IPPS-A AMP QASP - DRAFT - 21 NOV 2023.pdf
PDF 989 KB Posted
- Attached to
- IPPS-A Army Military Payroll 2nd DRAFT RFP Federal contract opportunity
- Solicitation number
- W91CRB-24-R-0003_DRAFT_RFP
About this file
This document outlines a Quality Assurance Surveillance Plan (QASP) for the Integrated Personnel and Pay System - Army (IPPS-A) Army Military Payroll contract. The QASP defines performance standards and surveillance methods for the contractor providing services including designing, configuring, building, testing, integrating, deploying, and transitioning an Army Military Payroll solution using Oracle PeopleSoft Global Payroll. Surveillance will include inspection of deliverables, performance metrics, and user stories to evaluate completion of requirements. Performance standards address areas such as program management, schedule adherence, cost control, quality metrics, cybersecurity compliance, training effectiveness, and payroll processing accuracy, timeliness, and compliance. Nonconformances will be documented and addressed according to levels of minor, major, or critical impact. Data analysis will identify trends to adjust surveillance as needed. The contract type includes both firm fixed price and cost reimbursement items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMP IPPSA 2nd Draft RFP Question and Answer 8 JAN 2024.xlsx | XLSX spreadsheet | |
| Reference 003-IPPS-A AMP PI Notional Plan and PI 1 - 3 (22 NOV 2023).pdf | ||
| Reference 005-IPPS-A AMP Business Process Maps - Interfaces - Pay Data-20 NOV 2023.zip | ZIP file | |
| DRAFT RFP W91CRB-24-R-0003_ 22 NOV 2023.pdf | ||
| IPPS-A AMP DRAFT CDRLS.zip | ZIP file | |
| IPPS-A AMP DRAFT RFP_ Comments Feedback_22 NOV 2023.xlsx | XLSX spreadsheet | |
| Reference 004-IPPS-A Functional Requirements List-20 NOV 2023.xlsx | XLSX spreadsheet | |
| IPPS-A Army Military Payroll PWS - DRAFT - 21 NOV 2023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Integrated Personnel and Pay System – Army
(IPPS-A)
Army Military Payroll
Quality Assurance Surveillance Plan
(QASP)
DRAFT
W91CRB-24-R-0003
November 21, 2023
Prepared by:
IPPS-A Product Manager (PdM) Future Capabilities Office
IPPS-A AMP QASP - DRAFT CUI
November 21, 2023 ii
THIS PAGE INTENTIONALLY LEFT BLANK 14
November 21, 2023 iii
Table of Contents 18
1.0 Introduction ......................................................................................................... 1 19
1.1 Purpose ............................................................................................................... 1 20
1.2 Intent .................................................................................................................... 2 21
1.3 Authority.............................................................................................................. 2 22
2.0 Contract Description .......................................................................................... 2 23
2.1 Background ......................................................................................................... 2 24
2.2 Scope of Work .................................................................................................... 3 25
2.3 Type of Contract ................................................................................................. 3 26
3.0 Roles and Responsibilities ................................................................................ 3 27
3.1 Government ........................................................................................................ 3 28
3.1.1 Contracting Officer ................................................................................... 3 29
3.1.2 Contracting Officer’s Representative ........................................................ 4 30
3.1.3 Product Manager and Associate PdM ...................................................... 4 31
3.1.4 Performance Monitors .............................................................................. 5 32
3.2 Contractor ........................................................................................................... 5 33
3.2.1 Contract Manager ..................................................................................... 5 34
3.2.2 Program Manager .................................................................................... 6 35
3.2.3 Quality Manager ....................................................................................... 6 36
4.0 Contract Quality Requirements ......................................................................... 6 37
4.1 Contractor’s Quality Control Program .............................................................. 6 38
4.2 Government Quality Assurance ........................................................................ 6 39
5.0 Government Surveillance .................................................................................. 7 40
5.1 Methods of Surveillance .................................................................................... 7 41
5.1.1 100% Inspection ....................................................................................... 7 42
5.1.2 Random Sampling .................................................................................... 7 43
5.1.3 Periodic Inspection ................................................................................... 7 44
5.1.4 Customer Feedback ................................................................................. 7 45
5.1.5 After Action Review (AAR) ....................................................................... 7 46
5.2 Performance Requirements Summary ............................................................. 7 47
5.3 Surveillance Schedule ..................................................................................... 15 48
November 21, 2023 iv
5.4 Surveillance Instructions/Checklists .............................................................. 15 49
5.5 Surveillance Documentation ........................................................................... 15 50
6.0 Nonconformance Reports (NCRs) (Attachment 1) ........................................ 16 51
6.1 Level 1 (Minor) .................................................................................................. 16 52
6.2 Level 2 (Major) .................................................................................................. 16 53
6.3 Level 3 (Critical) ................................................................................................ 17 54
6.4 Documenting NCRs .......................................................................................... 17 55
6.5 Tracking and Resolving NCRs ........................................................................ 18 56
6.6 Corrective Action Report (CAR). (Attachment 2) ........................................... 18 57
6.7 Performance Assessment Report (PAR). (Attachment 3) ............................. 18 58
7.0 Deduct Plan ....................................................................................................... 18 59
8.0 Data Analysis .................................................................................................... 19 60
9.0 Acceptance of Services ................................................................................... 20 61
10.0 COR Status Report ........................................................................................... 20 62
11.0 Contractor Manpower Reporting Initiative ..................................................... 20 63
12.0 Contractor Performance Assessment Reporting System (CPARS) ............. 20 64
13.0 Combating Trafficking In Persons (CTIP) ....................................................... 20 65
14.0 COR/Quality Assurance Surveillance Files .................................................... 21 66
15.0 QASP Changes ................................................................................................. 21 67
Attachment 1 - Nonconformance Report Worksheet ............................................... 22 68
Attachment 2 - Corrective Action Report (CAR) ....................................................... 23 69
Attachment 3 - Performance Assessment Report (PAR) ......................................... 24 70
List of Tables 73
Table 1. Evaluation Ratings Definitions ........................................................................... 8 74
Table 2. Performance Requirements Summary (Surveillance Matrix) ............................. 9 75
November 21, 2023 1
1.0 Introduction 78
The Integrated Personnel and Pay System – Army (IPPS-A) is a Defense Business 79 System acquisition program under the Milestone Decision Authority of the Army 80 Acquisition Executive. It is managed by the Army Program Executive Office Enterprise 81 Information Systems (PEO EIS), IPPS-A PMO, in Arlington, VA 22202. PEO EIS 82 develops, acquires, and deploys tactical and management Information Technology 83 systems and products and is a Systems Acquisition, Development and Integration 84 Center of Excellence. The IPPS-A mission is to develop and deliver a single, integrated, 85 multi-component Human Resources (HR) and Pay system that streamlines Army HR, 86 enhances the efficiency and accuracy of Army Personnel and Pay procedures, and 87 supports Soldiers and their families. IPPS-A is being deployed incrementally in a series 88 of software releases to the Total U.S. Army Force (Active Army, Army National Guard, 89 and Army Reserves) when complete. A major software release was deployed in 90 January 2023, providing Military Human Resource capabilities and bringing the Total 91 U.S. Army Force into a single authoritative system. This software release serves as the 92 production baseline and is in the Capability Support phase. 93
1.1 Purpose 94
The purpose of the Quality Assurance Surveillance Plan (QASP) is to describe the 95 systematic methods the Government will use to evaluate Contractor actions while 96 performing the requirements as laid out in the Performance Work Statement (PWS) for 97 the Army Military Pay (AMP). The QASP provides a means for evaluating whether the 98 Contractor is meeting the performance standards and acceptable quality levels 99 identified in the PWS and identification of surveillance methods used to document the 100 performance. 101
The QASP has been developed by IPPS-A, PEO EIS to provide direction to personnel 103 performing contract surveillance activities. Personnel performing surveillance of the 104 contract terms and conditions and PWS requirements will periodically review the QASP 105 throughout the life of the contract. The QASP establishes procedures on how this 106 assessment/inspection process will be conducted. It provides details for a 107 continuous oversight process as follows: 108
What will be monitored 109 How monitoring will take place 110 Who will be conduct the monitoring 111 How monitoring efforts and results will be documented 112
The Contractor is responsible for implementing and delivering performance that meets 113 contract standards using its Quality Control Plan. The QASP provides the structure for 114 the Government's surveillance of the Contractor's performance to assure that it meets 115 contract standards. It is the Government's responsibility to be objective, fair and 116 consistent in evaluating Contractor performance. 117
November 21, 2023 2
The QASP is not part of the contract, nor is it intended to duplicate the Contractor's 119 quality control plan. This QASP is a living document. Flexibility in the QASP is required 120 to allow for an increase or decrease in the level of surveillance necessary based on 121 Contractor performance. The Government will provide a copy of the QASP to the 122 Contractor to facilitate open communication. In addition, the QASP should recognize 123 that unforeseen or uncontrollable circumstances might occur that are outside the control 124 of the Contractor. As a result, the QASP should ensure early identification and 125 resolution of performance issues to minimize impact on mission performance. 126
1.2 Intent 128
The intent of this QASP is to: 1) ensure Contractor performance meets or exceeds 129 contract terms, conditions, and specifications; 2) hold the Contractor accountable for 130 quality control; and 3) encourage the Contractor to take appropriate steps to control and 131 improve quality. Accordingly, the Government will perform surveillance on the contract 132 in accordance with this QASP; and reserves the right to monitor the contract in any 133 manner necessary, at any times necessary, and at all places necessary to ensure that 134 the rendered services conform to contract requirements. The Government also reserves 135 the right to perform quality assurance at the Subcontractor level and perform quality 136 assurance at the Contractor's place of business, if applicable. Resolution of non-137 conforming services discovered at the Subcontractor level will be addressed with the 138 prime Contractor. 139
1.3 Authority 140
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition 141 Regulation, Inspection of Services clauses, which provides for inspection, acceptance 142 and documentation of the service called for in the contract or order. This acceptance is 143 to be executed by the Contracting Officer or a duly authorized representative. 144
2.0 Contract Description 145
2.1 Background 146
This is a non-personal services contract to obtain Contractor services to develop an 147 Army Military Payroll (AMP) solution using the Oracle PeopleSoft Global Payroll 148 application. The Army launched the Integrated Personnel and Pay System – Army 149 (IPPS-A) Increment II (Inc II) production baseline for Human Resources (HR) 150 processing in December 2023 utilizing PeopleSoft Human Capital Management (HCM). 151 The new AMP capability will be integrated with the IPPS-A production baseline. 152
Development will consider (1) Agile execution combined with Development, Security, 153 and Operations (DevSecOps) for all activities / tasks to allow for Continuous Integration 154 / Continuous Delivery (CI/CD) and compliance with the Continuous Risk Management 155 Framework (cRMF), (2) task automation to reduce / eliminate manual effort, and (3) 156 innovation and creativity in problem-solving. 157
November 21, 2023 3
For this contract, Agile execution is defined as a group of software methods (e.g., 158 Scrum, Kanban, SAFe®) based on iterative and incremental development and 159 deployment of software capabilities for end users, where requirements and solutions 160 evolve through collaboration between cross-functional teams. These teams include the 161 Government and Contractor communities working across parallel environments where 162 capabilities are implemented, and production system capability support is ongoing. 163
Contractors will apply and perform Agile execution in varying degrees to all aspects of 164 the program life cycle across and within key activities. These activities include 165 requirements analysis, elicitation, elaboration, and decomposition; architecture; design; 166 development, implementation; test; integration; training material development; and 167 deployment, in addition to support functions such as program management (planning, 168 reporting), configuration management, change control, release management, quality 169 assurance, and cybersecurity. 170
2.2 Scope of Work 171
The Army requires the following services, and the Contractor shall deliver an AMP 172 solution as follows: (1) design, configure, build, and test, (2) integrate and test the AMP 173 solution with the IPPS-A production baseline, (3) develop AMP training material, (4) 174 support AMP release and deployment activities, and (5) transition AMP functionality to 175 capability support. 176
These services will be acquired across the following tasks: 177
Task 1: Program Management 178 Task 2: Solution Configuration, Development, and Test 179 Task 3: Solution Integration 180 Task 4: Release and Deployment Support 181 Task 5: Government Software Reuse Integration 182 Task 6: Training Material Development 183 Task 7: Capability Support Transition 184 Task 8: Training Delivery [OPTIONAL] 185
2.3 Type of Contract 186
This is a Hybrid contract including Firm Fixed Price (FFP), Cost Plus Fixed Fee (CPFF) 187 Level of Effort (LOE), CPFF Completion, and Cost Reimbursable (no fee) line items for 188 Travel and Other Direct Costs (ODCs). 189
3.0 Roles and Responsibilities 190
3.1 Government 191
3.1.1 Contracting Officer 192
The Contracting Officer (KO) shall ensure performance of all necessary actions for 194 effective contracting and compliance with the contract terms and shall safeguard the 195
November 21, 2023 4 interests of the United States in the contractual relationship. The KO shall also ensure 196 the Contractor receives impartial, fair, and equitable treatment under this contract. The 197 KO shall determine and document the final assessment of the Contractor's performance 198 in the Government’s past performance tracking system. 199
Assigned CO: Kristin M. Height, Contracting Officer 200 Organization or Agency: U.S. Army Contracting Command – Aberdeen Proving Ground 201 Telephone: (443) 861-4613 202 Email: kristin.m.height.civ@army.mil 203
3.1.2 Contracting Officer’s Representative 204
The Contracting Officer’s Representative (COR) will be identified by separate letter. The 205 COR monitors all technical aspects of the contract and assists in contract 206 administration. The COR is authorized to perform the following functions: assure that 207 the Contractor performs the technical requirements of the contract: perform inspections 208 necessary in connection with contract performance: maintain written and oral 209 communications with the Contractor concerning technical aspects of the contract: issue 210 written interpretations of technical requirements, including Government drawings, 211 designs, specifications: monitor Contractor's performance and notifies both the 212 Contracting Officer and Contractor of any deficiencies; coordinate availability of 213 Government furnished property, and provide site entry of Contractor personnel. A letter 214 of designation issued to the COR, a copy of which is sent to the Contractor, states the 215 responsibilities and limitations of the COR, especially with regard to changes in cost or 216 price, estimates or changes in delivery dates. The COR is not authorized to change any 217 of the terms and conditions of the resulting order. 218
Assigned COR: Dawn Bare, Contracting Officer Representative 219 Organization or Agency: USARMY HQDA IPPS-A 220 Telephone: (703) 545-2743 221 Email: dawn.m.bare2.civ@army.mil 222
3.1.3 Product Manager and Associate PdM 223
The IPPS-A Product Manager (PdM) and AMP Associate PdM (APM) provide primary 224 program oversight. While the PdM and APM may serve as a direct conduit to provide 225 Government guidance and feedback to the Contractor on project matters, the PdM and 226 APM are not empowered to make any contractual commitments or any contract 227 changes on behalf of the Government. The PdM and APM will recommend a COR to 228 the KO, ensure the COR is trained before performing any delegated duties, and will 229 support COR performance assessment activities. 230
Product Manager: LTC Ryan Martin 231 Organization or Agency: USARMY HQDA IPPS-A 232 Telephone: (703) 545-3291 233 Email: ryan.p.martin7.mil@army.mil 234 Associate Product Manager: MAJ Lauri Blair 235 Organization or Agency: USARMY HQDA IPPS-A 236 Telephone: (832) 353-9695 237 Email: lauri.r.blair.mil@army.mil 238
November 21, 2023 5
3.1.4 Performance Monitors 239
3.1.4.1 Functional Monitor 240
The AMP Functional Monitor will provide detailed functional oversight of the 241 Contractor’s performance regarding business value and alignment with the AMP 242 functional requirements and report his or her findings to the COR in a timely, complete, 243 and impartial fashion to support the COR’s administration activities. Any changes that 244 the Contractor deems may affect contract, price, terms, or conditions shall be referred to 245 the Contracting Officer for action. The Functional Monitor is not empowered to provide 246 any guidance to the Contractor or make any contractual commitments or any contract 247 changes on behalf of the Government. 248
Functional Monitor: LTC Erica Miller 249 Organization or Agency: USARMY HQDA ASA MRA 250 Telephone: (703) 614-8208 251 Email: erica.l.miller.mil@army.mil 252
3.1.4.2 Technical Monitors 253
AMP Technical Monitors will provide detailed technical oversight of the Contractor’s 254 performance and report their findings to the COR in a timely, complete, and impartial 255 fashion to support the COR’s administration activities. Any changes that the Contractor 256 deems may affect contract, price, terms, or conditions shall be referred to the 257 Contracting Officer for action. Technical monitors may include performance monitors, 258 inspectors, technical experts, or others who provide information that helps the COR 259 monitor Contractor performance. The Technical Monitors are not empowered to provide 260 any guidance to the Contractor or make any contractual commitments or any contract 261 changes on behalf of the Government. 262
Lead Technical Monitor: Katherine Seifert 263 Organization or Agency: USARMY HQDA IPPS-A 264 Telephone: (571) 314-4046 265 Email: katherine.e.seifert.civ@army.mil 266
3.2 Contractor 267
3.2.1 Contract Manager 268
The Contract Manger manages the full range of acquisition activities. This individual will 269 be the primary point of contact for the KO and any designated CORs. Additionally, the 270 Contract Manger will 1) perform work related to Department of Defense (DoD) Contracts 271 Management, such as FAR, Defense Federal Acquisition Regulation Supplement 272 (DFARS), DoD Instructions (DoDI) 5000 series regulations and Clinger-Cohen Act 273 compliance; 2) track deadlines, deliverables, and other obligations; 3) plan, direct, and 274 manage projects/operations; 4) track and maintain a record of modifications; 4) record 275 and solve contract problems/issues; 5) report on contract deliverables and performance, 276 and 6) ensure product quality. In addition, the Contract Manager will be knowable of 277 different contract types; and will coordinate and interface with the Government 278 contracting office on contract-related action items and management activities. 279
November 21, 2023 6
Contract Manager: TBD 280 Telephone: 281 Email: 282
3.2.2 Program Manager 283
The Contractor will assign an individual to serve as a Program Manager (PM) for this 284 effort. This individual will be the single point of contact for the Government Task Monitor 285 (GTM) and COR. The PM will be responsible for the performance of the work. The 286 name of this person and an alternate, who will act for the Contractor when the PM is 287 absent, will be designated in writing to the Contracting Officer. The Contractor PM and 288 alternate will have full authority to act for the Contractor on all matters relating to daily 289 operation of this contract. 290
Program Manager: TBD 291 Telephone: 292 Email: 293
3.2.3 Quality Manager 294
The Quality Manager will maintain an effective quality control program to ensure 295 services are performed as agreed to in the contract. This will include the following: 296
Updating and implementing procedures to identify, prevent, and ensure the non-297 recurrence of defective services, to include products and software 298
Using programmatic and technical metrics as quality measures to assess 299 performance, progress, speed, cybersecurity, and quality of the product team, 300 leveraging automated tools to the maximum extent practicable 301
Quality Manager: TBD 302 Telephone: 303 Email: 304
4.0 Contract Quality Requirements 305
4.1 Contractor’s Quality Control Program 306
The Contractor’s quality control program (IAW FAR Part 46 and applicable 52.246 307 Clause(s)) is the means by which the Contractor assures that work complies with the 308 requirement of the contract. The Contractor shall ensure services are performed in 309 accordance with the PWS. The Contractor shall identify, prevent, and ensure non-310 recurrence of defective services. 311
4.2 Government Quality Assurance 312
The Government shall evaluate the Contractor’s performance under this contract in 313 accordance with this QASP. This plan is primarily focused on what the Government 314 must do to ensure that the Contractor has performed in accordance with the 315 performance standards. It defines how the performance standards will be applied, the 316 frequency of surveillance and minimum acceptable defect rate(s). 317
November 21, 2023 7
5.0 Government Surveillance 318
5.1 Methods of Surveillance 319
The following Methods of Surveillance will be utilized in monitoring the Contractors’ 320 performance: 321
5.1.1 100% Inspection 322
The Government will inspect 100% of each deliverable or service performed. This 323 surveillance method is appropriate where 100% inspection is required and is practical. 324
5.1.2 Random Sampling 325
The Government will randomly sample less than 100% of a designated deliverable or 326 performed service on a random basis. This surveillance method is appropriate for a 327 deliverable or performed service that occurs infrequently and where 100% inspection is 328 neither required nor practical. 329
5.1.3 Periodic Inspection 330
The Government will inspect less than 100% of a designated deliverable or performed 331 service, on a periodic basis. This surveillance method is appropriate for a deliverable or 332 performed service that occurs infrequently and where 100% inspection is neither 333 required nor practical. 334
5.1.4 Customer Feedback 335
The following procedures will be followed when a complaint is received regarding the 336 Contractor/Contractor Employees. 337
The COR will investigate and determine the validity of the complaint 338
If the complaint is determined to be invalid, the COR will inform the person who 339 submitted the complaint of the reason(s) as soon as practical 340
For validated complaints that are true contractual non-conformances, the 341 procedures in paragraph 6 below will be followed 342
5.1.5 After Action Review (AAR) 343
The Government will perform random AAR’s at the Planning Interval (PI) and/or sprint 344 level up to 100% of PI’s exercised. This surveillance method is appropriate for a 345 deliverable or performed service which will capture best practices, bottlenecks, and 346 future PI/sprint development processes for implementation. 347
5.2 Performance Requirements Summary 348
In evaluating the quality of the Contractor’s performance, the following performance 349 ratings under Table 1 may be used IAW FAR 42.1503, Table 42-1. 350
November 21, 2023 8
Table 1. Evaluation Ratings Definitions 351
Rating Definition Note
Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should not have been any significant weaknesses identified.
Very Good – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should not be any significant weaknesses identified.
Satisfactory – Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the Contractor recovered from without impact to the contract/order.
There should not have been significant weaknesses identified. A fundamental principle of assigning ratings is that Contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
Marginal – Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event in each category that the Contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the Contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which Contractor corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the Contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the Contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
The Performance Requirements Summary or Surveillance Matrix (Table 2) is the list of 352 performance objectives and standards that must be performed by the Contractor. This 353 matrix details the method of surveillance the COR will use to validate and inspect these 354 performance elements. Inspection of each element will be documented in the COR file. 355
Performance objectives define the desired outcomes. Performance Standards define 356 the level of service required under the contract to successfully meet the performance 357 objective. The inspection methodology defines how, when, and what will be assessed in 358 measuring performance. The Government performs surveillance, using this QASP, to 359 determine the quality of the Contractor's performance as it relates to the performance 360 element standards. The Program Requirements Summary will be used to form the 361 foundation of the COR's inspection checklist. 362
November 21, 2023 9
Table 2. Performance Requirements Summary (Surveillance Matrix) 363
Type
Deliverable or Required
Services
Rating Area
Description
Performance Standard(s)
Objective
Acceptable Quality Level
(AQL)
Threshold
Method of Surveillance
Program Management
PWS Section
5.1 - 5.8
Deliverables:
All
Program Planning and Reporting
Quality Control and Management
Risk Management
Schedule Management
Personnel Management
Cost and Software Data Reporting
Contract Funds Management
License Management
Property Management
Knowledge Management
Periodic and ad hoc Meetings and Reporting
RA: Management
Program Management activities span all contract tasks. This includes the management and oversight of all activities performed by Contractor personnel, including Subcontractors, to satisfy the requirements identified in the PWS.
Accurate, complete. and timely support of tasks and functions as directed by the Government
Implementation of the schedule
Milestones met on time Requirements met within proposed cost Metric reports delivered on time in correct format/content
Meetings and Reporting provides the information needed
Task activities defined in PWS successfully completed
Very Good: meets the following at a minimum of 95%:
Meets milestones as scheduled Meets contract cost baseline Personnel required to perform tasks are qualified and present
Exceptional: meets the following at a minimum of 97%:
Meets milestones as scheduled Meets contract cost baseline Personnel required to perform tasks are qualified and present
100% compliant with all procedures and applicable regulations
90% of Contract Data Requirements List (CDRLs) delivered on time and in compliance with the DD FORM 1423-1
Satisfactory: meets the following at a minimum of 93%:
Meets milestones as scheduled
Meets contract cost baseline
Personnel required to perform tasks are qualified and present
100% Inspection
CDRLs Staffing Levels and Quality of Performance
Outcomes and performance of regularly scheduled and ad hoc meetings
Progress against Roadmap
RA: Schedule
Compares targeted versus delivered value to help determine if appropriate progress is being made. This informs future planning, prioritization, and investment.
Very Good: 95% of Delivered values
Exceptional: 97% of Delivered values
Satisfactory: 93% of Delivered values
100% Inspection
Contract Performance
Schedule
Index (SPI)
Measures how efficiently the project is progressing compared to the planned timeline (SPI = Earned Value / Planned Value)
Very Good: 95% SPI
Exceptional: 97% SPI
Satisfactory: 93%
SPI
100% Inspection
November 21, 2023 10
Type
Deliverable or Required
Services
Rating Area
Description
Performance Standard(s)
Objective
Acceptable Quality Level
(AQL)
Threshold
Method of Surveillance
5.1
Deliverables:
A003 A009
Cost
Index (CPI)
RA: Cost Control
Evaluates the cost efficiency of the project by comparing earned value with actual costs (CPI = Earned Value / Actual Cost)
Very Good: 95% CPI
Exceptional: 97% CPI
Satisfactory: 93%
CPI
100% Inspection
Customer Satisfaction
Measures the level of satisfaction of stakeholders with the Contractor's performance
Customer satisfaction score = (total survey point score / total questions) x 100
Very Good: 95% Customer Satisfaction Score
Exceptional: 97% Customer Satisfaction Score
Satisfactory: 93% Customer Satisfaction Score
100% Inspection
Small Business Utilization
RA: Small Business Subcontracting
Actual achievements relative to Contractor proposed Small Business Participation Commitment Document by business category
Cumulative percentage total by adding the Percent of total contract value for each business category
Very Good: 26% Total cumulative percentage
Exceptional: 27% Total cumulative percentage
Satisfactory: 25% Total cumulative percentage
100% Inspection
% of Small business subcontracting value
RA: Small Business Subcontracting
Total value of small business contracting incurred on contract.
Total value of small business contracting = (Total value of small business contracting / Total value of contracting)
Very Good: 26% Total value of business contracting
Exceptional: 27% Total value of business contracting SPI Customer Satisfaction Score
Satisfactory: 25% Total value of business contracting
Agile Process
5.2 - 5.4
Deliverables:
A003 B006 B012 B014
Story Points
RA: Quality
Measure the complexity of a story and total amount of work to be completed in a sprint
% of Story Points completed versus planned
Very Good: 95%
Exceptional: 97%
% of Story Points completed versus planned
Satisfactory: 93%
Velocity
Actual amount of work completed in a sprint
Planned story points versus velocity (avg story point per sprint) each sprint
Very Good: 95%
Exceptional: 97%
Planned story points versus velocity (avg story point per sprint) each sprint
Satisfactory: 93%
100% Inspection
Velocity Predictability
Average Velocity is a measurement of the average amount of story (or story points)
Used to calculate Velocity
Calculated at the end of Planning Intervals (PIs)
Used to calculate Velocity
Calculated at the end of PIs
November 21, 2023 11
Type
Deliverable or Required
Services
Rating Area
Description
Performance Standard(s)
Objective
Acceptable Quality Level
(AQL)
Threshold delivered across a given time period.
Average Velocity = Total number of story (or story points) delivered / Total number of Sprints
Story Completion Rate
Number of stories completed in a sprint (and release)
This metric Threshold and Objective percentages may be adjusted if the number of total stories across Agile Teams is less then 20.
% of stories completed versus planned
Very Good: 95%
Exceptional: 97%
% of stories completed versus planned
Satisfactory: 93%
Release Burnup
Amount of work completed for a release (Note: work should increase as sprints are completed until release)
% of release work completed versus planned
Very Good: 95%
Exceptional: 97%
% of release work completed versus planned
Satisfactory: 93%
Recidivism
Stories returned to the team (this is where the levels of “why” come in)
% of stories returned versus completed in a sprint
Very Good: 6%
Exceptional: 4%
% of stories returned versus completed in a sprint
Satisfactory: 8%
Agile Quality
5.2 - 5.4
Deliverables:
A003 D001
First-time Pass Rate
Number of stories that pass the first time
% of stories passed (completed and accepted) in accordance with Definition of Done versus completed in a sprint
Very Good: 95%
Exceptional: 97%
% of stories passed (completed and accepted) in accordance with Definition of Done versus completed a sprint
Satisfactory: 93%
Defect Count
Number of defects per spring, PI, and release
% of defects per lines of code
Very Good: 6%
Exceptional: 4%
% of defects per lines of code
Satisfactory: 8%
Test Coverage
Level of testing performed in the value stream process
% of test coverage of capabilities, features, epics, and/or stories
Very Good: 95%
Exceptional: 97%
% of test coverage of capabilities, features, epics, and/or user stories
Satisfactory: 93%
Periodic Inspection
Number of Blockers
Number of events that prohibit completion of an activity or work item
Number of contract blockers currently open that prohibit the completion
Number of contract blockers currently open that prohibit the completion of an
November 21, 2023 12
Type
Deliverable or Required
Services
Rating Area
Description
Performance Standard(s)
Objective
Acceptable Quality Level
(AQL)
Threshold of an activity or work item in a sprint or release
Very Good: 6 blockers
Exceptional: 4 blockers activity or work item in a sprint or release
Satisfactory: 8 blockers
Integration (Interoperability) Testing
Number of stories that pass integration testing
% of stories that pass integration testing versus planned
Very Good: 97%
Exceptional: 99%
% of stories that pass integration testing versus planned
Satisfactory: 95%
100% Inspection
Delivered Features (or Capabilities)
Delivery progress relative to outcome (Note: Features (or Capabilities) should increase as PIs are completed until release)
% of Delivered Features (or Capabilities) completed in accordance with Definition of Done versus planned
Very Good: 95%
Exceptional: 97%
% of Delivered Features (or Capabilities) completed in accordance with Definition of Done versus planned
Satisfactory: 93%
Capability Delivery
PWS Section 5.2, 5.8
Deliverables:
A003 B004 B009 B010
Delivered Value Points
Value points delivered to users for a release (Note: Is are completed until release)
% of Value delivered versus Value planned
Very Good: 95%
Exceptional: 97%
8% of Value delivered versus Value planned
Satisfactory: 93%
100% Inspection
Level of User
User satisfaction based on the value delivered in a release
% of User satisfaction based on the delivered value in a release
Very Good: 95%
Exceptional: 97%
% of User satisfaction based on the delivered value in a release
Satisfactory: 93%
100% Inspection of Releases with a random number of users surveyed
Cybersecurity
5.2, 5.3
Deliverables:
A003 B009 C001
RMF actions
The Contractor shall follow DoD and Army RMF policies and regulations that govern the Department of Defense (DOD) RMF process (risk identification; risk measurement and assessment; risk mitigation; risk reporting and monitoring; and risk governance)
Conduct risk reduction activity by scanning delivered code to identify cybersecurity vulnerabilities and to modify code to reduce/eliminate/ vulnerabilities.
For vulnerabilities that cannot be eliminated, assist with RMF actions to identify risk, risk measurement and assessment, risk mitigation, risk reporting and monitoring (i.e., POAMs and eMASS documentation)
Very Good: Not Applicable
Exceptional: 100%
Satisfactory: 99.8% 100% Inspection
November 21, 2023 13
Type
Deliverable or Required
Services
Rating Area
Description
Performance Standard(s)
Objective
Acceptable Quality Level
(AQL)
Threshold
Method of Surveillance
Training Material
Development
5.6, 5.8
Deliverables:
A003 F001 F002
Training Material Effectiveness
Measure of the training materials’ effectiveness to convey the knowledge to users.
Accurate and complete Training Materials
Training proficiency levels identified in the agreed to Training Plan are met
Very Good: All training participants achieve a score of 80% or better and an average score of 82%
Exceptional: All training participants achieve a score of 80% or better and an average score of 85%
Accurate and complete Training Materials
Training proficiency levels identified in the agreed to Training Plan are met
Satisfactory: All training participants achieve a score of 80% or better and an average score of 80%
100% Inspection of user training scores
Training
5.8
Deliverable:
A003
Training experience satisfaction
Training metrics to measure and can usually be found in a post-training survey. It is used to gauge how satisfied learners are with the training they received.
Very Good: 87% Score from User Questionnaire
Exceptional: 90% Score from User Questionnaire
Satisfactory: 83% Score from User Questionnaire
Transition
5.1, 5.7
Deliverables:
A003 A008 G001
Follow the Transition Plan accepted by the Government and keep the Government fully informed of status throughout the Transition period.
Transition Planning and Management
Transition Accountability
Transition Activity
Collaboration Asset Transfer
Transfer responsibility for project documentation, resources, assets, and performance to the designated party.
Ensure the implementation and readiness of capabilities necessary for all aspects of performance without disruption in schedule, increased costs, degradation to performance, need for increased Government oversight, or likelihood of unsuccessful
Accurate, complete. and timely support of tasks and functions as directed by the Government
Products delivered on time in correct format/content
Meetings and Reporting provides
Very Good: meets the following at a minimum:
100% compliant with all procedures and applicable regulations
100% of CDRLs delivered on time and in compliance with the DD
FORM 1423-1.
95% Personnel required to perform tasks are qualified and present
Exceptional: meets the following at a minimum:
100% compliant with all procedures and applicable regulations
100% of CDRLs delivered on time and in compliance with the DD
FORM 1423-1.
97% Personnel required to perform tasks are qualified and present
Satisfactory: meets the following at a minimum:
100% compliant with all procedures and applicable regulations
90% of CDRLs delivered on time and in compliance with the DD
FORM 1423-1.
93% Personnel required to perform tasks are qualified and present
100% Inspection:
CDRLs Outcomes and performance of regularly scheduled and ad hoc meetings
November 21, 2023 14
Type
Deliverable or Required
Services
Rating Area
Description
Performance Standard(s)
Objective
Acceptable Quality Level
(AQL)
Threshold the information needed
Task activities defined in PWS successfully completed
AMP
Standards
5.3
Deliverable:
A003 B009 B010 C001
Accuracy
Percentage of accurately processed payroll transactions
Identify errors in:
Soldier data payroll calculation tax calculations rations allotments garnishments Thrift Savings Plan Government liabilities others
Soldiers receives accurate pay, error free:
Very Good: Not Applicable
Exceptional: 100%
Soldiers receives accurate pay, error free:
Satisfactory: 99%
Timeliness
Measures the time it takes for the system to process payroll transactions for 1M+ payees
Very Good: 6 hours
Exceptional: 4 hours
Satisfactory: 8 hours 100% Inspection
Compliance
Measures the percentage of payroll transactions that comply with:
relevant laws regulations policies
Compliance Score
Very Good: 95%
Exceptional: 97%
Compliance Score
Satisfactory: 93%
100% Inspection
Solider
Measures Soldier satisfaction with the payroll process; can be assessed through surveys, feedback forms, or focus groups.
A high level of satisfaction indicates that the system meets the needs of Soldiers and their families.
Soldier satisfaction score = (total survey point score / total questions) x 100
Very Good: 95%
Exceptional: 97%
Soldier satisfaction score = (total survey point score / total questions) x 100
Satisfactory: 93%
100% Inspection
*Note, the Government notifies the Contractor that it intends to adopt automated testing and will establish metric(s) for automated 364 testing at a later date under the terms of QASP paragraph 15.0. 365
In addition, the Government will inspect user stories (hereafter stories) at the end of 366 each Sprint to evaluate the “Definition of Done” achieved during the Sprint. The target 367 “Definition of Done” for each Sprint will be defined at the beginning of the Sprint up to 368 and including integration and interoperability criteria. The Government expects that 369 stories for interoperability between applications and interfaces will be explicitly identified 370 as part of the development process. 371
November 21, 2023 15
A CPARS rating area (RA) is assigned to each relevant metric. The rating areas are 372 Quality, Management, Schedule, Cost Control, Small Business Subcontracting, 373 regulatory compliance. Each rating area rating will be provided to the COR as input for 374 monthly and annual reporting. 375
The COR, along with the IPPS-A PdM, AMP APM, and designated Government 376 Functional and Technical Monitors, will inspect all tasks to ensure Contractor 377 compliance with the requirements at the conclusion of each Sprint or PI. Delivery will 378 occur by a data pull within the AMP agile development tools repository. Inspection 379 results will be recorded and reported. The COR may find the delivery satisfactory even 380 though further work is required, provided that the specific requirements of the sprint are 381 met. 382
At the conclusion of each sprint, the COR, along with the IPPS-A PdM, AMP APM, and 383 designated Government Functional and Technical Monitors, will review the completed 384 stories and related functionality. Incomplete or inadequate code and stories will be 385 noted in a mutually agreed-upon issue tracker, such as Trello or GitHub Issues, and 386 links to each issue shared with the COR. The Contractor may respond in that tracker as 387 appropriate, addressing the accuracy and validity of the defect as well as any planned 388 corrective action (if not already noted). The Contractor team will discuss and document 389 actions to prevent recurrence in their sprint retrospectives. 390
At the conclusion of the period of performance, a similar procedure will be followed to 391 document discrepancies and to assess overall performance. 392
5.3 Surveillance Schedule 393
A Surveillance Schedule will be created for each month of Contractor performance and 394 filed in the Procurement Integrated Enterprise Environment (PIEE), Surveillance and 395 Performance Monitoring (SPM), Surveillance Documents Section of the Contract File 396 using the Add Smart Form function. The schedule is “Controlled Unclassified 397 Information (CUI)” and is not releasable to anyone other than those authorized by the 398 Government. 399
5.4 Surveillance Instructions/Checklists 400
Surveillance Checklists will be completed when surveillances are conducted and filed in 401 the PIEE, SPM, Surveillance Documents Section of the Contract File using the Add 402 Smart Form function. Supplementary data, such as end of sprint reports directly 403 extracted from the development tools that provide a snapshot of real-time progress will 404 be captured when possible. The objective is to take advantage of any tools and 405 streamlined processes available that capture results suitably to obtain the most 406 accurate results in an administrative-efficient manner. 407
5.5 Surveillance Documentation 408
No later than the 15th of each month surveillance documentation for the preceding 409 month will be filed in the PIEE, SPM, Surveillance Documents Section. Surveillance 410 documentation includes a COR Status Report, the Surveillance Schedule, all completed 411 Surveillance Checklist(s) for the period the COR Status Report covers, 412
November 21, 2023 16
Nonconformance Reports, Performance Assessment Report, Correction Action Report, 413 if any, and Contractor Deliverables, if any. 414
6.0 Nonconformance Reports (NCRs) (Attachment 1) 415
Nonconformance occurs when a Contractor fails to meet Contract or Task Order terms, 416 conditions and/or specifications or the services are defective in some manner. All 417 instances of nonconformance will be documented via a Non-conformance Report 418 Worksheet, Attachment 1 and the Contracting Officer will notify the Contractor of the 419 nonconforming performance via Letter. Resolution of nonconformance discovered at the 420 Subcontractor level will be addressed with the prime Contractor. Nonconformance is 421 classified as either: Level 1 (Minor); Level 2 (Major); or Level 3 (Critical). NCRs may 422 contain multiple nonconformances, each characterized by a level and type. The level of 423 the NCR should normally correspond to the highest level of nonconformance listed in 424 the NCR. For example, if an NCR had one Level 3, one Level 2, and three Level 1 non-425 conformances, the NCR level would be Level 3. The exception might be when the 426 aggregate of multiple nonconformances considered in whole associate to a more 427 serious type of nonconformance defined in FAR 46.101 (e.g., if an NCR had three Level 428 2 nonconformances but the definition of critical nonconformance better describes the 429 impact/effect when considered in whole, the NCR level would be 3). 430
6.1 Level 1 (Minor) 431
Level 1 nonconformances are those that are ‘minor’ in nature such that they can be 432 promptly corrected by the Contractor, present no need for root cause analysis or 433 determination if other contract requirements are affected, present no need for further 434 preventive action, and do not materially reduce the usability of the supplies, services, 435 construction, or deliverables. While the Contractor must correct the nonconformance, 436 further actions and Government follow-up are not required, and no written response 437 from the Contractor is needed. 438
6.2 Level 2 (Major) 439
Level 2 nonconformance(s) are those that are ‘major’ in nature such that they are not 440 promptly correctable, and/or warrant root cause analysis and preventive action, and/or 441 need action by the Contractor to determine if other contract requirements are affected. 442 These nonconformances are serious enough to warrant not only correction of the 443 nonconformance, but also a written response from the Contractor in the form of a 444 Corrective Action Plan (CAP), and Government follow-up. The qualifying distinction 445 between a Level 1 and Level 2 nonconformance is the need for a CAP and Government 446 follow-up. An NCR identifying a Level 2 nonconformance may also be issued after 447 repetitive Level 1 instances of the same or similar nonconformance demonstrate the 448 Contractor is failing to institute effective corrective action and/or failing to implement 449 effective quality and/or internal control(s).