J-2 Category A Items.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- USNS JOSHUA HUMPHREYS MTA Federal contract opportunity
- Solicitation number
- N3220521R4013
About this file
This document contains a contractor price breakdown for category A items required for the USNS JOSHUA HUMPHREYS FY21 mid-term availability. The solicitation number is N3220521R4013 and was issued by the Department of the Navy Military Sealift Command in Norfolk, Virginia.
The contractor price breakdown lists over 100 category A items needed for the vessel's overhaul, including items like non-destructive testing, steel renewals, tank preservation, main propulsion repairs, electrical work, communication and navigation aid overhauls, auxiliary machinery repairs, habitability items, ventilation cleaning, drydocking and UNREP equipment refurbishment. For each item, the breakdown includes labor hours and material costs for both prime and subcontractors as well as totals. This attachment to the solicitation provides contractors with detailed requirements for category A overhaul work on the USNS JOSHUA HUMPHREYS to facilitate bidding on the mid-term availability contract.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| USNS JOSHUA HUMPHREYS (T-AO 188) FY21 MTA | ||||||||||||
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) Rev 11 May 20 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 011 | GENERAL SERVICES FOR THE SHIP TAO REV 02MAY20 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 012 | INFORMATION TECHNOLOGY SERVICES REV 03AUG19 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS 25FEB20 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 014 | WEIGHT AND MOMENT REPORT REV 13FEB20 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 015 | ILS GFM REV 28OCT18 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 016 | FIRE PROTECTION & SHIPS SAFETY PROGRAM REV 28Sep17 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 017 | HANDLING SHIPS STORES, REV FEB14 | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL REV 13Feb20 | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY REV 28Nov18 | |||||||||||
| 020 | GAS FREE CERTIFICATES REV 03Aug19 | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS, AND SPACES REV 03Aug19 | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS REV 13Feb20 | |||||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTACTOR'S FACILITY REV 03Aug19 | |||||||||||
| 090 | TAO187_SWI_DAILY COVID-19 PREVENTION AND CONTROL SERVICES | |||||||||||
| 100 | HULL AND STRUCTURAL ITEMS | |||||||||||
| 101 | TAO187_CSI_KINGPOST NON-DESTRUCTIVE TESTING (1 YR) | |||||||||||
| 103 | Sewage connection Coaming install | |||||||||||
| 104 | 01 Deck Steel Renewal | |||||||||||
| 105 | DFM Contam Tank Deck Replacement | |||||||||||
| 107 | Tank Deck Overhead Pres | |||||||||||
| 108 | Hydroblast 02 Level | |||||||||||
| 109 | Awnings Fabricated and replace | |||||||||||
| 110 | UW HULL CLEANING PROPELLOR POLISHING(ANNUAL) | |||||||||||
| 112 | 06 Fan Rm Steel Repla | |||||||||||
| 157 | Potable Water Tanks | |||||||||||
| 158 | Tank Preservation | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 211 | Main Red. Gear Tech Rep | |||||||||||
| 215 | TAO187_CSI_MAIN ENGINE LOCAL CONTROL PANEL SERVICE (3 YR) | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 307 | CARGO CONSOLE REPAIR AND GROOM | |||||||||||
| 351 | Switchboard Cleaning JSY MTA 20 | |||||||||||
| 352 | TAO187_CCSI_LOAD CENTER CLEANING (2.5 YR) | |||||||||||
| 353 | TAO187_CCSI_THERMOGRAPHIC SURVEY (1 YR) | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 402 | C-10315U Remote Switching Control Unit Groom | |||||||||||
| 410 | OE-82 UHF Satcom Antenna Overhaul | |||||||||||
| 411 | AVAYA Telephone System Groom | |||||||||||
| 412 | UHF SATCOM and LOS Transceiver Groom | |||||||||||
| 413 | URT-23(D) URR-2368A HF Set Groom | |||||||||||
| 415 | TVDTS System and Distribution Groom | |||||||||||
| 431 | ECDIS and RADAR Replacement T-AO 187 Class | |||||||||||
| 453 | Annual Gyro Service | |||||||||||
| 454 | Annual SVDR Certification | |||||||||||
| 455 | Annual Radio Comm Equipment | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | Fuel Oil Purifier Overhaul | |||||||||||
| 502 | Boiler Exhaust Uptake Inspect and Clean | |||||||||||
| 503 | Main Engine Lube Oil Cross Connect Piping Install | |||||||||||
| 504 | Miscellanous Valve Repair | |||||||||||
| 505 | SSDG FLEXIBLE COUPLING ELEMENT REPLACE | |||||||||||
| 507 | Helo Deck AFFF piping replace | |||||||||||
| 510 | CT winch test and calibrate | |||||||||||
| 515 | TAO187_CSI_START AIR COMPRESSOR OVERHAUL (1 X 4 Years) | |||||||||||
| 516 | Pipe repairs AFFF tank deck | |||||||||||
| 517 | Annual Incinerator Service | |||||||||||
| 518 | connex box service and preservation | |||||||||||
| 529 | TAO187_CSI_INSPECT AND OVERHAUL SSDG ENGINE JACKET WATER PUMP - ALCO (8K HRS) | |||||||||||
| 538 | GAYLORD BOOSTER HEATER REPLACEMENT (T-ALT 06-34) -RevA | |||||||||||
| 558 | TAO187_CCSI_PERSONNEL ELEVATOR ANNUAL INSPECTION | |||||||||||
| 561 | GAUGE CALIBRATION | |||||||||||
| 562 | TAO187_CCSI_SCBA ANNUAL INSPECTION | |||||||||||
| 563 | SCBA Air Compressor Inspection | |||||||||||
| 565 | Annual HALON Inspection Test | |||||||||||
| 569 | Annual Fire Smoke Detection Alarm | |||||||||||
| 570 | TAO187_CCSI_PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) | |||||||||||
| 570 | Portable Extinguisher Service | |||||||||||
| 571 | TAO187_CCSI_FIRE AND SMOKE DAMPER SERVICE (1 YR) | |||||||||||
| 571 | Annual Fire and Smoke Damper Service (rev 6MAR18) | |||||||||||
| 572 | Deep Fat Fryer Grill Range Hood Fire Extinguishing System | |||||||||||
| 574 | TAO187_CCSI_FIRE DOORS AND SHUTTERS (1 YR) | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | Annual Lifeboat Davit Inspection | |||||||||||
| 602 | SCBA compressor service | |||||||||||
| 604 | MSD Vacuum Pipe Acid Cleaning | |||||||||||
| 651 | Annual Lifeboat Davit Inspection | |||||||||||
| 653 | Annual Rescue Boat Davit Inspection | |||||||||||
| 656 | TAO187_CCSI_ANNUAL LIFERAFT CERTIFICATION | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 851 | TAO187_CCSI_ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING | |||||||||||
| 852 | TAO187_CCSI_ANNUAL LAUNDRY VENT CLEANING | |||||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | DRY DOCKING AND UNDOCKING VESSEL | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1002 | RAM Sheave Block Refurb Ppacking replacement final | |||||||||||
| 1003 | Highline ASD Frame and Foundation Refurbishment | |||||||||||
| 1004 | Saddle Winch Foundation Refurbishment | |||||||||||
| 1005 | Sweep Brake and Trolley Arms Repair | |||||||||||
| 1006 | Slip Clutch Cover Manufacture | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS JOSHUA HUMPHREYS | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220521R4013 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .