J-3 Category B Items.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- USNS JOSHUA HUMPHREYS MTA Federal contract opportunity
- Solicitation number
- N3220521R4013
About this file
This document contains a solicitation for the USNS JOSHUA HUMPHREYS Mid-Term Availability in fiscal year 2021. The Military Sealift Command Norfolk requires various category B items and services to support maintenance, repairs, and cleaning of the USNS JOSHUA HUMPHREYS. Key requirements include physical security services at a private contractor facility, vessel final cleaning, continuation of management and general services for 30 days, steel replacement including plate, shapes and crack repairs, and miscellaneous piping replacement including various sizes of pipe, flanges, elbows, and related materials. Offerors should review the attached solicitation N3220521R4013 and supporting documents for pricing, response dates, terms and conditions. The work is to be performed for the Department of the Navy Military Sealift Command.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| USNS JOSHUA HUMPHREYS (T-AO 188) FY 21 MTA | |||||||||||||||
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY REV 28 Nov18 | ||||||||||||||
| 7.1 | establish delta | 1 | day | ||||||||||||
| 7.1.1 | establish charlie | 1 | day | ||||||||||||
| 7.2 | maintain delta | 1 | day | ||||||||||||
| 7.2.1 | maintain Charlie | 1 | day | ||||||||||||
| WI 025 Sub-Total | |||||||||||||||
| 026 | VESSEL FINAL CLEANING REV A REV 11May20 | ||||||||||||||
| 7.0 | clean vessel in accordance with Item | 1 | job | ||||||||||||
| WI 026 SUBTOTAL | 1 | ||||||||||||||
| 030 | CONTINUATION OF SERVICES REV OCT 18 | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||
| 7.1 | Ovhl Mgmt team | 30 | day | ||||||||||||
| 7.2 | General Services | 30 | day | ||||||||||||
| 7.3 | Telephone Servcies | 30 | day | ||||||||||||
| 7.4 | Project Management | 30 | day | ||||||||||||
| 7.5 | Fire Protection | 30 | day | ||||||||||||
| 7.6 | Shipyd Acess and Security | 30 | day | ||||||||||||
| 7.7 | Gas Free Certs | 30 | day | ||||||||||||
| WI 030 Sub-Total | |||||||||||||||
| 106 | Steel Replacement | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||
| 7.2.1 | Structural Steel Plate | 10000 | lb | ||||||||||||
| 7.2.2 | structural shapes | 5000 | lb | ||||||||||||
| 7.3.1 | 6" Long Cracke repair | 50 | each | ||||||||||||
| 7.3.2 | 7-12 " Long Crack repair | 50 | each | ||||||||||||
| 7.3.3 | 1" Diameter 3/8 Inch Deep Pit repair | 50 | each | ||||||||||||
| 7.4.1 | striker plate replacement | 20 | each | ||||||||||||
| WI 106 Sub-Total | |||||||||||||||
| 508 | Misc. Piping replacement | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||
| 7.1.1 | 8" Pipe replacement | 60 | foot | ||||||||||||
| 7.1.10 | 3" Schedule 40 | 80 | feet | ||||||||||||
| 7.1.11 | 3" 150 lb flanges | 8 | ea | ||||||||||||
| 7.1.12 | 3" Elbows | 4 | ea | ||||||||||||
| 7.1.13 | 2.5" Dia Schedule 40 | 80 | foot | ||||||||||||
| 7.1.14 | 2.5 inch 150# flanges | 8 | ea | ||||||||||||
| 7.1.15 | 2.5 inch Elbows | 4 | ea | ||||||||||||
| 7.1.2 | eight inch flanges | 8 | ea | ||||||||||||
| 7.1.3 | 8" elbows | 4 | ea | ||||||||||||
| 7.1.4 | 6" Dia Schedule 80 Pipe replacement | 80 | feet | ||||||||||||
| 7.1.5 | six inch 150# flanges | 8 | ea | ||||||||||||
| 7.1.6 | 6" Elbows | 4 | each | ||||||||||||
| 7.1.7 | 5" Dia Sched 80 Pipe | 80 | feet | ||||||||||||
| 7.1.8 | 5" Flanges 150 LB | 8 | ea | ||||||||||||
| 7.1.9 | 5 inch Elbows | 4 | each | ||||||||||||
| WI 508 Sub-Total | |||||||||||||||
| Total |
| &"Times New Roman,Regular"&10USNS JOSHUA HUMPHREYS | &"Times New Roman,Bold"&14 |
| CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N322021R4013 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .