J - 7 MSC Ship Repair Facility Survey - HUMPHREYS 21R4013.docx

DOCX document 239 KB Posted

Attached to
USNS JOSHUA HUMPHREYS MTA Federal contract opportunity
Solicitation number
N3220521R4013
Issued by
Department of the Navy Military Sealift Command

About this file

This document is a ship repair facility survey form for the USNS JOSHUA HUMPHREYS (T-AO 188) Mid-Term Availability solicitation issued by the Military Sealift Command. The form requests detailed information from shipyards on their facilities, equipment, and capabilities for dry docks, shipbuilding ways, cranes, shops, storage, and certifications. Required submissions include a yard plot plan, certified water depth plot, machine listings for each shop, examples of prior ship repair work and costs, personnel qualifications, and a point of contact. Shipyards must also specify normal and maximum work shifts as well as current employment levels. The purpose of the form is to assess shipyard capabilities for the USNS JOSHUA HUMPHREYS mid-term availability work.

View the file

Other files for this federal contract opportunity

Other files attached to USNS JOSHUA HUMPHREYS MTA, newest first.
File Type Posted
Solicitation N3220521R4013 Amendment 0004.docx DOCX document
Solicitation N3220521R4013 Amendment 0003.docx DOCX document
Updated J-2 Category A Items 1_28 (Rev 3).xlsx XLSX spreadsheet
Updated J-2 Category A Items.xlsx XLSX spreadsheet
Solicitation N3220521R4013 Amendment 0002.docx DOCX document
HUMPHREYS JA Rev_Final_signed_Redacted.pdf PDF
Solicitation N3220521R4013 Amendment 0001.docx DOCX document
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 14 Technical Data Non-Disclosure.docx DOCX document
J-10 Interport Differential.doc DOC document
CDRL SWI-0024.pdf PDF
CDRL SWI-0023.pdf PDF
CDRL SWI-0020.pdf PDF
CDRL SWI-0019.pdf PDF
CDRL SWI-0016.pdf PDF
CDRL SWI-0011.pdf PDF
CDRL SWI-0010.pdf PDF
J-4 GFM List.xlsx XLSX spreadsheet
CDRL SWI-0015.pdf PDF
CDRL SWI-0014.pdf PDF
CDRL SWI-0012.pdf PDF
CDRL SWI-001.pdf PDF
J-2 Category A Items.xlsx XLSX spreadsheet
J-11 Dry Dock Evaluation Form.docx DOCX document
J-9 Disclsr Lobbying Activities SF-LLL.pdf PDF
J-8 RFC.doc DOC document
CDRL SWI-0022.pdf PDF
CDRL SWI-0021.pdf PDF
CDRL SWI-0018.pdf PDF
CDRL SWI-0013.pdf PDF
CDRL SWI-006.pdf PDF
Solicitation N3220521R4013 USNS JOSHUA HUMPHREYS.docx DOCX document
J - 12 Past Performance Data.doc DOC document
CDRL SWI-0017.pdf PDF
CDRL SWI-005.pdf PDF
CDRL SWI-004.pdf PDF
J-3 Category B Items.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220521R4013

USNS JOSHUA HUMPHREYS (T-AO 188)

MSC SHIP REPAIR FACILITY SURVEY

NOTE: If survey form has been previously submitted, then enter changes only.

DATE:

SHIPYARD AND ADDRESS

Commander (Code M-4E3) Military Sealift Command Washington, DC 20390

SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

BUILDING WAYS (M. I. W.)

NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE

OF (check one) (ton 2,240 lbs)

WAY

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

DEPTH OF WATER

CRANES SERVING WAY

CERTIFICATION DATE &

CERTIFIED BY WHOM

LIFT CAPACITY

(std. tons)

TYPE

NO.

AT DROP

OFF

OVER

WAY END

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.

TIDAL RANGE (DIFF. OF M.L. M.H)

IS SNUBBING NECESSARY?

YES NO

IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

SHEET 1 OF 5

DOCK

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

LENGTH

at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON

(FD)

CLEAR WIDTH

at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height

DEPTH/DRAFT

OVER OVER OVER

SILL FLOOR KEEL

(GD) BLOCKS

LIFTING CAPACITY

(ton 2,240)

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES

DRY DOCKS (continued)

MATERIAL TYPE

Floating--(FD) Graving--(GD) Marine Railway (MR)

DOCK

SERVICES AVAILABLE

(use abbreviation of service below)

USE

REPAIR/

OUTFIT-

ING

HEIGHT

OF

DOCK

(M.L.W.)

OUT-

BOARD

IN-

BOARD

TYPE

LENGTH

(actual & usable)

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

WATER DEPTH

(M. L. W.)

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.)DRY DOCKS (means high water)
MSC SHIP REPAIR FACILITY SURVEY (continued)SHIPYARD:

LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MAX REACH HEIGHT OF HOOK

NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM & (STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES

DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT

RAILROAD CONNECTION (identify)

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)

MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)

SHIPYARD:
MSC SHIP FACILITY SURVEY (continued)

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

PRINCIPAL SHOPS AND BUILDINGS

ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

LARGEST EXIT

WIDTH HEIGHT

DIMENSIONS OF

SHOP OR BUILDING

NAME OF SHOP

OR BUILDING

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RIGGER

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________

WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

LIST TYPES OF WORK NORMALLY SUBCONTRACTED

SHIPYARD:
MSC SHIP REPAIR FACILITY SURVEY (continued)

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND

EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUDE, NAME OF SHIP, DATES, AND

DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN

ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN

LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM

(NAME/TITLE/PHONE NUMBER).

NORMAL

SHIFTS

NORMAL

MAXIMUM

POTENTIAL MAXIMUM

CURRENT

CURRENT

EMPLOYMENT

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO

SHEET 5 OF 5

ATTACHMENT J - 7 MSC Form 4330/26

File details come from the government source that posted it. Updated .