This document outlines a federal contract solicitation for console modernization work at Long Beach Airport in California. The scope of work includes design, fabrication, and installation of new perimeter slat wall consoles; demolition of existing consoles; replacement of carpeting, counters, and millwork; relocation of outlets and equipment; provision of grounding and power solutions; and other miscellaneous work. The solicitation was issued by the Department of Transportation Federal Aviation Administration Southwestern Region. Key deliverables include 45%, 70%, and 100% design submittals for review. Installation will follow an approved transition plan to minimize impacts to air traffic operations. Electronic shop drawings and plans are required to be provided in DWG format.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Update_LGB Console Modernization SOW and Specifications.pdf | ||
| 697DCK-22-R-00432 Amendment 01.pdf | ||
| Hazmat Plan.pdf | ||
| IM Pei Standard Tower.pdf | ||
| LGB Cab and Junction Plans.pdf | ||
| ATCT Equipment List.pdf | ||
| Existing Electrical Drawings.pdf | ||
| 697DCK-22-R-00432.pdf | ||
| LGB Transition Plan and Drawings.pdf | ||
| LGB Console Modernization SOW and Specifications.pdf | ||
| LGB Sketch Up Model.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Davis Bacon Wage Determination.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comments
| LGB Console Replacement Project Solicitation RFI Questions | ||||||
| Deliverable | RFI Questions | |||||
| Deliverable Date: | July 18, 2022 | |||||
| Review Date: | July 22, 2022 | |||||
| Response (Resp.) Code Legend: C = Concur, NC = Non-concur, A = Action, W = Withdrawn, CL = Clarify | Disposition & Status: Done, N/A=No Action Req'd, Open | |||||
| Ques. | ||||||
| No. | Dwg/Section/ | |||||
| Page # | Question | Resp. | ||||
| Code | Response | Russ Bassett Responder | Disposition (with added clarficiation comments as required) | Status | ||
| 1 | SIR Pg. 5 | What grade of ESD carpet should be included in the bid: Level 1, 2, or 3 | Refer to specifications section 09 68 13.10 for ESD carpet requirements. If the levels in question are refering to the Static Smart levels, then it would be level 3. | |||
| 2 | Has the site been tested for Asbestos and Lead? Is there a report available | There is asbestos and lead at facility and there will be abatement work as part of another larger modernization project. Contractor will not be responsible for abatement work as part of this solicitation. Areas where contractor will be working will be free of asbestos and lead. See "Hazmat Plan" for location of asbestos and Lead | ||||
| 3 | Is contractor responsible to move Fire Panel to new Consoles? If yes, please provide name and number of the company that is servicing the alarm system in the building. | FAA will contact fire alarm company to move panel. Contractor is not responsible for moving panel and pull, but will have to coordinate with FAA and fire alarm company. | ||||
| 4 | Is there a location near the tower where the contractor can park two job trailers? | Trailors are allowed. Exact location to be worked out prior to construction | ||||
| 5 | Can the on-site installation team use the facility restrooms or is a porta-potty required? | Use Facility restrooms | ||||
| 6 | Is there any addition to the SOW regarding the stairway? | No Additional scope for stairway railing | ||||
| 7 | Is it possible to get CAD or PDF drawings of the Cab and the sub junction area below the cab? | Two Drawing sets added as addendum. First set is LGB Cab & Junction Layout. Second Set is IM Pei Standard tower design. Long Beach tower is a standard IM Pei tower, so the drawings apply, but measurements must be field verified |
| Product/ Equipment Questions | ||
| 1 | Confirm that Solid Surface (Corian type) material applies only to the galley countertop and that other worksurfaces are to be laminate with plexiglass inlay. | Confirmed |
| 2 | Are stamped and signed seismic engineering calculations also required | No |
| 3 | Standard finished height for a kitchen or galley counter is nominally 36" vs 38" requested. Is 36" acceptable for this project? | Match height of current counter. Height may change during design to 36" |
| 4 | There is no mention of any water filtration to be included under the sink, is any required? | No water filtration undersink |
| 5 | During site inspection it was discussed that the water chiller would be removed from the requirements. Please confirm. | Water Chiller removed from SOW |
| 6 | The sketch-up drawing shows the cubbies located in the Cab. Are they to be located in the lobby or the Cab? | Cubby unit is standalone located in lobby. Sketchup shows additional cubby/cabinet box for headsets located to the left of refrigerator |
| 7 | Please confirm that contractor is to provide all the 2" x 12" ground bars and that "re-using" applies only to the large, multi point facility ground plates. | Contractor to provide ground bars. Multipoint is to be reused. Connect new cabinets/slatwall ground bars to existing multipoint plate |
| 7a | Standard placement is normaly every other frame to accommodate the 13' cable length restriction, minimize congestion inside consoles and avoid redundant costs. Please confirm that every other frame is is acceptable, with minimum 2 per wall. | This is acceptable as long as there is enough space on ground bars to connect all equipment |
| 8 | Based on all prior projects, the acceptable sequence has been: … Please confirm that this sequence is acceptable on this project. | Sequence is acceptable |
| 9 | Can you provide details on the size of this piece of equipment? | This piece of equipment is not located in the cab. Contractor does not need to provide mount/space for it |
| 10 | Are the 2 STARS Keyboard and Trackball to be recessed or desktop? | Recessed |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
&"Times New Roman,Bold"&12Design Review Comments
&12&P of &N
File details come from the government source that posted it. Updated .