This solicitation is for the modernization of air traffic control tower consoles at Long Beach Airport in California. The scope of work includes design, demolition, fabrication and installation of new slat wall consoles; replacement of carpeting, millwork and sinks; relocation of outlets and equipment; and provision of temporary power. Drawings must be provided in DWG format. The contractor will work with FAA personnel to develop an installation plan to minimize impacts to operations. The solicitation number is 697DCK-22-R-00432 and was issued by the Department of Transportation Federal Aviation Administration Southwestern Region. The complete scope of work is detailed in Attachment 01 of Section J.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Update_LGB Console Modernization SOW and Specifications.pdf | ||
| 697DCK-22-R-00432 Amendment 01.pdf | ||
| Hazmat Plan.pdf | ||
| RFI Questions 7-18-22.xlsx | XLSX spreadsheet | |
| IM Pei Standard Tower.pdf | ||
| 697DCK-22-R-00432.pdf | ||
| LGB Sketch Up Model.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Davis Bacon Wage Determination.pdf | ||
| ATCT Equipment List.pdf | ||
| Existing Electrical Drawings.pdf | ||
| LGB Transition Plan and Drawings.pdf | ||
| LGB Console Modernization SOW and Specifications.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN FILE:
DATE: TIME: USER:
A
B
C
D
E
$$DATE $$TIME $$USER
$$DGN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
DRAWN BY
DESIGNED BY
CHECKED BY
APPROVED BY
DATE
DRAWING NO.
DESCRIPTIONREV.
REVIEWED BY
2 3 4 5 6
A
B
D
E
1 2 3 4 5 6
REV.
JCN:
JCN
DATE
REDLINE
APVD
DATE
APPROVED
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
R
LGB ATCT AND BASE BUILDING MODERNIZATION
07/08/21
LYNDON LAWYER VANCE WHITESEL
PROJECT ENGINEER, AJW-2W11C MANAGER, AJW-2W11C
LONG BEACH CA
ISSUED BY
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ISSUE FOR 100% DESIGN SUBMISSION
LGB-1508914- CALIFORNIA
LONG BEACH
LONG BEACH ATCT
1508914
LONG BEACH AIRPORT (LGB)
TERMINAL, LA A
ENGINEERING SERVICES
JULY 8, 2021
A4 ATCT - CAB LEVEL
SCALE:‚" = 1'-0"
N
CAB
DEMOLITION PLAN
02'4' 4' 8'
1/4" = 1'-0"
DEMOLITION - ATCT FLOOR PLANS
A2
SCALE:‚" = 1'-0"
A3
SCALE:‚" = 1'-0"
C1
SCALE:‚" = 1'-0"
C2
SCALE:‚" = 1'-0"
D1
SCALE:‚" = 1'-0"
D2
SCALE:‚" = 1'-0"
D3
SCALE:‚" = 1'-0"
ATCT - JUNCTION LEVEL C4
SCALE:‚" = 1'-0"
A1
SCALE:‚" = 1'-0"
ATCT - BASEMENT LEVEL ATCT - 3RD & 4TH LEVELS
ATCT - 1ST LEVEL ATCT - 5TH LEVEL
ATCT - 6TH & 7TH LEVELSATCT - 2ND LEVEL
CAB
ELEVATOR
VESTIBULE
ELEVATOR
SHAFT
ELEVATOR SHAFT
CABLE
SHAFT
CABLE
PIT
ELEVATOR
MACHINE ROOM
SHAFT
CABLE
SHAFT
ELEVATOR
SHAFT
ELEVATOR SHAFT
CABLE
R.A.
S.A.
SHAFT
CABLE
SHAFT
ELEVATOR
R.A.
S.A.
SHAFT
ELEVATOR SHAFT
CABLE
R.A.
S.A.
R.A.
S.A.
R.A.
S.A.
R.A.
S.A.
DN
UP
DN
DN
DN
UP
UP
UP
DN
UP
DN
DN
DN
UP
DN
UP
DN
DN
DN
UP
HATCH
FLOOR
REMOVE FLOOR CARPET
8 11
DEMOLITION PLAN DEMOLITION PLAN DEMOLITION PLAN
DEMOLITION PLAN
DEMOLITION PLANDEMOLITION PLAN
DEMOLITION PLAN DEMOLITION PLAN
DEMOLITION PLAN
ATCT - CAB ROOF
STAIR
STAIR
401 STAIR
B01
STAIR
STAIR
VEST
STAIR
STAIR
1002 1001
VEST
802A
B01
A
B1004
A
B
A
B
B
A
C
JUNCTION ROOM
ACCESS
CATWALK
STAIR
CATWALK
REMOVE ROOF HATCH, HATCH CURB TO REMAIN
14 14
14 14
VEST
REST ROOM
ATCT - 8TH LEVEL (SUB-JUNCTION LEVEL)
802C
802B
A.
B.
REMOVE DOOR FRAME FROM CONCRETE WALL
REMOVE FLOOR TILES AND WALL BASE, COORDINATE WITH HAZMAT.
CAB STAIR TREADS AND NOSINGS, TYP.
REMOVE RUBBER SLIP RESISTANT FINISH FROM THE
3 3
REFER TO MECH AND ELECT FOR MECH AND ELECT DEMOLITION ITEMS.
BUTT JOINTS.
REMOVE STRUCTURAL SEALANT AT GLAZING
TYP.
EXIST. HANDRAIL
REMOVE LADDER UP TO CAB ROOF ACCESS HATCH
DEMOLITION KEY NOTES:
GENERAL SHEET DEMOLITION NOTES:
AD103
AD103 AD103
AD103 AD103
AD103 AD103
AD103 AD103 AD103 AD103
K. KUSTRA
K. KUSTRA
W. STEVENS
REMOVE DOOR, COORDINATE WITH HAZMAT.
PROVIDE OPENING AT CAB PARAPET FOR OVERFLOW SCUPPER.
REMOVE STAIR HANDRAIL.
REMOVE DOOR AND FRAME, COORDINATE WITH HAZMAT.
TO MATCH ADJACENT EXISTING SURFACE AS REQUIRED.
REMOVE ROOM SIGNS. REPAIR AND FINISH WALL AND/OR DOOR
17 PREPARE GUARDRAIL FOR THE WORK. REMOVE LOOSE AND PEELING PAINT.
TYP. TYP.
TYP.
TYP.
TYP.
TYP. TYP.
TYP.
NOT USED
WITH COR TO MAINTAIN EGRESS IN THE ATCT DURING THE WORK.
REMOVE SLIP RESISTANT STRIPS FROM STAIR NOSING, TYP. COORDINATE
S E
A D
M A
T C
H
L
IN
NOT USED
EXIST. HOOD
EXIST. HOOD
COORDINATE WITH HAZMAT.
REMOVE DAMAGED SEALANT JOINTS FROM PARAPET COPING,
COORDINATE WITH HAZMAT.
REMOVE SEALANT AT PERIMETER OF CAB WINDOW FRAME,
Chanh Huynh Text Box This sheet and all sheets following it are part of a different modernization project for LGB ATCT. I've included them to show a clearer picture of tower. None of the work shown in these plans is part of solicitation for the slatwall consoles. They should only be used for reference and not indicate any additional scope or changes to the solicitation.
DESIGN FILE:
DATE: TIME: USER:
A
B
C
D
E
$$DATE $$TIME $$USER
$$DGN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
DRAWN BY
DESIGNED BY
CHECKED BY
APPROVED BY
DATE
DRAWING NO.
DESCRIPTIONREV.
REVIEWED BY
2 3 4 5 6
B
D
E
1 2 3 4 5 6
REV.
JCN:
JCN
DATE
REDLINE
APVD
DATE
APPROVED
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
R
LGB ATCT AND BASE BUILDING MODERNIZATION
07/08/21
LYNDON LAWYER VANCE WHITESEL
PROJECT ENGINEER, AJW-2W11C MANAGER, AJW-2W11C
LONG BEACH CA
ISSUED BY
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ISSUE FOR 100% DESIGN SUBMISSION
LGB-1508914- CALIFORNIA
LONG BEACH
LONG BEACH ATCT
1508914
LONG BEACH AIRPORT (LGB)
TERMINAL, LA A
ENGINEERING SERVICES
JULY 8, 2021
A3
N
HATCH
FLOOR
SCALE: 1/2" = 1'-0"
3/4" HW
3/4" CW
3" SAN
1 1/2" SAN 3" SAN DN
FD
3" V
3" SAN1" CW
WATER COOLER
BFP
1/2" CW
1/2" COND
1/2" COND UP
1/2" HW
1/2" CW
1/2" CW
1/2" HW
1 1/2" IW
1/2" HW DN
1/2" CW DN
1 1/2" INDIRECT DRAIN
SHEET NOTES:
ATCT - JUNCTION LEVEL PLAN - DEMOLITION
ATCT - CAB LEVEL PLAN -DEMOLITION
SCALE: 1/2 " = 1'-0"
02'4' 4' 8'
1/4" = 1'-0"
0 2' 4'1'12" 3' 5'
1/2" = 1'-0"
J. LEMENS
DEMOLISH WATER HEATER.
DEMOLISH SINK, BUBBLER AND FAUCET.
RESTROOM
ACCESS
CATWALK
VEST
JUNCTION ROOM
CAB
B01
STAIR
SHAFT
CABLE
ELEVATOR PIT
ELEVATOR MACHINE
DEMOLISH SUMP PUMP.
5 DEMOLISH LAVATORY AND FAUCET.
S. TRAN
S. TRAN
PD110
PD110
PD110
PD110
DEMOLISH WATER PRESSURE BOOSTER PUMP.
C1
B6
SCALE: 1/4" = 1'-0"
ATCT - BASEMENT LEVEL PLAN - DEMOLITION
GENERAL NOTES:
A.
GENERAL NOTES.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS AND
1/2" CW UP
1/2" CW
FLOOR PLANS DEMOLITION
PLUMBING CAB, JUNCTION, AND BASEMENT LEVEL
Chanh Huynh Sticky Note This is part of console solicitation needs to be removed from modernization scope.
Chanh Huynh Callout Supply duct/chase
Chanh Huynh Callout Supply chase/duct
File details come from the government source that posted it. Updated .