272 High St - GI v1 7-23-26.pdf

PDF 8 MB Posted

Attached to
High Street Green Infrastructure Project IELD
Solicitation number
BD-27-2264-IELD-IELD-132774
Issued by
Massachusetts

About this file

This is a Green Infrastructure Site Improvement Plan prepared for the Town of Ipswich Utilities Department for a project located at 272 High Street in Ipswich, Massachusetts. The plan was developed by Earthwater Design Solutions, Inc. in collaboration with ReEarth Solutions and is dated July 23, 2026. The project encompasses the design and installation of comprehensive green infrastructure improvements including an EV charging station with permeable paver parking, a 280-square-foot rain garden, two 55-gallon rain barrels, a 500-gallon rainwater tank, porous asphalt walkways with granite steps, native planting beds, and associated stormwater management systems. The design addresses stormwater runoff from approximately 2,500 square feet of impervious building surfaces through multiple interconnected green infrastructure components designed to capture, filter, and infiltrate rainwater while reducing site runoff and improving water quality.

The plan includes detailed construction and maintenance specifications for all components, including permeable pavers rated for light-duty vehicular traffic, porous asphalt walkway installation with specified aggregate base layers, rain garden soil media composition, native plant palettes organized by moisture tolerance zones, and rainwater harvesting system components with gravity-feed drip irrigation capabilities. Utility locations were determined by the Ipswich Utilities Department in June 2024, December 2025, and May 2026, with supplemental GPS data collected by Earthwater Design Solutions. The project includes comprehensive notes for installers addressing pre-construction coordination, utility verification through DIG Safe, permit acquisition, quality assurance testing in accordance with ASTM standards, and ongoing maintenance protocols including seasonal shutdown and startup procedures. The design accommodates handicap-accessible parking in compliance with 2010 ADA Architectural Design standards and Massachusetts Architectural Access Board regulations, with all work required to comply with applicable state and local regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GREEN INFRASTRUCTURE SITE IMPROVEMENT PLAN

PREPARED FOR

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938

PROJECT LOCATION

BY

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com

July 23, 2026

PROJECT

LOCATION

Copyright c 2026

DRAWING INDEX

SHEET 1

SHEET 2

SHEET 4

SHEET 3

COVER SHEET

EXISTING SITE PLAN

CONCEPTUAL DESIGN PLAN

EV CHARGING STATION DESIGN PLANSHEET 5

RAIN GARDEN DESIGN PLANSHEET 6

SHEET 7

SHEET 8 BUILDING ENTRANCE DESIGN PLAN

EXISTING SITE PLAN

SHEET 9 BUILDING ENTRANCE DESIGN PLAN

RAIN GARDEN DESIGN PLAN

SHEET 10 BUILDING ENTRANCE DESIGN PLAN

ESP-01

CDP-01

EVP-01

RGP-01

BEP-01

ESP-01

RGP-02

BEP-02

BEP-03

SITE PLAN

SCALE: 1" = 20'

0 20 6040

272 High Street Ipswich, MA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

EXISTING SITE PLAN

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

WATER VALVE

OHW ELECTRICAL OVERHEAD WIRE

WGV

UTILITY POLE

D

Y

H

HYDRANT

GUY WIRE

ELECTRICAL HAND HOLE

W

E

S

S

LEGEND

SEWER MANHOLE

WATERLINE

ELECTRIC SERVICE OR CONDUIT

SEWER PIPE

EXISTING GRADE

FM FORCE MAIN

G GAS

SCALE AS NOTED SHEET 2 OF 10PLAN DATE: July 23, 2026 ESP-01

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com

1. "Existing Conditions Plan" prepared by H. L .

Graham Associates, Inc. dated March 17, 2021

2. Deed Book 2701 Page 479

PLAN REFERENCES

1. Utility locations were determines by Ipswich Utilities Department in June of 2024, December of 2025 and May of 2026

2. Existing Conditions supplemented from GPS data collected by Earthwater Design Solutions, Inc. in September of 2024, December of 2025 and May of 2026

GENERAL NOTES

TP-1

SS

SS

S

S T O N E W A L L (T Y P .)

D

Y

H

WGV

S

S

S

D

Y

H

APPROXIMATE LOCATION OF

EXISTING SEPTIC SYSTEM

EXISTING

METAL

BUILDING

EXISTING

BRICK

BUILDING

GUY

POLE

UTILITY

POLE

UTILITY

POLE

HIGH STREET

U. S. ROUTE 1A

(VARIABLE WIDTH - 1932 (ALTERATION) STATE HIGHWAY LAYOUT)

T

E

EV

WGV

BUILDING ACCESS ROAD

(ASPHALT PAVEMENT)

APPROXIMATE EDGE OF HIGH STREET

HPHP

POST & RAIL FENCE

WOOD FE

NCE

CHAIN GATE

APPROXIMATE LOCATION OF

PROPERTY LINE

APPROXIMATE 200'

RIVERFRONT AREA LINE

HP

FM

FM

FM

CATCH BASIN

TOP GRATE

ELEV. = 28.6'

BRUSH & WOODS

SHRUB SHRUB

SHRUB

EXISTING

NATIVE

PLANTINGS

EXISTING NATIVE PLANTINGS SHRUB

24" TREE

12/8" TREE

16" TREE

24/10" TREE

24"

24"

8"

ASPHALT WALKWAY

EXISTING

EMPLOYEE

STONEDUST

PARKING AREA

FM

APPROXIMATE 200'

RIVERFRONT AREA LINE

S

SCALE: 1" = 10'

0 10 3020

272 High Street Ipswich, MA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

EXISTING SITE PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

WATER VALVE

OHW ELECTRICAL OVERHEAD WIRE

WGV

UTILITY POLE

D

Y

H

HYDRANT

GUY WIRE

ELECTRICAL HAND HOLE

W

E

S

S

LEGEND

SEWER MANHOLE

WATERLINE

ELECTRIC SERVICE OR CONDUIT

SEWER PIPE

EXISTING GRADE

FM FORCE MAIN

G GAS

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

SCALE AS NOTED SHEET 3 OF 10 ESP-02PLAN DATE: July 23, 2026

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com

1. "Existing Conditions Plan" prepared by H. L .

Graham Associates, Inc. dated March 17, 2021

2. Deed Book 2701 Page 479

PLAN REFERENCES

1. Utility locations were determines by Ipswich Utilities Department in June of 2024, December of 2025 and May of 2026

2. Existing Conditions supplemented from GPS data collected by Earthwater Design Solutions, Inc. in September of 2024, December of 2025 and May of 2026

GENERAL NOTES

x 25.0

TP-1

x 26.9 x 27.7

D

Y

H

W

G

V

S

S

S

D

Y

H

GUY

POLE

UTILITY

POLE

G

G

G

G x 25.8

T

E

EV

OHW

OHW

ELEC.

HH

ELEC.

MH

x 26.0x 26.7x 27.6

W

G

V

ASPHALT WALKWAYOHW

HPHP

POST & RAIL FENCE

WOOD FE

NCE

CHAIN GATE

HP

E

E

FM

FM

E

OHW

OHW

ELEC.

HH

CATCH BASIN

TOP GRATE

ELEV. = 28.6'

APPROXIMATE

LOCATION OF

SEPTIC TANKS

EXISTING

METAL

BUILDING

EXISTING

BRICK

BUILDING

FF = 28.9'±

FF = 28.9'± ELECTRICAL

CONDUIT

HEAT PUMPS

(TYP OF 3)

EV CHARGING

STATION

ELECTRICAL

METER

TRANSFORMER

BOLLARD

(TYP)

EXISTING EMPLOYEE

GRAVEL PARKING AREA

APPROXIMATE

LOCATION OF

PROPERTY LINE

APPROXIMATE 200'

RIVERFRONT AREA LINE

EXISTING EV

GRAVEL

PARKING AREA APPROXIMATE

BURRIED ELECTRIC

LINES (TYP)

UNDERGROUND

ELECTRICAL

VAULT

UNUSED

ELECTRICAL

CONDUIT

RAIN

BARREL

APPROXIMATE OVERHEAD

ELECTRIC LINES (TYP)

APPROXIMATE GAS

LINE LOCATION

BRUSH & WOODS

APPROXIMATE ROOF RUNOFF

FLOW SEPARATION LINE

SHRUB SHRUB

SHRUB

EXISTING

NATIVE

PLANTINGS

EXISTING NATIVE PLANTINGS SHRUB

STONE DRIP EDGE

(TYP)

24" TREE

12/8" TREE

16" TREE

24/10" TREE

24"

24"

8"

BUILDING ACCESS ROAD

(ASPHALT PAVEMENT)

APPROXIMATE LOCATION

OF FORCE MAIN

WINDOWS

APPROXIMATE

LOCATIONS

OHW

E

W

S

E

EXISTING EMPLOYEE

GRAVEL PARKING AREA

PERMEABLE PAVERS

POROUS ASPHALT

272 High Street Ipswich, MA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

CONCEPTUAL DESIGN PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

1. "Existing Conditions Plan" prepared by H. L .

Graham Associates, Inc. dated March 17, 2021

2. Deed Book 2701 Page 479

PLAN REFERENCES

1. Utility locations were determines by Ipswich Utilities Department in June of 2024, December of 2025 and May of 2026

2. Existing Conditions supplemented from GPS data collected by Earthwater Design Solutions, Inc. in September of 2024, December of 2025 and May of 2026

GENERAL NOTES

Isaac M. DaRowe Rainwater Harvesting System Designer

SITE PLAN

SCALE: 1" = 10'

0 10 3020

RAINWATER TANK

RAIN BARREL

NEED GRAPHIC

ReEarth Solutions Trevor Smith - Regenerative Landcare Professional

17 Grant Street, Milford, MA 01757 Phone: 617-308-7063 www.re-earthsolutions.com

Design prepared in collaboration with:

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

SCALE AS NOTED SHEET 4 OF 10 CDP-01PLAN DATE: July 23, 2026

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com x 25.0

TP-1

x 26.9 x 27.7

D

Y

H

W

G

V

S

S

S

D

Y

H

GUY

POLE

G

G

G

G x 25.8

T

E

EV

OHW

OHW

ELEC.

HH

ELEC.

MH

x 26.0x 26.7x 27.6

W

G

V

OHW

HPHP

POST & RAIL FENCE

WOOD FE

NCE

CHAIN GATE

HP

E

E

FM

NATIVE PLANTINGS

E

OHW

OHW

ELEC.

HH

CATCH BASIN

TOP GRATE

ELEV. = 28.6'

APPROXIMATE

LOCATION OF

SEPTIC TANKS

EXISTING

METAL

BUILDING

EXISTING

BRICK

BUILDING

FF = 28.9'±

FF = 28.9'± ELECTRICAL

CONDUIT

HEAT PUMPS

(TYP OF 3)

EV CHARGING

STATION

ELECTRICAL

METER

TRANSFORMER

BOLLARD

(TYP)

RIVERFRONT AREA LINE

APPROXIMATE

BURRIED ELECTRIC

LINES (TYP)

UNDERGROUND

ELECTRICAL

VAULT

UNUSED

ELECTRICAL

CONDUIT

APPROXIMATE OVERHEAD

ELECTRIC LINES (TYP)

APPROXIMATE GAS

LINE LOCATION

BRUSH & WOODS

APPROXIMATE ROOF RUNOFF

FLOW SEPARATION LINE

SHRUB SHRUB

SHRUB

EXISTING

NATIVE

PLANTINGS

SHRUB

STONE DRIP EDGE

(TYP)

24" TREE

12/8" TREE

16" TREE

24/10" TREE

24"

24"

8"

BUILDING ACCESS ROAD

(ASPHALT PAVEMENT)

EXISTING

EMPLOYEE

STONEDUST

PARKING AREA

D D D

500 GALLON

RAINWATER TANK

NATIVE PLANTINGS

D

WINDOWS

APPROXIMATE

LOCATIONS

P P P OHW

NATIVE

PLAN

TIN

GS

DDD

E

D

+ 25 .0

P EV EV

E

LIGHT POST

(TYP OF 3)

RAIN GARDEN

(280 SF±)

PERMEABLE PAVER

HANDICAP ACCESSIBLE

EV CHARGING & VISITOR

PARKING

CONCRETE

STOP BLOCK

OR EQUAL

(TYP OF 3)

RAIN BARREL

(TYP OF 2)

6" PVC DRAIN PIPE

(MIN. 2% SLOPE)

PVC DROP OVERFLOW #2

INLET ELEV. = 28.3'±

GRANITE CURBING

OR EQUAL (TYP)

VISITOR PARKING

(TYP OF 3)

CLEANOUT

4" SCH 40 PVC

OVERFLOW PIPE

(TYP OF 3)

PVC DROP OVERFLOW #1

INLET ELEV. =29.5'±

6" PVC DRAIN PIPE

(MIN. 2% SLOPE)

2" ELECTRICAL CONDUIT (TYP)

APPROXIMATE

LOCATION

HAND HOLD

DOWNSPOUT #3

DOWNSPOUT #5

DOWNSPOUT #1

DOWNSPOUT #2

DOWNSPOUT #4

4" MINUS

ROCK-LINED

OVERFLOW

POROUS ASPHALT

WALKWAY WITH

GRANITE STEPS

OR EQUAL

ASPHALT

POROUS

WALKWAYE

W

S

E

ASPHALT

POROUS

E

E

WALKWAYD

FLAG

POLE

PROPOSED NATIVE

PLANTINGS

FUTURE PROPOSED PAVED

EMPLOYEE PARKING AREA

FUTURE PROPOSED

PAVED EMPLOYEE

PARKING AREA

EXISTING TIMBERS TO BE

REMOVED AND REPLACED

WITH NON-TOXIC TIMBER

EDGING OR EQUIVALENT

SCALE: 1" = 10'

0 10 3020

272 High Street Ipswich, MA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

EV CHARGING STATION DESIGN PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

PERMEABLE PAVER - CONSTRUCTION NOTES:

1. Installer shall create a construction sequence plan

2. A pre-construction meeting shall be required to discuss:

2.1. Construction sequencing

2.2. Erosion control adjacent to the permeable pavers

2.3. Prevention of stormwater run-on until the permeable pavers are installed

3. Excavate using the smallest equipment possible and work from the sides/perimeter of the facility to avoid over-compaction of the subbase

4. Excavate a level base or slope slightly away from a building/structure

5. The condition of the soil subgrade is unknown in the location of the permeable paver parking at this time. The installer shall provide the designer with a 72 hour notice prior to excavation of the parking area. After the excavation the designer shall determine the condition of the soil subgrade in the location of the proposed permeable pavers. If soil amendments are required due to compacted or impervious soil conditions, then a proposed method will be submitted with the amendment recommendations to the client for approval

6. Scarify native soils to 3 or 4 inch depth and install geotextile fabric as noted in the detail section

7. Install base layer in 6 inch lifts. Use a vibratory roller for compaction until there is no visible movement of the aggregate. Do not crush the aggregate

8. Install aggregate base:

8.1. Base layer - No. 2 stone

8.2. Intermediate layer - No. 57 stone

8.3. Bedding layer - No. 8 stone

9. Install the permeable pavers:

9.1. The pavers are installed by hand or by machine that places a whole pallet section of pavers at one time

9.2. The pavers are compacted and then No. 8 stone spread on the pavers and swept into the openings

9.3. The pavers are compacted again so that the No. 8 stone is just below the paver structure when complete

10. No excavation of native soils to occur during wet or saturated conditions

PERMEABLE PAVER - MAINTENANCE NOTES:

General maintenance:

1. Determine maintenance schedule (annual is likely) based on final permeable paver product installed.

Refer to manufacturer's recommendations

2. Inform contractors working on the property of the locations of permeable paver area(s). A sign is recommended that identifies the surface as permeable

3. Inspect the permeable paver area after storms to ensure rainwater properly drains through the material

Typical annual maintenance:

4. Inspect the permeable paver installation after the initial storm event and seasonally to ensure there is no ponding water

5. Perform (1) surface infiltration test in accordance with ASTM 1701 Standard for every 500 S.F. of permeable paver surface

6. Clean permeable paver with high efficiency vacuum, sweeper-vacuum or walk behind vacuum to remove surface debris

7. Identify and stabilize any sediment sources adjacent to permeable paver area

8. Maintain adjacent landscaping to prevent excessive growth and debris onto permeable paver area

9. Remove excessive moss or other plant growth from permeable paver area using pressure washer, weed burner or an equivalent method. Remove any washed out sediment/debris

10. Replace/replenish the top layer of No. 8 stone between the joints with new clean No. 8 stone after sweeping, vacuuming, pressure washing or when stone is below specified height

11. Remove leaves from the permeable paver surface as needed

12. Snow removal:

12.1. Remove snow with a rubber tipped shovel/plow or keep the plow tip 1 inch above the surface by means of a skid or roller to avoid damage to permeable paver surface

12.2. Salt applications can often be reduced significantly since water drains and black ice does not form easily

12.3. Salt applications do stay on the permeable paver surface longer since it does not wash off compared to regular impervious surfaces that shed water

12.4. Do not apply sand on the permeable paver surface

Non-Routine maintenance:

13. Do not stockpile mulch, sand, soil, yard waste, snow containing sand or salt or any other material on the permeable paver area that could potentially clog the pore space between the joints

14. Protect permeable paver surface from sediment during installation of adjacent planting areas or infrastructure

15. Replace broken permeable paver as needed following manufacturers guidelines

16. Remove and replace permeable paver for utility repairs

17. Clean (rehab) clogged permeable paver using high pressure wash and vacuum to remove desired depth of aggregate. Replace aggregate to specified height

18. Do not replace vehicle fluids or wash a car/equipment over the permeable paver surface

19. Do not apply sealants or any other materials that prevent water to pass through the permeable paver surface

PERMEABLE PAVER

(NOT TO SCALE)

TECHO-BLOC MODEL# HYDRA - SHALE GREY OR EQUAL

6"-12"

4"

USE NO. 8 STONE IN OPENINGS

2"

BEDDING LAYER: NO. 8 STONE (3/8" - 1/2")

2" DEPTH

INTERMEDIATE LAYER:

NO. 57 STONE (3/4" - 1")

4" MIN. DEPTH

BASE LAYER:

NO. 2 STONE (1 1/2" - 2 1/2")

6" MIN. DEPTH

GEOTEXTILE FABRIC ON

SUBGRADE AND SIDES

OF EXCAVATION

NOTE: THE ABOVE DEPTHS OF

AGGREGATE ARE A GENERAL

GUIDELINE AND THE CONTRACTOR

SHALL ADHERE TO MANUFACTURER

INSTALLATION GUIDELINES FOR THE

EXACT DEPTH OF AGGREGATE FOR

THE PERMEABLE PAVERS SELECTED

3 15/16" MIN.

CONCRETE INTERLOCKING

PAVERS 3 15/16" MIN.

THICK RATED FOR LIGHT

DUTY VEHICULAR TRAFFIC

UNCOMPACTED OR

IMPERVIOUS SOIL SUBGRADE

(SEE THE PERMEABLE PAVER -

CONSTRUCTION NOTE #5)

4" SCH 40 PVC OVERFLOW

DRAIN PIPE (MIN 2% SLOPE)

P

EV

18'±

24'±

25'±

GENERAL NOTES:

1. This plan in intended for the location and design of the permeable paver system only

2. This plan shows features that were visually apparent on the date of the site inspection. The absence of sub-surface structures, utilities, etc is not intended or implied

3. Utility locations were GPS located by Earthwater Design Solutions, Inc. in November 2024 and

December 2025

4. No changes shall be made in the field without the approval of the designer

5. All work shall be performed in accordance with the any applicable state and local regulations

6. The handicap accessible parking space shall be installed in compliance with the 2010 American with Disabilities Act (ADA) Architectual Design standards and/or the rules and regulations of the Massachusetts Architectual Access Board (521 CMR)

NOTES TO THE PERMEABLE PAVER INSTALLER:

1. Installer shall verify existing conditions in the field prior to construction and notify the designer of any discrepancies before proceeding with the rainwater harvesting system installation

2. Installer shall provide a 48 hour notice to client and designer prior to construction

3. All existing underground utilities are shown as approximate and the exact location shall be confirmed prior to construction by the installer. Installer shall verify location of any existing utilities and services and provide protection during construction. Installer shall directly coordinate with DIG Safe. Utilities damaged during construction shall be repaired at installer's expense

4. Installer shall contact and inform client and designer to any unforeseen conditions which may affect the intended design as set forth in the drawings

5. Installer shall secure any necessary permits required for the work from any state or local agencies, departments, utility companies or other authorities having jurisdiction and affected by the work

6. The installer shall verify all existing grades in the field and report any discrepancies immediately to the designer

7. All proposed permeable paver system components and piping network shall be installed as proposed or an approved equivalent may be substituted if approved by the designer

8. All gravity flow piping shall be a minimum slope of 1/4" per foot (2.0%)

9. All finish grading shall be provided to direct surface water runoff away from all structures, system components and property lines

10. Any intended revision to horizontal or vertical locations or substitution for specified components must be approved by the designer

11. Any discrepancies between the design plan and actual field conditions should be noted to the designer before proceeding with the permeable system installation

12. All buried piping and components in the permeable paver system shall be covered with magnetic detectible marking tape labeled "Caution: Drain Line Below" at a depth no greater than 12" or an approved equivalent method to ensure the location of all system components after backfill

8' 8'5' 8'

146 SF±

95 SF±

190 SF±

206 SF±

PARKING SPACES DIMENSIONS

(NOT TO SCALE)

GRANITE CURBING

(TOTAL LENGTH = 58')

4'

EV

GRATED END CAP TO COVER

PIPE OPENING AND FASTENED

WITH 16 MESH FIBERGLASS

SCREEN OR EQUAL

4" SCH 40 PVC OVERFLOW

DRAIN PIPE (MIN 2% SLOPE)

PERMEABLE PAVER OVERFLOW

(NOT TO SCALE)

TO RAIN

GARDEN

FROM

OVERFLOW

AND ROOF

6" PVC

DRAIN PIPE

POROUS ASPHALT WALKWAY

PERMEABLE PAVER PARKING

GRANITE CURBING

4" SCH 40 PVC

45° BEND

4" SCH 40 PVC

45° BEND

FROM PERMEABLE

PAVER PARKING

6" X 4" PVC

SANITARY

REDUCING

TEE

6" PVC

DRAIN PIPE

METAL EDGING OR EQUAL

GRANITE CURBING OR EQUAL

6" PVC

DRAIN PIPE

SITE SPECIFIC NOTES:

1. Installer shall determine the exact location of all underground utilities prior to start of construction

2. Prior to construction, the installer shall obtain all other applicable state and local permits necessary to install the rainwater harvesting system

3. Prior to construction, a benchmark(s) shall be set within 50' of the proposed green infrastucture components and the EV charging station shall be staked out by the designer or a land surveyor

4. Finish grading shall direct runoff away from the permeable paver parking and the existing building

EV

ReEarth Solutions Trevor Smith - Regenerative Landcare Professional

17 Grant Street, Milford, MA 01757 Phone: 617-308-7063 www.re-earthsolutions.com

Design prepared in collaboration with:

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

SCALE AS NOTED SHEET 5 OF 10 EVP-01PLAN DATE: July 23, 2026

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com x 25.0x 26.9 x 27.7S

GUY

POLE

G

G x 25.8

T

E

EV

OHW

x 26.0x 26.7x 27.6

W

G

V

HPHP

POST & RAIL FENCE

HP

E

E

E

CATCH BASIN

TOP GRATE

ELEV. = 28.6'

APPROXIMATE ROOF RUNOFF

FLOW SEPARATION LINE

SHRUB SHRUB

SHRUB

EXISTING

NATIVE

PLANTINGS

SHRUB

8"

BUILDING ACCESS ROAD

(ASPHALT PAVEMENT)

D D D

NATIVE PLANTINGS

D

P P P OHW

NATIVE

PLAN

TIN

GS

DDD

E

+ 25 .0

P EV EV

E

LIGHT POST

(TYP OF 3)

RAIN GARDEN

(280 SF±)

PERMEABLE PAVER

HANDICAP ACCESSIBLE

EV CHARGING & VISITOR

PARKING

CONCRETE

STOP BLOCK

OR EQUAL

(TYP OF 3)

RAIN BARREL

(TYP OF 2)

6" PVC DRAIN PIPE

(MIN. 2% SLOPE)

PVC DROP OVERFLOW #2

INLET ELEV. = 28.3'±

GRANITE CURBING

OR EQUAL (TYP)

VISITOR PARKING

(TYP OF 3)

CLEANOUT

4" SCH 40 PVC

OVERFLOW PIPE

(TYP OF 3)

2" ELECTRICAL CONDUIT (TYP)

APPROXIMATE

LOCATION

HAND HOLD

DOWNSPOUT #3

DOWNSPOUT #5

DOWNSPOUT #2

DOWNSPOUT #4

4" MINUS

ROCK-LINED

OVERFLOW

WALKWAY

W

S

E

ASPHALT

POROUS

E

E

WALKWAYD

FLAG

POLE

PROPOSED NATIVE

PLANTINGS

FUTURE PROPOSED

PAVED EMPLOYEE

PARKING AREA

EXISTING TIMBERS TO BE

REMOVED AND REPLACED

WITH NON-TOXIC TIMBER

EDGING OR EQUIVALENT

272 High Street Ipswich, MA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

RAIN GARDEN DESIGN PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

SOIL TEST INFORMATION

TP-1 (6/11/24)

Ground Elev: 25.2 ESHWT: 20.2

0 - 60 FILL VFSL Dense w/mottles, dry soil 60 - 70 Ab FSL 10YR 2/1

70 C SIL 5YR 5/1

ESHWT @ 60", no weeping/standing water Roots to 60"

Soil Tests conducted on June 11, 2024 Performed by: Isaac DaRowe, Earthwater Design Solutions, Inc.

Soil Evaluator Exam Approval Date: Spring 2001 Witnessed by: Ipswich Utilities Department

RAIN GARDEN - MAINTENANCE NOTES:

Frequently and after rain events:

1. Visually inspect inlets and outlets and remove any obstructions

2. Inspect rain gardens for signs of erosion and stabilize/repair as needed

3. Remove debris/trash

Perform annual maintenance to confirm:

4. Remove unwanted vegetation

5. Prune/trim desirable vegetation as needed to maintain site lines

6. Clean and repair inlet and outlet pipes, screens or structures

7. Maintain vegetation in the rain gardens

8. More frequent water and weeding may be required during the first two years until the plants are established

9. Replace plants as needed to maintain 80% plant coverage

10. Replace mulch so built-up pollutants do not harm the vegetation and maintain a 3 inch depth

11. Check for erosion and sediment accumulations in ponding area

12. Remove any sediment or vegetation accumulation at inlet/overflow

13. Water during drought periods

14. Clean matted vegetation on rain garden bottom

RAIN GARDEN - CONSTRUCTION NOTES:

1. Installer shall create a construction sequence plan

2. A pre-construction meeting shall be required to discuss:

2.1. Construction sequencing

2.2. Erosion control adjacent to the rain garden

2.3. Prevention of stormwater run-on until the rain garden

is installed and stabilized

3. Installer shall prevent over-compaction of the rain garden area and adjacent areas

4. No excavation, soil placement or soil amendment shall occur during wet or saturated conditions

5. Operate any and all construction equipment adjacent to the proposed rain garden not in the rain garden area

6. Confirm downspout and overflow component elevations to ensure water flows through the facility properly

RAIN GARDEN CALCULATIONS:

Impervious Areas:

Building - East roof area = 2,400± s.f.

Building - Covered entry = 100± s.f.

Total Impervious Area = 2,500± s.f.

Static Storage Method: SA = WQV /d SA = Surface area of facility WQV = Water Quality Volume = 1" of runoff x impervious area d = Maximum ponding depth based on soil type

House Infiltration:

WQV = (2,500± s.f.)(0.083 ft) = 208 c.f.

d = 0.75 ft ponding depth SA = (208 c.f. ) / (0.75 ft) = 277 s.f. Required 280 s.f. Proposed > 277 s.f. Required

GENERAL NOTES:

1. This plan in intended for the location and design of the rain garden only

2. This plan shows features that were visually apparent on the date of the site inspection. The absence of sub-surface structures, utilities, etc is not intended or implied

3. All roof downspouts and rain barrel or rainwater tank overflows shall be connected to a 6" pvc drain pipe that discharges to the rain garden

4. Access to the rain barrels and rainwater tank shall be provided through the native planting beds by means of a stepping stone walking path or equivalent

5. Utility locations were GPS located by Earthwater Design Solutions, Inc. in November 2024 and

December 2025

6. No changes shall be made in the field without the approval of the designer

7. All work shall be performed in accordance with the any applicable state and local regulations

NOTES TO THE RAIN GARDEN INSTALLER:

1. Installer shall verify existing conditions in the field prior to construction and notify the designer of any discrepancies before proceeding with the rainwater harvesting system installation

2. Installer shall provide a 48 hour notice to client and designer prior to construction

3. All existing underground utilities are shown as approximate and the exact location shall be confirmed prior to construction by the installer. Installer shall verify location of any existing utilities and services and provide protection during construction. Installer shall directly coordinate with DIG Safe. Utilities damaged during construction shall be repaired at installer's expense

4. Installer shall contact and inform client and designer to any unforeseen conditions which may affect the intended design as set forth in the drawings

5. Installer shall secure any necessary permits required for the work from any state or local agencies, departments, utility companies or other authorities having jurisdiction and affected by the work

6. The installer shall verify all existing grades in the field and report any discrepancies immediately to the designer

7. All proposed rain garden materials and piping network shall be installed as proposed or an approved equivalent may be substituted if approved by the designer

8. All gravity flow piping shall be a minimum slope of 1/4" per foot (2.0%)

9. All finish grading shall be provided to direct surface water runoff away from all structures, system components and property lines

10. Any intended revision to horizontal or vertical locations or substitution for specified components must be approved by the designer

11. Any discrepancies between the design plan and actual field conditions should be noted to the designer before proceeding with the permeable system installation

12. All buried piping and components in the rain garden piping network system shall be covered with magnetic detectible marking tape labeled "Caution: Drain Line Below" at a depth no greater than 12" or an approved equivalent method to ensure the location of all system components after backfill

SITE PLAN

SCALE: 1" = 10'

0 10 3020

SITE SPECIFIC NOTES:

1. Installer shall determine the exact location of all underground utilities prior to start of construction

2. Prior to construction, the installer shall obtain all other applicable state and local permits necessary to install the rainwater harvesting system

3. Prior to construction, a benchmark(s) shall be set within 50' of the proposed green infrastucture components and the EV charging station shall be staked out by the designer or a land surveyor

4. Finish grading shall direct runoff away from the existing building

ReEarth Solutions Trevor Smith - Regenerative Landcare Professional

17 Grant Street, Milford, MA 01757 Phone: 617-308-7063 www.re-earthsolutions.com

Design prepared in collaboration with:

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

SCALE AS NOTED SHEET 6 OF 10 RGP-01PLAN DATE: July 23, 2026

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com x 25.0

TP-1

x 26.9 x 27.7

W

G

V

S

S

S

D

Y

H

GUY

POLEG

G

G x 25.8

T

E

EV

OHW

x 26.0x 26.7x 27.6

W

G

V

OHW

HPHP

POST & RAIL FENCE

WOOD FE

NCE

HP

E

E

FM

NATIVE PLANTINGS

E

OHW

CATCH BASIN

TOP GRATE

ELEV. = 28.6'

APPROXIMATE ROOF RUNOFF

FLOW SEPARATION LINE

SHRUB SHRUB

SHRUB

EXISTING

NATIVE

PLANTINGS

SHRUB

24"

24"

8"

BUILDING ACCESS ROAD

(ASPHALT PAVEMENT)

D D D

500 GALLON

RAINWATER TANK

NATIVE PLANTINGS

D

P P P OHW

NATIVE

PLAN

TIN

GS

DDD

E

D

+ 25 .0

P EV EV

E

LIGHT POST

(TYP OF 3)

RAIN GARDEN

(280 SF±)

PERMEABLE PAVER

HANDICAP ACCESSIBLE

EV CHARGING & VISITOR

PARKING

CONCRETE

STOP BLOCK

OR EQUAL

(TYP OF 3)

RAIN BARREL

(TYP OF 2)

6" PVC DRAIN PIPE

(MIN. 2% SLOPE)

PVC DROP OVERFLOW #2

INLET ELEV. = 28.3'±

GRANITE CURBING

OR EQUAL (TYP)

VISITOR PARKING

(TYP OF 3)

CLEANOUT

4" SCH 40 PVC

OVERFLOW PIPE

(TYP OF 3)

PVC DROP OVERFLOW #1

INLET ELEV. =29.5'±

6" PVC DRAIN PIPE

(MIN. 2% SLOPE)

2" ELECTRICAL CONDUIT (TYP)

APPROXIMATE

LOCATION

HAND HOLD

DOWNSPOUT #3

DOWNSPOUT #5

DOWNSPOUT #1

DOWNSPOUT #2

DOWNSPOUT #4

4" MINUS

ROCK-LINED

OVERFLOW

POROUS ASPHALT

WALKWAY WITH

GRANITE STEPS

OR EQUAL

ASPHALT

POROUS

WALKWAYE

W

S

E

ASPHALT

POROUS

E

E

WALKWAYD

FLAG

POLE

PROPOSED NATIVE

PLANTINGS

FUTURE PROPOSED

PAVED EMPLOYEE

PARKING AREA

EXISTING TIMBERS TO BE

REMOVED AND REPLACED

WITH NON-TOXIC TIMBER

EDGING OR EQUIVALENT

FUTURE

PROPOSED

PAVED

EMPLOYEE

PARKING

AREA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

RAIN GARDEN DESIGN PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

60% ASTM C-33 SAND

20% SCREENED SANDY LOAM

15% ORGANIC COMPOST

5% BIOCHAR

RAIN GARDEN SOIL

MEDIA COMPOSITION:

RAIN GARDEN

(NOT TO SCALE)

PROVIDE STONE SPLASH

PAD OR EQUAL TO

PREVENT EROSION

PONDING DEPTH

9" MIN.

USE DENSELY PLANTED

NATIVE GRASSES, PLANTS,

SHRUBS AND TREES

3:1 SLOPE MAX. (TYP.)

TOP OF BERM

ELEV. = 25.0'

4" MINUS ROCK-LINED

OVERFLOW TO PREVENT

EROSION SHALL BE 3"

BELOW TOP OF BERM

ELEV. = 24.75'

3" MAX.

MULCH LAYER

12" OF WELL BLENDED

RAIN GARDEN SOIL MEDIA

FROM OVERFLOW

AND ROOF

6" PVC DRAIN PIPE

WITH INVERT 4" MIN

ABOVE BOTTOM OF

RAIN GARDEN

ELEV. = 24.33

2.5'

BOTTOM RAIN

GARDEN MEDIA

ELEV. = 22.75'

BOTTOM

RAIN GARDEN

ELEV. = 24.00'

DESIGN ESHWT

ELEV = 20.2

REMOVE FILL HORIZON AND REPLACE

WITH ASTM C-33 SAND MEETING 310

CMR 15.255 SPECIFICATIONS

4" SCH 40

PVC

FROM

DOWNSPOUT

#4 AND #5

FROM

DOWNSPOUT #2

TO RAIN

GARDEN

6" PVC

DRAIN PIPE

6" X 4" PVC

REDUCING WYE

DOWNSPOUT #2

DRAIN PIPE CONNECTION

(NOT TO SCALE)

DOWNSPOUT #3

DRAIN PIPE CONNECTION

(NOT TO SCALE)

6" PVC

DRAIN PIPE

TO RAIN

GARDEN

(2) 6" X 4" 45°

PVC ELBOW

4" SCH 40

PVC

4" SCH 40 PVC

FROM

DOWNSPOUT #3

FROM DROP

OVERFLOW #1

DOWNSPOUT #1

DRAIN PIPE CONNECTION

(NOT TO SCALE)

6" PVC

DRAIN PIPE

TO RAIN

GARDEN

4" SCH 40 PVC

6" X 4" PVC

REDUCING

FITTING

FROM

DOWNSPOUT #1

6" X 4" 90°

PVC ELBOW

ALL VENT, OVERFLOW OR

DRAIN PIPES SHALL HAVE

#24-MESH NON-CORRODIBLE

SCREEN OR EQUAL TO

PREVENT INSECT AND

RODENT ENTRY

TO RAIN

GARDEN

FROM

OVERFLOW

AND ROOF

6" PVC

DRAIN PIPE

6" X 4" PVC

SANITARY

REDUCING

TEE

6" PVC

DRAIN PIPE

6" X 4" PVC

REDUCING

FITTING

DOWNSPOUT #4 AND #5

DRAIN PIPE CONNECTION

(NOT TO SCALE)

PLAN VIEW PLAN VIEW

PLAN VIEW PLAN VIEW

PLAN VIEW

SECTION VIEW

12" SPACING

BETWEEN ALL

PLANTS

Common Name Botanical Name Qty Height Blue flag iris Iris versicolor 9 2-3 ft Swamp milkweed Asclepias incarnata 7 3-4 ft Cardinal flower Lobelia cardinalis 7 2-4 ft Great blue lobelia Lobelia siphilitica 7 2-3 ft Soft rush Juncus effusus 5 2-3 ft

Common Name Botanical Name Qty Height Culver’s root Veronicastrum virginicum 5 4-5 ft Joe-Pye weed Eutrochium dubium 5 3-4 ft Wild bergamont Monarda fistulosa 7 2.5-4 ft New England aster Symphyotrichum novae-angliae 7 3-5 ft Fox sedge Carex vulpinoidea 7 2-3 ft

Common Name Botanical Name Qty Height Black-eyed Susan Rudbeckia fulgida 9 2-3 ft Purple coneflower Echinacea purpurea 7 2.5-4 ft Zagreb coreopsis Coreopsis verticillata 7 1.5-2 ft October Skies aster Symphyotrichum oblongifolium 5 1.5-2 ft Little bluestem Schizachyrium scoparium 5 3-4 ft

280 SF PERENNIAL-ONLY RAIN GARDEN PLANTING LIST

Zone 1 - Lowest / Wettest Center

Zone 2 - Middle Basin / Side Slopes

Zone 3 - Upper Edge / Drier Rim

*Final quantity shall be determined prior to installation

MULCH = 2 YDS±

ASTM C-33 SAND = 6 1/2 YDS±

SCREENED SANDY LOAM = 2 YDS±

ORGANIC COMPOST = 1 1/2 YDS±

BIOCHAR = 1/2 YDS±

ASTM C-33 SAND = 30 YDS±

(BELOW RAIN GARDENMEDIA)

APPROXIMATE MATERIALS

NEEDED IN RAIN GARDEN:

Rendering - full -color perennial rain garden.

Lowest center: wet-tolerant species for temporary ponding.

Middle slope: adaptable species for wet-to-average soil.

Upper edge: colorful full-sun species that tolerate drying between storms.

Total rain garden count: 99 plants.

ReEarth Solutions Trevor Smith - Regenerative Landcare Professional

17 Grant Street, Milford, MA 01757 Phone: 617-308-7063 www.re-earthsolutions.com

Design prepared in collaboration with:

NOTE: IMAGES

SHOWN FOR PLANT

REPRESENTATION

ONLY AND DO NOT

DEPICT ACTUAL SITE

CONDITIONS

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

SCALE AS NOTED SHEET 7 OF 10 RGP-02PLAN DATE: July 23, 2026

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com

SCHEDULE OF INVERTS - RAIN GARDEN

TOP OF RAIN GARDEN BERM = 25.0'

RAIN GARDEN OUT = 24.75'

RAIN GARDEN IN = 24.33'

BOTTOM RAIN GARDEN/TOP MULCH = 24.00'

TOP RAIN GARDEN MEDIA = 23.75'

BOTTOM RAIN GARDEN MEDIA = 22.75'

DESIGN ESHWT ELEV. = 20.2'

0 20 40 60 80 120

140 160 180100

SCALED SYSTEM PROFILE

(NORTH OF COVERED ENTRY)

HORIZONTAL 1" = 20'

VERTICAL 1" = 2'

6" PVC

DRAIN PIPE

L=137' S=0.02

EXISTING GRADE

NATIVE PLANTING BED

2.5'

ACCESS ROAD

DESIGN ESHWT

ELEV = 20.2

3" MULCH

LAYER

9"

FINISH GRADE

RAIN GARDEN

SCHEDULE OF SYSTEM INVERTS

DOWNSPOUT INVERT #3 = 27.07'

6" PVC DRAIN PIPE CONNECTION INVERT = 26.87'

DOWNSPOUT INVERT #4 = 26.67'

PVC DROP OVERFLOW #2 INLET = 28.3'

PVC DROP OVERFLOW #2 INVERT = 26.49'

DOWNSPOUT INVERT #5 = 26.39'

PERMEABLE PAVER OVERFLOW INVERT #1 = 25.81'

PERMEABLE PAVER OVERFLOW INVERT #2 = 25.55'

PERMEABLE PAVER OVERFLOW INVERT #2 = 25.39'

RAIN GARDEN IN = 24.33'

RAIN GARDEN ROCK LINED OVERFLOW = 24.75'

ROCK-LINED OVERFLOW

TO VEGETATED SWALE

6" PVC

DRAIN PIPE

PERMEABLE PAVER

OVERFLOW #3

PERMEABLE PAVER

OVERFLOW #2

PERMEABLE PAVER

OVERFLOW #1

REMOVE FILL HORIZON

AND REPLACE WITH

SAND MEETING ASTM

C-33 SPECIFICATIONS

IN ACCORDANCE WITH

310 CMR 15.255

CLEANOUT

PVC DROP OVERFLOW #2

DOWNSPOUT #3

DOWNSPOUT #4

DOWNSPOUT #5

4" SCH 40 PVC

(TYP OF 3)

RAIN

GARDEN

MEDIA

2" X 3" ALUMINUM DOWNSPOUT (TYP)

34 34

0 20 40 80

SCALED SYSTEM PROFILE

(SOUTH OF COVERED ENTRY)

HORIZONTAL 1" = 20'

VERTICAL 1" = 2'

POROUS ASPHALT

WALKWAY

DOWNSPOUT #1

2" X 3" ALUMINUM DOWNSPOUT (TYP)

DOWNSPOUT #2

SCHEDULE OF SYSTEM INVERTS

DOWNSPOUT INVERT #1 = 27.90'

DROP OVERFLOW #1 INLET = 29.5'

DROP OVERFLOW #1 INVERT = 27.35'

DOWNSPOUT INVERT #2 = 27.30'

6" PVC DRAIN PIPE CONNECTION INVERT = 26.87'

6" PVC

DRAIN PIPE

L=47' S=0.02 CONNECTION

TO 6" PVC

4" SCH

40 PVC

(TYP OF 2)

PVC DROP OVERFLOW #1

34 34

NATIVE

PLANTING

BED

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

BUILDING ENTRANCE DESIGN PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

UNCOMPACTED

SUBGRADE

12" COURSE

AGGREGATE BASE

OF 1 1/2" DOUBLE

WASHED CRUSHED

STONE, COMPACTED

POROUS ASPHALT

WALKWAY (TYP)

2" CHOKER COURSE

OF 3/4" DOUBLE

WASHED CRUSHED

STONE, COMPACTED

GEOTEXTILE FABRIC ON

SUBGRADE AND SIDES

OF EXCAVATION

POROUS ASPHALT

(NOT TO SCALE)

3"

NATIVE PLANTING BED

(NOT TO SCALE)

6" MAX

DEPTH

12" OF WELL BLENDED

RAIN GARDEN SOIL

MEDIA

3" MAX. MULCH LAYER

USE DENSELY PLANTED NATIVE

GRASSES, PLANTS AND SHRUBS

TO ENSURE 80% PLANT

COVERAGE

1' MIN.

ESHWT

RAIN GARDEN SOIL

MEDIA COMPOSITION

80% COURSE SAND

15% ORGANIC COMPOST

5% TOPSOIL

NOTE: ELEVATIONS OF THE RAIN GARDEN SHALL BE PROVIDED TO FOLLOW

THE SLOPE OF THE ADJACENT WALKWAY OR EXISTING GRADE AS NEEDED

POROUS ASPHALT - CONSTRUCTION NOTES:

1. Contractor shall create a construction sequence plan

2. A pre-construction meeting shall be required to discuss:

2.1. Construction sequencing

2.2. Erosion control adjacent to the porous asphalt

2.3. Prevention of stormwater run-on until the porous asphalt is installed

3. No excavation of native soils to occur during wet or saturated conditions

4. Excavate using the smallest equipment possible and work from the sides/perimeter of the facility to avoid over-compaction of the subbase

5. Excavate a level base or slope slightly away from a building/structure

6. Scarify native soils to 3 or 4 inch depth and install geotextile fabric as noted in the detail section

7. Install base layer in 6 inch lifts. Use a vibratory roller for compaction until there is no visible movement of the aggregate. Do not crush the aggregate

8. Install aggregate base: 12" of 1 1/2" double washed crushed stone and compacted

9. Install choker course: 2"of 3/4" double washed crushed stone and compacted

10. Install the porous asphalt:

10.1. The porous asphalt shall be installed like conventional asphalt. The porous asphalt is placed in an asphalt machine from a dump truck at a specific temperature according to manufacturer

10.2. The porous asphalt is compacted using a 10-ton static roller

11. After installation of the porous asphalt, a minimun of (2) infiltration tests shall be conducted in accordance with ASTM 1701 standard. the results of the infiltration tests shall be provided to the designer and system owner.

POROUS ASPHALT- MAINTENANCE NOTES:

General maintenance:

1. Determine maintenance schedule (bi-annual is likely) based on final porous asphalt product installed. Refer to manufacturer's recommendations

2. Inform contractors working on the property of the locations of porous asphalt area(s). A sign is recommended that identifies the surface as permeable

3. Inspect the porous asphalt area after storms to ensure rainwater properly drains through the material

Typical annual maintenance:

4. Inspect the porous asphalt installation after the initial storm event and seasonally to ensure there is no ponding water

5. Perform (1) surface infiltration test in accordance with ASTM 1701 Standard for every 500 S.F. of porous asphalt surface

6. Clean porous asphalt with high efficiency vacuum, sweeper-vacuum or walk behind vacuum to remove surface debris

7. Identify and stabilize any sediment sources adjacent to porous asphalt area

8. Maintain adjacent landscaping to prevent excessive growth and debris onto porous asphalt area

9. Remove excessive moss or other plant growth from porous asphalt area using pressure washer, weed burner or an equivalent method. Remove any washed out sediment/debris

10. Replace/replenish the top layer of No. 8 stone between the joints with new clean No. 8 stone after sweeping, vacuuming, pressure washing or when stone is below specified height

11. Remove leaves from the porous asphalt surface as needed

12. Snow removal:

12.1. Remove snow with a rubber tipped shovel/plow or keep the plow tip 1 inch above the surface by means of a skid or roller to avoid damage to porous asphault surface

12.2. Salt is acceptable for use as a deicer on the porous asphault though non-toxic, organic deicers, applied either as a blended, magnesium chloride-based liquid products or a preteated salt, are preferable. Any deicing materials should be used in moderation

12.3. Snow storage on the porous asphault should be avoided, because it could lead to clogging due to sediment accumulation

12.4. Do not apply sand on the porous asphault surface

Non-Routine maintenance:

13. Do not stockpile mulch, sand, soil, yard waste, snow containing sand or salt or any other material on the porous asphalt area that could potentially clog the pore space between the joints

14. Protect porous asphalt surface from sediment during installation of adjacent planting areas or infrastructure

15. Replace porous asphalt for utility repairs or other purposes with like material if available. If not, patch with conventional asphalt. Patched with convetional asphalt shall not exceed 10% of the total porous asphalt area

16. Remove and replace porous asphalt for utility repairs

17. Clean (rehab) clogged porous asphalt using high pressure wash and vacuum

18. Do not replace vehicle fluids or wash a car/equipment over the porous asphalt surface

19. Do not apply sealants or any other materials that prevent water to pass through the porous asphalt surface

STEEL EDGING OR EQUAL USE DENSELY PLANTED

NATIVE GRASSES,

PLANTS, SHRUBS AND

TREES TO ENSURE 80%

PLANT COVERAGE

9" MIN.

PVC DROP OVERFLOW

(NOT TO SCALE)

6" PVC DRAIN PIPE

MIN. 2% SLOPE

PONDING

DEPTH

3" MIN.

SITE PLAN

SCALE: 1" = 10'

0 10 3020

STEEL EDGING OR

EQUAL BETWEEN

PLANTING BED

MATERIAL AND

WALKWAY

POROUS

ASPHALT

WALKWAY

TO RAIN

GARDEN

6" X 4" PVC

SANITARY

REDUCING TEE

INVERT

INLET

GENERAL NOTES:

1. This plan in intended for the location and design of the porous asphalt walkway only

2. This plan shows features that were visually apparent on the date of the site inspection. The absence of sub-surface structures, utilities, etc is not intended or implied

3. Utility locations were approximately GPS located by Earthwater Design Solutions, Inc. in April 2026

4. No changes shall be made in the field without the approval of the designer

5. Access to the rain barrels and rainwater tank shall be provided through the native planting beds by means of a stepping stone walking path or equivalent

6. All work shall be performed in accordance with the any applicable state and local regulations

SITE SPECIFIC NOTES:

1. Installer shall determine the exact location of all underground utilities prior to start of construction

2. Prior to construction, the installer shall obtain all applicable state and local permits necessary to install the porous asphalt

3. Prior to construction, a benchmark(s) shall be set within 50' of the proposed green infrastucture components and the porous asphalt walkway shall be staked out by the designer or a land surveyor

4. Finish grading shall direct runoff away from the existing building and septic tank manhole covers

GRANITE STEPS

(NOT TO SCALE)

POROUS ASPHALT

WALKWAY

1-2% SLOPE

(TYP)

15"3"POROUS ASPHALT

WALKWAY

7"

SWENSON GRANITE STEP

3'L X 1'-6"W OR EQUAL

4" SCH 40 PVC

6" PVC DRAIN PIPE

MIN. 2% SLOPE

NOTES TO THE POROUS ASPHALT INSTALLER:

1. Installer shall verify existing conditions in the field prior to construction and notify the designer of any discrepancies before proceeding with the porous asphalt installation only

2. Installer shall provide a 48 hour notice to client and designer prior to construction

3. All existing underground utilities are shown as approximate and the exact location shall be confirmed prior to construction by the installer. Installer shall verify location of any existing utilities and services and provide protection during construction. Installer shall directly coordinate with DIG Safe. Utilities damaged during construction shall be repaired at installer's expense

4. Installer shall contact and inform client and designer to any unforeseen conditions which may affect the intended design as set forth in the drawings

5. Installer shall secure any necessary permits required for the work from any state or local agencies, departments, utility companies or other authorities having jurisdiction and affected by the work

6. The installer shall verify all existing grades in the field and report any discrepancies immediately to the designer

7. All proposed permeable paver system components and piping network shall be installed as proposed or an approved equivalent may be substituted if approved by the designer

8. All gravity flow piping shall be a minimum slope of 1/4" per foot (2.0%)

9. All finish grading shall be provided to direct surface water runoff away from all structures, system components and property lines

10. Any intended revision to horizontal or vertical locations or substitution for specified components must be approved by the designer

11. Any discrepancies between the design plan and actual field conditions should be noted to the designer before proceeding with the porous asphalt installation

12. All buried piping and components in the porous asphalt shall be covered with magnetic detectible marking tape labeled "Caution: Drain Line Below" at a depth no greater than 12" or an approved equivalent method to ensure the location of all system components after backfill

NOTE: INSTALL 2 OR 3 GRANITE STEPS TO FOLLOW SLOPE AS NEEDED

ReEarth Solutions Trevor Smith - Regenerative Landcare Professional

17 Grant Street, Milford, MA 01757 Phone: 617-308-7063 www.re-earthsolutions.com

Design prepared in collaboration with:

GREEN INFRASTRUCTURE

SITE IMPROVEMENT PLAN

SCALE AS NOTED SHEET 8 OF 10 BEP-01

Hagstrom Co., Inc.

167 Western Avenue - Porous asphalt walkway installation Gloucester, MA 01930 978-283-0322 www.hagstrompaving.com

POROUS ASPHALT CONTRACTOR CONTACT:

The following contact may be used to provide service for the porous asphalt system installation

SERVICE CONTRACTOR SERVICE

PLAN DATE: July 23, 2026

Earthwater Design Solutions, Inc.

46 Middle Street, Gloucester, MA 01930

Phone: 978-879-6591 www.earthwaterdesignsolutions.com x 26.9 x 27.7

W

G

V

S

S

S

D

Y

H

GUY

POLEG

G x 25.8

T

E

EV

OHW

x 26.7x 27.6

W

G

V

OHW

HPHP

POST & RAIL FENCE

WOOD FE

NCE

HP

E

E

FM

NATIVE PLANTINGS

E

OHW

CATCH BASIN

TOP GRATE

ELEV. = 28.6'

APPROXIMATE ROOF RUNOFF

FLOW SEPARATION LINE

SHRUB SHRUB

SHRUB

SHRUB

8"

BUILDING ACCESS ROAD

(ASPHALT PAVEMENT)

D D D

500 GALLON

RAINWATER TANK

NATIVE PLANTINGS

P P P

NATIVE

PLAN

TIN

GS

DDD

E

D

P EV EV

E

LIGHT POST

(TYP OF 3)

PERMEABLE PAVER

HANDICAP ACCESSIBLE

EV CHARGING & VISITOR

PARKING

CONCRETE

STOP BLOCK

OR EQUAL

(TYP OF 3)

RAIN BARREL

(TYP OF 2)

6" PVC DRAIN PIPE

(MIN. 2% SLOPE)

PVC DROP OVERFLOW #2

INLET ELEV. = 28.3'±

GRANITE CURBING

OR EQUAL (TYP)

VISITOR PARKING

(TYP OF 3)

CLEANOUT

4" SCH 40 PVC

OVERFLOW PIPE

(TYP OF 3)

PVC DROP OVERFLOW #1

INLET ELEV. =29.5'±

6" PVC DRAIN PIPE

(MIN. 2% SLOPE)

2" ELECTRICAL CONDUIT (TYP)

APPROXIMATE

LOCATION

HAND HOLD

DOWNSPOUT #3

DOWNSPOUT #5

DOWNSPOUT #1

DOWNSPOUT #2

DOWNSPOUT #4

POROUS ASPHALT

WALKWAY WITH

GRANITE STEPS

OR EQUAL

ASPHALT

POROUS

WALKWAYE

W

S

E

ASPHALT

POROUS

E

E

WALKWAYD

EXISTING TIMBERS TO BE

REMOVED AND REPLACED

WITH NON-TOXIC TIMBER

EDGING OR EQUIVALENT

FUTURE

PROPOSED

PAVED

EMPLOYEE

PARKING

AREA

FUTURE PROPOSED

PAVED EMPLOYEE

PARKING AREA

(Map 20D, Lot 8) Prepared for:

Town of Ipswich - Utilities Department 272 High Street

Ipswich, MA 01938REVISIONS TO PLAN

DESCRIPTION DATE

BUILDING ENTRANCE DESIGN PLAN

Copyright c 2026

Isaac M. DaRowe Rainwater Harvesting System Designer

SITE PLAN

SCALE: 1" = 10'

0 10 3020

3/4" PVC GREY MANUAL

TWO-WAY BALL VALVE,

STRAIGHT, FIP X FIP,

FULL PORT AND BALL PORT

(GRAINGER ITEM # 4YLH1)

3/4" PVC GREY NIPPLE

(GRAINGER ITEM # 6MX65)

RAINWATER TANK SPIGOT

(NOT TO SCALE)

2" BULKHEAD

FITTING

GRAINGER

ITEM# 4YLH1

RAINWATER TANK

GENERAL NOTES:

1. This plan in intended for the location and design of the rain barrels and the rainwater tank only

2. This plan shows features that were visually apparent on the date of the site inspection. The absence of sub-surface structures, utilities, etc is not intended or implied

3. Utility locations were approximately GPS located by Earthwater Design Solutions, Inc. in April 2026

4. No changes shall be made in the field without the approval of the designer

5. Access to the rain barrels and rainwater tank shall be provided through the native planting beds by means of a stepping stone walking path or equivalent

6. All work shall be performed in accordance with the any applicable state and local regulations

7. Untreated rainwater is non-potable water. A sign shall be installed at all end use location and shall indicate "Rainwater Non-Potable Do Not Drink"

8. All vent, overflow or drain pipes shall have #24-mesh non-corrodible screen or equal to prevent insect and rodent entry

9. The following roof materials shall not be used for rainwater collection: wood/cedar shake and lead flashing

NOTES TO THE RAINWATER HARVESTING SYSTEM INSTALLER:

1. Installer shall verify existing conditions in the field prior to construction and notify the designer of any discrepancies before proceeding with the rainwater harvesting system installation

2. Installer shall provide a 48 hour notice to client and designer prior to construction

3. All existing underground utilities are shown as approximate and the exact location shall be confirmed prior to construction by the installer. Installer shall verify location of any existing utilities and services and provide protection during construction. Installer shall directly coordinate with DIG Safe. Utilities damaged during construction shall be repaired at installer's expense

4. Installer shall contact and inform client and designer to any unforeseen conditions which may affect the intended design as set forth in the drawings

5. Installer shall secure any necessary permits required for the work from any state or local agencies, departments, utility companies or other authorities having jurisdiction and affected by the work

6. The installer shall verify all existing grades in the field and report any discrepancies immediately to the designer

7. All proposed rainwater harvesting system components and piping network shall be installed as proposed or an approved equivalent may be substituted if approved by the designer

8. All gravity flow piping shall be a minimum slope of 1/4" per foot (2.0%)

9. All finish grading shall be provided to direct surface water runoff away from all structures, system components and property lines

10. Any intended revision to horizontal or vertical locations or substitution for specified components shall be approved by the designer

11. Any discrepancies between the design plan and actual field conditions should be noted to the designer before proceeding with rainwater harvesting system installation

12. The rain barrel shall be installed using the Ipswich Utilities Department "Rain Barrel Installation

Guide"

13. Rain barrel shall be on a stable concrete cinder block base and set level. The concrete cinder blocks shall be on a manually compacted base with 3" of crushed stone or sand beneth and set level

14. Rainwater tank shall be set on a stable base and set level. Rainwater tank shall be on a mechanically compacted base with 6"-12" of crushed stone beneath and set level

15. Rainwater tank shall be watertight

16. Rainwater tank to be fitted with bulkhead fittings cast in place by the manufacturer or an approved equal

17. All pipe fittings, access ports and manhole covers shall be made watertight

18. All buried piping and components in the rainwater system shall be covered with magnetic detectible marking tape labeled "Caution: Water Line Below" at a depth no greater than 12" or an approved equivalent method to ensure the location of all system components after backfill

19. Pump literature should be placed near the pump for reference purposes. An examination of the existing electrical system will need to occur to confirm adequate conditions exist for the proposed rainwater harvesting system

SITE SPECIFIC NOTES:

1. Installer shall determine the exact location of all underground utilities prior to start of construction

2. Prior to construction, the installer shall obtain all applicable state and local permits necessary to install the rainwater harvesting system

3. Prior to construction, a benchmark(s) shall be set within 50' of the proposed green infrastucture components by the designer or a land surveyor

4. Finish grading shall direct runoff away from the existing building, rain barrel base and rainwater tank base

RAINWATER HARVESTING SYSTEM - MAINTENANCE:

Frequently and after rain events:

1. Keep roof clean of debris

2. Visually inspect downspouts and piping network

3. Inspect and remove debris/sediment from gutters and downspout filters

Perform annual maintenance to confirm:

4. Removal of any nests from rooftops and trim overhanging tree branches

5. All piping and fittings are structurally sound and in good condition.

Replace as needed before piping starts to visibly degrade

6. Access cover is secure and functioning properly

7. Vent is unobstructed, structurally sound and in good condition

8. Screen is securely in place on the overflow pipe

9. If installed, confirm the tank level gauge is functioning properly and recalibrate if needed

10. No deterioration has occurred to any part of the rainwater harvesting system

11. Replace system components as needed to ensure proper functioning

Seasonal shut-down:

12. Manually disconnect the flexi-fit downspout diverters from the rain barrel and rainwater tank to direct rainwater back down the off-seasonal drainage path

13. Drain water from rain barrel and the rainwater tank to the level of the bottom drain port to prevent freeze damage. Drain water from the rain barrel and rainwater tank using the dedicated bottom drain ports.

Connect a hose to the bottom valve on the rain barrel and rainwater tank drain ports and drain water away from the building, tank base and utilities

Seasonal start-up:

14. Perform annual maintenance procedures as noted…

This is the start of the file's text. The full file is on GovTribe.