Amendment 0003 - incorporate Questions and Answers (changes made) and incorporate new section (09 990 00 Painting Coating) into the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract - Dublin.pdf | ||
| SF-30 AMENDMENT 0004.pdf | ||
| SF-30 AMENDMENT 0002.pdf | ||
| SF-30 AMENDMENT 0001.pdf | ||
| Site Visit Minutes.pdf | ||
| 06 - SF-24 Bid Bond Form.pdf | ||
| 04 - Drawings.pdf | ||
| 02 - Solicitation.pdf | ||
| 03 - Specifications.pdf | ||
| 05 - Alameda County Wage Rate 07012011.pdf | ||
| 01 - IFB Coverletter.pdf | ||
| 07 - NCIC Forms.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour a nd date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date sp ecified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by Elite Federal Forms, Inc.
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
BOP02152
Typewritten Text
BOP02152
Typewritten Text
FCI DUBLIN – RE-ROOF THREE HOUSING UNITS
PROJECT 6RX QUESTIONS
SOLICITATION IFBP06021100001
The following are all questions submitted to the Federal Bureau of Prisons prior to the established deadline. Beneath each questions is the change or clarification.
SUBMITTED BY: FIDELITY ROOFING COMPANY
1. How thick is the roof insulation on the shingle roofs?
CLARIFICATION: Roof insulation on the shingle roof is 4” rigid insulation.
2. How thick is the insulation on the lower roofs starting on the scupper and how thick is by the windows?
CHANGE: Generally the insulation on the lower roof consists of one layer of 4” tapered rigid insulation over 2” rigid insulation for a total thickness at the windows is 6” (See detail 4B/A5). The thickness of the insulation at the scupper is 2” of tapered rigid insulation on 2” rigid insulation at
1’-3” from parapet and then slopes to 1” rigid insulation for 1’-0” to scupper. (See detail 1/A6).
Also see drg. A1 for that shows insulation thicknesses that vary according to location.
1. Modify section 07 22 00 to read as follows (change)
a. Add1.2 D ASTM C1289-02 standard specification for faced rigid cellular polyisocyanurate thermal insulation board
b. 2.1 B delete “Tapered” add “Sloped roof”
c. 2.1 B revise “ASTM C578” to read “ASTM C578-10a”
d. 2.1 C Flat roof insulation: ASTM C1289-02 Type II, Derbiboard CA, factory tapered polyisocyanurate rigid cellular foam with a coated cementitious glass fiber facer conforming to the following:
1) Flame Spread Index: 25 or less when tested in accordance with ASTM E84.
2) Smoke Development Index: 450 or less, when tested in accordance with ASTM E84.
3) Compressive Strength: 25 psi
4) Board Size: 48 x 48 inches.
5) Board thickness: Minimum 2” per layer.
6) Thermal Resistance: Average over entire roof R-value of 30.
7) Board Edge: Square.
8) Thickness: Maximum 3 inches per layer
e. Add 3.1 B Install sloped roof insulation material over existing metal roof deck in accordance with insulation manufacturers recommendation
3. How many roof layers are in the low slope roofs?
CLARIFICATION: It is unknown on the low roofs, but on the sloped asphalt shingle roofs the institution indicated that the roofs had been reroofed once.
4. Clarify the building letters that are for the base bid?
CHANGE:
Housing Unit D shown on Drawing Sheet S1 shall read as Housing C.
Housing Unit E shown on Drawing Sheet S1 shall read as Housing D.
Housing Unit F shown on Drawing Sheet S1 shall read as Housing E.
Housing Unit G shown on Drawing Sheet S1 shall read as Housing F.
5. Which building is for Alternate?
Housing Unit E shown on Drawing Sheet S1 shall read as Housing D.
Housing Unit D is the Alternate. (See note on S1)
6. The shingle roof details calls for 3/8” plywood, please clarify what are the requirements for the roofing manufacture and building code?
CLARIFICATION: Per APA Technical Note Q225G Span Tables, 3/8” plywood with 24” support spacing meets the requirements for deflection, bending and shear of the 2010 CBC.
7. Does detail A5-4, A5-2, requires wood nailer?
CLARIFICATION: Wood nailers are not required on Details 4B and 4C/A5 or on Details 5A and
5B/A5.
8. All the sheet metal flashings including copings, reglets need to be painted?
CLARIFICATION: Sheet Metal Flashing, including copings and reglets are to be painted. See spec section 09 90 00 attached.
9. The tapered roof insulation starts at ½” at drain and 4” thick at wall?
CLARIFICATION: The insulation on the lower roof consists of one layer of 4” tapered rigid insulation over 2” rigid insulation for a total thickness at the walls is 6” to 8.5”. The thickness of the insulation at the scupper is 2” of tapered rigid insulation on 2” rigid insulation at 1’-3” from parapet and then slopes to 1” rigid insulation for 1’-0” to scupper. Also see drg. A1 for that shows insulation thicknesses that vary according to location. (Clarification)
10. Is the complete roof system applied with cold adhesive?
CHANGE: Yes, see specification section 07 52 00 paragraph 1.3 A
2. Modify section 07 52 00 to read as follows:
a. Delete 1.2 E and add “ASTM C1289-10 standard specification for faced rigid cellular polyisocyanurate thermal insulation board” to be the new 1.2 E
b. Delete 2.1 A in its entirety and add 2.1 A General: Provide a multiple-ply, modified bitumen membrane system. The base ply shall consist of a fiberglass base sheet in cold adhesive over rigid insulation to the deck and an 80-mil APP base sheet in cold and cap sheet installed in cold adhesive. The modified bitumen system must comply with the following physical properties.
1. System Specification: Derbigum Specification # 1IGB
2. Base Sheet: One ply of PRS Derbibase base sheet installed in Permastic adhesive over rigid insulation. Heat weld laps.
3. Base Ply: One ply of Derbigum GP double reinforced, smooth surfaced, APP modified bitumen membrane installed in Permastic adhesive at a minimum rate of 1.89# per square. Heat weld laps.
4. Top ply: DerbiBrite, double reinforced, acrylic surfaced, APP modified bitumen membrane installed in Permastic adhesive at a minimum rate of
1.8# per square. Heat weld laps.
c. 2.1G at end of paragraph delete the words “or by full heat welding”
d. 2.3 Accessory Products: Add 2.3G Insulation adhesive, low rise polyurethane foam: OMG-Olybond 500 or spot shot.
e. 2.3 Accessory Products: Add 2.3H Polyurathane liquid flashing membrane:
Derbigum EF liquid flashing system.
f. 3.2C deleted the word “Mechanical”
g. 3.2C1. Delete “Mechanically fasten insulation to deck” add “Attach insulation to deck using adhesive”
h. 3.4C Delete” ---hot mopped---“ and add “ –cold adhesive”
i. Add paragraph 3.4 E “ Laps of all base sheets, base ply and top ply shall be heat welded”
j. 3.5A Delete “ or by full heat welding”
k. 3.5 Q Add the following sentence at the end of the paragraph “ Where the parapet wall has less than 8” to provide flashing, provide a high temperature self-adhering underlayment (Grace Ultra) up and over the top and down the face of the wall at least 3”. Overlap the underlayment on the inside parapet wall at least 4“with polyurethane liquid flashing membrane. Run the liquid flashing up and over the top and down the wall to completely cover the underlayment.
Install in accordance with manufacturers recommendations.
l. Add 3.5R Scuppers: Provide a high temperature self-adhering underlayment
(Grace Ultra) on bottom, top and sides of scuppers. Run underlayment up, down and to the sides of the face of the wall at least 3” all round scupper opening. Overlap the underlayment with polyurethane liquid flashing membrane to completely cover the underlayment in all directions. Install in accordance with manufacturers recommendations. Paint overlapping membrane to match existing wall cover. Follow manufacturers recommendations for painting membrane.
11. Is the contractor required to have a job site trailer on site?
CLARIFICATION: The contractor is not required to have a job site trailer on site.
SUBMITTED BY: RMC ROOFING
1. In the designated lay- down area, can the contractor stockpile materials or does he have to bring in just the material required for that day's work?
CLARIFICATION: The contractor may stockpile materials in the designated lay-down area.
2. On the buildings that were looked at during the job walk, where are the roofs currently leaking?
CLARIFICATION: Currently, there are no roofs leaking.
3. Has these roofs been tested for asbestos, including mastics applied at flashing's and penetrations? If so, can the results be part of the package?
CLARIFICATION: The roofs have not been tested.
4. The exterior stucco walls above the roof areas are extremely cracked in almost all locations. These are obviously leaking. Installing a new roof will not result in eliminating all of the leaks in these buildings.
Are these repairs part of the contractor's responsibility? Can these be addressed as a line item cost?
CLARIFICATION: Repair of the exterior plaster wall finish was not a part of the scope of work.
5. The drawings (Building identifications) are mislabeled on the drawings. Are the drawings going to be re- issued with the correct labels?
Housing Unit D shown on Drawing Sheet S1 shall read as Housing C.
Housing Unit E shown on Drawing Sheet S1 shall read as Housing D.
Housing Unit F shown on Drawing Sheet S1 shall read as Housing E.
Housing Unit G shown on Drawing Sheet S1 shall read as Housing F.
6. Can work be performed on more than one building at a time, if so how many escorts will be assigned to a single roofing crew?
CLARIFICATION: No, work cannot be performed on more than one building our housing unit at a time. Amount of escorts may vary day to day.
SUBMITTED BY: MADSEN ROOFING & WATERPROOFING
1) Section 01 50 00 [Temporary Facilities and Controls] 1.6, D. Office Trailer. Is it a requirement that the contractor has an onsite office trailer, or is this optional?
2) Section 01 50 00 [Temporary Facilities and Controls] 1.6, D. Office trailer. If an onsite trailer is required, will full time staffing of office also be required? Does office staff personnel have to be the project manager or other responsible individual, or can onsite office staff be administrative/clerical worker?
3) Section 02 41 00 [Demolition] Will bidders are provided information regarding what the existing roof assemblies [steep slope and low slope assemblies] are comprised of, ie.: roof core sample information?
This is critical in determining costs related to demolition labor, landfills, etc.
Other than what was indicated on the original construction documents, there is not any additional information available as to the existing roof assemblies. No core samples have been taken.
Institution did not know on the low roofs, but on the sloped asphalt shingle roofs the institution indicated that the roofs had been reroofed once.
4) Section 02 41 00 [Demolition] Is there any asbestos, lead containing paint, or other hazardous material present that will have to be removed and disposed of?
CLARIFICATION: The contractor is not required to have a job site trailer on site. It is unknown if there is any asbestos, lead containing paints or other hazardous material present.
5) Section 07 60 00 [Flashing and Sheet Metal] 1.8, A, 1.-2. Special Warranty on Finishes 1. Exposed
Panel Finish a-c and 2. Warranty Period 20 years. This information would seem to indicate that 20 year warranted paint finish [ i.e. KYNAR 500/HYLAR 5000 or similar] is required on the architectural sheet metal flashings [copings, edge flashings, downspouts, etc.]. However there is a reference to “Exposed
Panel Finish” as if this description would be relevant to metal roof panels as opposed to architectural sheet metal flashings.
CHANGE: Delete section 07 60 00 /1.8/A – Add the following:
A. Warranty on Galvanized Finish: Manufacturer's standard form in which manufacturer agrees to repair finish or replace sheet metal flashing and trim that shows evidence of deterioration of factory-applied finishes within specified warranty period.
1. Warranty Period: 20 years from date of Project completion.
6) Section 07 60 00 [Flashing and Sheet metal] Pt. 2, 2.1, A., 1. “…mil phosphatized for field painting.”
This indicates that the sheet metal is to be a “Bonderized,” “Paint Grip,” “Jet Kote,” or similar treated
[mill phosphatized} type and then be field painted. This contradicts the requirement of a factory applied
20 year paint finish sheet metal. Is the sheet metal utilized for fabrication of architectural sheet metal flashings to be mill phosphatized and then field painted, or is to have a factory applied 20 year warranted paint finish?
CLARIFICATION: Field painting is acceptable.
7) If the sheet metal flashings are to be field painted, what is the warranty requirement for the paint finish?
CLARIFICATION: Warranty is to be 20 years.
8) Section 07 60 00 [ Flashing and Sheet Metal] Pt. 2 , 2.1, A, 1. States that the sheet metal is to be field painted. Would it be permissible to paint the metal flashings off-site, in contractors shop for example, and then touch-up the paint as necessary [to cover/conceal damage to paint finish during handling and installation] in the field after installation?
CLARIFICATION: Yes.
9) Section 07 60 00 [Flashings and Sheet Metal] Part 2, 2.3, A. Item A. Indicates that the sheet metal is to be mill phosphatized for paint finish in accordance with section 09 90 00. There is no section 09 90 00 included in the specification. Will a section 09 90 00 be issued?
CHANGE: See attached Specification Section 09 90 00.
10) Section 07 60 00 [Flashing and Sheet Metal] Pt. 2, 2.1F. , 3., A&B Reglets. The products mentioned are manufactured item that typically are not made in 20 gauge or with a mill phosphatized finish. Is it permissible to furnish and install these items in the manufactured standard available, i.e.: 24 gauge galvanized or factory applied KYHNAR paint finish?
CLARIFICATION: Yes.
11) Where does housing unit C end and where does housing Unit D begin?
CLARIFICATION: The work for housing unit C does not include the triangular flat roof between units C&D. The scope of work for Housing Unit D includes the triangular flat roof area between
Housing Unit C and Housing D.
12) In the specifications we are told to provide a fence and we were showed the back side of the housing unit. My question is how big of an area are we required to fence in? Is there a minimum or a maximum space we can fence in?
CLARIFICATION: A 40’ x 40’ area is the maximum space available.
KITCHELL CEM DUBLIN FEDERAL CORRECTION INSTITUTION (FCI) AND
PROJECT NUMBER: 3985A3 FEDERAL DETENTION CENTER (FDC) (NIC) RE-ROOF
PROJECTS
1.1 SUMMARY
A. Section Includes:
1. Paint materials.
2. Surface preparation.
3. Exterior painting and finishing schedule.
B. Related Sections:
1. Section 01 35 43 - Environmental Procedures: Additional storage requirements.
1.2 REFERENCES
A. ASTM D16 - 11a Standard Terminology for Paint, Related Coatings, Materials, and
Applications
1. Paint: Paint system materials, including primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate, or finish coats.
2. Exposed: Visible in the completed Work.
1.3 SYSTEM DESCRIPTION
A. Surface preparation and finish painting of exterior surfaces and miscellaneous components.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 00. In addition to the number of copies required by
Section 01 33 00. The submittals shall include the initial and subsequent submittals.
B. Samples:
1. Provide color sample for approval by owner that matches existing exterior color.
C. For consideration of products of manufacturers other than those named, in addition to the information required to be submitted for substitutions under the provisions of Division 0, for each product submit current (within the last 6 months) test data from a recognized independent testing laboratory, accompanied by a letter stating that the proposed products are equal to or better than those specified.
D. Manufacturer’s application instructions.
1.5 QUALITY ASSURANCE
A. Paint materials not otherwise specified shall be products of one manufacturer regularly producing materials of types specified.
1.6 FIELD SAMPLES
A. Provide field samples in accordance with Section 01 45 00.
B. Construct field sample for each type of finish on each substrate.
C. Paint a sample panel for each color selected.
D. Large Surface Areas, More than 40 sf: Apply to entire surface in one plane, terminating only at corners.
E. Small surface Areas, 40 sf or Less: Apply to minimum 4 sf.
F. Construct field sample using surface preparation method, material, and application of material as specified.
G. Review:
1. The OWNER Representative will review field sample no later than 4 days following receipt of request.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver paints and stains ready mixed in labeled, tightly covered containers to the Project site.
B. Store materials on pallets or skids in clean, dry, well-ventilated areas, away from heat, sparks, flame, and direct rays of sunshine; maintain storage areas free from fire hazard.
C. Remove used rags and hazardous waste materials at end of work each day, unless properly stored in metal containers with tightly-fitting metal covers.
D. Frequently remove accumulated waste materials.
1.8 PROJECT CONDITIONS
A. Comply with manufacturer’s recommendations for environmental conditions under which paint and paint systems shall be applied.
B. Do not apply exterior paint in rain, snow, fog or mist, when temperature is below 45 degrees
F, or when relative humidity is above 50 percent.
1.9 WARRANTY
A. Provide 20 year warranty.
2.1 ACCEPTABLE MANUFACTURERS
A. Manufacturer:
1. Dunn-Edwards Paint Co.
2. Fuller O’Brien Paint Company.
3. ICI Paints.
4. Frazee.
2.2 MATERIALS - GENERAL DESCRIPTION
A. Cementitious Filler: Nonshrink formulation; white portland cement with fine silicate aggregate, zinc-oxide pigment, and reinforcing chemical binder as approved.
B. Thinner: As recommended by each manufacturer for his respective product.
C. Equipment: Provide scaffolding, staging, drop cloths, covers, brushes, rollers, and spraying and other equipment of the type, grade, and size required for proper execution of the Work.
2.3 MISCELLANEOUS SURFACE PREPARATION MATERIALS
A. Galvanized Metal Chemical/Acid Etch
1. Dunn-Edwards - Galva-Etch Etching Liquid, GE 123.
2.4 PAINT MATERIALS
A. Exterior non-ferrous metal shall contain or have properties which are equivalent to the following:
1. Alkyd Option:
a. Vehicle: Alkyd resins, thinners and additives.
b. Pigments: Titanium dioxide and reinforcing pigments.
c. Solids by Volume: 44 percent minimum.
d. Solvent Type: Paint thinner.
e. Resin Type: Alkyd.
2. Acrylic Option:
a. Vehicle: Acrylic resins, water and additives.
b. Pigments: Titanium dioxide, reinforcing, and corrosion inhibiting pigments.
c. Solids by Volume: 38 percent minimum.
d. Solvent Type: Waterborne.
e. Resin Type: 100 percent acrylic.
B. Primer for exterior ferrous metal shall contain or have properties which are equivalent to the following:
1. Vehicle: Alkyd resins and oils, thinners and additives.
2. Pigments: Titanium dioxide, rust inhibitive and reinforcing pigments.
3. Solids by Volume: 56 percent minimum.
4. Solvent type: Paint thinner.
5. Resin Type: Alkyd.
C. Semi-gloss paint for exterior ferrous and non-ferrous metals shall be formulated for interior and exterior applications and shall contain or have properties which are equivalent to the following:
1. Vehicle: Acrylic resins, water and additives.
2. Pigments: Titanium dioxide.
3. Solids by Volume: 34 percent minimum.
4. Solvent Type: Waterborne.
5. Resin Type: 100 percent acrylic.
D. Additional surface preparation and paint materials required by other Sections and not listed herein shall be manufacturer’s best quality for the intended purpose.
2.5 PAINT MATERIALS FOR EXTERIOR USE
A. Primers and Undercoats:
Dunn-Edwards
Product Product / Number
Galvanized/Aluminum Primer Galv-Alum QD 43-7
White Alkyd Corrosion Inhibitive Primer Corrobar 43-5
B. Paint Finish Coats:
Dunn-Edwards
Product Product / Number
100 percent Acrylic Semi-Gloss Paint (Ext.) Permasheen W 901
2.6 COLORS
A. The OWNER Representative will select the finish colors and textures and determine the basic colors of surfaces to be painted.
3.1 EXAMINATION
A. Verify that conditions are satisfactory for the application of paint finishes.
B. Before commencing paint applications, have an authorized representative of paint manufacturer inspect work areas and report his findings.
C. If unsatisfactory conditions exist, do not commence the application until such conditions have been corrected.
D. Application of first coat of finish constitutes acceptance of surface conditions and responsibility for ultimate finish.
3.2 PREPARATION
A. Clean before commencement of paint application.
B. Surfaces to be finished shall be dry, clean, smooth, and free from rust, scale, oil, grease, grit, frost, sap, and other foreign matter. Shellac and seal marks which might bleed through surface finish.
C. Protect stainless steel, aluminum, and other surfaces which are not to be painted by masking or other means.
D. Hardware, hardware accessories, and similar items in place shall be sufficiently protected or removed prior to painting, and replaced upon completion of painting of each space.
E. Locate and install scaffolding and staging to avoid interference with the Work of other
Sections.
F. Metals:
1. Remove mill scale, rust, corrosion, and other foreign matter by wire brushing, scraping, sandblasting, or solvent, as required to produce a clean, smooth surface.
2. Clean oil, grease, and dust from surfaces using mineral spirits.
3. Touch up chipped or abraded areas in shop primer using primer compatible with existing.
4. Pretreat galvanized metal with phosphoric acid etch or vinyl wash. Apply primer within four hours of acid etching.
3.3 APPLICATION
A. Do not apply initial coating until moisture content of surface, as tested with a moisture meter, is within limitations recommended by the coating manufacturer.
B. Apply coatings in accordance with manufacturer’s printed instructions.
C. Methods of Application: Brush (B), Roller (R) or Spray (S) application shall be used in accordance with the following schedule:
Surface 1st Coat 2nd Coat 3rd Coat
Ferrous Metal
Primed ---- B, R, S B, R, S
Unprimed B, S B, R, S B, R, S
Non-Ferrous Metal*
Primed ---- B, R, S B, R, S
Unprimed B, S B, R, S B, R, S
* Does not apply to large wall surfaces. Use sheepskin daubers to reach surfaces which are inaccessible to brushes.
** Back-roll first coat when using a spray application.
D. Coats:
1. Apply coats and undercoats in accordance with the manufacturer’s recommendations. A uniform and opaque painted finish utilizing at least three coats is the minimum requirement. More coats of paint may be required to obtain a finish acceptable to the
OWNER Representative.
2. Tint pigmented undercoats to approximately the same shade as the final coat.
Perceptibly increase the depth of shade in successive coats.
3. Allow each coat to thoroughly dry before application of succeeding coat; comply with manufacturer’s recommendations for drying time between coats.
4. Sand and dust between each coat to remove defects visible from a distance of 5 feet.
5. Finish coats shall be smooth, even and free from brush marks, streaks, laps and pile-up of paints, and skipped and missed areas.
6. Finish mill and shop primed items with materials compatible with prime coat.
7. Paint surfaces of galvanized steel drip moldings, reveal joints and trim, and casing beads that will be exposed in the finished Work.
E. Edges of paint adjoining other materials and colors shall be clean and sharp with no overlapping.
F. Refinish whole surfaces where portion of finish is not acceptable.
G. Pretreatment of Existing Surfaces: Unless specified first coat is suitable for materials and conditions encountered, apply one additional coat of surface conditioner as recommended by paint manufacturer.
H. Priming:
1. Metals:
a. Prime surfaces of miscellaneous iron and steel not embedded in concrete, and surfaces of ungalvanized, unprimed sheet steel.
b. Time lapse between priming and application of second coat shall be as short as possible to provide for proper bonding to prime coat.
I. Spraying:
1. Spray only with airless sprayer.
2. Apply in fine, even spray without addition of thinner.
3. When necessary, follow by brushing to ensure uniform coverage and to eliminate wrinkling, blistering, and air holes.
4. If spraying becomes detrimental to equipment or objectionable to personnel, brush painting will be required.
J. Exposed Plumbing, Mechanical, and Electrical Items:
1. Finish exposed items without factory finish to match adjacent finished surfaces, unless otherwise directed. Where adjacent surface is unfinished, color will be selected by the
OWNER Representative.
2. Finish shop primed and/or factory primed items to match adjacent finished surfaces, unless otherwise directed. Where adjacent surface is unfinished, color will be selected by the OWNER Representative.
3. Wash exposed metal with solvent, then prime and paint as scheduled.
4. Spray-paint wherever practicable.
K. Miscellaneous Painting: Perform as indicated or required and as directed to coordinate appearance and/or color of incidental items or surfaces with adjacent surfaces.
L. Touch-up and restore finish where damaged.
M. When complete, painted surfaces shall be clean, uniform in appearance, and free from holidays, skips, runs, bubbles, streaks, scratches, and other damage and defects.
3.4 PROTECTION
A. Provide barriers and post signs as necessary to protect newly applied finishes.
3.5 CLEANING
A. Clean up spilled and spattered paint daily.
B. Remove spilled and spattered paint, taking care not to mar surface finish of item being cleaned.
C. Leave the Project site in a clean and orderly condition.
3.6 PAINT SYSTEMS
A. Paint all exterior surfaces not specifically excluded.
B. Only major areas are scheduled, but all miscellaneous items and areas within the room or space shall be painted.
C. The number of coats specified is the minimum number acceptable. If full coverage is not obtained with the specified number of coats, apply additional coats as necessary to produce the required finish, at no increase in Contract Price.
D. Acceptance of Final Colors: Final coat of paint for both exterior and interior shall not be applied until the colors have been accepted by the OWNER Representative.
3.7 SCHEDULE - ITEMS NOT TO BE PAINTED
A. Do Not Paint the Following Items:
1. Products having factory finish (products which are shop or factory primed only shall be painted).
2. Copper, stainless steel, aluminum, brass, bronze and chromium-plated surfaces.
3. Elastomeric materials.
4. Glass, glazing compound and sealants.
5. Roofing finishing materials.
6. Other items specifically indicated not to be painted.
3.8 SCHEDULE - EXTERIOR PAINT SYSTEMS
A. Ferrous metal surfaces - semi-gloss finish (exposed exterior surfaces and items which are generally visible from the ground):
1. First Application: White alkyd corrosion inhibitive primer.
2. Second Application: White alkyd corrosion inhibitive primer, half tinted.
3. Third Application: Interior/exterior 100 percent acrylic semi-gloss paint.
B. Non-ferrous or galvanized metal surfaces - semi-gloss finish (exposed exterior surfaces and items which are generally visible from the ground):
1. First Application: Galvanized/aluminum primer or acrylic multi-purpose primer.
2. Second Application: Interior/exterior 100 percent acrylic semi-gloss paint.
3. Third Application: Interior/exterior 100 percent acrylic semi-gloss paint.
| Amendment 0003 |
| Questions AND Answers |
| 09 90 00 - Painting and Coating |
| contract_id_code: |
| first_page: 1 |
| last_page: 14 |
| modification_no: 0003 |
| effective_date: 8/1/2011 |
| requisition_no: RP0288-11 |
| project_no: 6RX |
6RX
issued_by: FEDERAL BUREAU OF PRISONS
WESTERN REGIONAL OFFICE
7338 SHORELINE DRIVE
STOCKTON, CA 95219
| administered_by: |
| code_2: |
| contractor_name_address: |
| check_1: Yes |
| amendment_solicitation_no: IIBP06021100001 |
| dated: 7/6/11 |
| check_2: Off |
| contract_order_no: |
| dated_2: |
| code: |
| faculty_code: |
| checkbox_1: Off |
| copies: |
| acct_and_appropriation: |
| check_a: Off |
| change_order: |
| check_b: Off |
| contract_order_modified: |
| check_c: Off |
| authority_of: |
| check_d: Off |
| other: |
| number_of_copies_return: 01 |
| amendment_description: AMENDMENT IS AS FOLLOWS: |
A. INCORPORATE SECTION 09 990 00 PAINTING AND COATING INTO THE SPECIFICATIONS.
B. INCORPORATE QUESTIONS AND ANSWERS (6 PAGES). CHANGES ARE MADE WITHIN THIS DOCUMENT TO THE SPECIFICATIONS.
NO OTHER CHANGES ARE MADE AT THIS TIME.
| signer_name_title: |
| contracting_name_title: |
| date_signed_contractor: |
| date_signed_contracting_officer: |
| checkbox_2: Off |
| checkbox_3: Yes |
| checkbox_4: Off |
| checkbox_5: Yes |
File details come from the government source that posted it. Updated .