IELD_IFB_-_High St Office Green Infrastructure_Final~1.pdf

PDF 9 MB Posted

Attached to
High Street Green Infrastructure Project IELD
Solicitation number
BD-27-2264-IELD-IELD-132774
Issued by
Massachusetts

About this file

This is an Invitation for Bids (IFB) document issued by the Ipswich Electric Light Department (IELD), a municipal light plant in Massachusetts, for a High Street Green Infrastructure Project. The project involves the installation of various green infrastructure improvements at the IELD office building located at 272 High Street, Ipswich, MA. The work includes permeable paver parking with granite curbing, porous asphalt walkways with granite steps, a rain garden with native plantings, two rain barrels with drip irrigation systems, a 500-gallon above-ground rainwater tank with drip irrigation, flag pole installation, and three lamp posts with underground electrical conduit. A pre-bid conference and site visit will be held on September 8, 2026, at 10:00 AM at the project location; attendance is strongly encouraged but not required. Sealed bids must be submitted in duplicate by 10:00 AM on September 22, 2026, to Dylan Lewellyn at the IELD office. Work is expected to begin no sooner than October 1, 2026, and be completed by December 15, 2026, except for planting activities scheduled between April and June 2027. No award date is specified, but the contract will be awarded to the lowest responsible and eligible bidder.

Bidders must submit a lump sum price for all work, with pricing to include all labor, equipment, materials, mobilization, demobilization, applicable taxes, and other expenses; IELD is tax-exempt, so sales tax should not be included. A bid deposit of five percent of the lump sum price, submitted as cash, certified check, cashier's check, or bid bond, is required in a separate sealed envelope. The successful contractor must furnish a payment bond equal to 50 percent of the total contract price within 10 days of award notification. Prevailing wage rates apply to this project pursuant to Massachusetts General Law Chapter 149, Sections 26-27G, and all employees must complete a ten-hour OSHA-approved construction safety and health course before commencing work. Minimum bidder qualifications include five years of similar work experience, ten years of continuous business operation, specific experience with rainwater harvesting and native planting installation, possession of all required licenses and permits, completion of at least two similar projects in the past five years with references, and the ability to perform work with minimal subcontracting except for electrical and porous asphalt work. Bids will be rejected if incomplete, conditional, or non-responsive; minor informalities may be waived at IELD's discretion in accordance with Massachusetts law.

View the file

Other files

File Type Posted
IELD_IFB_-_High St Office Green Infrastructure_Final~1.docx DOCX document
272 High St - GI v1 7-23-26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IPSWICH ELECTRIC LIGHT DEPARTMENT (“IELD”)

CONTRACT DOCUMENTS

FOR

HIGH STREET GREEN INFRASTRUCTURE PROJECT

August 26, 2026

TABLE OF CONTENTS

Section Contract Documents

Invitation to Bid A Information and Instructions to Bidders B Bid Form C Price Sheet (Appendix A) Bidder Qualification Form (Appendix B) Certificate of Vote (Appendix C) Specifications D Agreement E Sample Payment Bond F Insurance Requirements G Terms and Conditions H Prevailing Wage Schedule I

FAQ’s and Bidder Checklist

B-3

SECTION A

INVITATION FOR BIDS

IFB ___

Pursuant to M.G.L. c. 30, § 39M, the Ipswich Electric Light Department (IELD) solicits sealed bids for:

HIGH STREET GREEN INFRASTRUCTURE PROJECT

The work involves the provision of labor, materials, supervision, vehicles, equipment, and materials, and related work required to install various green infrastructure and other improvements as detailed in the specifications. The work will be performed outside of IELD’s office 272 High Street, Ispwich, MA.

Bid documents may be obtained by contacting CJ Kanouff by email at _ckanouff@ipswichutilities.org_________.

A Pre-Bid conference and site visit will be held on _September 8th, 2026___ at 10:00 AM. Attendence is strongly encouraged, but not required.

Bids shall be submitted in duplicate in a sealed envelope marked, “HIGH STREET GREEN INFRASTRUCTURE PROJECT”, IFB August 26th, 2026.” All bids shall be accompanied by a bid deposit in the form of cash, a bid bond, a certified check, treasurer’s or a cashier's check issued by a responsible bank or trust company payable to “Ipswich Electric Light Department” in the amount of five (5) percent of the lump sum price. The bid deposit must be submitted in a separate, sealed envelope, marked “Bid Deposit.” No bidder may withdraw its bid for a period of sixty (60) days, excluding Saturdays, Sundays, and legal holidays, after the date of opening bids.

The work is subject to prevailing wage laws. Attention is directed to the minimum wage rates to be paid as determined by the Commissioner of Labor and Workforce Development and the weekly payroll record submittal requirements under the provisions of M.G.L. c. 149, §§ 26 -27D inclusive.

IELD will receive sealed bids until 10:00 AM, July 8, 2026, at 272 High Street, Ipswich, MA 01938, ATTN: _Dylan Lewellyn_________, at which time bids will be opened and read aloud Bids received after the deadline and/or without the required bid deposit will not be accepted.

IELD reserves the right to reject any and all bids, waive minor irregularities and informalities, and to take such action as it deems to be in the public interest.

No award shall be final until IELD executes the agreement signed by a duly authorized representative.

B-4

SECTION B

INFORMATION AND INSTRUCTIONS TO BIDDERS

1. Receipt and Opening of Bids

Pursuant to M.G.L. c. 30, § 39M, the Ipswich Electric Light Department (“IELD”) seeks sealed bids for the installation of permeable paver parking area, porous asphalt walkways, rain garden, native planting beds and rainwater harvesting barrels/tank, and related work at its office building property for a green infrastructure site improvement project. The original and one copy of the bid shall be submitted in a sealed envelope, addressed to the Ipswich Electric Light Department, 272 High Street, Ipswich, MA 01938, ATTN: Dylan Lewellyn and marked “HIGH STREET GREEN INFRASTRUCTURE PROJECT”, IFB August 26, 2026.”

Bids must be received no later than 10:00 AM, Tuesday, September 22nd, 2026.

Any bid may be withdrawn or modified prior to the deadline for the opening of bids. Any bid received after the deadline will not be considered. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 60 days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids.

2. Description and Location and Work

IELD is a municipal light plant providing electric services to customers in the Town of Ipswich, MA. The work consists of the provision of labor, materials, vehicles, and services in connection with installing various green infrastructure strategies at the IELD office building (“Work”). The Work shall include mobilization and demobilization, permeable paver parking with granite curbing, stop blocks, overflow drain pipes and paint designations for parking spaces, rain garden with native plantings, downspout drain pipe connections, drain pipe conveyance system, non-toxic timber edging, (2) rain barrels with a drip irrigation system, a 500 gallon above ground rainwater tank with a drip irrigation system, porous asphalt walkways with steps, planting beds with native plants, flag pole and (3) lamp posts with underground electric conduit. Existing vegetation will be protected and remain to the greatest extent possible. All work will be performed at the IELD office building property.

The Work is expected to begin no sooner than October 1st, 2026 and be completed no later than December 15th , 2026, except for planting schedule detailed in the Section D, SPECIFICATIONS, which are to be completed between April 2027 and June 2027.

The location, general characteristics, and principal details of the Work are set forth in Section D, SPECIFICATIONS.

The Bidder shall furnish all labor, services, supervision, vehicles, materials (unless otherwise provided in the Specifications), equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the work and as herein specified.

B-5

The work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item.

A Pre-Bid Conference and Site Visit will be held at:

Time: 10:00 AM Date: September 8th, 2026 Location: 272 High St, Ipswich MA 01938

Attendance is optional. Contact CJ Kanouff ckanouff@ipswichutilities.org to register.

3. Preparation of Bid

Each bid must be submitted on the prescribed forms. All blank spaces for bid prices must be filled in, in ink or typewritten, in both words and figures. All documents must be completed, and where required, documents must be signed by an authorized person. Information currently on file with the IELD will not relieve the Bidder from submitting all required forms and information. Do not submit any pricing or other information not requested in this Invitation for Bids (“IFB”). The submission of extraneous information may render the bid non-compliant and subject to rejection.

The person signing the bid must initial any change or strikeout to the response, but any changes or strikeouts to the provisions of the IFB may render the bid non-responsive and subject to rejection. The bid shall include an acknowledgment of receipt of all addenda, the numbers of which must be filled in on the BID FORM, Section C.

Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, address, and endorsed with the name of the project as specified in Receipt and Opening of Bids, above.

If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in Receipt and Opening of Bids, above.

Bidders are expected to read all sections of this IFB and deliver bid in accordance with these Instructions. By submitting a bid, the bidder accepts all terms and conditions, specifications and requirements of the Contact Documents and represents and warrants that all information provided is true and accurate to the best of the bidder’s knowledge at the time of submission.

IELD shall not be responsible for completeness or accuracy of any bid documents obtained from third party sources, plan rooms, etc.

4. Signatures mailto:ckanouff@ipswichutilities.org

B-6

Bids must be signed in the designated space on the Bid Form. Bids signed by an agent must be accompanied by written proof of the agent’s authority to sign the bid and bind the bidder.

Bids submitted by corporations must be executed in the corporate name by the president, a vice president, or other corporate officer accompanied by evidence of authority to sign (see Certificate of Vote), and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature. Evidence of authority to conduct business as an out-of-state corporation in the Commonwealth of Massachusetts shall be provided. State contractor license number, if any, must also be shown.

Bids submitted by partnerships must be executed in the partnership name and signed by a partner whose title must appear under the signature. The official address of the partnership must be shown below the signature.

Bids submitted by limited liability companies (LLCs) must be executed by a manager or member.

All names must be typed or printed in ink below the signature.

UNAUTHORIZED SIGNATURES ARE CAUSE FOR THE BID BEING DEEMED NON-

RESPONSIVE, AND THEREFORE, REJECTED.

5. Contact Information

Bidders must provide the name, title, address, telephone number and e-mail address, of a contact person to whom questions and requests for clarification may be addressed.

6. Pricing

Bidders shall provide a Lump Sum Price for all Work as set forth in the Specifications, Section D. The Lump Sum Price shall include all labor, equipment, materials, tools, services, transportation, deliveries, required bonds, excavation and site preparation work, mobilization and demobilization, applicable taxes, fees, and other expenses, including travel, lodging, rentals, shipping, handling, and administrative expenses, downtime (if any), and profit. Material shall be shipped FOB Ipswich Massachusetts, freight prepaid and allowed. IELD is a tax-exempt entity;

pricing shall not include sales and use taxes. Conforming bids will be compared and awarded based on the Lump Sum Price for such Work.

Unless otherwise indicated in the bid documents, all prices bid shall be firm fixed pricing for the duration of the contract.

7. Substitute and “Or Equal” Items

Whenever a manufacturer’s name, part number, or style designation is used, the intent is not to be restrictive but solely to indicate the type and quality of merchandise required. When

B-7 submitting a bid for substitute “or equal” items, bidders shall provide written certification that parts offered meet manufacturer’s or industry standards. Materials that do not, in the opinion of IELD, meet specified requirements will not be accepted. Bidders must provide a written warranty statement for alternate materials offered.

8. Prevailing Wages

Prevailing Wage Rates as determined by the Department of Labor Standards pursuant to M.G.L.

c. 149, §§ 26 - 27G, apply to the work. It is the responsibility of the bidder, before bid opening, to request, if necessary, any additional information on Prevailing Wage Rates for those tradespersons who may be employed for the proposed work.

Prevailing wage rates for this project are included in Section I, PREVAILING WAGE

SCHEDULE.

Copies of Payroll Record and Statement of Compliance forms may be found at www.mass.gov/dos/pw.

9. Bid Deposit

Each bid must be accompanied by bid deposit in amount of five (5) percent of the LUMP SUM PRICE in the form of a certified check, a bid bond, cash, or cashier’s check payable to IELD.

Bid security shall be enclosed in a separate envelope clearly marked “Bid Deposit” and attached to the bid. Bid deposits will be returned to all except the three lowest responsible and eligible bidders within five (5) days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids, and the remaining deposits will be returned promptly after the execution of the Agreement, or if no Agreement is executed, after the deadline for accepting bids has expired.

10. Bid Procedure

The following list of requirements shall apply to each filed bid. Bids not meeting all the requirements for timeliness and security will be rejected without opening; bids not meeting signature and addenda requirements will be rejected prior to checking bid amounts.

Bids shall be submitted at the place and before the time specified in Receipt and Opening of Bids, above.

Properly executed bid security shall be placed in a sealed envelope and shall be attached to the outside of the envelope containing the bid as described above.

Bid signatures will be checked.

All addenda will be sent by email to all prospective bidders as provided in paragraph 13. All bidders shall acknowledge receipt of all Addenda on Section C, BID FORM.

B-8

The total dollar amount of each bid will be read, and the three apparent lowest bids will be selected for further review. All those present at the bid opening may examine all bids after the bid opening and reading.

11. Ability and Experience of Bidder

Bidders must complete the Bidder Qualification Form provided in the bid package (Appendix B to the Bid Form). The information should be based on direct experience with Work contained in this IFB. Bidders must meet and submit the following minimum qualifications and experience:

• The bidder must have 5 years of experience performing similar work. The bidder also must have been in business continually for a period of 10 years;

• The bidder must have 5 years of experience with installing rainwater and/or stormwater harvesting/collection systems and sunken planting beds with native plantings;

• The bidder must possess all required licenses, registrations, and permits to perform the work and operate required equipment and vehicles in the Commonwealth of Massachusetts;

• The bidder must have completed at least two (2) similar projects in the past five (5) years. The bidder must provide a work reference for each project and shall describe each project in detail including dollar size as well as start and completion dates. (See Bidder Qualification Form);

• The bidder must submit the name, address, qualifications and work experience (e.g., brief resume) of key personnel who will be assigned to perform work under the contract. Include all licenses, registrations and permits held;

• The bidder must provide the names and contact information for a minimum of three (3) current clients. Municipalities and utilities are preferred but not a requirement. Include the name, address, phone number, and/or email of the person who may be contacted for a reference.

• The bidder will be able to perform all the required work with minimal to no use of subcontractors except for the electrical and porous asphalt paving work.

• The bidder shall provide a proposed construction schedule to demonstrate its ability to perform the work in a timely manner. Once the contract is awarded, final construction schedules and the coordination of Work shall be subject to IELD’s review and approval.

No award will be made to any bidder who cannot satisfy to IELD that it has sufficient ability and experience in this class of work and sufficient capital and resources to enable it to prosecute and complete the work successfully within the times specified. IELD’s decision or judgment on these matters will be final, conclusive, and binding.

IELD may make such investigations as it deems necessary, and the bidder shall furnish to IELD, under oath if so required, all such information and data for this purpose as IELD may request.

12. Conditions of Work

B-9

Each bidder must familiarize himself fully with the conditions relating to the performance of the work in IELD’s service territory and the employment of labor thereon. Failure to do so will not relieve a successful bidder of its obligation to furnish all material and labor necessary to carry out the provisions of the contract. Insofar as possible, the contractor in carrying out its work, must employ such methods or means as will not cause any interruption of or interference with the work of any other contractor and shall work cooperatively with IELD work crews.

13. Addenda and Interpretations

No interpretation of the meaning of specifications or other bid documents will be made to any bidder orally. All information given to bidders other than by means of plans, specifications, or addenda, as described below, is given informally and shall not be used as the basis of a claim against IELD.

Every request for such clarification, interpretation, or modification must be in writing and directed to: CJ Kanouff ckanouff@ipswichutilities.org, Ipswich Electric Light Department (IELD), 272 High Street, Ipswich, MA 01938.

Requests should be sent by email to: ckanouff@ipswichutilities.org.

In order to receive consideration, such request must be received at least five (5) business days prior to the deadline for opening of bids. Any and all such interpretations, supplemental instructions or changes to the IFB will be in the form of written addenda which, when issued, will be sent to all prospective bidders of record (at the respective email address furnished by them for such purposes), not later than three (3) days prior to the deadline for the opening of bids. Failure of any bidder to receive any such addendum shall not relieve such bidder from any obligation under its bid as submitted. All addenda so issued shall become part of the Contract Documents. Post-bid clarifications are not permitted.

14. Payment Bond

In accordance with M.G.L. c. 30, § 39M and M.G.L. c. 149, § 29, the successful bidder shall furnish a payment bond in the amount of 50% of the total contract price (Section C - Bid Form, Paragraph II B), for payment by the contractor and subcontractors for labor performed or furnished and materials used or employed therein as specified in Section G (Payment Bond) and Section H (Terms and Conditions). The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the Commonwealth of Massachusetts and satisfactory to IELD. The bond shall remain in force for one year after final acceptance of all work performed under the Agreement, unless IELD, in writing, releases the contractor from the obligation sooner. The Payment Bond shall be provided within 10 days of the notification of contract award.

15. Power of Attorney

B-10

Attorneys-in-fact who sign contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.

16. Laws and Regulations

Attention is directed to the fact that all applicable federal and state laws, municipal ordinances, and the rules and regulations (“Laws”) of all authorities having jurisdiction over the procurement and performance of work shall apply to the contract throughout, and such Laws will be deemed to be included in the contract the same as though herein written out in full.

17. Liquidated Damages for Failure to Enter into Contract

The successful bidder, upon its failure or refusal to execute and deliver the Agreement and the payment bond within ten (10) days after receiving notice of the acceptance of its bid, shall forfeit to IELD, as liquidated damages for such failure or refusal, the bid deposit furnished with its bid.

In case of death, disability, bona fide and obviously clerical or mechanical error of a substantial nature, or other similar unforeseen circumstances affecting the bidder, its bid deposit will be returned. Clerical errors shall not include errors in calculating applicable rates or the bidder’s expected profit.

18. Obligation of Bidder

At the time of the opening of bids, each bidder will be presumed to have read and to be thoroughly familiar with the Contract Documents, including all addenda. The failure or omission of any bidder to examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect of its bid.

19. Right to Reject Bid

To the extent permitted by law, IELD reserves the right to reject any and all bids should IELD deem it to be in the public interest to do so.

IELD shall reject bids which in its sole judgment are either incomplete, conditional, obscure or not responsive or which contain exceptions, additions or clarifications not called for, erasures not properly initialed, alterations, or similar irregularities. Provided however, IELD, in its discretion, may waive non-statutory minor informalities to the extent permitted by law.

IELD also reserves the right to reject the bid of any bidder that IELD considers to be not responsive or otherwise unqualified based on the criteria set forth herein.

20. Comparison of Bids

Bids will be compared based the LUMP SUM PRICE on the Bid Form.

In the event that there is a discrepancy between the words and figures stated on the Bid Form, the prices written in words will govern.

B-11

21. Award of Contract

The Contract will be awarded to “the lowest responsible and eligible bidder” pursuant to M.G.L.

c. 30, § 39M. Such a bidder shall possess the skill, ability and integrity necessary for the faithful performance of the work, shall be able to furnish labor that can work in harmony with all other elements of labor employed, or to be employed, in the work, and shall otherwise comply with all applicable provisions of law.

Bidders may be asked to validate qualifications to fulfill the bid requirements specified by submitting detailed evidence such as financial data, previous experience, present commitments and other such data as applicable.

Clarity and completeness of bid along with results of reference and credit checks will be taken into consideration in determination of responsible and eligible bidders.

The term “lowest responsible and eligible bidder” is defined under M.G.L. c. 30, § 39M as follows:

“The bidder:

(1) whose bid is the lowest of those bidders possessing the skill, ability and integrity necessary for the faithful performance of the work;

(2) who shall certify that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work;

(3) who shall certify that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the U.S. Occupational Safety and Health Administration (OSHA) that is at least (ten) 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee;

(4) who, where the provisions of section 8B of Chapter 29 apply, shall have been determined to be qualified thereunder; and

(5) who obtains within ten (10) days of the notification of contract award the security by bond required under section 29 of Chapter 149; provided that for the purposes of this section the term “security by bond” shall mean the bond of a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the awarding authority; and provided further;

that if there is more than one surety company, the surety companies shall be jointly and severally liable. [M.G.L. c.30 § 39M(c)].”

Responses to, and results of reference checks or submitted information, and information obtained from other sources can be used to determine bidder responsibility and may be cause for rejection of any bid.

See paragraph 20 (Comparison of Bids) for a description of how the low bid will be determined.

If two or more responsible and eligible bidders have submitted the same bid price, there will be a ‘second heat’ of bidding between the tied bidders. The tied vendors will be contacted and

B-12 advised that their bid prices were tied and invited to submit a second sealed bid for the same contract by a specified date and time.

22. Grounds for Disqualification

The following, without limitation, are some of the causes that may be considered as sufficient for the disqualification of a bidder and the rejection of their bid:

a. More than one bid for the same work from an individual, firm, partnership or corporation;

b. Evidence of collusion among bidders;

c. Poor performance in the execution of work under a previous contract or contracts;

d. Failure to achieve reasonable progress on existing contract;

e. Default on previous contracts or failure to execute contract documents after award;

f. Failure to supply bid bond, certified check or cashier’s check as bid security;

g. Failure to fully complete Bid Form and submit required information and attachments; or

h. The Inclusion of conditions, clarifications or qualifiers regarding amounts, prices, terms, or specifications. Bids must be accepted based on the pricing, terms, and specifications in this IFB. Exceptions or deviations are not permitted. Changes to the scope of work or additional pricing only are permitted through the execution a change order as allowed by this IFB and applicable Laws.

23. Statutes Regulating Competitive Bidding

M.G.L. c. 30, § 39M governs this bid process. Bidders shall be responsible for familiarizing themselves with all statutory requirements and any rules and interpretations established by the courts and/or the Attorney General Office’s Bid Unit thereunder. Any bid which does not comply M.G.L. c. 30, § 39M shall be rejected. Pricing, terms and conditions, and other material aspects of the IFB are not negotiable or waivable or subject to discussion with individual bidders.

Exceptions may not be taken in the bid submission and only may be entertained through the request for clarification/modification process prior to the deadline. By law, IELD only has the authority to waive minor informalities in the submitted bids, which IELD may exercise in its discretion. M.G.L. c. 30, § 39M is a competitive bid process, not a proposal process.

Accordingly, bidders shall not furnish any information that has not been requested. The submission of extraneous information and materials may be grounds for rejection.

24. Contractor Records

The successful bidder shall comply with the provisions of M.G.L. c. 30, § 39R concerning contractor records.

25. Insurance

The successful bidder shall carry, and continuously maintain through the completion of the contract, insurance as specified in Section G, Insurance Requirements, and in such form as shall protect the Contractor and IELD and its employees, agents and officials, from all claims and liability for damages for bodily injury, including accidental death, and for property damage, which may arise from operations under the Contract Documents. The successful bidder

B-13 covenants and agrees to hold IELD and its employees, agents and officials harmless from loss or damage due to claims for personal injury and/or property damage arising from, or in connection with operations under the contract.

SECTION C

BID FORM

Bid of __________________________________ (hereinafter called “Bidder”)*

(____) a corporation, organized and existing under the laws of the state of

(____) a partnership

(____) a joint venture

(____) an individual doing business as _____________________________________

To Ipswich Electric Light Department (“IELD” or “Owner”):

The Bidder, in compliance with the Invitation for Bids (or “IFB”) for the “HIGH STREET GREEN INFRASTRUCTURE PROJECT”, IFB August 26, 2026, having examined the specifications, terms and conditions, and all related documents, and being familiar with nature, locations and conditions of the work, including the availability of materials and labor, hereby proposes to furnish all labor, materials, vehicles, equipment and supplies as set forth in the specifications, and to perform the work in accordance with the Contract Documents at the prices stated below. The prices are to cover all expenses incurred in performing the work required under the Contract Documents, of which this bid is a part.

*Insert corporation, partnership or individual as applicable.

I. BIDDER REPRESENTATIONS

In submitting this bid, the Bidder represents that:

1. Bidder has examined copies of all the Contract Documents as defined in the IFB, including the following Addenda (Acknowledge receipt by entering Addendum number and date below.)

ADDENDUM NUMBER DATE

2. Bidder is familiar with the nature and extent of the Contract Documents and the work, associated documents, goods, special services, and all local conditions, laws, and regulations that may affect cost, progress, or furnishing of the goods or services.

II.CONTRACT PRICE:

A. The Bidder agrees to furnish all work as set forth in the Specifications, Section D, at the following Lump Sum Price:

(figures) (words)

For bid comparison purposes, the lowest eligible and responsible bidder will be determined based on the Lump Sum Price” above.

B. The Bidder agrees to furnish out-of-scope work and any other additional or revised work agreed-upon and required by a properly executed change order at the following Unit Prices. Unit Prices shall include all overhead, profit, and other costs, and will be used for the basis of change orders.

III. BIDDER QUALIFICATIONS

The completed Bidder Qualification Form (Appendix A) and copies of resumes, work experiences, licenses and other requested information are submitted with the Bid Form. The Bidder represents and warrants that all information is true and accurate to the best of its knowledge.

IV. BIDDER ACKNOWLEDGMENTS AND CERTIFICATIONS

The Bidder understands that all bids for work are subject to the applicable bidding laws of the

Commonwealth of Massachusetts, including M.G.L. c. 30, § 39M.

The Bidder understands that IELD reserves the right to reject any or all bids and to waive minor informalities in the bidding in accordance with applicable law.

The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 90 days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids.

Within 10 days of receipt of the written notice of acceptance of this bid, the Bidder will execute the formal Agreement set forth in Section E, AGREEMENT.

The selected Contractor shall furnish a payment bond in an amount at least equal to fifty percent (50%) of the total contract price, Section II above.

The selected Contractor shall furnish a Certificate of Insurance in accordance with Section G –

Insurance Requirements.

A bid deposit is attached in the sum of five percent (5%) of the total bid (Section II above) in accordance with the conditions of Section B, INSTRUCTIONS TO BIDDERS. The bid security may become the property of IELD in the event the Agreement and bond are not executed within the time set forth above.

The undersigned offers the information in the Bidder Qualification Form as evidence of its qualifications to perform the work in accordance with the Contract Documents.

Pursuant to M.G.L. c. 62C, § 49A, I certify under the penalties of perjury that I, to my best knowledge and belief, have filed all state tax returns and paid all State Taxes Required under law.

The undersigned hereby certifies that it is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work.

The undersigned hereby certifies that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration (“OSHA”) of at least 10 hours in duration at the time the employee begins work. The Contractor will furnish documentation of successful completion of said course with the first certified payroll report for each employee.

The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this paragraph the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.

Respectfully submitted:

Date:____________ By: _________________________________ (Signature)

(Name of Bidder)

(SEAL - if bid is by a corporation)

(Title)

(Business Address)

(City and State)

(Telephone Number)

(Attach Certificate of Vote, Appendix B, if applicable.)

APPENDIX A

BIDDER QUALIFICATION FORM

BIDDER NAME

TIME IN BUSINESS Bidder’s organization has been in business continuously from the year

EXPERIENCE SERVICE OR CONSTRUCTION SUPPLIERS

Bidder has had experience in similar projects or services as defined in the IFB as a Prime contractor for years and / or as a Subcontractor for years.

PREVIOUS

PROJECTS

PRIME

CONTRACTOR

Following is a partial list of the projects that the Bidder’s organization, and suppliers have completed that are similar in scope and magnitude to this IFB.

Use additional sheets as necessary to include all pertinent information.

OWNER OR CLIENT

(Must Include Contact Name and Phone No.)

CONTRACT

AMOUNT

PROJECT DESCRIPTION AND

LOCATION

(include number and type of meters}

START

DATE

END DATE

PREVIOUS PROJECTS

SUBCONTRACTOR(S)

Following is a partial list of the projects that the subcontractor’s organization, and suppliers have completed that are similar in scope and magnitude to this IFB.

Use additional sheets as necessary to include all pertinent information.

OWNER OR CLIENT

(Must Include Contact Name and Phone No.)

CONTRACT

AMOUNT

PROJECT DESCRIPTION AND LOCATION

(include number and type of meters}

START

DATE

END

DATE

PROJECT RESOURCES

The following personnel are currently employed by the bidder (prime contractor) and/or subcontractor and available for assignment on the project. Note: The

Prime Contractor’s and Subcontractor’s Project Manager for this project must be included. Workers must meet the minimum requirements set forth in

Section D before commencing the work. If the minimum requirements will not be met at the time of submission of the bid, please explain when such requirement(s) will be met.

ATTACH RESUMES AND HISTORY OF EXPERIENCE TO THIS FORM.

NAME RESIDENCE ADDRESS BUSINESS ADDRESS AND PHONE

PRINCIPALS Following are the names and addresses of the members of the Board of Directors of the bidding corporation, or the names and addresses of all partners or individuals that have a stake in this bid. (Attach additional sheets as necessary.)

NAME RESIDENCE ADDRESS BUSINESS ADDRESS AND PHONE

CREDIT REFERENCES

Provide a list of at least three (3) credit references, including contact name, telephone number. References shall include key suppliers, vendors, and banks

NAME OF REFERENCE ADDRESS CONTACT NAME

PHONE AND FAX NUMBER

SAFETY RECORD

Following is a list of Safety Citations issued to the bidder within the last 3 years. (Attach additional sheets as necessary.)

CLIENT OR PROJECT CONTACT NAME AND

TELEPHONE

TYPE OF CITATION ISSUED BY

SETTLEMENT HISTORY Following is a list of projects undertaken within the last three (3) years which have resulted in partial or final settlement of the contract by arbitration or litigation. (Attach additional sheets as necessary.)

CLIENT OR PROJECT CONTACT NAME AND

TELEPHONE

ORIGINAL CONTRACT

AMOUNT

TOTAL CLAIMS AMOUNT

By signing this statement, the bidder represents and warrants under the pains and penalties of perjury that all information is true and accurate to the best of its knowledge and belief.

Dated at this day of , 2026

(Name of Bidder)

(Legal address of Bidder)

By:

Title:

State of: , County of:

Being duly sworn, deposes and says that he/she is:

(provide name of individual) of:

(provide name of company or corporation and legal address)

Sworn to before me this day of , 20__

(Notary Public Seal) My commission expires:

Notary Public Name:

Address:

APPENDIX B

CERTIFICATE OF VOTE

(to be filed if Contractor is a Corporation)

I, _______________________________, hereby certify that I am (Secretary of the Corporation) the duly qualified and acting Secretary of ______________________ (Name of Corporation) and I further certify that a meeting of the Directors of said Company, duly called and held on _______________________, at which (Date of Meeting) all Directors were present and voting, the following vote was unanimously passed:

VOTED: To authorize and empower

Anyone acting singly, to execute Forms of Bid, Contracts or Bonds on behalf of the Corporation.

I further certify that the above vote is still in effect and has not been changed or modified in any respect.

By:________________________________ (Secretary of Corporation)

A True Copy:

Attest:_________________________________

(Notary Public)

My Commission Expires:__________________ (Date)

SECTION D

SPECIFICATIONS

GREEN INFRASTRUCTURE SITE IMPROVEMENT PLAN

PREPARED FOR

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938

PROJECT LOCATION

BY

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com

July 23, 2026

PROJECT

LOCATION

Copyright c 2026

DRAWING INDEX

SHEET 1

SHEET 2

SHEET 4

SHEET 3

COVER SHEET

EXISTING SITE PLAN

CONCEPTUAL DESIGN PLAN

EV CHARGING STATION DESIGN PLANSHEET 5

RAIN GARDEN DESIGN PLANSHEET 6

SHEET 7

SHEET 8 BUILDING ENTRANCE DESIGN PLAN

EXISTING SITE PLAN

SHEET 9 BUILDING ENTRANCE DESIGN PLAN

RAIN GARDEN DESIGN PLAN

SHEET 10 BUILDING ENTRANCE DESIGN PLAN

ESP-01

CDP-01

EVP-01

RGP-01

BEP-01

ESP-01

RGP-02

BEP-02

BEP-03

SITE PLAN

SCALE: 1" = 20'

0 20 6040

272 High Street Ipswich, MA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

EXISTING SITE PLAN

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

WATER VALVE

OHW ELECTRICAL OVERHEAD WIRE

WGV

UTILITY POLE

D

Y

H

HYDRANT

GUY WIRE

ELECTRICAL HAND HOLE

W

E

S

S

LEGEND

SEWER MANHOLE

WATERLINE

ELECTRIC SERVICE OR CONDUIT

SEWER PIPE

EXISTING GRADE

FM FORCE MAIN

G GAS

SCALE AS NOTED SHEET 2 OF 10PLAN DATE: July 23, 2026 ESP-01

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com

1. "Existing Conditions Plan" prepared by H. L .

Graham Associates, Inc. dated March 17, 2021

2. Deed Book 2701 Page 479

PLAN REFERENCES

1. Utility locations were determines by Ipswich Utilities Department in June of 2024, December of 2025 and May of 2026

2. Existing Conditions supplemented from GPS data collected by Earthwater Design Solutions, Inc. in September of 2024, December of 2025 and May of 2026

GENERAL NOTES

TP-1

SS

SS

S

S T O N E W A L L (T Y P .)

D

Y

H

WGV

S

S

S

D

Y

H

APPROXIMATE LOCATION OF

EXISTING SEPTIC SYSTEM

EXISTING

METAL

BUILDING

EXISTING

BRICK

BUILDING

GUY

POLE

UTILITY

POLE

UTILITY

POLE

HIGH STREET

U. S. ROUTE 1A

(VARIABLE WIDTH - 1932 (ALTERATION) STATE HIGHWAY LAYOUT)

T

E

EV

WGV

BUILDING ACCESS ROAD

(ASPHALT PAVEMENT)

APPROXIMATE EDGE OF HIGH STREET

HPHP

POST & RAIL FENCE

WOOD FE

NCE

CHAIN GATE

APPROXIMATE LOCATION OF

PROPERTY LINE

APPROXIMATE 200'

RIVERFRONT AREA LINE

HP

FM

FM

FM

CATCH BASIN

TOP GRATE

ELEV. = 28.6'

BRUSH & WOODS

SHRUB SHRUB

SHRUB

EXISTING

NATIVE

PLANTINGS

EXISTING NATIVE PLANTINGS SHRUB

24" TREE

12/8" TREE

16" TREE

24/10" TREE

24"

24"

8"

ASPHALT WALKWAY

EXISTING

EMPLOYEE

STONEDUST

PARKING AREA

FM

APPROXIMATE 200'

RIVERFRONT AREA LINE

S

SCALE: 1" = 10'

0 10 3020

272 High Street Ipswich, MA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

EXISTING SITE PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

WATER VALVE

OHW ELECTRICAL OVERHEAD WIRE

WGV

UTILITY POLE

D

Y

H

HYDRANT

GUY WIRE

ELECTRICAL HAND HOLE

W

E

S

S

LEGEND

SEWER MANHOLE

WATERLINE

ELECTRIC SERVICE OR CONDUIT

SEWER PIPE

EXISTING GRADE

FM FORCE MAIN

G GAS

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

SCALE AS NOTED SHEET 3 OF 10 ESP-02PLAN DATE: July 23, 2026

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com

1. "Existing Conditions Plan" prepared by H. L .

Graham Associates, Inc. dated March 17, 2021

2. Deed Book 2701 Page 479

PLAN REFERENCES

1. Utility locations were determines by Ipswich Utilities Department in June of 2024, December of 2025 and May of 2026

2. Existing Conditions supplemented from GPS data collected by Earthwater Design Solutions, Inc. in September of 2024, December of 2025 and May of 2026

GENERAL NOTES

x 25.0

TP-1

x 26.9 x 27.7

D

Y

H

W

G

V

S

S

S

D

Y

H

GUY

POLE

UTILITY

POLE

G

G

G

G x 25.8

T

E

EV

OHW

OHW

ELEC.

HH

ELEC.

MH

x 26.0x 26.7x 27.6

W

G

V

ASPHALT WALKWAYOHW

HPHP

POST & RAIL FENCE

WOOD FE

NCE

CHAIN GATE

HP

E

E

FM

FM

E

OHW

OHW

ELEC.

HH

CATCH BASIN

TOP GRATE

ELEV. = 28.6'

APPROXIMATE

LOCATION OF

SEPTIC TANKS

EXISTING

METAL

BUILDING

EXISTING

BRICK

BUILDING

FF = 28.9'±

FF = 28.9'± ELECTRICAL

CONDUIT

HEAT PUMPS

(TYP OF 3)

EV CHARGING

STATION

ELECTRICAL

METER

TRANSFORMER

BOLLARD

(TYP)

EXISTING EMPLOYEE

GRAVEL PARKING AREA

APPROXIMATE

LOCATION OF

PROPERTY LINE

APPROXIMATE 200'

RIVERFRONT AREA LINE

EXISTING EV

GRAVEL

PARKING AREA APPROXIMATE

BURRIED ELECTRIC

LINES (TYP)

UNDERGROUND

ELECTRICAL

VAULT

UNUSED

ELECTRICAL

CONDUIT

RAIN

BARREL

APPROXIMATE OVERHEAD

ELECTRIC LINES (TYP)

APPROXIMATE GAS

LINE LOCATION

BRUSH & WOODS

APPROXIMATE ROOF RUNOFF

FLOW SEPARATION LINE

SHRUB SHRUB

SHRUB

EXISTING

NATIVE

PLANTINGS

EXISTING NATIVE PLANTINGS SHRUB

STONE DRIP EDGE

(TYP)

24" TREE

12/8" TREE

16" TREE

24/10" TREE

24"

24"

8"

BUILDING ACCESS ROAD

(ASPHALT PAVEMENT)

APPROXIMATE LOCATION

OF FORCE MAIN

WINDOWS

APPROXIMATE

LOCATIONS

OHW

E

W

S

E

EXISTING EMPLOYEE

GRAVEL PARKING AREA

PERMEABLE PAVERS

POROUS ASPHALT

272 High Street Ipswich, MA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

CONCEPTUAL DESIGN PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

1. "Existing Conditions Plan" prepared by H. L .

Graham Associates, Inc. dated March 17, 2021

2. Deed Book 2701 Page 479

PLAN REFERENCES

1. Utility locations were determines by Ipswich Utilities Department in June of 2024, December of 2025 and May of 2026

2. Existing Conditions supplemented from GPS data collected by Earthwater Design Solutions, Inc. in September of 2024, December of 2025 and May of 2026

GENERAL NOTES

Isaac M. DaRowe Rainwater Harvesting System Designer

SITE PLAN

SCALE: 1" = 10'

0 10 3020

RAINWATER TANK

RAIN BARREL

NEED GRAPHIC

ReEarth Solutions Trevor Smith - Regenerative Landcare Professional

17 Grant Street, Milford, MA 01757 Phone: 617-308-7063 www.re-earthsolutions.com

Design prepared in collaboration with:

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

SCALE AS NOTED SHEET 4 OF 10 CDP-01PLAN DATE: July 23, 2026

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com x 25.0

TP-1

x 26.9 x 27.7

D

Y

H

W

G

V

S

S

S

D

Y

H

GUY

POLE

G

G

G

G x 25.8

T

E

EV

OHW

OHW

ELEC.

HH

ELEC.

MH

x 26.0x 26.7x 27.6

W

G

V

OHW

HPHP

POST & RAIL FENCE

WOOD FE

NCE

CHAIN GATE

HP

E

E

FM

NATIVE PLANTINGS

E

OHW

OHW

ELEC.

HH

CATCH BASIN

TOP GRATE

ELEV. = 28.6'

APPROXIMATE

LOCATION OF

SEPTIC TANKS

EXISTING

METAL

BUILDING

EXISTING

BRICK

BUILDING

FF = 28.9'±

FF = 28.9'± ELECTRICAL

CONDUIT

HEAT PUMPS

(TYP OF 3)

EV CHARGING

STATION

ELECTRICAL

METER

TRANSFORMER

BOLLARD

(TYP)

RIVERFRONT AREA LINE

APPROXIMATE

BURRIED ELECTRIC

LINES (TYP)

UNDERGROUND

ELECTRICAL

VAULT

UNUSED

ELECTRICAL

CONDUIT

APPROXIMATE OVERHEAD

ELECTRIC LINES (TYP)

APPROXIMATE GAS

LINE LOCATION

BRUSH & WOODS

APPROXIMATE ROOF RUNOFF

FLOW SEPARATION LINE

SHRUB SHRUB

SHRUB

EXISTING

NATIVE

PLANTINGS

SHRUB

STONE DRIP EDGE

(TYP)

24" TREE

12/8" TREE

16" TREE

24/10" TREE

24"

24"

8"

BUILDING ACCESS ROAD

(ASPHALT PAVEMENT)

EXISTING

EMPLOYEE

STONEDUST

PARKING AREA

D D D

500 GALLON

RAINWATER TANK

NATIVE PLANTINGS

D

WINDOWS

APPROXIMATE

LOCATIONS

P P P OHW

NATIVE

PLAN

TIN

GS

DDD

E

D

+ 25 .0

P EV EV

E

LIGHT POST

(TYP OF 3)

RAIN GARDEN

(280 SF±)

PERMEABLE PAVER

HANDICAP ACCESSIBLE

EV CHARGING & VISITOR

PARKING

CONCRETE

STOP BLOCK

OR EQUAL

(TYP OF 3)

RAIN BARREL

(TYP OF 2)

6" PVC DRAIN PIPE

(MIN. 2% SLOPE)

PVC DROP OVERFLOW #2

INLET ELEV. = 28.3'±

GRANITE CURBING

OR EQUAL (TYP)

VISITOR PARKING

(TYP OF 3)

CLEANOUT

4" SCH 40 PVC

OVERFLOW PIPE

(TYP OF 3)

PVC DROP OVERFLOW #1

INLET ELEV. =29.5'±

6" PVC DRAIN PIPE

(MIN. 2% SLOPE)

2" ELECTRICAL CONDUIT (TYP)

APPROXIMATE

LOCATION

HAND HOLD

DOWNSPOUT #3

DOWNSPOUT #5

DOWNSPOUT #1

DOWNSPOUT #2

DOWNSPOUT #4

4" MINUS

ROCK-LINED

OVERFLOW

POROUS ASPHALT

WALKWAY WITH

GRANITE STEPS

OR EQUAL

ASPHALT

POROUS

WALKWAYE

W

S

E

ASPHALT

POROUS

E

E

WALKWAYD

FLAG

POLE

PROPOSED NATIVE

PLANTINGS

FUTURE PROPOSED PAVED

EMPLOYEE PARKING AREA

FUTURE PROPOSED

PAVED EMPLOYEE

PARKING AREA

EXISTING TIMBERS TO BE

REMOVED AND REPLACED

WITH NON-TOXIC TIMBER

EDGING OR EQUIVALENT

SCALE: 1" = 10'

0 10 3020

272 High Street Ipswich, MA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

EV CHARGING STATION DESIGN PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

PERMEABLE PAVER - CONSTRUCTION NOTES:

1. Installer shall create a construction sequence plan

2. A pre-construction meeting shall be required to discuss:

2.1. Construction sequencing

2.2. Erosion control adjacent to the permeable pavers

2.3. Prevention of stormwater run-on until the permeable pavers are installed

3. Excavate using the smallest equipment possible and work from the sides/perimeter of the facility to avoid over-compaction of the subbase

4. Excavate a level base or slope slightly away from a building/structure

5. The condition of the soil subgrade is unknown in the location of the permeable paver parking at this time. The installer shall provide the designer with a 72 hour notice prior to excavation of the parking area. After the excavation the designer shall determine the condition of the soil subgrade in the location of the proposed permeable pavers. If soil amendments are required due to compacted or impervious soil conditions, then a proposed method will be submitted with the amendment recommendations to the client for approval

6. Scarify native soils to 3 or 4 inch depth and install geotextile fabric as noted in the detail section

7. Install base layer in 6 inch lifts. Use a vibratory roller for compaction until there is no visible movement of the aggregate. Do not crush the aggregate

8. Install aggregate base:

8.1. Base layer - No. 2 stone

8.2. Intermediate layer - No. 57 stone

8.3. Bedding layer - No. 8 stone

9. Install the permeable pavers:

9.1. The pavers are installed by hand or by machine that places a whole pallet section of pavers at one time

9.2. The pavers are compacted and then No. 8 stone spread on the pavers and swept into the openings

9.3. The pavers are compacted again so that the No. 8 stone is just below the paver structure when complete

10. No excavation of native soils to occur during wet or saturated conditions

PERMEABLE PAVER - MAINTENANCE NOTES:

General maintenance:

1. Determine maintenance schedule (annual is likely) based on final permeable paver product installed.

Refer to manufacturer's recommendations

2. Inform contractors working on the property of the locations of permeable paver area(s). A sign is recommended that identifies the surface as permeable

3. Inspect the permeable paver area after storms to ensure rainwater properly drains through the material

Typical annual maintenance:

4. Inspect the permeable paver installation after the initial storm event and seasonally to ensure there is no ponding water

5. Perform (1) surface infiltration test in accordance with ASTM 1701 Standard for every 500 S.F. of permeable paver surface

6. Clean permeable paver with high efficiency vacuum, sweeper-vacuum or walk behind vacuum to remove surface debris

7. Identify and stabilize any sediment sources adjacent to permeable paver area

8. Maintain adjacent landscaping to prevent excessive growth and debris onto permeable paver area

9. Remove excessive moss or other plant growth from permeable paver area using pressure washer, weed burner or an equivalent method. Remove any washed out sediment/debris

10. Replace/replenish the top layer of No. 8 stone between the joints with new clean No. 8 stone after sweeping, vacuuming, pressure washing or when stone is below specified height

11. Remove leaves from the permeable paver surface as needed

12. Snow removal:

12.1. Remove snow with a rubber tipped shovel/plow or keep the plow tip 1 inch above the surface by means of a skid or roller to avoid damage to permeable paver surface

12.2. Salt applications can often be reduced significantly since water drains and black ice does not form easily

12.3. Salt applications do stay on the permeable paver surface longer since it does not wash off compared to regular impervious surfaces that shed water

12.4. Do not apply sand on the permeable paver surface

Non-Routine maintenance:

13. Do not stockpile mulch, sand, soil, yard waste, snow containing sand or salt or any other material on the permeable paver area that could potentially clog the pore space between the joints

14. Protect permeable paver surface from sediment during installation of adjacent planting areas or infrastructure

15. Replace broken permeable paver as needed following manufacturers guidelines

16. Remove and replace permeable paver for utility repairs

17. Clean (rehab) clogged permeable paver using high pressure wash and vacuum to remove desired depth of aggregate. Replace aggregate to specified height

18. Do not replace vehicle fluids or wash a car/equipment over the permeable paver surface

19. Do not apply sealants or any other materials that prevent water to pass through the permeable paver surface

PERMEABLE PAVER

(NOT TO SCALE)

TECHO-BLOC MODEL# HYDRA - SHALE GREY OR EQUAL

6"-12"

4"

USE NO. 8 STONE IN OPENINGS

2"

BEDDING LAYER: NO. 8 STONE (3/8" - 1/2")

2" DEPTH

INTERMEDIATE LAYER:

NO. 57 STONE (3/4" - 1")

4" MIN. DEPTH

BASE LAYER:

NO. 2 STONE (1 1/2" - 2 1/2")

6" MIN. DEPTH

GEOTEXTILE FABRIC ON

SUBGRADE AND SIDES

OF EXCAVATION

NOTE: THE ABOVE DEPTHS OF

AGGREGATE ARE A GENERAL

GUIDELINE AND THE CONTRACTOR

SHALL ADHERE TO MANUFACTURER

INSTALLATION GUIDELINES FOR THE

EXACT DEPTH OF AGGREGATE FOR

THE PERMEABLE PAVERS SELECTED

3 15/16" MIN.

CONCRETE INTERLOCKING

PAVERS 3 15/16" MIN.

THICK RATED FOR LIGHT

DUTY VEHICULAR TRAFFIC

UNCOMPACTED OR

IMPERVIOUS SOIL SUBGRADE

(SEE THE PERMEABLE PAVER -

CONSTRUCTION NOTE #5)

4" SCH 40 PVC OVERFLOW

DRAIN PIPE (MIN 2% SLOPE)

P

EV

18'±

24'±

25'±

GENERAL NOTES:

1. This plan in intended for the location and design of the permeable paver system only

2. This plan shows features that were visually apparent on the date of the site inspection. The absence of sub-surface structures, utilities, etc is not intended or implied

3. Utility locations were GPS located by Earthwater Design Solutions, Inc. in November 2024 and

December 2025

4. No changes shall be made in the field without the approval of the designer

5. All work shall be performed in accordance with the any applicable state and local regulations

6. The handicap accessible parking space shall be installed in compliance with the 2010 American with…

This is the start of the file's text. The full file is on GovTribe.