03 - Specifications.pdf
PDF 470 KB Posted
- Attached to
- RE-ROOF THREE HOUSING UNITS
- Solicitation number
- IFBP06021100001
About this file
03 - Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract - Dublin.pdf | ||
| SF-30 AMENDMENT 0004.pdf | ||
| SF-30 AMENDMENT 0003.pdf | ||
| SF-30 AMENDMENT 0002.pdf | ||
| SF-30 AMENDMENT 0001.pdf | ||
| Site Visit Minutes.pdf | ||
| 06 - SF-24 Bid Bond Form.pdf | ||
| 04 - Drawings.pdf | ||
| 02 - Solicitation.pdf | ||
| 05 - Alameda County Wage Rate 07012011.pdf | ||
| 01 - IFB Coverletter.pdf | ||
| 07 - NCIC Forms.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KITCHELL CEM DUBLIN FEDERAL CORRECTION INSTITUTION (FCI) AND
PROJECT NUMBER: 3985A3 FEDERAL DETENTION CENTER (FDC) (NIC) RE-ROOF
PROJECTS
00 01 10 - 1
SECTION 00 01 10
TABLE OF CONTENTS
00 01 00 Project Cover Sheet 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets
BIDDING REQUIREMENTS - NOT USED
CONTRACT FORMS - NOT USED
CONDITIONS OF THE CONTRACT - NOT USED
DIVISION 1 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 23 00 Alternates 01 31 13 Project Coordination 01 31 19 Project Meetings 01 33 00 Submittal Procedures 01 33 23 Shop Drawings, Product Data, and Samples 01 35 43 Environmental Procedures 01 41 00 Regulatory Requirements 01 45 00 Quality Control 01 50 00 Temporary Facilities and Controls 01 74 19 Construction Waste Management and Disposal 01 78 00 Closeout Submittals 01 78 23 Operation and Maintenance Data
DIVISION 2 - EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 3 - CONCRETE
03 60 00 Grouting
DIVISION 4 – NOT USED
DIVISION 5 - METALS
05 50 00 Metal Fabrications
DIVISION 6 - WOOD AND PLASTICS
06 16 00 Sheathing
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 22 00 Roof and Deck Insulation 07 31 13.13 Fiberglass-Reinforced Asphalt Shingles
00 01 10 - 2
07 52 00 Modified Bituminous Membrane Roofing 07 60 00 Flashing and Sheet Metal 07 90 00 Joint Protection 07 95 00 Expansion Control
DIVISION 8 - NOT USED
DIVISION 9 – FINISHES – NOT USED
DIVISION 10 thru 12 - NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED
DIVISION 14 thru 21 – NOT USED
DIVISION 22 – PLUMBING
22 05 00 Common Work Results for Plumbing 22 05 10 Basic Plumbing Installation Requirement 22 14 13 Facility Storm Drainage Piping
DIVISION 23 thru 49 – NOT USED
END OF TABLE OF CONTENTS
PROJECTS
00 01 15 - 1
DOCUMENT 00 01 15
LIST OF DRAWING SHEETS
SHEET NO. SHEET TITLE
G1 Cover Sheet
ARCHITECTURAL
S1 Overall Site Plan D1 FCI Housing Unit Roof Demolition Plan - Typical D2 FDC Housing Unit A Roof Demolition Plan (NIC) D3 FDC Housing Unit B Roof Demolition Plan (NIC) D4 FDC Housing Unit C Roof Demolition Plan (NIC) A1 FCI Housing Unit Roof Plan - Typical A2 FDC Housing Unit A Roof Plan (NIC) A3 FDC Housing Unit B Roof Plan (NIC) A4 FDC Housing Unit C Roof Plan (NIC) A5 FCI Housing Unit Roof Details A6 FCI Housing Unit Roof Details A7 FDCHousing-Administration Roof Details (NIC)
END OF SECTION
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes
1. Project Description.
2. Use of Premises.
3. Contractor's Acceptance of Other Work.
B. Related Sections
1. Refer to requirements of Division 0.
1.2 PROJECT DESCRIPTION
The Federal Correctional Institution FCI, Dublin, California is located in Northern California approximately 20 miles southeast of Oakland adjacent to the U.S. Army’s Parks reserve Forces Training Area.
A. Work Covered by Base Bid: Re-roofing of FCI Housing Unit A, B and D.
B. Work Covered by Alternate Bid 1: Reroofing of FCI Housing Unit E if accepted.
C. FCI Housing Unit F & G are Not in Contract (NIC) D. FDC is Not in Contract (NIC).
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
01 23 00 - 1
SECTION 01 23 00
ALTERNATES
PART 1 GENERAL
1.1 SUMMARY
A. Section includes
1. Definitions.
2. Requirements.
B. RELATED SECTIONS
1.2 DEFINITIONS
A. Alternate: Modifications to work included under Base Bid.
1.3 REQUIREMENTS
A. Coordinate related work and modify surrounding work to integrate the Work of accepted Alternate.
3.1 SCHEDULE OF ALTERNATES
A. Alternate No. 1, Reroofing of Housing E.
01 31 13 - 1
SECTION 01 31 13
PROJECT COORDINATION
1. Coordination and the division of responsibilities between this Contractor and the Contracting Officer and Contract Monitor.
2. Information for locating and orienting buildings and other site features.
1. Section 01 33 00 – Submittal Procedures.
2. Individual sections specifying materials and installation
A. Contractor: The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term “Contractor” means the Contractor or the Contractor’s authorized representative.
1.3 SUBMITTALS
A. Submit under provisions of Section 01 33 00.
1.4 SCHEDULING
A. Coordinate all work of this Contract with the Contracting Officers and Contract Monitor.
01 31 19 - 1
SECTION 01 31 19
PROJECT MEETINGS
1. Preconstruction conference.
2. Weekly Contractor meetings.
3. Weekly coordination meetings.
4. Preinstallation conferences.
1.2 PRECONSTRUCTION CONFERENCE
A. Location
1. A preconstruction conference will be held at the work site.
2. Location, time, and date will be set by Contract Officer.
B. Government Contracting Officer, Contract Monitor, Architect, Contractor and major subcontractors shall attend the conference.
C. The meeting will be chaired, and minutes taken, by Contracting Officer.
D. The subjects to be reviewed include, but are not limited to:
1. Introduction.
2. Construction Coordination.
3. Correspondence.
4. Requests for Information (RFI)
5. Submittals.
6. Permits.
7. Dust Control.
8. Schedule.
9. Survey Control.
10. Contractor's Representative.
11. Testing and Inspection.
12. Contractor Reporting Requirements.
13. Changes and Clarifications.
14. Clean-up.
15. As-Built Documents.
16. Prevailing Wage Requirements.
17. Environmental Protection, Plan and Procedures.
18. Temporary Facilities Construction.
19. Notice of Labor Disputes.
20. Progress Payments.
21. Site Regulations.
22. Security.
23. Operation and Maintenance Data.
01 31 19 - 2
24. Training Requirements.
25. General Discussion.
1.3 WEEKLY CONTRACTOR MEETINGS
A. Once a week during the contract period, Contractor shall meet at the work site with the Contract Monitor.
B. Time and location of the meeting will be determined during the Preconstruction Conference.
C. The Contract Monitor will serve as chairman and take minutes of meetings.
D. Topics for discussion will include schedule, requests for information, disputed items, Potential
Change Order (PCO) and Change Order (CO) status, Quality control, submittals, exception notices, and other topics as required.
1.4 WEEKLY COORDINATION MEETINGS
A. Once a week during the contract period, the Contractor shall meet at the work site with the
B. Time and location of the meetings will be determined by the Contract Monitor.
C. The Contract Monitor will serve as chairman and take minutes of meetings.
D. Topics for discussion will include upcoming closures, coordination of construction activities, and other topics of interest to all parties.
1.5 PREINSTALLATION CONFERENCES
A. Convene a preinstallation conference for items of work contained in each Division of the Specifications, each trade within the Division, and each subcontractor within the Division.
1. Convene a preinstallation conference prior to commencing the work of the Section, trade or subcontractor.
2. Require attendance of each subcontractor and each trade directly affecting or affected by the work within the Division.
3. Convene additional conferences when required by individual Section of the
Specification.
4. Prepare an agenda, preside over the conference, and record minutes, and distribute copies within two (2) days after the conference to participants, with two (2) copies to the Contract Monitor.
5. Review conditions of installation, coordination, preparation, approved submittals, contract documents, and means and methods planned to be used to perform the work.
B. Within 45 days after Notice to Proceed, submit a proposed list of preinstallation conferences, and items of work to be covered, for approval by the Contract Monitor.
01 31 19 - 3
01 33 00 - 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1. Submittal Log.
2. Submittal Procedures.
3. Submittal Contents.
4. Submittal Quantities.
5. Manufacturer's Instructions.
B. Belated Sections and Documents
2. Section 01 33 23 - Shop Drawings, Product Data and Samples.
3. Section 01 41 00 - Regulatory Requirements: Submittals to enforcing authorities.
1.2 SUBMITTAL LOG
A. Prepare submittal log in format approved by Architect.
B. Cross reference to the first activity of the Approved Contract Schedule which will be dependent on the approved submittal.
C. Submit to Contract Monitor concurrent with Contract Schedule submission.
1.3 SUBMITTAL PROCEDURES
A. Provide submittals only as required in individual Specification Section.
B. Submittals not required will not be reviewed.
C. Neither the review nor lack of review of any submittal shall waive any of the requirements of the Contract, or relieve the Contractor of any obligations hereunder.
D. Make submittals promptly in accordance with the approved submittal log, and in such sequence as to cause no delay in the work or in the work of any other contractor.
E. Number submittals sequentially, using alphabetic suffixes on resubmittals.
F. Each submittal shall contain data representing only one specification Section.
G. Architect will review and return submittals within 20 days after receipt thereof, or within 20 days after receipt of all information necessary for such review, whichever is later.
1. Review status will be marked "No Exception Taken", "Make Corrections Noted", "Revise and Resubmit", "Rejected", or "Not Reviewed".
01 33 00 - 2
2. Revise and resubmit within 15 days of return submittals marked "Revise and Resubmit" or "Rejected".
H. Distribute copies of the reviewed submittals to concerned parties. Instruct parties to promptly report inability to comply with provisions. Notify Contract Monitor of every such report.
I. Do not begin work covered by a submittal designated "Revise and Resubmit" or "Rejected".
Contractor may begin work covered by submittals marked “No Exceptions Taken” or “Make Corrections Noted” in accordance with review notes and comments.
1.4 SUBMITTAL CONTENTS
A. Submittals Shall Contain:
1. Date of submission and dates of any previous submissions.
2. Project title and number.
3. Contract Identification.
4. Names of Contractor, supplier, and manufacturer.
5. Identification of the product, with the specification Section number.
6. Dimensions and values in units to match those indicated.
7. Field dimensions, clearly identified as such.
8. Relation to adjacent or critical features of the work or materials.
9. Applicable standards, such as ASTM or Federal Specification numbers.
10. Identification of revisions on resubmittals.
11. An 8 by 3-inch space for review stamps in the lower right hand corner of each page.
12. Contractor's stamp, initialed or signed, certifying to review of submittal, verification of products, field measurements and field construction criteria, and coordination of the information within the submittal with requirements of the work and of the Contract.
1.5 SUBMITTAL QUANTITIES
A. Unless otherwise specified, submit a total of nine copies of each submittal. Seven copies will be retained and two copies will be returned after review. Submittals shall be organized in identical order in copies.
1.6 MANUFACTURER'S INSTRUCTIONS
A. Where any item of work is required by the Contract to be delivered, stored, assembled, installed, started-up, adjusted, or finished in accordance with the Manufacturer's instructions, submit manufacturer's printed instructions.
B. Identify conflicts between manufacturer's instructions and the Contract. Report conflicts to
01 33 00 - 3
01 33 23 - 1
SECTION 01 33 23
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
2. Shop drawings.
3. Product Data.
4. Samples.
B. Related Sections and Documents
2. Section 01 33 00 - Submittals.
A. Manufactured: Standard units, usually mass-produced.
B. Fabricated: Specifically assembled or made out of selected materials to meet design requirements.
C. Shop Drawings: Documents establishing the actual detail of manufactured or fabricated items, indicating relation to adjoining work, identifying what work is performed at the project site, and amplifying design details of mechanical and electrical equipment in proper relation to physical spaces in the structure.
D. Product Data: Manufacturer's standard drawings, descriptive literature, catalogs, brochures, performance and test data, wiring and control diagrams, other drawings and descriptive data pertaining to specified products.
1.3 SHOP DRAWINGS
B. Submit one reproducible transparency and eight opaque reproductions. The reproducible copy will be returned after review.
C. Reproductions of Contract Drawings, Specifications, or portions thereof shall not be used for shop drawing submittals.
D. Present information in clear and thorough manner.
E. Identify details by reference to Drawing and detail, schedule, or room numbers shown and specified.
1.4 PRODUCT DATA
01 33 23 - 2
B. Clearly mark each copy to identify pertinent products and models.
1. Modify to delete inapplicable information.
2. Supplement standard information as required.
C. Indicate performance characteristics and capacities.
D. Show dimensions and clearances required.
E. Show piping diagramss.
1.5 SAMPLES
B. Submit the number of samples indicated in each Section. Where no number is indicated, submit 9 samples.
C. Submit samples of sufficient size to illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
D. Submit samples of finishes from the full range of manufacturer's standard colors, custom colors when specified, textures and patterns for selection.
E. Include identification on each sample with full project information.
F. Reviewed samples which may be used in the work are indicated in individual specification
Sections.
1. Only samples marked "No Exception Taken" may be incorporated in the work.
2. Samples that were intended to be incorporated in the work will be returned, together with a written notice designating the sample with the appropriate review status and indicating errors discovered on review.
3. Other samples will not be returned, but the same notice will be given, and such notice shall be considered a return of the sample.
01 35 43, Attachment A - Page 1
SECTION 01 35 43 – ATTACHMENT A
PARTIAL LIST OF POTENTIAL POLLUTANTS
1.1 Contractor shall identify the pollutants present during construction and take the necessary measures to restrict their entry into the natural drainage system, based on the National Pollutant Discharge Elimination System (NPDES) applicable laws, codes and regulations.
1.2 Potential pollutants that may be used at the site and that have the potential to enter the storm water drainage system are included in the list below. This is not intended to be a complete list of categories, products and pollutants.
1.3 CONSTRUCTION SITE POTENTIAL POLLUTANTS
CATEGORY PRODUCT, ACTIVITY POLLUTANTS
Adhesives Adhesives, Glues
Resins, Epoxy Synthetics
Calks, Sealers, Putty, Sealing Agents
Coal Tars (Naptha, Pitch)
Phenolics, Formaldehydes
Phenolics, Formaldehydes
Asbestos, Phenolics,Formaldehydes
Benzene, phenols,Naphthalene
Cleaners Polishes, (Metal, Ceramic, Tile)
Etching Agents
Cleaners, Ammonia, Lye, Caustic Sodas
Bleaching Agents
Chromate Salts
Metals
Acidity/Alkalinity
Acidity/Alkalinity
Chromium
Plumbing Solder (Lead, Tin), Flux (Zinc Chloride)
Pipe Fitting (Cut Shavings)
Galvanized Metals
Lead, Copper, Zinc, Tin
Copper
Zinc
Electrical Wiring
Copper, Lead
Painting Paint Thinner, Acetone, MEK, Stripper
Paints, Lacquers, Varnish, Enamels
Turpentine, Gum Spirit, Solvents
Sanding, Stripping
Paints (Pigments), Dyes
VOC's
Metals, Phenolics, Mineral Spirits
VOC's
Metals
Metals
Woods Sawdust
Particle Board Dusts
Treated Woods
BOD
Formaldehyde
Copper, Creosote
01 35 43, Attachment A - Page 2
CATEGORY PRODUCT, ACTIVITY POLLUTANTS
Masonry & Concrete
Dusts (Brick, Cement)
Colored Chalks (Pigments)
Concrete Curing Compounds
Glazing Compounds
Cleaning Surfaces
Acidity, Sediments
Acidity
Floors & Walls Flashing
Drywall
Tile Cutting (Ceramic Dusts)
Copper, Aluminum
Dusts
Minerals
Remodeling & Demolition
Insulation
Venting Systems
Asbestos
Aluminum, Zinc
Air Conditioning & Heating
Insulation
Coolant Reservoirs
Asbestos
Freon
Yard O&M Vehicle and Machinery Maintenance
Gasoline, Oils, Additives
Marking Paints (Sprays)
Grading, Earth Moving
Portable Toilets
Fire Hazard Control (Herbicides)
Wash Waters
Oils and grease, Coolants
Benzene & Derivatives, Oils & Grease
Vinyl Chloride, Metals
Erosion (Sediments)
BOD, Disinfectants (Spills)
Sodium Arsenite, Dinitro
Rodenticides, Insecticides, Herbicides, Concrete, Oils, Greases
Materials Storage Waste Storage (Used Oils, Solvents, Etc.)
Hazardous Waste Containment
Raw Material Piles
Spills, Leaks
Spills, Leaks
Dusts, Sediments
Note: VOC = Volatile Organic Compounds.
BOD = Biochemical Oxygen Demand due to the use of oxygen by decomposing materials.
END OF ATTACHMENT
01 35 43 - 1
SECTION 01 35 43
ENVIRONMENTAL PROCEDURES
1. Potential Pollutants.
2. Concrete waste management.
3. Vehicle and equipment fueling and maintenance.
4. Spill prevention and control.
5. Temporary containment removal.
6. Non-storm water management.
2. Section 01 50 00 - Temporary Facilities and Controls
3. Section 01 74 19 - Construction Waste Management and Disposal
4. Other Sections: Equipment and materials that may contain potential site pollutants.
1.2 POTENTIAL POLLUTANTS
A. Identify potential pollutants that are used in the Work.
B. Certain potential pollutants are identified in Attachment A, immediately following this
Section.
1.3 SUBMITTALS
1. Submit under provisions of Section 01 33 00.
2. Implementation Drawings: Indicate the areas of the construction site for storage of potential pollutants.
3. Hazardous Material Clean Up and Solid Waste Management Data: List the employees trained in emergency spill cleanup procedures and indicate the training procedures for employees and subcontractors in spill prevention and cleanup and solid waste management.
4. Concrete Waste Management Data: Indicate concrete washout areas and the procedures to train employees and subcontractors in proper concrete waste management.
5. Vehicle and Equipment Fueling and Maintenance Data: Indicate fueling and maintenance areas and the procedures to train employees and subcontractors in proper fueling, spill prevention and clean up procedures, and maintenance.
01 35 43 - 2
1.4 PRECONSTRUCTION CONFERENCE
1. Review delivery routes, storage areas, spill prevention and clean up procedures, and training procedures.
1.5 DELIVERY, STORAGE, AND HANDLING
1. Keep an accurate, current inventory of materials containing potential pollutants, delivered and stored onsite.
2. Use personnel trained in spill prevention and emergency spill clean up procedures to unload and store materials containing potential pollutants.
3. Store construction raw materials containing potential pollutants off the ground in designated areas in secondary containment structures or surrounded by earth berms away from storm drain inlets, waterways, and drainage paths. Material storage shall be located in paved areas. Store chemicals in their original labeled containers. Cover the materials with plastic tarps when not in use.
a. Store hazardous waste and materials in sealed containers; protect from vandalism.
Place in areas that will be paved and surround the areas with earth berms.
b. Store reactive, ignitable, or flammable liquids in accordance with fire codes.
c. Store materials in a covered area during wet weather.
d. Small amounts of material may be secondarily contained in "bus boy" trays or concrete mixing trays.
4. Remove and dispose of residual materials and contaminated soil after construction is complete.
3.1 CONCRETE WASTE MANAGEMENT
A. Wash out concrete trucks in approved areas only. Locate washout area at least 50 feet from storm drains, open ditches, streams, streets, or water bodies. Prevent runoff from washout area.
B. Wash out wastes and allow to harden. Break the hardened concrete into pieces and dispose offsite.
C. Do not wash recently placed concrete unless runoff will be drained to a bermed or level area, away from water ways and storm drain inlets.
D. Do not dump excess concrete on-site, except in approved designated areas.
01 35 43 - 3
3.2 VEHICLE AND EQUIPMENT FUELING AND MAINTENANCE
A. No vehicle fueling will be allowed onsite without prior approval from the Contract Monitor.
B. Where construction equipment will use fuel, fueling will take place only within approved areas.
The contractor will provide temporary fueling from trucks, or fuel equipment off-site; no stationary fuel tanks will be allowed on site. Where fueling trucks are used, Contractor will dispense fuel in accordance with all federal, state and local requirements.
C. Use personnel trained in emergency spill cleanup procedures to dispense fuel.
D. Regularly inspect onsite vehicles and equipment for leaks, and repair immediately. Do not allow leaking vehicles or equipment onsite.
E. Clean oil and grease build up from vehicles and equipment at approved areas.
F. Segregate and recycle wastes, such as greases, used oil, oil filters, anti-freeze, cleaning solutions, automotive batteries, hydraulic, and transmission fluids.
3.3 SPILL PREVENTION AND CONTROL
A. Use secondary containment devices such as drain pans or drop cloths at all areas when fueling, or removing or changing fluids.
B. Place a stockpile of spill cleanup materials where it will be readily accessible.
C. Use personnel trained in emergency spill clean up procedures.
D. Clean up leaks and spills immediately, in accordance with waste management regulations.
E. Clean up spills on paved surfaces with minimal water usage. Clean small spills with cloths and larger spills with absorbent material. Immediately send used hazardous cleanup cloth material to a certified laundry or remove and dispose as hazardous waste, in accordance with waste management regulations.
F. Do not hose down or bury dry material spills.
3.4 TEMPORARY CONTAINMENT REMOVAL
A. Remove all temporary containment structures, devices and equipment when directed by Contract Monitor. Clean and repair damage caused by installation and use of temporary work.
3.5 NON-STORM WATER MANAGEMENT
A. Minimize the use of water sprayed for dust control and washing off structures for cleaning to avoid causing runoff and erosion.
01 35 43 - 4
PROJECTS
01 41 00 - Attachment A
MINED PRODUCTS AND MATERIALS CERTIFICATION FORM
Contractor Name Date:
Address: Contract No.:
Project: Bid Package No.:
Pay Period: Estimate No.:
In accordance with Specification Section 01 41 00 and the provisions of Section 10295.5 of the Public Contract Code, no sand, gravel, aggregates, or other minerals produced from a surface mining operation subject to the Surface Mining and Reclamation Act (SMARA) of 1975 (Public Resources Code Section 2710, et. seq.,) shall be purchased or utilized in the work of the contract, unless the operation is identified in the list published quarterly in the California Regulatory Notice Register pursuant to subdivision (b) of Section 2717 of the Public Resources Code.
Indicate the California Mine Identification Number of each site from which products or materials have been purchased.
DATE SMARA# MINE MATERIAL WEIGHT
If additional space is needed, attach additional page(s) to this page.
I hereby certify that no sand, gravel, aggregates, or other minerals produced from a surface mining operation subject to the Surface Mining and Reclamation Act of 1975 have been purchased or utilized in the work of the contract, which have come from sites not currently identified in the list published quarterly in the California Regulatory Notice Register pursuant to subdivision (b) of Section 2717 of the Public Resources Code.
I declare under penalty of perjury that the foregoing is true and correct under the laws of the State of California.
AUTHORIZING SIGNATURE DATE
This certification must be completed and returned with your pay estimate; failure to return with your pay estimate could result in delayed payment.
FALSE REPORTS ARE SUBJECT TO PENALTY UNDER THE CALIFORNIA FALSE CLAIMS ACT
GOVERNMENT CODE §12650 et. seq.
01 41 00 - 1
SECTION 01 41 00
REGULATORY REQUIREMENTS
1. Submittals.
2. Quality Assurance.
3. Regulatory Requirements.
4. Field Quality Control.
2. Section 01 33 00 – Submittal Procedures.
3. Section 01 33 23 - Shop Drawings, Product Data, and Samples.
4. Section 01 35 43 - Environmental Procedures.
1.2 SUBMITTALS
A. Submit under provisions of Section 01 33 00 and 01 33 23.
B. Immediately following this Section is the Mined Products and Materials Certification Form, indicated as 01 41 00 - Attachment A. Once each month, submit completed Form.
C. Submit certification of inspection confirming approval by authority having jurisdiction when required by individual Section.
D. Submit the following directly to enforcing authorities when required by individual Section:
1. Shop drawings.
2. Product data.
3. Design data.
4. Test reports.
5. Certificates.
6. Manufacturer's Instructions.
7. Manufacturer's Field Reports.
8. Operation and Maintenance Data.
9. Guarantee.
10. Other items indicated.
1.3 QUALITY ASSURANCE
A. Perform work in accordance with specific standards indicated. Maintain one copy of each document on site.
B. UL Assemblies:
1. UL Design Numbers are indicated for various fire-rated floor/ceiling, roof/ceiling, wall, PROJECTS
01 41 00 - 2 and structural frame assemblies.
2. Where Documents indicate UL Assemblies, the materials and installation shall comply exactly with the particulars of the Design Number indicated.
3. Components may not be interchanged or substituted from different assemblies.
1.4 REGULATORY REQUIREMENTS
A. Conform to applicable codes, except conform to more stringent requirements of the Drawings and Specifications.
B. Applicable codes include, but are not limited to:
1. The California Building Standards Code, also known as the California Code of Regulations (CCR), Title 24.
a. 2010 California Building Standards Administrative Code (Part 1, Title 24, CCR)
b. 2010 California Building Code (2009 IBC and 2010 California Amendments, Part
2, Title 24, CCR)
c. 2010 Electrical Code (2008 NEC and 2010 California Amendment Part 3, Title 24, CCR)
d. 2010 California Mechanical Code (2009 UMC and 2010 California Amendments
Part 4, Title 24, CCR)
e. 2010 California Plumbing Code (2009 UPC and 2010 California Amendments Part
5, Title 24, CCR)
f. 2010 California Fire Code (2009 IFC and 2001 California Amendments, Part 9, Title 24, CCR)
g. For copies of the California Building Standards Code or the California
Amendments only, contact Building New Inc. (BNI) at (310) 202-7775, International Conference of Building Officials (ICBO) at 1-800-423-6587, International Code Council at 1-800-786-4452, or Book Mark Inc. at 1-800-642-
1. Federal Codes:
a. Federal Clean Water Act Amendments - 1987 and the National Pollutant Discharge
Elimination System (NPDES): General Permit for Storm Water Discharges Associated with Construction Activity.
2. Surface Mining and Reclamation Act of 1975 (Public Resources Code Section 2710, et.
seq.).
PART 3 EXECUTION
3.1 FIELD QUALITY CONTROL
A. When required by individual Section, arrange for enforcing authority to witness indicated tests.
01 45 00 - 1
SECTION 01 45 00
QUALITY CONTROL
1. Field Samples.
2. Manufacturers' Field Services and Reports.
3. Detention Equipment Specialist.
1. Section 01 33 00 - Submittals.
2. Section 01 65 00 – Product Delivery Requirement.
1.2 FIELD SAMPLES
A. When Field Sample is required, perform no installation or application until Field Sample is approved.
B. Submit schedule for Field Sample construction; show date and relationship to Approved
Contract Schedule.
C. Construct Field Samples required by individual specifications Sections in location as approved.
D. OWNER Representative will review Field Sample for conformance with the drawings and specifications.
E. Modify or replace Field Sample until Field Sample is approved.
F. Approved Field Samples
1. Shall remain until the remainder of the work of the Section requiring Field Sample is complete.
2. Will be used as the standard of acceptable quality for the remainder of the project.
3. May be incorporated into the work at the discretion of the Contract Monitor.
4. Shall be removed at completion of the work of that Section when required by Section or when not incorporated into the work.
1.3 MANUFACTURERS' FIELD SERVICES AND REPORTS
A. Observers' Qualifications:
1. Submit qualifications of observer to Contract Monitor 30 days in advance of required observations.
2. Observer subject to approval of Contract Monitor.
01 45 00 - 2
B. Observer to report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.
C. Submit report in duplicate within 30 days of observation to Contract Monitor for review.
PROJECTS
01 50 00 - 1
SECTION 01 50 00
TEMPORARY FACILITIES AND CONTROLS
1. Security
2. Work Hours
3. Temporary Construction Fences
4. Temporary Utilities
5. Construction Area and Field Office/Facilities
6. Progress/Work Area Cleaning.
7. Project Signage.
8. Removal.
2. Section 01 35 43 - Environmental Procedures.
1.2 SECURITY
A. A staff escort shall be onsite during construction to provide security for contract workers, construction equipment and materials within the security perimeter of the Institution.
B. For safety and security of the Institution and Contractor workers, all Contractor Workers shall be escorted at all times by Bureau of Prison Staff.
1.3 WORK HOURS
A. Work hours shall be between 6:00 am and 2:00 pm Monday through Friday exclusive of
Federal Holidays.
B. The Contractor should allow for delays of up to one hour getting into the Institution in the morning and leaving at the end of the work day, thus the Contractor’s effective work day shall be 7:00 am to 1:00 pm.
1.4 TEMPORARY CONSTRUCTION FENCES
A. Contractor shall provide a temporary 12 foot high temporary fence with a lockable gate and one roll of Man barrier wire at the top of the fence for storage of construction materials on site behind the Housing Units. During optional Pre-bid Site Visit, the Contractor may view the area behind the Housing Units for the temporary fence.
PROJECTS
01 50 00 - 2
1.5 TEMPORARY UTILITIES
A. Contractor shall be responsible for providing his own utilities if required.
B. Contractor shall coordinate any plans with the Contract Monitor.
1.6 CONSTRUCTION AREA AND FIELD OFFICE/FACILITIES
A. The Institution shall mark an out of bounds area that inmates and construction workers shall not pass. The Institution shall change the normal entrances to the Housing Units to keep inmates away from construction workers.
B. The Contractor shall store tools for daily use in a securable job box that shall be inventoried daily. The box shall be stored in the vehicle sally port after work hours.
C. During the demolition of the existing roofs, material removed shall be placed in dumpsters in the vehicle sally port. Dumpsters shall not be removed until five inmate counts have occurred (overnight).
D. The Contractor’s construction office trailer shall be located outside the secure perimeter of the
Institution next to the institutional garage. During the optional Pre-Bid Site Visit, potential bidders may view this site.
The Contractor shall be required to provide portable restroom facilities inside and outside the Institution. The portable toilet or toilets for use inside the secure perimeter shall be removed from inside the secure perimeter at the end of each work day.
1.7 PROGRESS/WORK AREA CLEANING
A. Maintain staging and work areas in a clean and orderly condition free from trash. "Trash" shall include all: food scraps, office garbage, construction rubbish/debris, waste/excess materials, shipping/packing materials, and wind blown trash. Trash shall be collected and placed into containers daily at designated waste storage areas in locations approved by Contract Monitor, and removed periodically for offsite disposal at Contractor’s expense.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed spaces and remote spaces, prior to enclosing the space.
C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.
1.8 PROJECT SIGNAGE
A. Provide three 4-feet by 4-feet project signs of exterior grade plywood and wood frame construction, painted, with lettering. Maintain signs in good repair for the duration of the work.
B. Locate one sign at each access road to direct visitors to the Contractor's field office. Locate the third sign in the immediate vicinity of the Contractor's field office to identify the building.
PROJECTS
01 50 00 - 3
C. Allow no other signs, except those required by law, without approval of Contract Monitor.
1.9 REMOVAL
A. Remove temporary equipment, facilities, and materials prior to request for final inspection.
B. Clean and repair damage caused by installation and use of temporary work.
C. Remove all temporary site improvements. Except as noted below, all materials removed shall be disposed of off-site and the area shall be returned to the design as set forth in Contract Documents.
01 74 19 - 1
SECTION 01 74 19
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
2. Performance Requirements.
3. Submittals.
4. Quality Assurance.
5. Construction Waste Management Plan.
6. Plan Implementation.
7. Salvaging and Recycling Demolition Waste.
8. Disposal of Waste.
2. Section 01 35 43 – Environmental Procedures.
3. Section 02 41 00 – Demolition.
A. Clean: Untreated and unpainted; not contaminated with oils, solvents, caulk, paint, or the like.
B. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
C. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.
D. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.
E. Diversion: Avoidance of demolition and construction waste sent to landfill or incineration.
Diversion does not include using materials for landfill, alternate daily cover on landfills, or materials used as fuel in waste-to-energy processes.
01 74 19 - 2
F. Hazardous: Exhibiting the characteristics of hazardous substances, i.e., ignitability, corrosiveness, toxicity or reactivity.
G. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.
H. Recycling: The process of sorting, cleansing, treating, and reconstituting solid waste and other discarded materials for the purpose of using the altered form. Recycling does not include burning, incinerating, or thermally destroying waste.
I. Salvage: Recovery of demolition or construction waste and subsequent reuse or sale in another facility.
J. Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.
K. Source Separation: The act of keeping different types of waste materials separate beginning from the first time they become waste.
L. Toxic: Poisonous to humans either immediately or after a long period of exposure.
M. Trash: Any product or material unable to be reused, returned, recycled, or salvaged.
N. Waste: Extra material or material that has reached the end of its useful life in its intended use.
Waste includes salvageable, returnable, recyclable, and reusable material.
O. Waste Management Coordinator hired by Contractor to implement, monitor and report status of waste management work plan.
1.3 PERFORMANCE REQUIREMENTS
A. The Contract Monitor has established that this Project shall generate the least amount of waste possible and that processes that ensure the generation of as little waste as possible due to error, poor planning, breakage, mishandling, contamination, or other factors shall be employed.
B. Of the waste that is generated, as many of the waste materials as economically feasible shall be reused, salvaged, or recycled. Waste disposal in landfills or incinerators shall be minimized, thereby reducing disposal costs.
C. Develop a construction waste management plan that results in end-of-Project rates for salvage/recycling of 50-percent (by weight) of construction and demolition waste.
01 74 19 - 3
D. Salvage/Recycle Requirements: Salvage and recycle as much non-hazardous demolition and construction waste as possible, including the following materials:
1. Demolition Waste:
a. Roofing
b. Insulation
2. Construction Waste:
a. All untreated wood, including lumber and finish materials
b. Wood sheet materials
c. Metals
d. Roofing
e. Insulation
f. Packaging: Regardless of salvage/recycle goal indicated above, salvage or recycle
100-percent of the following uncontaminated packaging materials:
1) Paper
2) Cardboard
3) Boxes
4) Plastic sheet and film
5) Polystyrene packaging
6) Wood Crates
7) Plastic pails
8) Glass and plastic containers
1.4 SUBMITTALS
A. Construction Waste Management Plan (CWMP): It is the intent of this specification to maximize the diversion of demolition and construction waste from landfill disposal.
Accordingly, not more than 30 days after receipt of Notice to Proceed and prior to the generation of any waste, prepare and submit a draft Construction Waste Management Plan in accordance with this Section including, but not limited to, the following:
1. Procedures for Recycling/Reuse Program to divert a minimum of 50-percent (by weight) of construction and demolition waste from landfill disposal, including waste resulting from demolition of any existing building and site paving scheduled for demolition; any site paving is required to be ground on site and reused as granulated fill on-site.
2. Approval of the Contractor’s CWMP shall not relieve the Contractor of responsibility for adequate and continuing control of pollutants and other environmental protection measures.
B. Submit a 3-ring binder with calculations on end-of-project recycling rates, salvage rates, and landfill rates itemized by waste material, demonstrating that a minimum of 50-percent of construction wastes were recycled or salvaged and diverted from landfill. Include documentation of recovery rate (if commingled), waste hauling certificates or receipts, and a brief narrative explaining how and to where each waste type has been diverted.
C. Construction Waste Management Plan: Submit four copies of plan within 60 days of date established for the Notice to Proceed.
01 74 19 - 4
D. Waste Reduction Progress Reports: Concurrent with each Application for Payment, submit four copies of report. Include separate reports for demolition and construction waste. Include the following information:
1. Material category
2. Generation point of waste
3. Total quantity of waste in tons
4. Quantity of waste salvaged, both estimated and actual in tons
5. Quantity of waste recycled, both estimated and actual in tons
6. Total quantity of waste recovered (salvaged plus recycled) in tons
7. Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste
8. Include up-to-date records of donations, sales, recycling and landfill/incinerator manifests, weight tickets, hauling receipts, and invoices.
E. Waste Reduction Calculations: Before request for Substantial Completion, submit four copies of calculated end-of-project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work. Complete a table similar to the example below.
Recycled/Salvaged/Diverted Materials Hauler or Location Quantity of Material (tons)
Total Construction Waste Diverted
Landfilled Materials
Total Construction Waste Landfilled
Total Construction Waste Total Construction Waste Diverted + Total Construction Waste Landfilled
Percentage of Construction Waste Diverted from Landfill
(Total Construction Waste Diverted / Total Construction Waste)*100
F. Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax-exempt.
01 74 19 - 5
G. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax-exempt.
H. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
I. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills (or transfer stations) and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with all applicable local ordinances and regulations.
B. Waste Management Meetings: Conduct an initial conference at Project Site to comply with requirements of Section 01 31 13. Contractor shall include discussions on construction waste management requirements in the preconstruction meeting. Contractor shall include discussions on construction waste management requirements in the regular job meetings conducted during the course of the Project; at these meetings, review methods and procedures related to waste management including, but not limited to, the following:
1. Review and discuss waste management plan including responsibilities of the Waste
Management Coordinator.
2. Review requirements for documenting quantities of each type of waste and its disposition.
3. Review and finalize procedures for materials separation and verify availability of containers and bins needed to avoid delays.
4. Review procedures for periodic waste collection and transportation to recycling and disposal facilities.
5. Review waste management requirements for each trade.
1.6 CONSTRUCTION WASTE MANAGEMENT PLAN
A. General: Develop and implement a CWMP consisting of waste identification, waste reduction work plan, and cost/revenue analysis. Include separate sections in plan for demolition and construction waste. Indicate quantities by weight or volume, but use the same units of measure throughout the CWMP.
B. Draft Construction Waste Management Plan: Within 30 days after receipt of Notice to Proceed, or prior to any waste removal, whichever occurs sooner, the Contractor shall submit to the Owner and Architect a Draft Waste Management Plan.
C. Final Construction Waste Management Plan: Once the Owner has determined which of the recycling options addressed in the draft Waste Management Plan are acceptable, the Contractor shall submit, within 15-calendar days, a Final Waste Management Plan.
01 74 19 - 6
D. Waste Identification: Indicate anticipated types and quantities of demolition, site-clearing, and construction waste generated by the Work. Include estimated quantities and assumptions for estimates.
E. Landfill Options: Indicate the name of the landfill(s) and/or transfer station(s) and/or incinerator(s) where trash will be disposed of, the applicable landfill tipping fee(s), and the projected cost of disposing of all Project waste in the landfill(s).
F. Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, reused, recycled, or disposed of in landfill or incinerator. Include points of waste generation, total quantity of each type of waste, quantity for each means of recovery, and handling and transportation procedures.
1. Salvaged Materials for Reuse: For materials that will be salvaged and reused in this
Project, describe methods for preparing salvaged materials before incorporation into the Work.
2. Salvaged Materials for Sale: For materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers.
3. Salvaged Materials for Donation: For materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers.
4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.
5. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.
6. Handling and Transportation Procedures: Describe method that will be used for separating recyclable waste, including sizes of containers, container labeling, and designated location on Project Site where materials separation will be located.
G. Materials: The following list of required materials, at a minimum, must be included for salvaging/recycling:
1. Cardboard
2. Clean dimensional wood
3. Glass/plastic containers
4. Paper
5. Concrete
6. Concrete Masonry Units (CMUs)
7. Asphalt: Include the approximate weight of the asphalt paving to be crushed and utilized as granulated fill from the existing paving as a component of waste material diverted from the landfill.
8. Ferrous and non-ferrous metals (banding, stud trim, ductwork, piping, rebar, roofing, other trim, steel, iron, galvanized sheet steel, stainless steel, aluminum, copper, zinc, lead, brass, and bronze)
9. Stretch and shrink wrap
10. Gypsum wallboard
11. Paint containers and other clean, empty plastic containers
H. Meetings: Provide a description of the regular meetings to be held to address waste management.
01 74 19 - 7
I. Materials Handling Procedures: Provide a description of the means by which any waste materials identified will be protected from contamination, and a description of the means to be employed in recycling the above materials consistent with requirements for acceptance by designated facilities
J. Transportation: Provide a description of the means of transportation of the recyclable materials (whether materials will be site-separated and self-hauled to designated centers, or whether mixed materials will be collected by a waste hauler and removed from the site) and destination of materials.
1.7 CONSTRUCTION WASTE MANAGEMENT PROCEDURES
A. General information contacts regarding construction and demolition waste:
1. EPA Construction and demolition (C&D) debris website:
http://www.epa.gov/epaoswer/non-hw/debris-new/bytype.
2. Directory of Wood-Framed Building Deconstruction and Reused Building Materials
Companies:
http://www.fpl.fs.fed.us/documnts/fplgtr/fpl_gtr150.pdf
3.1 PLAN IMPLEMENTATION
A. General Implement waste management plan as approved by Owner Representative. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
1. Comply with Section 01 35 43.
B. Waste Management Coordinator: Engage a waste management coordinator to be responsible for implementing, monitoring, and reporting status of waste management work plan.
Coordinator shall be present at the Project Site full-time for duration of Project.
C. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work occurring at Project Site.
1. Distribute waste management plan to everyone concerned within three days of submittal return.
2. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.
D. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
01 74 19 - 8
1. Designate and label specific areas on Project Site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold. Location as designated by Owner Representative.
2. Recycling and waste bin areas are to be kept neat, and clean, and clearly marked in order to avoid contamination of materials.
3. Comply with Section 01 35 43 for controlling dust and environmental protection.
4. Contractor shall coordinate activities with the Contract Monitor to minimize noise.
E. Hazardous Wastes: Hazardous wastes shall be separated, stored, and disposed of according to local regulations and should not be included in Construction Waste Management Plan’s calculations of waste.
3.2 SALVAGING DEMOLITION WASTE
A. Salvaged items for Reuse in the Work:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until installation.
4. Protect items from damage during transport and storage.
5. Install salvaged items to comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.
B. Salvaged Items for Owner’s Use:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Contract Monitor.
4. Transport items to storage area designated by Contract Monitor .
5. Protect items from damage during transport and storage.
C. Doors and Hardware: Brace open end of door frames. Except for removing door closers, leave door hardware attached to doors.
3.3 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL
A. General: Recycle clean paper and beverage containers used by on-site workers.
B. Recycling Receivers and Processors: List below is provided for information only; available recycling receivers and processors include, but are not limited to, the following:
1. List to be developed by Contractor.
C. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall accrue to Contractor.
D. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project Site to the maximum extent practical.
01 74 19 - 9
1. Provide appropriately marked containers or bins for controlling recyclable waste until they are removed from Project Site. Include list of acceptable and unacceptable materials at each container and bin.
2. Inspect containers and bins for contamination and remove contaminated materials if found.
3. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
4. Stockpile materials away from construction area. Do not store within drip line of remaining trees.
5. Store components off the ground and protect from the weather.
6. Remove recyclable waste off Owner's property and transport to recycling receiver or processor.
3.4 RECYCLING DEMOLITION WASTE
A.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .