Hazmat Plan.pdf

PDF 237 KB Posted

Attached to
Console modernization at Long Beach Airport, CA Federal contract opportunity
Solicitation number
697DCK-22-R-00432
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document includes an engineering design file and related federal contract opportunity. The engineering design file provides plans and notes for hazardous material abatement work at the Long Beach Airport air traffic control tower and base building modernization project. It identifies locations of potential asbestos, lead-based paint, and other hazardous materials throughout the facility. The related federal contract opportunity is a solicitation to provide console modernization work at the Long Beach Airport air traffic control tower. The scope of work involves designing and installing a new slat wall console system, demolishing existing perimeter consoles, replacing carpeting and millwork, relocating electrical equipment and outlets, and performing other modernization and transition work to minimize impacts to air traffic operations. The contracting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files for this federal contract opportunity

Other files attached to Console modernization at Long Beach Airport, CA, newest first.
File Type Posted
Update_LGB Console Modernization SOW and Specifications.pdf PDF
697DCK-22-R-00432 Amendment 01.pdf PDF
RFI Questions 7-18-22.xlsx XLSX spreadsheet
IM Pei Standard Tower.pdf PDF
LGB Cab and Junction Plans.pdf PDF
ATCT Equipment List.pdf PDF
Existing Electrical Drawings.pdf PDF
697DCK-22-R-00432.pdf PDF
LGB Transition Plan and Drawings.pdf PDF
LGB Console Modernization SOW and Specifications.pdf PDF
LGB Sketch Up Model.pdf PDF
Past Performance Questionnaire.pdf PDF
Davis Bacon Wage Determination.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN FILE:

DATE: TIME: USER:

A

B

C

D

E

$$DATE $$TIME $$USER

$$DGN

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

APPROVED BY

DATE

DRAWING NO.

DESCRIPTIONREV.

REVIEWED BY

2 3 4 5 6

A

B

D

E

1 2 3 4 5 6

REV.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

R

LGB ATCT AND BASE BUILDING MODERNIZATION

07/08/21

LYNDON LAWYER VANCE WHITESEL

PROJECT ENGINEER, AJW-2W11C MANAGER, AJW-2W11C

LONG BEACH CA

ISSUED BY

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

ISSUE FOR 100% DESIGN SUBMISSION

LGB-1508914- CALIFORNIA

LONG BEACH

LONG BEACH ATCT

1508914

LONG BEACH AIRPORT (LGB)

TERMINAL, LA A

ENGINEERING SERVICES

JULY 8, 2021

HAZMAT SHEET NOTES:

HAZMAT GENERAL NOTES:

HAZMAT KEY NOTES:

LEAD COATINGS

- EXTERIOR DOOR FRAME CAULK

- FLOOR TILE AND MASTIC

- FLOOR TILE AND MASTIC (MULTIPLE LAYERS)

KEY:

ASBESTOS

KEY

- ROOF MASTIC

- REMNANT FLOOR TILE MASTIC

- ROOF TAR

- MUDDED TSI FITTINGS

- METAL FIRE DOORS (ASSUMED)

D. STRUCTURAL STEEL

E. WALL AND CEILING PAINT

A. FIRE DOORS/FRAMES

B. STAIR RAILING

C. METAL STAIR SYSTEM

ARCHITECTURE AND MECHANICAL DEMOLITION.

CONTAINED AREA APPROXIMATE LIMITS. COORDINATE WITH

COORDINATE LOCATION OF BARRIER IN FIELD.

CRITICAL BARRIER ON DOORWAYS AND OPENINGS

SPECIFICATIONS.

LEAD. COORDINATE DEMOLITION AND REMOVAL, AS REQUIRED, WITH

WALLS, PLASTER SURFACES, FIRE DOORS AND FRAMES MAY CONTAIN

PAINT THROUGHOUT THE AREA ON ORIGINAL CONCRETE, CMU

CONTAINMENT AREA. COORDINATE LOCK OUT TAG OUT WITH FAA.

ELECTRICAL CIRCUITS SHALL BE CUT AND CAPPED OUTSIDE THE

OF EQUIPMENT DEMOLITION.

REFER TO ARCH, MECH AND ELEC FOR LOCATIONS

CONTAINMENT AREA. COORDINATE LOCK OUT TAG OUT WITH FAA.

CUT AND CAP PIPE CONNECTIONS FOR HOT WATER OUTSIDE

G.

F.

H.

I.

B.

A.

C.

E.

D.

9- EXTERIOR WINDOW FRAME CAULK

WITH COR AND DEMOLITION.

COORDINATE PHASING OF HAZARDOUS MATERIALS REMOVAL

FAA ASBESTOS CONTROL WORK PERMIT.

AND OCCUPATIONAL SAFETY & HEALTH CHECKLIST AND THE

FORM 3900-18, FAA PRE-CONSTRUCTION ENVIRONMENTAL

CONTRACTOR TO COORDINATE WITH COR TO COMPLETE

ACCORDANCE WITH SPECIFICATION SECTION 02 80 00.

REMOVE ASBESTOS CONTAINING MATERIAL IN

SPECIFICATION SECTION 02 80 00.

IDENTIFYING REMAINING ACM IN ACCORDANCE WITH

DO NOT DISTURB. PROVIDE WARNING LABELS

EXISTING IDENTIFIED ACM TO REMAIN IN PLACE.

SECTION 02 80 00.

SHALL BE REMOVED INTACT IN ACCORDANCE WITH

FLUORESCENT LIGHT TUBES AND MERCURY VAPOR LIGHTING

SHALL BE HANDLED AND DISPOSED AS A TSCA WASTE.

02 80 00. BALLAST NOT SPECIFICALLY LABELLED AS " NON-PCB"

USED REMOVE LIGHT BALLASTS IN ACCORDANCE WITH SECTION

PCB LIGHT BALLASTS : WHERE FLUORESCENT LIGHT TUBES ARE

LEAD BASED ON THE AGE OF FACILITY & EQUIPMENT.

PRACTICES. PAINT ON THESE ITEMS ARE "ASSUMED" TO CONTAIN

THE AREA. REFER TO SPECIFICATION SECTION 02 80 00 FOR WORK

THE FOLLOWING MAY BE LEAD CONTAINING COATINGS WITHIN

WHERE HAZMAT OCCURS.

FOR HAZMAT ABATEMENT WORK, CAUTIONS AND SPECIFIC AREAS

REFER T0 THIS SHEET AND SPECIFICATION SECTIONS 02 80 00

WORK AREA (AND BUILDING) CONTAINS HAZARDOUS MATERIALS.

CONTRACTOR TO PROTECT WITH SEALED BARRIER. COORD WITH COR.

ACTIVE TELECOMMUNICATIONS EQUIPMENT IS IN THE WORK AREA.

TO BE COORDINATED WITH COR.

FAA WILL BE REQUIRED TO MAINTAIN ACCESS TO ROOM WITH LIMITS

- EXTERIOR CAULK AT METAL CAP FLASHING10

H103

D3

SCALE:‚" = 1'-0"

ATCT - JUNCTION LEVEL

H103

N

CATWALK

02'4' 4' 8'

1/4" = 1'-0"

ATCT FLOOR PLANS

HAZMAT ABATEMENT-

HAZMAT ABATEMENT

H103

A2

SCALE:‚" = 1'-0" H103

A3

SCALE:‚" = 1'-0"

H103

C1

SCALE:‚" = 1'-0" H103

C2

SCALE:‚" = 1'-0"

H103

A4 ATCT - CAB LEVEL

SCALE:‚" = 1'-0"

H103

D1

SCALE:‚" = 1'-0" H103

D2

SCALE:‚" = 1'-0"

H103

C4

SCALE:‚" = 1'-0"

H103

A1

SCALE:‚" = 1'-0"

ATCT - BASEMENT LEVEL ATCT - 3RD & 4TH LEVELS

ATCT - 1ST LEVEL ATCT - 5TH LEVEL

ATCT - 6TH & 7TH LEVELSATCT - 2ND LEVEL

CABELEVATOR

VESTIBULE

ELEVATOR

SHAFT

ELEVATOR

SHAFT

CABLE

SHAFT

CABLE

PIT

ELEVATOR

MACHINE ROOM

SHAFT

CABLE

SHAFT

ELEVATOR

SHAFT

ELEVATOR

SHAFT

CABLE

R.A.

S.A.

SHAFT

CABLESHAFT

ELEVATOR

R.A.

S.A.

SHAFT

ELEVATOR

SHAFT

CABLE

R.A.

S.A.

R.A.

S.A.

R.A.

S.A.

R.A.

S.A.

DN

UP

DN

DN

DN

UP

UP

UP

DN

UP

DN

DN

DN

UP

DN

UP

DN

DN

DN

UP

HATCH

FLOOR

ATCT - CAB ROOF

STAIR

STAIR

401 STAIR

B01

STAIR

VEST

STAIR

STAIR

1002 1001

VEST

802A

B01

A

B

A

B

A

B

B

A

C

S E

A

A

M A

T C

H

L I

N

JUNCTION ROOM

ACCESS

CATWALK

STAIR

CATWALK

STAIR

VEST

REST ROOM

ATCT - 8TH LEVEL (SUB-JUNCTION LEVEL)

802C

802B

HAZMAT ABATEMENT

HAZMAT ABATEMENT HAZMAT ABATEMENT

HAZMAT ABATEMENT HAZMAT ABATEMENT HAZMAT ABATEMENT

HAZMAT ABATEMENT

HAZMAT ABATEMENT HAZMAT ABATEMENT

DA-3

2 DA-2

K. KUSTRA

K. KUSTRA

W. STEVENS