consoles

2.3.3.2 If folding table will be used for daytime operation, move folding table in front of new consoles CM22 thru CM26. Mount and secure

2.3.3.3 Notify SSC for installation and connectivity of all the equipment listed in Table 3 for daytime operation.

2.3.3.4 Certification of equipment/systems is required by Tech Ops before

2.3.3.5 Engineering Services will conduct a hand-off meeting with AT and the

2.3.3.6 Repeat the above steps as necessary each night until the new consoles

LGB ATCT Console Replacement Project Page 20

Phase 3

2.3.4 Final Day Phase 3 Equipment Restoration

2.3.4.1 On the last morning of this phase, retrieve equipment stored in storage

2.3.4.2 Relocate equipment from folding table and mount equipment in

2.3.4.3 Certification of equipment/systems is required by Tech Ops before

END OF PHASE 3

LGB ATCT Console Replacement Project Page 21

Phase 4

2.4 Phase 4

This phase involves the removal of existing consoles C13 thru C18, the present Flight

Data (FD) and Supervisor (SUP) positions. New consoles CM28 thru CM38 will be installed and designated FD and SUP. LGB-D-ATCT-Q045, -Q049 and SK-AE-2935-

001.

NOTE: AT will operate from the positions TBD during construction of this phase.

Existing Console C13 thru C18

New Consoles CM28 thru CM38

FD & SUP Positions

• Verify proper coordination has been conducted with Air Traffic, Tech Ops and

Southern California TRACON (SCT) SOC for all equipment being removed.

• Remove equipment from existing console C13 thru C18

• Remove existing console C13 thru C18

• Install new consoles CM28 thru CM38, power, and grounding

• Continue installation of consoles CM28 thru CM38, power, and grounding

• Stop operation for daytime operations (4:45 am – 5:00 am)

• Final night, restore and certify equipment for daytime operations (4:30 am –

5:00 am)

Return equipment for next day operation

Return equipment to operation at end of phase

ETVS TED (QTY 2) ETVS TED Dimmer Switches

ETVS Jack Box (QTY

3)

ETVS Jack Box Admin Phone

ETVS POT Module

(QTY 2)

ETVS POT Module

ETVS Speaker Module

(QTY 2)

ETVS Speaker Module

ETVS PIP (QTY 2) ETVS PIP

VSBP JB VSBP JB

NIDS Monitor KB &

TB

NIDS Monitor & KB

STARS SDM STARS SDM

ATIS RCU ATIS RCU

LGB ATCT Console Replacement Project Page 22

Phase 4

ATIS M/S Switch ATIS M/S Switch

ASOS AAIU ASOS AAIU

FDIO\ASOS Monitor &

KB

FDIO\ASOS Monitor &

KB

FDIO Printers (QTY 2) FDIO Printers (QTY 2)

FDIO A/B/ Switch FDIO A/B/ Switch

Admin Monitor, KB, &

CPU

Admin Monitor, KB, &

CPU

CCTV Monitor CCTV Monitor

Switch for Security

Monitor

Switch for Security

Monitor

Dimmer Switches

Admin Phone

Table 4

• Identify risk of work to be done

• Identify PPE required to perform task

2.4.1 Equipment Site Prep

systems affected by the console replacement to be present when the equipment is being disconnected and reinstalled to ensure that the equipment is not damaged and the disconnect/reinstall process does not interfere with other operational equipment.

2.4.1.1 Attach labels to all equipment and cables to aid in the restoration of the

NOTE: Protect equipment from dust when removed from consoles.

2.4.1.2 Disconnect and remove the ETVS TEDs, Jack Boxes, POT & Speaker

Modules, and PIPs from console C14 & C15 and place on folding table.

LGB ATCT Console Replacement Project Page 23

Phase 4

2.4.1.3 Disconnect and remove the NIDS monitor, KB, TB, and CPU from console C9 and place on folding table. NOTE: This equipment will return to operations for daytime air traffic operations.

2.4.1.4 Disconnect and remove the STARS SDM and place on folding table.

2.4.1.5 Disconnect the ASOS AAIU, ATIS RCU and M/S switch from console

C14 and C15 and place on folding table. Reconnect equipment while sitting on folding table. These units will remain on the folding table until the new consoles CM28 thru CM38 are installed. NOTE: This equipment will return to operations for daytime air traffic operations.

2.4.1.6 Disconnect and remove the STARS SDM and place on folding table.

2.4.1.7 Disconnect and remove the dimmer switch from consoles and place in storage until final phase of project. NOTE: The dimmer switch will remain in storage until this Phase is completed.

2.4.1.8 Disconnect and remove the Admin Phone. NOTE: The Admin Phone will remain in storage until this Phase is completed.

2.4.2 Existing Console Removal & New Console Installation

2.4.2.1 At this time the console manufacturer will remove existing consoles C13 thru C18, and install new consoles CM28 thru CM38, grounding, and

NOTE: Around 5:00 AM, stop console installation work.

2.4.3 Equipment Restoration For Day Operations

2.4.3.1 If slat wall consoles are secure enough to mount equipment on consoles

2.4.3.2 If folding table will be used for daytime operation, move folding table in front of new consoles CM31 thru CM36. Mount and secure equipment onto folding table. Connect equipment cables to equipment.

LGB ATCT Console Replacement Project Page 24

Phase 4

2.4.3.3 Notify SSC for installation and connectivity of all the equipment listed in Table 4 for daytime operation.

2.4.3.4 Certification of equipment/systems is required by Tech Ops before

2.4.3.5 Engineering Services will conduct a hand-off meeting with AT and the

2.4.3.6 Repeat the above steps as necessary each night until the new consoles

2.4.4 Final Day Phase 4 Equipment Restoration

2.4.4.1 On the last morning of this phase, retrieve equipment stored in storage

2.4.4.2 Relocate equipment from folding table and mount equipment in

2.4.4.3 Certification of equipment/systems is required by Tech Ops before

END OF PHASE 4

LGB ATCT Console Replacement Project Page 25

Phase 5

2.5 Phase 5

This phase involves the removal of existing consoles C24, the present Supervisor (SUP) position. New consoles CM39 will be installed and designated SUP. See drawing

LGB-D-ATCT-Q045, -Q050 and SK-AE-2935-001.

This phase will require approximately three (3) nights of installation work.

Existing Console C24

New Consoles CM39

SUP Position

• Verify proper coordination has been conducted with Air Traffic, Tech Ops and

Southern California TRACON (SCT) SOC for all equipment being removed.

• Remove equipment from existing consoles C24

• Remove existing consoles C24

• Install new consoles CM39, power, and grounding

• Remove folding table with equipment

• Continue installation of consoles CM39, power, and grounding

• In temporary location, setup NAS equipment on folding table

Return equipment for next day operation

Return equipment to operation at end of phase

ETVS TED ETVS TED

ETVS Jack Box ETVS Jack Box

ETVS POT Module ETVS POT Module

ETVS Speaker Module ETVS Speaker Module

ETVS PIP ETVS PIP

Table 5

LGB ATCT Console Replacement Project Page 26

Phase 5

SAFETY MOMENT

• Conduct tool box meeting

• Identify risk of work to be done

• Identify PPE required to perform task

2.5.1 Equipment Site Prep

systems affected by the console replacement to be present when the equipment is being disconnected and reinstalled to ensure that

2.5.1.1 Set folding table adjacent to new consoles CM30 thru CM33.

2.5.1.2 Attach labels to all equipment and cables to aid in the restoration of the

2.5.1.3 Disconnect and remove the ETVS TED, Jack Box, POT & Speaker

Modules, and PIP from console C24 and place in storage. NOTE: This equipment will remain in storage until this Phase is completed.

2.5.2 Existing Consoles Removal & New Consoles Installation

2.5.2.1 At this time the console manufacturer will remove existing consoles

C24, and install new consoles CM39, grounding, and power. Air

Traffic should contact the FAA TOR when noise level is too high for controlling air traffic.

NOTE: Around 4:30 AM, stop console installation work and prepare for installation of NAS operational equipment.

2.5.3 Equipment Restoration For Day Operations

NOTE: All equipment will remain in storage until consoles installation for this phase is completed.

2.5.3.1 Engineering Services will conduct a hand-off meeting with AT and the

LGB ATCT Console Replacement Project Page 27

Phase 5

2.5.4 Final Day Phase 5 Equipment Restoration

2.5.4.1 On the last morning of this phase, retrieve equipment stored in storage

2.5.4.2 Certification of equipment/systems is required by Tech Ops before

END OF PHASE 5

LGB ATCT Console Replacement Project Page 28

Phase 6

2.6 Phase 6

This phase involves the removal of existing consoles C19 thru C23, the present Gallery area. New consoles and counter top will be installed and designated Gallery area. See drawing LGB-D-ATCT-Q045, -Q051 and SK-AE-2935-001.

Existing Consoles C18 thru C23

New Consoles TBD

Gallery area

• Verify proper coordination has been conducted with Air Traffic, and Tech Ops for all equipment being removed.

• Remove equipment from existing consoles C18, thru C23

• Remove existing consoles C18, thru C23

• Install new consoles, power, and grounding

• Remove folding table with equipment

• Continue installation of consoles TBD, power, and grounding

• In temporary location, setup NAS equipment on folding table

Return equipment for next day operation

Return equipment to operation at end of phase

Sink

Microwave

Coffee Maker

Refrigerator

Admin Copier/Printer

Table 6

LGB ATCT Console Replacement Project Page 29

• Identify risk of work to be done

• Identify PPE required to perform task

2.6.1 Equipment Site Prep

systems affected by the console replacement to be present when the equipment is being disconnected and reinstalled to ensure that

NOTE: Protect equipment from dust when removed from consoles.

2.6.1.1 Remove refrigerator and place in safe area.

2.6.1.2 Remove Coffee Maker and place in safe area.

2.6.1.3 Remove Microwave and place in safe area.

2.6.1.4 Remove Sink and place in safe area.

2.6.1.5 Remove copier/printer and place in safe area.

2.6.2 Existing Consoles Removal & New Consoles Installation

2.6.2.1 At this time the console manufacturer will remove existing consoles

C18 thru C23 and install new consoles in Gallery area, grounding, and prepare for installation of NAS operational equipment.

2.6.3 Equipment Restoration For Day Operation

2.6.3.1 Notify SSC for installation and connectivity of all the equipment listed in Table 6 for daytime operation.

2.6.3.2 Certification of equipment/systems is required by Tech Ops before

LGB ATCT Console Replacement Project Page 30

2.6.3.3 Engineering Services will conduct a hand-off meeting with AT and the

2.6.3.4 Repeat above steps as necessary each night until the new consoles are permanently installed.

END OF PHASE 6

LGB ATCT Console Replacement Project Page 31

Phase 7

2.7 Phase 7

This phase involves the cleanup of all consoles and tower cab.

• Install dimmer switches in location TBD

• Reposition and balance consoles

• Correct power, grounding and lighting issues

• Install new EDS flooring

• Install new protective gate over stairway

• Identify risk of work to be done

• Identify PPE required to perform task

2.7.1 Clean Up

2.7.1.1 Install dimmer switches in locations TBD.

2.7.1.2 If required, reposition, balance and secure consoles CM1 thru CM9.

2.7.1.3 If required, reposition, balance and secure consoles CM11 thru CM18.

2.7.1.4 If required, reposition, balance and secure consoles CM21 thru CM28.

2.7.1.5 If required, reposition, balance and secure consoles CM30 thru CM37.

2.7.1.6 Clean any remaining power and lighting issues.

2.7.1.7 Install new protective gate over stairway.

2.7.1.8 Install new ESD flooring.

2.7.1.9 Engineering Services conduct CAI with console manufacturer.

2.7.1.10 Engineering Services conduct JAI with LGB SSC and Air Traffic.

END OF PHASE 7

LGB ATCT Console Replacement Project Page 32 Appendix B

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

NOT TO SCALE

VICINITY MAP

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O R

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O R

CA

ENGINEERING SERVICES

TERMINAL

ATCT

& VICINITY MAP

TITLE SHEET, DRAWING INDEX

LONG BEACH MUNICIPAL AIRPORT

LONG BEACH

STEVE YANGJENNIFER NGUYEN

PROJECT ENGINEER MGR: ENGINEERING - LA

LGB-D-ATCT-G023

lg b -d -a tc t-g .d g n

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

& VICINITY MAP

TITLE SHEET, DRAWING INDEX

LONG BEACH MUNICIPAL AIRPORT

LONG BEACH

STEVE YANGJENNIFER NGUYEN

PROJECT ENGINEER MGR: ENGINEERING - LA

LGB-D-ATCT-G023

-d -a tc t-g .d g n

FEDERAL AVIATION ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

LONG BEACH, CALIFORNIA

CAB CONSOLES REPLACEMENT

LONG BEACH MUNICIPAL AIRPORT

DRAWING NUMBER

GENERAL

DRAWING TITLE

LGB-D-ATCT-G023

CONSTRUCTION DRAWING INDEX

SK-AE-2935-001

LGB-D-ATCT-Q051

LGB-D-ATCT-Q050

LGB-D-ATCT-Q049

LGB-D-ATCT-Q048

LGB-D-ATCT-Q047

LGB-D-ATCT-Q046

LGB-D-ATCT-Q045

ELECTRONICS

TITLE SHEET, DRAWING INDEX & VICINITY MAP

CAB CONSOLE LAYOUT

CAB EQUIPMENT LAYOUT - PHASE 6

CAB EQUIPMENT LAYOUT - PHASE 5

CAB EQUIPMENT LAYOUT - PHASE 4

CAB EQUIPMENT LAYOUT - PHASE 3

CAB EQUIPMENT LAYOUT - PHASE 2

CAB EQUIPMENT LAYOUT - PHASE 1

CAB EQUIPMENT LAYOUT

LGB-D-STARS-Q014

LGB-D-STARS-Q012

LGB-D-STARS-Q008

LGB-D-STARS-Q001

LGB-D-ATCT-Q700

LGB-D-ATCT-Q042

LGB-D-ATCT-Q041

LGB-D-ATCT-Q040

LGB-D-ATCT-Q039

LGB-D-ATCT-Q038

LGB-D-ATCT-Q012

LGB-D-ATCT-E032

WP-D-601-41127-5

WP-D-601-41127-17E2

WP-D-601-41127-13B-14

WP-D-601-41127-13B-12

WP-D-601-41127-13B-11

WP-D-601-41127-13B-10

WP-D-601-41127-13B-9

WP-D-601-41127-13B-8

WP-D-601-41127-13B-7

WP-D-601-41127-13B-6

WP-D-601-41127-13B-5

WP-D-601-41127-13B-4

WP-D-601-41127-13B-3

TDW1 TOWER CAB POWER

TDW1 TOWER CAB EQUIPMENT

TDW1 TOWER CAB DISPLAY EQUIPMENT

REMOTE TOWER BLOCK DIAGRAM

LCU, RCSU AND RSIU INTERCONNECTION WIRING DIAGRAM

NIDS TOWER CAB

NIDS PERIPHERAL INTERFACE CONNECTIVITY

NIDS WS RACK SIGNAL ROUTING 2 OF 2

NIDS WS RACK SIGNAL ROUTING 1 OF 2

AUTOMATIC TERMINAL INFORMATION SERVICE (ATIS)

DALR RECORDER FLOW DIAGRAM

CAB ELECTRICAL PLAN

RVR SIGNAL FLOW DIAGRAM

APOLO, FDIO, AWIS SIGNAL FLOW DIAGRAM

RECEPTACLE PLAN

SECTION 10 CAB CONSOLE DETAILS

SECTION 9 CAB CONSOLE DETAILS

SECTION 8 CAB CONSOLE DETAILS

SECTION 7 CAB CONSOLE DETAILS

SECTION 6 CAB CONSOLE DETAILS

SECTION 4 CAB CONSOLE DETAILS

SECTION 3 AND 5 CAB CONSOLE DETAILS

SECTION 1 AND 2 CAB CONSOLE DETAILS

CAB CONSOLE TYPICAL DETAILS AND GENERAL NOTES

CAB EQUIPMENT LAYOUT

DRAWING NUMBER DRAWING TITLE

REFERENCE DRAWINGS

GT

TN

RLH 02/26/2020 1508914

C O

N S

T R

U C

T

IO

N

GT

TN

RLH 02/26/2020 1508914

C O

N S

T R

U C

T

IO

N

S A

F E

T Y

Q

U A L

IT

Y

INTEGRITY

IN

N

O V

A T I

O N

T E

C H

N I C

A

L S

U P

PORTSERVI

C E S

C

O N

T R

A C

T

RELEASED FOR:

FOR REVIEW PURPOSES ONLY

CONSTRUCTION, OR BIDDING

NOT TO BE USED FOR PERMITTING,

PTSI Managed Services Inc.

(310) 414-4050

880 Apollo Street

Suite 155

El Segundo, CA 90245

(310) 414-4088 (Fax)

11/19/2021100% SUBMITTAL-

WR-2935

A

T OF TRANSPO

R T A T

IO

N

M

E R

IC

A

OF

STATES

U N

IT

E D

D E P A

R

TM

EN

AVIA

T

I O

N

LAR

E

D E

F

TRAT

IO

N

SI

NI

M

D A

/1

/2

:1

:5

A

M rl u p in

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

C

U s e rs \R lu p in \A p p

D a ta \L o c a l\ p w w o rk in g \a w p e d m s \r lu p in \d m s \l g b -d -a tc t-g .d g n

A

E

V A

Y

R

E H

C

NORTH

.TS WOLLIW .E

.TS MIEHANA .E

.TS NOTREHTA .E

.TS SNRAETS

.TS WOLLIW .E EVA ALLETAK

.TS GNIRPS .E SOTIRREC .W

.TS GNIRPS .E

.DR WOLDRAW .E

.TS TNANOC .E

.TS NOSRAC .E

.DVLB OMA LED

D

V L

B

H C

A E

G N

O L

E

CI

T N

A L

T A

E

N

A R

O

E

O P

SI

B

O

E

D

N O

D E

R

E

K

A

L C

D

V

W O

L F

L L

E B

N

E

F F

U R

D O

O W

E

R

A P

K A

B E

D U

T S

N

L A

N O

G

AI

S

T O

Y

L

D

V

E N

OI

P

D

V

K

A W

R O

N

D V

TI

M A

L

.DVLB OMA LED

.RD

OIN

OTNA NAS .E

.TS REVOC

E

M

D

E

CI

FI

C A

P

E

Y

R

E H

C lgb-d-atct-g023.dgn 11/15/2021 8:19:53 AM

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O

CAB EQUIPMENT LAYOUT

LONG BEACH AIRPORT

LONG BEACH

LGB-D-ATCT-Q045

-d -a tc t-q .d g n

LEGEND:

C -2

F D

LC

LA-1

B B

PBS

PBS

BB

BB

PBS

PBS

PBS

PBS

B B

P B S

B B

BB

S U

P

G C

BENEATH CONSOLE

TERMINAL

CONFIGURATION

SUPERVISORY

LA-2

C D

FE

01’ 2’ 5’

SCALE: 1/2" = 1’-0"

1’

L C

J U

T

C

C

C

PHASE 2

PHASE 3

PHASE 5

PHASE 6

PHASE 1

C

C

PHASE 4

N

C

C

C

C

T

T

J

U

F

T

F

T

T

F

F

T

F

14 17

T

T

T

52 53

T

T

F

C24

FLAT

TURRET

F

2T

F

ENLARGED PLAN

SEE Q047 FOR

ENLARGED PLAN

SEE Q046 FOR

ENLARGED PLAN

SEE Q051 FOR

ENLARGED PLAN

SEE Q049 FOR

ENLARGED PLAN

SEE Q050 FOR

ENLARGED PLAN

SEE Q048 FOR

1"

1/

1"

1"

1"

1"

1"

1/

1"

1"

1"

132�"

1"

1"

1"

34" 28"

1/

"C

C

C

C

C

C

C

C

C

C

C

C18 C19 C20 C21 C22 C23 C1

20�"

1/2

11�" 21�"37" 25�"

ENGINEERING SERVICES

TERMINAL

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

JENNIFER NGUYEN STEVE YANG

02/26/2020

C O

N S

T R

U C

T

IO

N

WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS

ENGINEERING SERVICES

TERMINAL

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

S A

F E

T Y

Q

U A L

IT

Y

INTEGRITY

IN

N

O V

A T I

O N

T E

C H

N I C

A

L S

U P

PORTSERVI

C E S

C

O N

T R

A C

T

RELEASED FOR:

FOR REVIEW PURPOSES ONLY

CONSTRUCTION, OR BIDDING

NOT TO BE USED FOR PERMITTING,

PTSI Managed Services Inc.

(310) 414-4050

880 Apollo Street

Suite 155

El Segundo, CA 90245

(310) 414-4088 (Fax)

11/19/2021100% SUBMITTAL-

WR-2935

/1

/2

:2

:2

A

M rl u p in

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

C

U s e rs \R lu p in \A p p

D a ta \L o c a l\ p w w o rk in g \a w p e d m s \r lu p in \d m s \l g b -d -a tc t-q .d g n

A lgb-d-atct-q045.dgn 11/15/2021 8:20:25 AM

SCALE: 3/4 " = 1’-0"

Q045

EXISTING EQUIPMENT LAYOUT

01’ 1’ 3’2’

SCALE: 3/4" = 1’-0"

N

BB

C2C4 C3

32 32

T T

T

38 39

T

22 54

36 36 36

C1

C

C

C

C M

CM2CM3CM4CM5CM6CM7CM8

WS1

SCALE: 3/4 " = 1’-0"

Q045

PLAN VIEW

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O R

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O

PHASE 1

PHASE 1

TURRET

LEGEND:

T

C5

LONG BEACH MUNICIPAL AIRPORT

LGB-D-ATCT-Q046

-d -a tc t-q .d

LGB-D-ATCT-Q046

-d -a tc t-q .d g n

ENGINEERING SERVICES

TERMINAL

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

TERMINAL

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

CAB EQUIPMENT LAYOUTCAB EQUIPMENT LAYOUT

P H

A S

E

PHASE 2

CM9

PHASE 2

P H

A S

E

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

S A

F E

T Y

Q

U A L

IT

Y

INTEGRITY

IN

N

O V

A T I

O N

T E

C H

N I C

A

L S

U P

PORTSERVI

C E S

C

O N

T R

A C

T

RELEASED FOR:

FOR REVIEW PURPOSES ONLY

CONSTRUCTION, OR BIDDING

NOT TO BE USED FOR PERMITTING,

PTSI Managed Services Inc.

(310) 414-4050

880 Apollo Street

Suite 155

El Segundo, CA 90245

(310) 414-4088 (Fax)

11/19/2021100% SUBMITTAL-

WR-2935

PHASE 1 PHASE 1

DRAWINGS FOR EQUIPMENT LAYOUT.

REFER TO CONSOLE MANUFACTURER’S

NEW CONSOLES

/1

/2

:2

:5

A

M rl u p in

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

C

U s e rs \R lu p in \A p p

D a ta \L o c a l\ p w w o rk in g \a w p e d m s \r lu p in \d m s \l g b -d -a tc t-q .d g n

A lgb-d-atct-q046.dgn 11/15/2021 8:20:56 AM

Q045

EXISTING EQUIPMENT LAYOUT

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O R

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O

PHASE 2

PHASE 2

LGB-D-ATCT-Q047

-d -a tc t-q .d

LGB-D-ATCT-Q047

-d -a tc t-q .d

26 26

26 26

C M

C M

C M

CM10

CM17 CM16 CM15 CM14 CM13 CM12 CM11

SCALE: 3/4 " = 1’-0"

Q045

PLAN VIEW

WS2

01’ 1’ 3’2’

SCALE: 3/4" = 1’-0"

01’ 1’ 3’2’

SCALE: 3/4" = 1’-0"

C8 C7 C6 C5

C

T

F

TTF

LEGEND:

F FLAT

TURRETT

ENGINEERING SERVICES

TERMINAL

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

TERMINAL

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

CAB EQUIPMENT LAYOUT

P H

A S

E

CM18

P H

A S

E

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

S A

F E

T Y

Q

U A L

IT

Y

INTEGRITY

IN

N

O V

A T I

O N

T E

C H

N I C

A

L S

U P

PORTSERVI

C E S

C

O N

T R

A C

T

RELEASED FOR:

FOR REVIEW PURPOSES ONLY

CONSTRUCTION, OR BIDDING

NOT TO BE USED FOR PERMITTING,

PTSI Managed Services Inc.

(310) 414-4050

880 Apollo Street

Suite 155

El Segundo, CA 90245

(310) 414-4088 (Fax)

11/19/2021100% SUBMITTAL-

WR-2935

PHASE 2

DRAWINGS FOR EQUIPMENT LAYOUT.

REFER TO CONSOLE MANUFACTURER’S

NEW CONSOLES

PHASE 2

PHASE 3PHASE 3

/1

/2

:2

:1

A

M rl u p in

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

C

U s e rs \R lu p in \A p p

D a ta \L o c a l\ p w w o rk in g \a w p e d m s \r lu p in \d m s \l g b -d -a tc t-q .d g n

A lgb-d-atct-q047.dgn 11/15/2021 8:21:14 AM

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O R

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O

PHASE 3

01’ 1’ 3’2’

SCALE: 3/4" = 1’-0"

LGB-D-ATCT-Q048

-d -a tc t-q .d

LGB-D-ATCT-Q048

-d -a tc t-q .d g n

SCALE: 3/4 " = 1’-0"

Q045

PLAN VIEW

SCALE: 3/4 " = 1’-0"

Q045

EXISTING EQUIPMENT LAYOUT

P B S

PBSPBSPBS

2 3

1 1

2 3

C M

CM27 CM26 CM25 CM24 CM23 CM22 CM21 C

M

C M

C M

WS3

N

C12 C11 C10 C9

C

F

F

TT

F

T

LEGEND:

F FLAT

TURRETT

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

TERMINAL

LONG BEACH

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

TERMINAL

LONG BEACH

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

CAB EQUIPMENT LAYOUT

C13

C

PHASE 4

P H

A S

E

CM28

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

P H

A S

E

PHASE 4

S A

F E

T Y

Q

U A L

IT

Y

INTEGRITY

IN

N

O V

A T I

O N

T E

C H

N I C

A

L S

U P

PORTSERVI

C E S

C

O N

T R

A C

T

RELEASED FOR:

FOR REVIEW PURPOSES ONLY

CONSTRUCTION, OR BIDDING

NOT TO BE USED FOR PERMITTING,

PTSI Managed Services Inc.

(310) 414-4050

880 Apollo Street

Suite 155

El Segundo, CA 90245

(310) 414-4088 (Fax)

11/19/2021100% SUBMITTAL-

WR-2935

PHASE 3 PHASE 3

DRAWINGS FOR EQUIPMENT LAYOUT.

REFER TO CONSOLE MANUFACTURER’S

NEW CONSOLES

/1

/2

:2

:3

A

M rl u p in

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

C

U s e rs \R lu p in \A p p

D a ta \L o c a l\ p w w o rk in g \a w p e d m s \r lu p in \d m s \l g b -d -a tc t-q .d g n

A lgb-d-atct-q048.dgn 11/15/2021 8:21:35 AM

BB PBS

2 3

P B S

BB

121135

2 3

SCALE: 3/4 " = 1’-0"

Q045

EXISTING EQUIPMENT LAYOUT

C M

C M

C M

C M

C M

CM35CM37 CM36 CM34 CM33 CM32 CM31 CM30

SCALE: 3/4 " = 1’-0"

Q045

PLAN VIEW

WS4

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O R

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O

PHASE 4

SCALE: 3/4" = 1’-0"

LGB-D-ATCT-Q049

-d -a tc t-q .d

LGB-D-ATCT-Q049

-d -a tc t-q .d

C17 C16 C15 C14 C13

F C

T

TT

F

C

F

LEGEND:

F FLAT

TURRETT

LONG BEACH

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

TERMINAL

LONG BEACH

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

TERMINAL

CAB EQUIPMENT LAYOUT

C

C

P H

A S

E

6 P

H A S

E

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

S A

F E

T Y

Q

U A L

IT

Y

INTEGRITY

IN

N

O V

A T I

O N

T E

C H

N I C

A

L S

U P

PORTSERVI

C E S

C

O N

T R

A C

T

RELEASED FOR:

FOR REVIEW PURPOSES ONLY

CONSTRUCTION, OR BIDDING

NOT TO BE USED FOR PERMITTING,

PTSI Managed Services Inc.

(310) 414-4050

880 Apollo Street

Suite 155

El Segundo, CA 90245

(310) 414-4088 (Fax)

11/19/2021100% SUBMITTAL-

WR-2935

DRAWINGS FOR EQUIPMENT LAYOUT.

REFER TO CONSOLE MANUFACTURER’S

NEW CONSOLES

PHASE 4 PHASE 4

/1

/2

:2

:5

A

M rl u p in

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

C

U s e rs \R lu p in \A p p

D a ta \L o c a l\ p w w o rk in g \a w p e d m s \r lu p in \d m s \l g b -d -a tc t-q .d g n

A lgb-d-atct-q049.dgn 11/15/2021 8:21:58 AM

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O R

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O

PHASE 5

PHASE 5

LGB-D-ATCT-Q050

-d -a tc t-q .d

LGB-D-ATCT-Q050

-d -a tc t-q .d

SCALE: 3/4" = 1’-0"

SCALE: 3/4 " = 1’-0"

Q045

EXISTING EQUIPMENT LAYOUT

PHASE 5

DN

C24

38 C

SCALE: 3/4 " = 1’-0"

Q045

PLAN VIEW

PHASE 5

CUSTOM

LEGEND:

F FLAT

TURRETT

T

F

ENGINEERING SERVICES

TERMINAL

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

TERMINAL

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

LONG BEACHLONG BEACH

CAB EQUIPMENT LAYOUT

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

S A

F E

T Y

Q

U A L

IT

Y

INTEGRITY

IN

N

O V

A T I

O N

T E

C H

N I C

A

L S

U P

PORTSERVI

C E S

C

O N

T R

A C

T

RELEASED FOR:

FOR REVIEW PURPOSES ONLY

CONSTRUCTION, OR BIDDING

NOT TO BE USED FOR PERMITTING,

PTSI Managed Services Inc.

(310) 414-4050

880 Apollo Street

Suite 155

El Segundo, CA 90245

(310) 414-4088 (Fax)

11/19/2021100% SUBMITTAL-

WR-2935

DRAWINGS FOR EQUIPMENT LAYOUT.

REFER TO CONSOLE MANUFACTURER’S

NEW CONSOLES

/1

/2

:2

:1

A

M rl u p in

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

C

U s e rs \R lu p in \A p p

D a ta \L o c a l\ p w w o rk in g \a w p e d m s \r lu p in \d m s \l g b -d -a tc t-q .d g n

A lgb-d-atct-q050.dgn 11/15/2021 8:22:16 AM

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O R

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

DO

NOT

SI

GN

E D

M

IS

S

U E

D F

O

PHASE 6

PHASE 6

LGB-D-ATCT-Q051

-d -a tc t-q .d

LGB-D-ATCT-Q051

-d -a tc t-q .d

Q045

EXISTING EQUIPMENT LAYOUT

N

01’ 1’ 3’2’

SCALE: 3/4" = 1’-0"

SCALE: 3/4 " = 1’-0"

Q045

PLAN VIEW

52 53

CUSTOM

PHASE 6PHASE 6

C19 C20 C21 C22 C23 C1C18

ENGINEERING SERVICES

TERMINAL

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

TERMINAL

STEVE YANGJENNIFER NGUYEN

GT

TN

RLH

PROJECT ENGINEER MGR: ENGINEERING - LA B

02/26/2020 1508914

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

LONG BEACHLONG BEACH

CAB EQUIPMENT LAYOUT

P H

A S

E

P H

A S

E

PHASE 1PHASE 4

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

S A

F E

T Y

Q

U A L

IT

Y

INTEGRITY

IN

N

O V

A T I

O N

T E

C H

N I C

A

L S

U P

PORTSERVI

C E S

C

O N

T R

A C

T

RELEASED FOR:

FOR REVIEW PURPOSES ONLY

CONSTRUCTION, OR BIDDING

NOT TO BE USED FOR PERMITTING,

PTSI Managed Services Inc.

(310) 414-4050

880 Apollo Street

Suite 155

El Segundo, CA 90245

(310) 414-4088 (Fax)

11/19/2021100% SUBMITTAL-

WR-2935

DRAWINGS FOR EQUIPMENT LAYOUT.

REFER TO CONSOLE MANUFACTURER’S

NEW CONSOLES

/1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .