J-3 Category B Items.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
USNS LEROY GRUMMAN FY21 ROH/DD
Solicitation number
N3220520R4015
Issued by

About this file

This document provides a contractor price breakdown for category B items required for the regular overhaul and dry-docking of the USNS LEROY GRUMMAN (T-AO 195). The Military Sealift Command (Norfolk) seeks pricing for various physical security, general services, steel replacement, drydocking, shaft alignment, and bearing reaction check tasks to be performed. Pricing is required for labor hours and materials for prime contractor and subcontractor work. The solicitation number for this opportunity is N3220520R4015, with responses due under the USNS LEROY GRUMMAN FY21 ROH/DD requirement. Category B items include tasks such as establishing and maintaining physical security at protection conditions Charlie and Delta, providing general services like overhaul management and IT support for 30 days, replacing 5000 pounds each of structural steel and shapes, and performing shaft alignment checks both when drydocked and waterborne.

View the file

Other files

File Type Posted
INDEX GRUMMAN N32205-20-R-4015 Rev A.doc DOC document
J-2 Category A Items Rev B.xlsx XLSX spreadsheet
N3220520R4015 Amendment 0001.docx DOCX document
J-12 Past Perf Data.docx DOCX document
J-10 Interport Differential.doc DOC document
J-2 Category A Items.xlsx XLSX spreadsheet
J-14 Technical NDA.pdf PDF
N3220520R4015.pdf PDF
J-6 CDRLS.zip ZIP file
J-13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J-9 Disclsr Lobbying Activities SF-LLL.pdf PDF
J-4 GRUMMAN.pdf PDF
J-11 Dry Dock Evaluation Form.docx DOCX document
N32205-20-R-4015 JA GRUMMAN ROH_Redacted.pdf PDF
J-7 MSC Ship Repair Facility Survey.pdf PDF
J-8 RFC.doc DOC document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat B Items

Contractor's price will be broken down for each item of the specification, as follows:
CATEGORY “B” ITEMS
GENERAL REQUIREMENTPrice / TankQTYUIUnit PriceTotalPRIME ContractorSUBCONTRACTOROTHER COSTS
ITEM NO.TITLE CAT B ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
CATEGORY "B"
025PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION BRAVO-DELTA
7.11COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
7.11COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
WI 025 SUBTOTAL
26COVID Clean
7Final Cleaning1Total
WI 026 SUBTOTAL
030CONTINUATION OF SERVICES
7.1Overhaul Management Team30DAY
7.2General Services For The Ship30DAY
7.3Information Technology Services30DAY
7.4Project Planning and Monitoring30DAY
7.5Fire Protection and Ship's Safety30DAY
7.6Shipboard Access and Security30DAY
7.7Gas Free Certificates30DAY
WI 030 SUBTOTAL
115STEEL REPLACEMENT
7.1.1Structural Steel5000lbs
7.1.2Structural Shape5000lbs
7.2.1Fillet Welds 6" and less50ea
7.2.2Fillet Welds 6" and more50ea
7.3.1Striker Plate20ea
7.4.1Clad Weld Pits20ea
WI 115 SUBTOTAL
917DRYDOCKING AND UNDOCKING SHIP- ADDITIONAL DAYS
7.17.1. Submit unit price per day up to a maximum of TEN (10) days to continue all services in accordance with parent item if directed10DAYS
WI 917 SUBTOTAL
967Shaft Alignment and Bearing Reaction Check (Set3 and 4)
7.8.ca) Set No.3: On Drydock - after the re-installation of all shafting components and reestablishment of the “dry dock” internal load condition recorded in Step No.2 and prior to water entering the dry dock. If the vessel is dry docked on a floating dock the dock trim and load condition must be similar to that at the time of the second set of measurements including positions of wing-wall mounted cranes. Record strain gage readings, jack-up readings and bearing clearances.
7.8.da) Set No.4: Waterborne - after the vessel is afloat and reestablishment of the “original waterborne” internal load condition as recorded in Step No.1. The final alignment of the main propulsion shafting of a vessel should always be accomplished when the vessel is waterborne. Per ref 2.1.4, when coming out of drydock, the ship’s hull should be given time to stabilize in the water (up to two days) prior to performing the final alignment checks. Record strain gage readings.
WI 967 SUBTOTAL
968Shaft Alignment and Bearing Reaction Check (Post Sea Trials)
7.8.dSet No.5: Immediately after the sea trial high speed run. Record strain gage readings.
WI 968 SUBTOTAL
Total CAT "B"
&14USNS LEROY GRUMMAN (T-AO 195)&14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "B" ITEMS&14N32205-20-R-4015

ATTACHMENT J-3