J-2 Category A Items.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- USNS LEROY GRUMMAN FY21 ROH/DD
- Solicitation number
- N3220520R4015
About this file
This document contains a price breakdown for Category A items required for the USNS Leroy Grumman FY21 Regular Overhaul/Dry-Docking. The Navy's Military Sealift Command in Norfolk requires various hull, machinery, electrical, and outfitting items. High-cost items include main engine and generator overhauls, paint and non-skid deck resurfacing, crane and lifeboat inspections, and dry-docking services. The contractor price breakdown lists over 1,000 labor and material line items across 11 categories including hull structures, machinery, electrical systems, communications, auxiliary equipment, outfitting, HVAC, drydocking, and UNREP equipment. Pricing is provided for prime contractor and subcontractor labor and materials with totals for each item and category.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| INDEX GRUMMAN N32205-20-R-4015 Rev A.doc | DOC document | |
| J-2 Category A Items Rev B.xlsx | XLSX spreadsheet | |
| N3220520R4015 Amendment 0001.docx | DOCX document | |
| J-12 Past Perf Data.docx | DOCX document | |
| J-10 Interport Differential.doc | DOC document | |
| J-14 Technical NDA.pdf | ||
| N3220520R4015.pdf | ||
| J-6 CDRLS.zip | ZIP file | |
| J-13 PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| J-9 Disclsr Lobbying Activities SF-LLL.pdf | ||
| J-4 GRUMMAN.pdf | ||
| J-11 Dry Dock Evaluation Form.docx | DOCX document | |
| N32205-20-R-4015 JA GRUMMAN ROH_Redacted.pdf | ||
| J-7 MSC Ship Repair Facility Survey.pdf | ||
| J-8 RFC.doc | DOC document | |
| J-3 Category B Items.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHE PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | GENERAL SERVICES FOR SHIP (T-AO) | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | ILS GFM | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 090 | DAILY COVID 19 PREVENTATION AND CONTROL SERVICES | |||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | NDT Kingposts | |||||||||||
| 102 | Tank Deck Pedestrain Non-Skid 06 _ 07 | |||||||||||
| 104 | 01 Level Non Skid FR 30 -60 | |||||||||||
| 105 | Tank Deck Vent valves | |||||||||||
| 107 | 06 Level Deck Steel Replacement | |||||||||||
| 108 | STBD Cargo Potable Water Steel | |||||||||||
| 109 | Pump Room Deck Replace | |||||||||||
| 131 | Garbage Shute Removal (T-ALT) | |||||||||||
| 134 | Misc Piping Replacement | |||||||||||
| 156 | Flight Deck Preservation (NAVAIR) | |||||||||||
| 157 | STBD Cargo Potable Water Paint | |||||||||||
| 158 | Flight Deck Safety Net Repairs | |||||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | STBD Main Engine 12 K | |||||||||||
| 202 | Turbo Charger Overhaul | |||||||||||
| 252 | Main Reduction Gear Inspection | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 302 | AC Motor Overhauls | |||||||||||
| 304 | Annual Cargo Console Groom | |||||||||||
| 306 | Bulkhead Collar | |||||||||||
| 315 | Port Liferaft Station (T-ALT) | |||||||||||
| 331 | Circuit Breaker Overhaul (1 YRS) | |||||||||||
| 351 | Switchboard Cleaning | |||||||||||
| 352 | Motor Control Center Cleaning | |||||||||||
| 353 | Switchboard Cleaning | |||||||||||
| 354 | Generator Cleaning | |||||||||||
| 400 | COMMUNICATION & NAV AIDS | |||||||||||
| 401 | Avaya Telephone System Groom | |||||||||||
| 402 | C-1031 Remote Switch | |||||||||||
| 403 | UHF SATCOM AND LOS Groom | |||||||||||
| 404 | AN/URT23 SET GROOM | |||||||||||
| 406 | Doppler Speed Log Groom | |||||||||||
| 430 | Hand Held Radio Transceives (TALT 931) | |||||||||||
| 451 | Annual Radar Service | |||||||||||
| 452 | Annual ECDIS Service | |||||||||||
| 453 | Annual Gyro Service | |||||||||||
| 454 | Annual SVDR Certification | |||||||||||
| 455 | Annual Radio Comm Equipment | |||||||||||
| 456 | Magnetic Compass Service | |||||||||||
| 457 | EPIRB Services (5 Yrs) | |||||||||||
| 459 | ECHO Sounder Services | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | MSD Treatment Tank Renewal | |||||||||||
| 504 | No 3 SSDG 10 K Overhaul | |||||||||||
| 505 | No 4 SSDG 10 K Overhaul | |||||||||||
| 535 | Auxiliary Boiler Maintenance No 1 and 2 | |||||||||||
| 509 | Annual Incinerator Maintenance | |||||||||||
| 515 | AC and Refrigeration PM | |||||||||||
| 528 | Steering Gear Maintenance | |||||||||||
| 524 | ER OWS and Cargo OCM Certification | |||||||||||
| 535 | Auxiliary Boiler Maintenance No 1 and 2 | |||||||||||
| 555 | Cranes and Hoist | |||||||||||
| 558 | Personal Elevator Annual Inspection | |||||||||||
| 562 | SCBA Annual Inspection | |||||||||||
| 563 | SCBA Air Compressor Inspection | |||||||||||
| 565 | Annual HALON Inspection Test | |||||||||||
| 567 | Annual AFFF Inspection Test | |||||||||||
| 569 | Annual Fire & Smoke Detection & Alarm | |||||||||||
| 570 | Portable Extinguisher Service | |||||||||||
| 572 | Deep Fat Fryer, Grill & Range Hood Fire Extinguishing System | |||||||||||
| 573 | Fire Hoses | |||||||||||
| 600 | OUTFIT, FURNISHING & HABITABILITY | |||||||||||
| 613 | Floor Covering Renewal | |||||||||||
| 616 | Annual Fire and Smoke Damper Inspection | |||||||||||
| 652 | Five Year Lifeboat Davit Inspection | |||||||||||
| 653 | Five Rescue Boat Davit Inspection | |||||||||||
| 655 | Immersion Suit Service | |||||||||||
| 656 | Annual Liferaft Certification | |||||||||||
| 657 | Accommodation Ladder Inspect and Test | |||||||||||
| 659 | Port Liferaft Station (T-ALT) | |||||||||||
| 662 | Deep Fat Fryer, Grill & Range Hood Fire Extinguishing System | |||||||||||
| 800 | HVAC | |||||||||||
| 803 | Misc Insulation Lagging Renewal | |||||||||||
| 851 | Annual Galley Vent and Gaylord Hood Cleaning | |||||||||||
| 852 | Annual Laundry Vent Cleaning | |||||||||||
| 853 | Vent Cleaning | |||||||||||
| 900 | DRYDOCKING | |||||||||||
| 901 | DRY-DOCKING AND UNDOCKING VESSEL | |||||||||||
| 903 | INSPECTION OF BILGE KEELS, BOW VOID & SKEGS | |||||||||||
| 905 | Propeller Shaft Weardown Reading | |||||||||||
| 911 | PROPELLER SYSTEM MAINTENANCE | |||||||||||
| 912 | STERN TUBE SEAL MAINTENANCE | |||||||||||
| 913 | SPURS LINE AND NET CUTTER MAINTENANCE | |||||||||||
| 915 | ROPE GUARD ZINC ANODE REPLACEMENT | |||||||||||
| 953 | ANCHORS, CHAINS, & LOCKERS | |||||||||||
| 954 | RUDDER AND STERN FRAME EXAMINATION | |||||||||||
| 956 | OVERHAULING SEA VALVES | |||||||||||
| 960 | UNDERWATER HULL CLEANING & PAINTING - SPOT BLAST | |||||||||||
| 961 | FREEBOARD PRESERVATION | |||||||||||
| 962 | CATHODIC PROTECTION SYSTEM | |||||||||||
| 963 | SEA CHEST MARINE GROWTH PREVENTION SYSTEM | |||||||||||
| 966 | SHAFT ALIGNMENT & BEARING REACTION CHECKS | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | Cargo Gear quad Inspect | |||||||||||
| 1002 | ASD Cooling Fan OH | |||||||||||
| 1003 | Station 3 HW Lab Replacement | |||||||||||
| 1004 | Winch Control Booth Window Replacement | |||||||||||
| 1005 | Gypsy Winch Foundation Replacement | |||||||||||
| 1006 | ASD Frame and Foundation Repalcement | |||||||||||
| 1007 | Heat Exchanger Frame Replacement | |||||||||||
| 1008 | Preserve below Sts 3_4 Booth | |||||||||||
| 1009 | UNREP Station 2 Steel Replacement | |||||||||||
| 1010 | UNREP Sts 2 Below Deck Replacement | |||||||||||
| 1011 | Lead Angle Compensator Repairs | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS LEROY GRUMMAN (T-AO 195) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220520R4003 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .