Instructions for Completing a CCNA RFP.pdf
PDF 343 KB Posted
- Attached to
- CEI Continuing Professional Services
- Solicitation number
- RFP 360 2026053 1
- Issued by
- Palm Beach County, Florida
About this file
This document is an instruction guide for responding to Requests for Proposal (RFP) issued by the Palm Beach County Engineering and Public Works Department for professional services under the Consultants' Competitive Negotiation Act (CCNA). The solicitation requires proposers to submit one bound original and one electronic PDF version of their proposal package by the deadline specified in the Notice of Solicitation. Proposal packages must include a Letter of Interest (maximum four pages) with a team summary table, GSA Form SF 330 for each team member, Prime Consultant and Sub-Consultant Qualification Questionnaires, copies of relevant certifications, EBO Schedules 1 and 2, Commercial Non-Discrimination Certification, Conflict of Interest Disclosure Forms, and an optional Prime Firm's Past SBE Participation Statement. At minimum, one team member must be assigned to and CCNA certified for each category of work listed in the Notice. Proposals must be submitted in person to the Roadway Production office at 2300 N. Jog Road, Room 3W-33, West Palm Beach, Florida 33411-2745 by the deadline to be considered.
The RFP emphasizes compliance with Palm Beach County's Equal Business Opportunity (EBO) Program under County Code Sections 2-80.20 through 2-80.40, which sets Affirmative Procurement Initiatives (APIs) for Small Business Enterprises (SBEs) in professional services. Failure to meet mandatory APIs results in non-responsive proposals. All proposers must register in the County's Vendor Self Service (VSS) system, and all team members, including subconsultants, must be registered as vendors. SBE participation percentages must be exact with no rounding allowed; numbers are truncated rather than rounded. Only SBE firms certified with Palm Beach County's Office of Equal Business Opportunity count toward meeting EBO APIs, and successful firms must achieve the SBE percentage proposed during the selection process. The document references PPM CW-O-048, which details the new point system for CCNA selections, and provides contact information and website resources for additional assistance and compliance information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Alternate Format Availability.pdf | ||
| Prime Firms SBE Past Participation Statement.docx | DOCX document | |
| Qualification Questionnaire Prime.pdf | ||
| Conflict of Interest.docx | DOCX document | |
| OSBD Schedules and Instructions.pdf | ||
| RFI Form.pdf | ||
| Conflict of Interest.pdf | ||
| Prime Firms SBE Past Participation Statement.pdf | ||
| RFI Form.docx | DOCX document | |
| Qualification Questionnaire Subconsultant.pdf | ||
| Disclosure of Ownership Interests.docx | DOCX document | |
| Commercial Non-discrimination.pdf | ||
| 2026053 - CCNA RFP Package - signed.pdf | ||
| Commercial Non-discrimination.docx | DOCX document | |
| Qualification Questionnaire Prime.docx | DOCX document | |
| Qualification Questionnaire Subconsultant.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions for Replying to an RFP for the PBC
Engineering and Public Works Department
*** IMPORTANT ITEMS ***
Equal Business Opportunity (EBO)
Program - Pursuant to the Palm Beach
County Code Section 2-80.20 – 2-80.40
(EBO Ordinance), the County will provide contracting opportunities for SBEs in the area of professional services pursuant to Section
287.055, Florida Statutes, as amended, known as the ''Consultants’ Competitive
Negotiation Act" (CCNA). Affirmative
Procurement Initiatives (APIs) will be set by the County’s Goal Setting Committee and may be mandatory.
EBO Waivers – if a firm finds it is impossible to meet the API for a project despite good faith efforts, the firm may apply for a waiver with the EBO office at least seven business days prior to the proposal due date (PPM# CW-O-043 Sec. 11a).
http://discover.pbcgov.org/oebo/Pages/Com pliance-Programs.aspx
Proposer must register in the County’s
Vendor Self Service (VSS) at https://pbcvssp.pbc.gov/vssprd/Advantage4 in order to be awarded a County contract. If proposer intends to use subconsultants, proposer must also ensure that all subconsultants are registered as vendors in
VSS.
Firms shall not add or delete team members, or adjust team participation after the proposal due date. If a SBE team member withdraws before final selection, the respondent firm must submit a new
Subconsultant’s Questionnaire Form or new
Schedules 1 and 2 and request a substitution from the County’s Office of Equal Business
Opportunity.
After the notification of recommended award has been posted, any unsuccessful proposer may request a debriefing from the Roadway
Production Division at Engineering & Public
Works Department, Roadway Production
Division, 2300 N. Jog Road, Room 3W-33, West Palm Beach, FL 33411-2745.
Communication with Engineering Staff–
No oral interpretation of this RFP shall be issued or considered binding. Any interpretation, clarification, correction, or change to this RFP will be made only via
Addendum.
The point system for CCNA selections has changed PPM CW-O-048 details the new procedure.
Please review all solicitation documents carefully to ensure familiarity will all new procedures and requirements to prevent disqualification.
http://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx https://pbcvssp.pbc.gov/vssprd/Advantage4
General Consultants interested in a project are required to furnish one original (bound) and one electronic version (PDF format) of their proposal package no later than the deadline listed in the Notice.
The electronic version must accompany the bound hardcopy as either a CD or a thumbdrive. Do not email proposals.
Proposal Package
The proposal package should include the following sections:
1. Letter of Interest with summary table
2. GSA Form SF 330 (for each team member)
3. Prime Consultant Qualification Questionnaire
4. Subconsultant Qualification Questionnaire (for each sub)
5. Copy of SBE certifications with Palm Beach County
(do not include certifications from other agencies unless specifically requested)
6. EBO Schedule 1 (listing entire team) and EBO Schedule 2 (for each team member)
7. Commercial Non-Discrimination Certification (for each team member)
8. Conflict of Interest Disclosure Form (for each team member)
9. Prime Firm’s Past SBE Participation Statement (Optional)
Notes:
- It is helpful if the proposal sections are kept separate and not intermingled.
- Ensure that information that appears in more than one place is the same in all locations.
- Use each firm’s full legal name as it appears on Sunbiz.
- Do not leave any blanks. Enter a zero or N/A if there is no data.
- Verify CCNA and SBE certifications for all team members prior to submitting.
- Ensure at least one team member is assigned to each category of work listed on the Notice.
- Submit before the deadline – must be time stamped in at Roadway Production office to be considered submitted.
- No one-on-one discussions will be held with consultants.
- Project specific questions must be submitted in writing or asked at the pre-proposal meeting.
- General/procedural questions may be asked at any time in writing or verbally.
- Read the Notice carefully to ensure all requirements are met.
https://www.gsa.gov/forms-library/architect-engineer-qualifications https://discover.pbcgov.org/engineering/roadwayproduction/Links/Qualification%20Questionnaire%20Prime%20Consultant.pdf https://discover.pbcgov.org/engineering/roadwayproduction/Links/Qualification%20Questionnaire%20Subconsultant.pdf https://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx https://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx https://discover.pbcgov.org/engineering/roadwayproduction/Links/COMMERCIAL%20NON-DISCRIMINATION%20CERTIFICATION.pdf https://discover.pbcgov.org/engineering/roadwayproduction/Links/Conflict%20of%20Interest.pdf https://discover.pbcgov.org/engineering/roadwayproduction/Links/Prime%20Firms%20SBE%20Past%20Participation%20Statement.pdf https://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx https://discover.pbcgov.org/oebo/Pages/Vendor-Directory.aspx
Letter of Interest (LOI) Letter of Interest (4 pages maximum, single sided) including reference to this Notice and a summary table. Minimum font of 11 and minimum margins of 0.75” requested along with sufficient spacing within letter for both the letter and summary table shown below.
The last paragraph of the Prime consultant’s Letter of Interest (LOI) must include a team summary in the format below showing the information that is provided on the prime and sub-consultant questionnaires. Firms’ full Sunbiz registered names should be used on this table. Do not leave blanks or enter “TBD” on this table. The team summary must be signed to confirm the accuracy of the attached information. All information for the team summary shall be derived from the signed Questionnaires, which must accompany the LOI.
The same size (or larger) font as used in the rest of the letter of interest should be used for this table.
This table defines your official team and will supersede any conflicting or supplemental information listed elsewhere in the proposal.
It will be what is used to assign points and analyze the team for completeness.
It is what will be presented to the committees in their summaries.
Service Provided (Category #) – Ensure at least one team member is assigned to each category listed in the Notice. A team member must be CCNA certified in a CCNA category to be eligible to provide that service.
The Fee Considered Total $ reflects the total prior work awarded to the firm by PBC, and is derived from the total in the Questionnaire. For your convenience this information can be found
Prime/Sub-
Consultant
C/SBE
Type or C
Service
Provided
(Category #)
Participation
(For this Project)
Fee Considered
Total $ *
Prime, Inc.
(>50%)
C/XX # % $$$$$$$
Sub-consultant #1 C/SBE # % $$$$$$$
Sub-consultant #2 C/XX # % $$$$$$$
Total Participation for the Team 100% $$$$$$$$
By signing below, signatory confirms that the above information matches the information on the attached questionnaires.
Print (Name and Title) Signature https://dos.myflorida.com/sunbiz/ https://discover.pbcgov.org/engineering/roadwayproduction/Links/CCNA%20Category%20Descriptions.pdf online (see websites listed at the end of this document). DO NOT LEAVE BLANK OR SAY
TBD.
C = CCNA Certified
C/SBE = Certified CCNA & SBE
N/A = Non-Certified firm (only allowable for firms providing non-CCNA services)
Participation (for this project) – The percent participation must match the percent participation on the Prime or Sub-Consultant Questionnaire.
Prime Consultant Questionnaire and Sub-Consultant Questionnaire
• The contact information shown on the
“Prime Consultant Qualification
Questionnaire” will be utilized for all notifications regarding the RFP.
• List all the fees paid by PBC to the firm in the last four years. For your convenience this information can be found online (see websites listed at the end of this document).
• For local office credit, firm must have a Palm Beach County Tax Receipt
A Complete Submittal Shall Include the Following Components at a
Minimum:
• Letter of Interest with summary table at the end
• GSA Standard Form 330 for each member of the team
• Prime Consultant Qualification
Questionnaire
• Sub-Consultant Qualification
Questionnaire (for each sub-consultant)
• Copy of PBC SBE Certificate for firms who are certified in this program.
• EBO Schedule 1 (list entire team)
• EBO Schedules 2 (for each team member)
• Non-discrimination Certification
• Conflict of Interest Disclosure Form
• Prime Firm’s SBE Past Participation
Statement (Optional)
• Any additional project specific requirements as listed in the RFP
Advertisement
Check prior to submitting
• Consider readability when preparing four page letter. Fonts and margins that are too small make reviewing the proposal difficult.
• Team participation adds up to 100%
• All requested categories are listed on summary chart at end of letter
• Team members are CCNA certified for categories of work they propose to perform
• No unrequested services are listed on the summary chart at end of letter
• Project manager is specified and FL
PE if signed and sealed plans are required
• Each required CCNA category has at least one team member CCNA certified to perform it and proposing to perform it.
Submitting
• One original bound proposal
• One electronic version (PDF format) of the proposal. This version should be created in such a way that the text is able to be recognized and searched. A CD or thumbdrive are both acceptable means of providing this version. Must accompany the hardcopy submittal.
Do not email the proposal.
EBO Ordinance The Notice will list any Equal Business Opportunity (EBO) ordinance requirements for the solicitation. The Affirmative Procurement Initiatives (APIs) are the requirements put on the solicitation by the Goal Setting Committee. More information on the Ordinance or assistance with the APIs can be found by contacting the Office of Equal Business Opportunity at https://discover.pbcgov.org/oebo/Pages/default.aspx
Important Information Regarding the EBO Ordinance:
• It is highly recommended to read the ordinance paragraphs referenced in the notice. The
EBO Ordinance can be found at the website listed at the end of this document.
• Failure to comply with a mandatory API will result in the proposal being non-responsive and ineligible for selection.
• Some APIs are mandatory and some are not.
• Some APIs earn the proposer points and some do not. See the EBO ordinance and
Selection PPM (links at end of this document).
• No rounding is allowable when calculating SBE participation. Numbers will be truncated, not rounded.
• EBO Schedule 1 must list the entire team.
https://discover.pbcgov.org/oebo/Pages/default.aspx
• EBO Scheule 2 must be submitted by all subconsultants (even if they are not SBE).
• EBO Schedule 2 must be submitted by the prime if the prime is an SBE firm.
• The prime/sub questionnaires and EBO Schedules must list in detail the type of work being provided by the firm or SBE credit may not be given.
• Firms only count for SBE credit for providing services that is listed on their SBE certificate.
• Only SBE firms certified with Palm Beach County OEBO count toward meeting the EBO
APIs.
Important!
Successful firms will be required to achieve the SBE percentage proposed during the selection process when negotiating the scope and fee.
Notes:
• Proposal Packages must be received no later than the time/date specified in the advertisement, or they will not be considered.
• If a shipping service is used to deliver a proposal package, it is the responsibility of the Prime Consultant to ensure that it reaches the Roadway Production
Offices.
• The completeness and accuracy of information submitted is the responsibility of the prime consultant.
• Word and PDF format versions of the
RFP submittal forms are available online
(see websites at end of instructions).
• Sub-Consultants providing services that were not requested in the Notice will be disregarded (for the unrequested services only)
• Teams must provide all services requested in the RFP by a PBC CCNA certified firm or their team will be considered “incomplete”.
• If your firm needs to apply for CCNA certification or to add categories to an existing certification, do it as soon as possible. Waiting until the last week before the RFP due date is highly discouraged. Note: The Engineering
Department requires CCNA applications to be significantly complete prior to the
RFP due date. This means it must be reviewed and in for signature by the
Deputy County Engineer, or have only a minor revision needed. Typically
CCNA applications are reviewed on
Mondays as time allows.
Contact Information If additional assistance is needed in completing the forms, please contact:
JaeAnn Dean
(561) 684-4154
JAdean@pbc.gov
Holly Knight
(561) 684-4122
HKnight@pbc.gov
Project specific information may be requested at Eng-RoadwayBids@pbc.gov
Websites Palm Beach County (PBC) Homepage http://discover.pbcgov.org/Pages/default.aspx
PBC Engineering – Roadway Production Homepage http://discover.pbcgov.org/engineering/roadwayproduction/Pages/default.aspx
PBC Engineering – CCNA Solicitations Information
Includes fees considered, list of CCNA certified firms http://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx
PBC CCNA Selection Policy & Procedure Manual (PPM CW-O-048) http://discover.pbcgov.org/publicaffairs/Pages/Policies-and-Procedures-Manual.aspx
PBC Engineering – Roadway Production - CCNA/Contracts Section http://discover.pbcgov.org/engineering/roadwayproduction/Pages/CCNA.aspx
PBC CCNA Certification https://discover.pbcgov.org/engineering/roadwayproduction/Pages/CCNA.aspx
PBC Equal Business Opportunity Ordinance https://discover.pbcgov.org/oebo/PDF/EBO_Ordinance.pdf
PBC Office of Equal Business Opportunity – Compliance Program & Forms
PBC Equal Business Opportunity Policy and Procedure Manual (CW-O-043) http://discover.pbcgov.org/oebo/PDF/Publications/CW-O-043.pdf#search=CW%2DO%2D043
PBC Vendor Self Service (VSS) https://pbcvssp.pbc.gov/vssprd/Advantage4https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService mailto:JAdean@pbc.gov mailto:HKnight@pbc.gov mailto:Eng-RoadwayBids@pbc.gov http://discover.pbcgov.org/Pages/default.aspx http://discover.pbcgov.org/engineering/roadwayproduction/Pages/default.aspx http://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx http://discover.pbcgov.org/publicaffairs/Pages/Policies-and-Procedures-Manual.aspx http://discover.pbcgov.org/engineering/roadwayproduction/Pages/CCNA.aspx https://discover.pbcgov.org/engineering/roadwayproduction/Pages/CCNA.aspx https://discover.pbcgov.org/oebo/PDF/EBO_Ordinance.pdf http://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx http://discover.pbcgov.org/oebo/PDF/Publications/CW-O-043.pdf#search=CW%2DO%2D043 https://pbcvssp.pbc.gov/vssprd/Advantage4 https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService
| Untitled |
| *** IMPORTANT ITEMS *** |
General
Proposal Package
Letter of Interest (LOI)
Prime Consultant Questionnaire and Sub-Consultant Questionnaire
A Complete Submittal Shall Include the Following Components at a Minimum:
Check prior to submitting
Submitting
EBO Ordinance
Important Information Regarding the EBO Ordinance:
Important!
Notes:
Contact Information
Websites
File details come from the government source that posted it. Updated .