Amendment_0002_-_H.pdf
PDF 6 MB Posted
- Attached to
- FCC HAZELTON - REPLACE CHILLER
- Solicitation number
- IFBP01211500002
About this file
Amendment 0002 - SOW and Drawings Changes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_HAZ.pdf | ||
| HAZ_AMEND_0003.pdf | ||
| Q_and_A_-_HAZELTON_CHILLER.pdf | ||
| Flap_A_Tab_9C_-_HAZ_App1B1Q_Chiller_Location_Drawing.pdf | ||
| 6_-_NCIC_Form.pdf | ||
| 2_-_Solicitation.pdf | ||
| 4_-_Wage_Rate_WV46_03202015.pdf | ||
| 3_-_SOW.pdf | ||
| 1_-_Coverletter.pdf | ||
| Flap_B_Tab_2_-_Amendment_0001.pdf | ||
| 5_-_SF-24_Bid_Bond_Form.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour a nd date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date sp ecified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by Elite Federal Forms, Inc.
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
BOP02152
Typewritten Text
BOP02152
Typewritten Text bop02152 Highlight
Amendment 0002
Solicitation IFBP01211500002
Modification 0002 is issued as follows:
1. Delete previous posted drawing titled “Project 1B1Q, Replace Chiller “.
2. Add new drawing titled “Project 1B1Q, Replace Chiller” (included in this amendment).
3. Add new drawing titled “Project 1B1Q, Replace Chiller, Site”.
4. Page 3 of SOW: Paragraph H, titled “General Requirements”, Change model # 1-8-CH-1-HAZ to York Chiller Model # YKHBGDH7 –CVE, Serial # SBLM-643520.
5. Page 4 of the SOW: Paragraph H , titled “General Requirements”, bullet starting with BACnet – Change to “BACnet communication module (Compatible with existing SEIMENS system) - Contractor shall interface new chiller system with the existing Building Management Control (BMS). Contractor shall provide control points to correspond with the existing chiller plant operation, as shown by three (3) added graphics schematics in the SOW.”
6. Page 4 of the SOW: Paragraph H , titled “General Requirements”, bullet starting with New line voltage
– Change to “New line voltage wiring as required per the National Electrical Code including all control wiring. All conductors shall be installed in conduits. Exposed conduits are to be installed flat against the wall or other vertical surface, secured with straps and non-removable security fasteners. Rigid metal conduit is required, whether exposed or concealed, at all floor and security wall penetrations. For electrical metallic tubing, compression fittings and mechanical junction boxes are required. Fittings: use steel hexagonal compression type with insulated throat bushings. Set screw, die cast, and indented type fittings are not permitted. Utilize thermoplastic bushings and heavy duty steel with heavy duty steel lockouts as well. EMT conduit must comply with ANS C80.3.”
THERE ARE 5 ADDITIONAL ATTACHED PAGED TO SUPPORT THIS AMENDMENT, TO INCLUDE NEW
DRAWINGS AND PICTURES.
NO OTHER CHANGES ARE MADE AT THIS TIME.
N
FCC Hazelton
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
USP
SFF
FCI
CAMP
Project Site
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
ADDED IN AMENDMENT 0002 DATE 07/07/2015
USP Powerhouse
Chillers
Parking Lot
Chiller 1 Chiller 2Chiller 3
24'x24'
Bay Door
FCC HAZELTON
FACILITIES OFFICE
ASSIGNED TO:
ENGINEERING TECHNICIAN
ELECTRICAL ENGINEER
MECHANICAL ENGINEER
ENVIRONMENTAL ENGINEER
TEL. COMM
ARCHITECT
OTHER
APPROVED APPROVED DATE
WARDEN (Complex) - Terry O'Brien
APPROVALS
DATE
FACILITY MANAGER - Gregory Allender
SAFETY MANAGER - Garth Heikkenin
MID-ATLANTIC REGIONAL OFFICE
AW(O) - Michael Breckon
ASSIGNED TO:
FACILITY MGMT OFFICER
ARCHITECT
LIFE SAFETY
MECHANICAL
CHIEF, FACILITIES PROGRAMS
NOT APPROVED
FEDERAL BUREAU OF PRISONS
CENTRAL OFFICE WASHINGTON, D.C.
APPROVED DATE
SHEET 1 TITLE SHEET / DETAILS
Project 1B1Q, Replace Chiller
ADMINISTRATION
FACILITIES
INSTITUTIONAL KEY PLAN: N.T.S. DRAWING INDEX PROJECT INFORMATION
DESCRIPTION OF WORK
GENERAL NOTES
1. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE FEDERAL, STATE AND LOCAL CODES.
2. MATERIALS AND INSTALLATION FOR THE PROPOSED MODIFICATIONS SHALL BE IN STRICT CONFORMANCE WITH
THE FEDERAL BUREAU OF PRISONS TECHNICAL DESIGN GUIDELINES.
3. ALL DEBRIS CREATED BY THE CONSTRUCTION SHALL BE DEEMED "HOT TRASH" AND REMOVED AT THE END OF
EACH WORK SHIFT.
4. WHERE CONFLICT OCCUR BETWEEN DRAWINGS AND/OR DESIGN GUIDELINES TO STRICTER OF THE TWO SHALL
PREVAIL.
5. ANY PENETRATIONS INTO THE EXTERIOR OF THE BUILDING WILL BE SEALED WITH A WATER PROOF SILICON BASED
CAULKING TO PREVENT WATER FROM ENTERING THE WALL SYSTEM.
CAPTAIN (Complex) - Jack Phipps
LEGEND
NOT
N
FCC Hazelton
Contractor shall remove one chiller (Chiller #1 - 8-CH-1-HAZ) from the confines of the Power House located at FCC Hazelton. An existing York chiller will be removed and replaced by the same brand or other new similar name brand or equal. See Statement of Work for additional information.
AS NOTED
APPROVED
IF PROJECT TYPE IS MINOR WORK
REQUEST, WHAT IS THE ESTIMATED COST?
PROJECT TITLE:
PROJECT TYPE:
PROJECT NUMBER:
N/A
REPLACE CHILLER
B&F
1B1Q
ARE THE ORIGINAL CONSTRUCTION
DRAWINGS AVAILABLE FOR THE AREA(S)
SHOWN?
N/A
IF YES, WHAT IS THE USE GROUP AND
CONSTRUCTION TYPE?
WHAT BUILDING CODE AND YEAR WAS THE
PROJECT CONSTRUCTED UNDER?
THIS INFORMATION IS USUALLY FOUND EITHER ON THE TITLE SHEET, ARCHITECTURAL FLOOR PLAN OR FIRE
PROTECTION PLAN. LARGE PROJECTS WILL OFTEN HAVE SHEETS DEDICATED TO CODE INFORMATION.
IF NO ORIGINAL CONSTRUCTION DRAWINGS
ARE AVAILABLE, WHAT WAS THE
APPROXIMATE YEAR THIS BUILDING WAS
CONSTRUCTED?
WHAT IS THE NUMBER OF STORIES OF THE
BUILDING?
WHAT TYPE OF STRUCTURAL SYSTEM (STEEL
FRAME, MASONRY BEARING, CONCRETE
FRAME, WOOD FRAME) IS THE BUILDING?
IS THE BUILDING SPRINKLERED?
FOR NEW CONSTRUCTION, (NEW BUILDING OR
BUILDING ADDITION), WHAT IS THE TOTAL
SQUARE FOOTAGE?
FOR BUILDING ADDITIONS, WHAT IS THE
SQUARE FOOTAGE OF THE EXISTING
BUILDING?
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
N/A
N/A
N/A
N/A
USP
SFF
FCI
CAMP
Project Site
J. James /s/ 6/8/15
6/8/15
6/8/15
6/8/15
6/9/15
S. LLewellyn /s/
J. Phipps /s/
M. Breckon /s/
Terry O'Brien /s/
BOP02152
Typewritten Text
UPDATED 07/07/2015
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Typewritten Text
| Flap B Tab 2 - Amendment 0002 |
| Flap B Tab 2 - Amendment 0001 |
| Flap A Tab 9C - HAZ App1B1Q Chiller Location Drawing |
| pAGE 2 |
| 3-7 |
| 1 |
| 2 |
| DSCN4196 |
| DSCN4197 |
| DSCN4195 |
| contract_id_code: |
| first_page: 1 |
| last_page: 7 |
| modification_no: 0002 |
| effective_date: 07/07/2015 |
| requisition_no: 0717-15 |
| project_no: 1B1Q |
| issued_by: FEDERAL BUREAU OF PRISONS |
MID ATLANTIC REGIONAL OFFICE
302 SENTINEL DRIVE, SUITE 200
ANNAPOLIS JUNCTION, MD 20701
| code_2: |
| contractor_name_address: |
| administered_by: |
| check_1: Yes |
| amendment_solicitation_no: IFBP01211500002 |
| dated: 06/05/2015 |
| check_2: Off |
| contract_order_no: |
| dated_2: |
| code: |
| faculty_code: |
| checkbox_1: Yes |
| copies: 01 |
| acct_and_appropriation: |
| check_a: Off |
| change_order: |
| check_b: Off |
| contract_order_modified: |
| check_c: Off |
| authority_of: |
| check_d: Off |
| other: |
| number_of_copies_return: |
| amendment_description: |
AMENDMENT IS AS FOLLOWS:
A. SEE PAGES 2-7 FOR ALL CHANGES TO THIS SOLICITATION. CHANGES ARE TO THE DRAWINGS AND STATEMENT OF WORK. PICTURES ARE INCLUDED.
NO OTHER CHANGES ARE MADE AT THIS TIME.
| signer_name_title: |
| contracting_name_title: |
| date_signed_contractor: |
| clear_form: |
| save_form_data: |
| Email Form: |
| checkbox_2: Off |
| checkbox_3: Yes |
| checkbox_4: Off |
| checkbox_5: Off |
| date_signed_contracting_officer: |
File details come from the government source that posted it. Updated .