Template for Justification and Approval for Other Than Full and Open Competition Completion Instructions: The Department of Health and Human Services (HHS) has established a standard template for the preparation of a J&A for Other Than Full and Open Competition. If this is an 8(a) set-aside, please note this form is not required unless the acquisition is valued (including all options) at greater than $22 million. This template is NOT applicable for actions using simplified acquisition procedures (FAR Part 13), Federal Supply Schedule orders (FAR 8.4) or task or delivery orders subject to fair opportunity (FAR 16.505).

Tailor all aspects of this template to the individual acquisition. Consult FAR Subpart 6.3 for guidance. An addendum may be added in case additional space is needed.

When this document is printed, the blue italic instructions are automatically deleted on the printed version.

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

Acquisition Title: CBR Freezers Acquisition

Agency: CDC

Acquisition Year (FY): 2021

Author and Title: Saraine Ross

2. Description of Action:

Nature: New Requirement Follow-on Requirement

Modification to Existing Purchase Order/Contract Number:

Pricing: Firm-Fixed Price Time & Materials Cost

Other:

Funds: OMA Other Funds:

Name of Proposed Contractor(s): Multiple vendors as resellers - only one manufacturer - Chart Industries

Street Address:

City, State, Zip:

3. Description of Services or Supplies:

Basis for Approval (FAR 6.303-1(d)): Individual Basis Class Basis

The total estimated value of the proposed action, including all options is $ 17,500,000.00

As applicable, briefly describe the services or supplies required to meet the agency's needs, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. If the action is a modification to an existing contract, distinguish clearly between the work covered by the original contract and the work to be obtained by the proposed modification.

The equipment to be ordered on this new contract are:

Three (3) varieties of liquid nitrogen (LN2) freezers manufactured by Chart Industries (MVE 1894R-190F-CDC, MVE Vario 1879P -TS Touch Screen Auto Cooling, GB, and MVE 1536P-190F-CDC, including shipping, installation, and qualification on-site, and associated racks

Services include shipping, installation, and qualification.

CDC intends to award as an Blanket Purchase Agreement with a period of performance (POP) for 5 years.

This J&A requires a specific manufacturer, although there are multiple resellers. The number of freezers purchased during the POP will be variable, depending on need and available funding but is not expected to exceed 125 for the MVE 1894R-190F-CDC, and 100 for the remaining two freezer types. Purchases of freezer racks will be as needed, depending on the number of freezers purchases, and is not expected to exceed 2000 for the POP.

4. Authority and Rationale: Identify the statutory authority, FAR title and FAR citation permitting other than full and open competition. It may be one of the following most commonly used citations by the operating divisions of the Department of Health and Human Services (HHS), but other exceptions may apply per FAR Subpart 6.3.

Actions other than simplified acquisition procedures (select only one and provide an explanation):

FAR 6.302-1: Only one responsible source and no other supplies or services will satisfy agency requirements, 41 U.S.C.

3304(a)(1)

Explain why the intended contractor is the only responsible source who can provide the required supplies or services.

Discuss the unique capabilities, expertise, etc. that support the lack of competition/why no other type of supplies or services will satisfy agency requirements. Explain factors/unique qualifications such as proprietary data or exclusive licensing rights, if applicable. When competition is limited to items particular to one manufacturer, this justification must explain why the particular brand name, product, or feature is essential to the Government's requirements, and that market research indicates other companies' similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet the agency's needs in accordance with FAR 11.105. If in connection with a follow-on contract for continued development or production of highly specialized equipment, detail the substantial duplication of cost or unacceptable delays. May not Exceed one year, including all options, unless the head of the agency (Secretary of HHS) determines that exceptional circumstances apply.

This is a brand name justification only. CDC requires the LN2 freezers manufactured by Chart Industries because they are made with an adapter that allows integration of the freezers with the existing monitoring system already in use at the CDC Biorepository (CBR).

Attempting to integrate freezers without the proper adapter would reduce the monitoring capabilities for those freezers and increase the likelihood of loss of sample integrity. There are multiple distributor/resellers who can provide these freezers manufactured by Chart. Installation and qualification are required to be performed by the licensed distributors/resellers.

FAR 6.302-2: Unusual and compelling urgency, 41 U.S.C. 3304(a)(2) If unusual and compelling urgency is the basis for the justification, explain the chronological events leading up to the requirement and explain why time constraints cannot permit even a limited competition. Describe the detrimental effects/ serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved. Describe impact of required delivery/performance date. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source contractor. Failure to plan for expiring funds is not a valid reason for citing this exception. May not exceed one year, including all options, unless the head of the agency determines that exceptional circumstances apply.

FAR 6.302-5: Authorized or Required by Statute, 41 U.S.C. 3304(a)(5) Provide a citation to the statutory authorization and a brief description of its content, or identify the specified source or other agency.

Other (See FAR Subpart 6.3 for additional authority) Provide the authority and citation to the applicable section of FAR 6.3.

Provide a full explanation to justify use of the exception.

5. Agency Actions to Take or Remove Barriers That Led to Other Than Full and Open Competition (If applicable):

Describe the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration prior to any subsequent acquisition for the supplies of services is made. If no such actions have been taken, explain why.

Different LN2 freezer models lack compatibility with CDC's current monitoring/communication systems. The "CDC"-designated versions of the MVE freezers have an integrated communication monitoring system that is compatible with the monitoring system used at CBR. While Chart Industries appears to be the only manufacturer of the required LN2 models, market research shows there are a handful of vendors able to distribute and install them. Market research will continue to be performed to see if other freezers are compatible with CBR's monitoring system in the future. If so, future actions will be competed.

6. Bridge Contracts:

For contract extensions or bridge contracts when a competitive follow-on is in the process of being developed, summarize history of current contract and explain the reasons for any delays in the acquisition. Include discussion of the milestones for the follow-on action; the milestones should be as efficient as possible. Discuss why it would be neither cost effective nor realistic to expect another contractor to perform during the brief interim period; include issues such as start-up costs, phase-in, transfer of GFP, recruitment and staffing, etc. If the action is because of a protest, provide a brief discussion of the protest including the date the protest was filed and the basis of the protest. Explain that the action will provide the minimum quantity or performance period.

N/A

7. Actions to Increase Competition:

Describe efforts made to compete the action, including whether a notice was or will be publicized as required by FAR Subpart

5.2 or which exception under FAR 5.202 applies. If a notice was publicized, discuss the number of written responses to the synopsis and the results of the assessment of the written responses. List sources, if any, that expressed, in writing, an interest in the acquisition. Provide rationale if interested sources were rejected. If applicable, state that no other sources have expressed interest, but all offers received shall be considered. Describe what actions will be taken to increase competition before subsequent acquisition of the supplies or services is required. You may state that an action is a one-time requirement, but if a similar requirement arises, every effort will be made to compete it to the maximum extent possible. If action is sole source because of proprietary data or licensing rights and there will be a continuing need for the requirement, there must be evidence that advanced planning has been initiated to overcome the barriers to competition, or there should be documentation to support an analysis that replacement costs/licensing purchase costs outweigh the benefits of competition.

If the action is a contract extension or bridge, explain actions to compete the follow-on. If action is an urgent new requirement and a competitive follow-on is anticipated, explain that efforts are underway to facilitate a full and open competition.

Solicitation will be competed full and open on beta.SAM.gov among companies who are authorized resellers of the products to which this J&A applies. If additional manufacturers can provide freezers which are compatible with the current monitoring system at CBR, they can contact CDC because they will have opportunity to view the posting on beta.SAM.gov. Previous J&As have been posted for freezer purchases. No additional sources have expressed interest.

8. Market Research:

Describe the extent of the market research conducted to identify all qualified sources and the results thereof. “Market Research” is defined as those attempts you made to ascertain whether other qualified sources exist, and can include contact with knowledgeable experts regarding similar or duplicate requirements, contact with industry, results of a sources sought synopsis, or draft solicitations. Research of the marketplace may consist of written, electronic (i.e. email) telephonic, or world wide web inquiries. Lack of advanced planning is not an acceptable reason for the lack of market research, but true urgency may necessitate abbreviated market research that is limited to readily available historical and commercial information. If action is a contract extension or bridge contract, describe the market research efforts underway or completed for the follow-

on. See FAR 10.002(b)(2).

After Internet & independent market research, we found there to be no other manufacturers compatible to integrate with CBR's existing monitoring system. There are multiple distributors/resellers who can provide the required freezer models made by this sole source manufacturer.

9. Procurement History:

Purchase order or contract number: Multiple

Was action competed? Yes No

If action was not competed, state the cited authority, summarize rationale, and describe the actions that were supposed to be taken to increase competition and the results thereof:

Freezers for CBR have been solicited via numerous mechanisms in the past. A few recent actions include: 200-2020-M-08153;

200-2020-M-08190; and 200-2020-08250. These were solicited under a sole source basis under FAR 6.302-2.

10. Additional Information to support the justification:

If applicable, explain why technical packages or specifications to facilitate competition were not developed or available;

describe actions taken to remedy the situation.

11. Technical / Requirements Certification: By my signature below, I certify that the supporting data included in this J&A is accurate and complete.

Program Manager

Name: Saraine Ross

Position Title: COR

Email address: fpe6@cdc.gov

Phone: 404-718-4888

Program Manager Supervisor (or one level above Program Manager)

Name: John (Brad) Bowzard

Position Title: Deputy Chief, Informatics and Data Science Branch

Email address: jbowzard@cdc.gov

Signature:

Date: 01/26/2021

12. Fair and Reasonable Price/Cost Determination: As Contracting Officer, by my signature below, I hereby determine that the anticipated price/cost to the Government for this contract action will be fair and reasonable.

Provide the basis for this determination, e.g., describe techniques to be used to determine fair and reasonable price (FAR Subpart 15.402), such as price analysis, cost analysis, cost realism. Per FAR Subpart 15.403-4(a)(1), the threshold for obtaining cost or pricing data is $750,000.

Fair and reasonable price will be based upon price analysis and competition.

Name: Lauren Peel Phone: 770-488-2649

Signature: Date: 1/27/2021

13. Contracting Officer's Approval (Required for proposed contract not to exceed $700,000 (value calculated including all options)): I hereby certify that this justification is accurate and complete to the best of my knowledge. I approve this justification subject to availability of funds, and provided that the services and supplies herin describe have otherwise been authorized for acquisition.

Name: Lauren Peel Phone: 770-488-2649

Signature: Date: 1/27/2021

14. Legal Review:

All J&As greater than $68 million must have a legal review from the General Law Division of the Office of the General Counsel prior to sending it to the Department.

15. OPDIV Competition Advocate Approval (Required for proposed contract over $700,000 but not exceeding $13.5 million value calculated including all options)):

I have reviewed this justification and find that it adequately supports other than full and open competition.

Name: Sherry Smallwood Phone: 404-639-7291

Signature: Date: Feb 4, 2021

16. Office of Small and Disadvantaged Business Utilization:

I have reviewed this justification and find that it adequately supports other than full and open competition.

Name: Phone:

Signature: Date:

17. OPDIV HCA Approval (Required for proposed contract over $13.5 million but not exceeding $68 million value calculated including all options)):

Name: Julio E Lopez, Acting Director Phone:

Signature: Date:

18. Department Competition Advocate:

Concur: Non-Concur:

Name: Phone:

Signature: Date:

(The below approval paragraph is required if the cumulative contract value, including all options, exceeds $68 million.)

19. HHS Senior Procurement Executive (SPE) Approval:

Based on the foregoing justification, I hereby approve other than full and open competition for the above stated procurement, subject to the availability of funds, and provided that the services herein described have otherwise been authorized for acquisition.

State supplies/services being procured:

The equipment to be ordered on this new contract are:

Three (3) varieties of liquid nitrogen (LN2) freezers manufactured by Chart Industries (MVE 1894R-190F-CDC, MVE Vario 1879P -TS Touch Screen Auto Cooling, GB, and MVE 1536P-190F-CDC, including shipping, installation, and qualification on-site, and associated racks

Services include shipping, installation, and qualification.

CDC intends to award as an Blanket Purchase Agreement with a period of performance (POP) for 5 years.

This J&A requires a specific manufacturer, although there are multiple resellers. The number of freezers purchased during the POP will be variable, depending on need and available funding but is not expected to exceed 125 for the MVE 1894R-190F-CDC, and 100 for the remaining two freezer types. Purchases of freezer racks will be as needed, depending on the number of freezers purchases, and is not expected to exceed 2000 for the POP.

State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304:

Name: Phone:

Signature: Date:

Template for Justification and Approval for Other Than Full and Open Competition Completion Instructions: The Department of Health and Human Services (HHS) has established a standard template for the preparation of a J&A for Other Than Full and Open Competition. If this is an 8(a) set-aside, please note this form is not required unless the acquisition is valued (including all options) at greater than $22 million. This template is NOT applicable for actions using simplified acquisition procedures (FAR Part 13), Federal Supply Schedule orders (FAR 8.4) or task or delivery orders subject to fair opportunity (FAR 16.505).

Tailor all aspects of this template to the individual acquisition. Consult FAR Subpart 6.3 for guidance. An addendum may be added in case additional space is needed.

When this document is printed, the blue italic instructions are automatically deleted on the printed version.

JUSTIFICATION AND APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION

2. Description of Action:

Nature:

Pricing:

Funds:

3. Description of Services or Supplies:

Basis for Approval (FAR 6.303-1(d)):

As applicable, briefly describe the services or supplies required to meet the agency's needs, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. If the action is a modification to an existing contract, distinguish clearly between the work covered by the original contract and the work to be obtained by the proposed modification.

4. Authority and Rationale: Identify the statutory authority, FAR title and FAR citation permitting other than full and open competition. It may be one of the following most commonly used citations by the operating divisions of the Department of Health and Human Services (HHS), but other exceptions may apply per FAR Subpart 6.3.

Actions other than simplified acquisition procedures (select only one and provide an explanation):

Explain why the intended contractor is the only responsible source who can provide the required supplies or services. Discuss the unique capabilities, expertise, etc. that support the lack of competition/why no other type of supplies or services will satisfy agency requirements. Explain factors/unique qualifications such as proprietary data or exclusive licensing rights, if applicable. When competition is limited to items particular to one manufacturer, this justification must explain why the particular brand name, product, or feature is essential to the Government's requirements, and that market research indicates other companies' similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet the agency's needs in accordance with FAR 11.105. If in connection with a follow-on contract for continued development or production of highly specialized equipment, detail the substantial duplication of cost or unacceptable delays. May not Exceed one year, including all options, unless the head of the agency (Secretary of HHS) determines that exceptional circumstances apply.

If unusual and compelling urgency is the basis for the justification, explain the chronological events leading up to the requirement and explain why time constraints cannot permit even a limited competition. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved. Describe impact of required delivery/performance date. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source contractor. Failure to plan for expiring funds is not a valid reason for citing this exception. May not exceed one year, including all options, unless the head of the agency determines that exceptional circumstances apply.

Provide a citation to the statutory authorization and a brief description of its content, or identify the specified source or other agency.

Provide the authority and citation to the applicable section of FAR 6.3.

Provide a full explanation to justify use of the exception.

5. Agency Actions to Take or Remove Barriers That Led to Other Than Full and Open Competition (If applicable):

Describe the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration prior to any subsequent acquisition for the supplies of services is made. If no such actions have been taken, explain why.

6. Bridge Contracts:

For contract extensions or bridge contracts when a competitive follow-on is in the process of being developed, summarize history of current contract and explain the reasons for any delays in the acquisition. Include discussion of the milestones for the follow-on action; the milestones should be as efficient as possible. Discuss why it would be neither cost effective nor realistic to expect another contractor to perform during the brief interim period; include issues such as start-up costs, phase-in, transfer of GFP, recruitment and staffing, etc. If the action is because of a protest, provide a brief discussion of the protest including the date the protest was filed and the basis of the protest. Explain that the action will provide the minimum quantity or performance period.

7. Actions to Increase Competition:

Describe efforts made to compete the action, including whether a notice was or will be publicized as required by FAR Subpart 5.2 or which exception under FAR 5.202 applies. If a notice was publicized, discuss the number of written responses to the synopsis and the results of the assessment of the written responses. List sources, if any, that expressed, in writing, an interest in the acquisition. Provide rationale if interested sources were rejected. If applicable, state that no other sources have expressed interest, but all offers received shall be considered. Describe what actions will be taken to increase competition before subsequent acquisition of the supplies or services is required. You may state that an action is a one-time requirement, but if a similar requirement arises, every effort will be made to compete it to the maximum extent possible. If action is sole source because of proprietary data or licensing rights and there will be a continuing need for the requirement, there must be evidence that advanced planning has been initiated to overcome the barriers to competition, or there should be documentation to support an analysis that replacement costs/licensing purchase costs outweigh the benefits of competition. If the action is a contract extension or bridge, explain actions to compete the follow-on. If action is an urgent new requirement and a competitive follow-on is anticipated, explain that efforts are underway to facilitate a full and open competition.

8. Market Research:

Describe the extent of the market research conducted to identify all qualified sources and the results thereof. “Market Research” is defined as those attempts you made to ascertain whether other qualified sources exist, and can include contact with knowledgeable experts regarding similar or duplicate requirements, contact with industry, results of a sources sought synopsis, or draft solicitations. Research of the marketplace may consist of written, electronic (i.e. email) telephonic, or world wide web inquiries. Lack of advanced planning is not an acceptable reason for the lack of market research, but true urgency may necessitate abbreviated market research that is limited to readily available historical and commercial information. If action is a contract extension or bridge contract, describe the market research efforts underway or completed for the follow-on. See FAR 10.002(b)(2).

9. Procurement History:

Was action competed?

If action was not competed, state the cited authority, summarize rationale, and describe the actions that were supposed to be taken to increase competition and the results thereof:

10. Additional Information to support the justification:

If applicable, explain why technical packages or specifications to facilitate competition were not developed or available; describe actions taken to remedy the situation.

11. Technical / Requirements Certification: By my signature below, I certify that the supporting data included in this J&A is accurate and complete.

Program Manager Name:

Position Title:

Email address:

Phone:

Program Manager Supervisor (or one level above Program Manager) Name:

Position Title:

Email address:

Signature:

Date:

12. Fair and Reasonable Price/Cost Determination: As Contracting Officer, by my signature below, I hereby determine that the anticipated price/cost to the Government for this contract action will be fair and reasonable.

Provide the basis for this determination, e.g., describe techniques to be used to determine fair and reasonable price (FAR Subpart 15.402), such as price analysis, cost analysis, cost realism. Per FAR Subpart 15.403-4(a)(1), the threshold for obtaining cost or pricing data is $750,000.

Name:

Phone:

Signature:

Date:

13. Contracting Officer's Approval (Required for proposed contract not to exceed $700,000 (value calculated including all options)): I hereby certify that this justification is accurate and complete to the best of my knowledge. I approve this justification subject to availability of funds, and provided that the services and supplies herin describe have otherwise been authorized for acquisition.

Name:

Phone:

Signature:

Date:

14. Legal Review:

All J&As greater than $68 million must have a legal review from the General Law Division of the Office of the General Counsel prior to sending it to the Department.

15. OPDIV Competition Advocate Approval (Required for proposed contract over $700,000 but not exceeding $13.5 million value calculated including all options)):

I have reviewed this justification and find that it adequately supports other than full and open competition.

Name:

Phone:

Signature:

Date:

16. Office of Small and Disadvantaged Business Utilization:

I have reviewed this justification and find that it adequately supports other than full and open competition.

Name:

Phone:

Signature:

Date:

17. OPDIV HCA Approval (Required for proposed contract over $13.5 million but not exceeding $68 million value calculated including all options)):

Name:

Phone:

Signature:

Date:

18. Department Competition Advocate:

Concur:

Non-Concur:

Name:

Phone:

Signature:

Date:

(The below approval paragraph is required if the cumulative contract value, including all options, exceeds $68 million.)

19. HHS Senior Procurement Executive (SPE) Approval:

Based on the foregoing justification, I hereby approve other than full and open competition for the above stated procurement, subject to the availability of funds, and provided that the services herein described have otherwise been authorized for acquisition.

State supplies/services being procured:

State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304:

State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304 Name:

Phone:

Signature:

Date:

11.0.0.20130303.1.892433.887364 Justification & Approval - Other Than Full and Open Competition Health and Human Services Justification & Approval - Other Than Full and Open Competition

AcquisitionTitle: CBR Freezers Acquisition
Agency: CDC
NIHDrop:
PSCDrop:
PSCOther:
AcqusitionYear: 2021
Author: Saraine Ross
CheckBox4: 1
CheckBox5: 0
CheckBox1: 0
Purchase order/contract number:
CheckBox8: 1
CheckBox7: 0
CheckBox6: 0
CheckBox9: 0
Agency Actions to Take or Remove Barriers That Led to Fair Opportunity Exception (If applicable): Different LN2 freezer models lack compatibility with CDC's current monitoring/communication systems. The "CDC"-designated versions of the MVE freezers have an integrated communication monitoring system that is compatible with the monitoring system used at CBR. While Chart Industries appears to be the only manufacturer of the required LN2 models, market research shows there are a handful of vendors able to distribute and install them. Market research will continue to be performed to see if other freezers are compatible with CBR's monitoring system in the future. If so, future actions will be competed.
CheckBox10: 0
CheckBox11: 0
Other funds:
TextField5: Multiple vendors as resellers - only one manufacturer - Chart Industries
CheckBox2: 1
CheckBox3: 0
TextField7: 17,500,000.00
As applicable, briefly describe the services or supplies required to meet the agency's needs, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. If the action is a modification to an existing contract, distinguish clearly between the work covered by the basic order and the work to be obtained by the proposed modification.:

The equipment to be ordered on this new contract are:

Three (3) varieties of liquid nitrogen (LN2) freezers manufactured by Chart Industries (MVE 1894R-190F-CDC, MVE Vario 1879P -TS Touch Screen Auto Cooling, GB, and MVE 1536P-190F-CDC, including shipping, installation, and qualification on-site, and associated racks

Services include shipping, installation, and qualification.

CDC intends to award as an Blanket Purchase Agreement with a period of performance (POP) for 5 years.

This J&A requires a specific manufacturer, although there are multiple resellers. The number of freezers purchased during the POP will be variable, depending on need and available funding but is not expected to exceed 125 for the MVE 1894R-190F-CDC, and 100 for the remaining two freezer types. Purchases of freezer racks will be as needed, depending on the number of freezers purchases, and is not expected to exceed 2000 for the POP.

CheckBox12: 1
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: This is a brand name justification only. CDC requires the LN2 freezers manufactured by Chart Industries because they are made with an adapter that allows integration of the freezers with the existing monitoring system already in use at the CDC Biorepository (CBR). Attempting to integrate freezers without the proper adapter would reduce the monitoring capabilities for those freezers and increase the likelihood of loss of sample integrity. There are multiple distributor/resellers who can provide these freezers manufactured by Chart. Installation and qualification are required to be performed by the licensed distributors/resellers.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: N/A
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Solicitation will be competed full and open on beta.SAM.gov among companies who are authorized resellers of the products to which this J&A applies. If additional manufacturers can provide freezers which are compatible with the current monitoring system at CBR, they can contact CDC because they will have opportunity to view the posting on beta.SAM.gov. Previous J&As have been posted for freezer purchases. No additional sources have expressed interest.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: After Internet & independent market research, we found there to be no other manufacturers compatible to integrate with CBR's existing monitoring system. There are multiple distributors/resellers who can provide the required freezer models made by this sole source manufacturer.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Freezers for CBR have been solicited via numerous mechanisms in the past. A few recent actions include: 200-2020-M-08153; 200-2020-M-08190; and 200-2020-08250. These were solicited under a sole source basis under FAR 6.302-2.
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Fair and reasonable price will be based upon price analysis and competition.
CheckBox13: 0
CheckBox14: 0
CheckBox15: 0
TextField9: Multiple
CheckBox16: 0
CheckBox17: 1
Program Manager name: Saraine Ross
Program Manager position title: COR
Program Manager email address: fpe6@cdc.gov
Program Manager phone: 404-718-4888
Program Manager Supervisor name: John (Brad) Bowzard
Program Manager Supervisor position title: Deputy Chief, Informatics and Data Science Branch
Program Manager Supervisor email address: jbowzard@cdc.gov
HHS Senior Procurement Executive (SPE) signature:
Program Manager Supervisor date: 01/26/2021
Contract Officer's Approval name: Lauren Peel
Contract Officer's Approval name: Lauren Peel
HHS Senior Procurement Executive (SPE) phone: 770-488-2649
HHS Senior Procurement Executive (SPE) phone: 770-488-2649
HHS Senior Procurement Executive (SPE) phone: 404-639-7291
Contract Officer's Approval date: 1/27/2021
Contract Officer's Approval date: 1/27/2021
HHS Senior Procurement Executive (SPE) name: Sherry Smallwood
HHS Senior Procurement Executive (SPE) name: Julio E Lopez, Acting Director
DateField6: 2021-02-04
Office of Small Business date:
OPDIV HCA date:
Concur with Acquisition: 0
Non-Concur with Acquisition: 0
HHS Senior Procurement Executive (SPE) date:
State supplies/services being procured:

The equipment to be ordered on this new contract are:

Three (3) varieties of liquid nitrogen (LN2) freezers manufactured by Chart Industries (MVE 1894R-190F-CDC, MVE Vario 1879P -TS Touch Screen Auto Cooling, GB, and MVE 1536P-190F-CDC, including shipping, installation, and qualification on-site, and associated racks

Services include shipping, installation, and qualification.

CDC intends to award as an Blanket Purchase Agreement with a period of performance (POP) for 5 years.

This J&A requires a specific manufacturer, although there are multiple resellers. The number of freezers purchased during the POP will be variable, depending on need and available funding but is not expected to exceed 125 for the MVE 1894R-190F-CDC, and 100 for the remaining two freezer types. Purchases of freezer racks will be as needed, depending on the number of freezers purchases, and is not expected to exceed 2000 for the POP.