J1_Cost_Summary_Details.v3.xlsx

XLSX spreadsheet 81 KB Posted

Attached to
NOAA Systems Engineering and Technical Services (SETS) Federal contract opportunity
Solicitation number
ID01150067
Issued by
General Services Administration Federal Acquisition Service Assisted Acquisition Services Region 1

About this file

Attachment J1

View the file

Other files for this federal contract opportunity

Other files attached to NOAA Systems Engineering and Technical Services (SETS), newest first.
File Type Posted
ID01150067_Tab_10_Solicitation_Final_v4.pdf PDF
ID01150067_Tab_10_Solicitation_Final_v4-clean.pdf PDF
J8_Work_Assignment_2_GOES-R_v4-clean.pdf PDF
J10_Work_Assignment_4_OSGS_v4-TC.pdf PDF
J7_Work_Assignment_1_CIO_v4-TC.pdf PDF
J5_NDA_Form.pdf PDF
J6_RELEASE_OF_CLAIMS_GSA1142-15a.pdf PDF
J8_Work_Assignment_2_GOES-R_v4-TC.pdf PDF
J7_Work_Assignment_1_CIO_v4-clean.pdf PDF
ID01150067_Tab_10_Solicitation_Final_v3-TC.pdf PDF
J4_SOW_v2.3-Clean.pdf PDF
J3_Labor_Category_Definitions.v3.pdf PDF
J2_Payment_of_Fixed_Fee.v3.xlsx XLSX spreadsheet
J10_Work_Assignment_4_OSGS_v4-clean.pdf PDF
J9_Work_Assignment_3_OPPA_v3-TC.pdf PDF
J4_SOW_v2.3-TC.pdf PDF
ID01150067_Tab_10_Solicitation_Final_v2_with_TC.pdf PDF
J4_SOW_v2.2.pdf PDF
J3_Labor_Category_Definitions.v3_-_with_TC.pdf PDF
ID01150067_Tab_10_FINAL_SOLIC_Q A_05.pdf PDF
J3_Labor_Category_Definitions.v3.pdf PDF
ID01150067_Tab_10_Solicitation_Final_v2.pdf PDF
J8_Work_Assignment_2_GOES-R_v2.pdf PDF
ID01150067_Tab_10_Solicitation_Final_v1.pdf PDF
J4_SOW_v2.1.pdf PDF
J9_Work_Assignment_3_OPPA_v1.pdf PDF
ID01150067_Tab_10_Solicitation_Final_v1_No_TC.pdf PDF
J2_Payment_of_Fixed_Fee.v3.xlsx XLSX spreadsheet
J10_Work_Assignment_4_OSGS_v2.pdf PDF
J1_Cost_Summary_Details.v4.xlsx XLSX spreadsheet
J3_Labor_Category_Definitions.v2.pdf PDF
J11_NOAA_2016_Small_Business_Goals.pdf PDF
J6_RELEASE_OF_CLAIMS_GSA1142-15a.pdf PDF
ID01150067_Tab_10_Draft_Solicitation__2_Q A_04.pdf PDF
J5_NDA_Form.pdf PDF
ID01150067_Tab_10_Solicitation_Draft_2_Final.pdf PDF
J3_Labor_Category_Definitions.pdf PDF
J8_Work_Assignment_2_GOES-R_v1.pdf PDF
J10_Work_Assignment_4_OSGS_v1.pdf PDF
J11_NOAA_2016_Small_Business_Goals.pdf PDF
ID01150067_Tab_9_Interested_Parties.pdf PDF
ID01150067_Tab_9_Presolicitation_Conference_Q A_02-asked_and_answered_at_conference.pdf PDF
ID01150067_Tab_9_Draft_Solicitation_J1_v1.xlsx XLSX spreadsheet
ID01150067_Tab_9_SETS_PreSolicitation_Conference_Slide_Deck.pdf PDF
ID01150067_Tab_9_SETS_Presolicitation_Conference_Q A_01.pdf PDF
ID01150067_Tab_9_Presolicitation_Conference_Notice_03.pdf PDF
J.3 Labor Categories.xlsx XLSX spreadsheet
J.6D_OSGS SOW WA.docx DOCX document
J.6C_OPPA SOW WA.docx DOCX document
J.2 Payment of Fixed Fee.xlsx XLSX spreadsheet
Show all 50

NOAA Systems Engineering and Technical Services (SETS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period

BASE PERIOD: July 1, 2016 through June 30, 2017CONTRACTOR NAME:
KEY PersonnelSolicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program ManagerON-SITE1880$0.00$0.00$0.00
Chief Engineer / Engineer 5ON-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE1880$0.00$0.00$0.00
BASE PERIOD KEY PERSONNEL SUBTOTAL$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Project ManagerON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE7520$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Engineer 4ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Engineer 3ON-SITE20680$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Engineer 2ON-SITE45120$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Engineer 1ON-SITE22560$0.00$0.00$0.00
OFF-SITE5640$0.00$0.00$0.00
Scientist 3ON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scientist 2ON-SITE18800$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Scientist 1ON-SITE9400$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Technician 3ON-SITE24440$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 2ON-SITE5640$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 1ON-SITE5640$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 2ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 1ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Administrative AssistantON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scheduler 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 1ON-SITE0$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Technical WriterON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Program Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Program Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
BASE PERIOD ESTIMATED WAR LABOR SUBTOTAL$0.00$0.00$0.00
BASE PERIOD LABOR TOTAL$0.00$0.00$0.00
TRAVEL$100,000.00$0.00$0.00
Other Direct Costs (ODC)$100,000.00$0.00$0.00
TOTAL BASE PERIOD$0.00
Please use formulas in calculating costs, rates & fees above, so that the Government evaluators are better able to understand your pricing.
* The J1 has been pre-populated with estimated quantities of each labor category and a standarad number of hours per Full Time Equivalent (FTE). These estimated quantities are being used for evaluation purposes only, and are not a guarantee of the specific labor category quantities that may be required over the course of performance. As WARs are issued, the awarded Contractor will be expected to propose the labor mix required to perform the specific work.
The prices proposed by the Offeror on the J1 create a ceiling rate for each category. The awarded Contractor is welcome, and encouraged, to propose lower rates than their awarded J1 for individual WARs, as appropriate.
**A stipulated amount for Travel and ODC has been provided for evaluation purposes only. This is not a budget number and may not represent what will be required or provided in the actual award.

ID01150067 - NOAA SETS

Option One

OPTION PERIOD ONE: July 1, 2017 through June 30, 2018CONTRACTOR NAME:
Contract Level KEY PersonnelSolicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program ManagerON-SITE1880$0.00$0.00$0.00
Chief Engineer / Engineer 5ON-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE1880$0.00$0.00$0.00
OPTION PERIOD ONE KEY PERSONNEL SUBTOTAL$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Project ManagerON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE7520$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Engineer 4ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Engineer 3ON-SITE20680$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Engineer 2ON-SITE45120$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Engineer 1ON-SITE22560$0.00$0.00$0.00
OFF-SITE5640$0.00$0.00$0.00
Scientist 3ON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scientist 2ON-SITE18800$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Scientist 1ON-SITE9400$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Technician 3ON-SITE24440$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 2ON-SITE5640$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 1ON-SITE5640$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 2ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 1ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Administrative AssistantON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scheduler 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 1ON-SITE0$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Technical WriterON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Program Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Program Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
OPTION PERIOD ONE ESTIMATED WAR LABOR SUBTOTAL$0.00$0.00$0.00
OPTION PERIOD ONE LABOR TOTAL$0.00$0.00$0.00
TRAVEL$100,000.00$0.00$0.00
Other Direct Costs (ODC)$100,000.00$0.00$0.00
TOTAL OPTION PERIOD ONE$0.00
Please use formulas in calculating costs, rates & fees above, so that the Government evaluators are better able to understand your pricing.
* The J1 has been pre-populated with estimated quantities of each labor category and a standarad number of hours per Full Time Equivalent (FTE). These estimated quantities are being used for evaluation purposes only, and are not a guarantee of the specific labor category quantities that may be required over the course of performance. As WARs are issued, the awarded Contractor will be expected to propose the labor mix required to perform the specific work.
The prices proposed by the Offeror on the J1 create a ceiling rate for each category. The awarded Contractor is welcome, and encouraged, to propose lower rates than their awarded J1 for individual WARs, as appropriate.
**A stipulated amount for Travel and ODC has been provided for evaluation purposes only. This is not a budget number and may not represent what will be required or provided in the actual award.

ID01150067 - NOAA SETS

Option Two

OPTION PERIOD TWO: July 1, 2018 through June 30, 2019CONTRACTOR NAME:
Contract Level KEY PersonnelSolicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program ManagerON-SITE1880$0.00$0.00$0.00
Chief Engineer / Engineer 5ON-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE1880$0.00$0.00$0.00
OPTION PERIOD TWO KEY PERSONNEL SUBTOTAL$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Project ManagerON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE7520$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Engineer 4ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Engineer 3ON-SITE20680$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Engineer 2ON-SITE45120$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Engineer 1ON-SITE22560$0.00$0.00$0.00
OFF-SITE5640$0.00$0.00$0.00
Scientist 3ON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scientist 2ON-SITE18800$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Scientist 1ON-SITE9400$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Technician 3ON-SITE24440$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 2ON-SITE5640$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 1ON-SITE5640$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 2ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 1ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Administrative AssistantON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scheduler 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 1ON-SITE0$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Technical WriterON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Program Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Program Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
OPTION PERIOD TWO ESTIMATED WAR LABOR SUBTOTAL$0.00$0.00$0.00
OPTION PERIOD TWO LABOR TOTAL$0.00$0.00$0.00
TRAVEL$100,000.00$0.00$0.00
Other Direct Costs (ODC)$100,000.00$0.00$0.00
TOTAL OPTION PERIOD TWO$0.00
Please use formulas in calculating costs, rates & fees above, so that the Government evaluators are better able to understand your pricing.
* The J1 has been pre-populated with estimated quantities of each labor category and a standarad number of hours per Full Time Equivalent (FTE). These estimated quantities are being used for evaluation purposes only, and are not a guarantee of the specific labor category quantities that may be required over the course of performance. As WARs are issued, the awarded Contractor will be expected to propose the labor mix required to perform the specific work.
The prices proposed by the Offeror on the J1 create a ceiling rate for each category. The awarded Contractor is welcome, and encouraged, to propose lower rates than their awarded J1 for individual WARs, as appropriate.
**A stipulated amount for Travel and ODC has been provided for evaluation purposes only. This is not a budget number and may not represent what will be required or provided in the actual award.

ID01150067 - NOAA SETS

Option Three

OPTION PERIOD THREE: July 1, 2019 through June 30, 2020 (LEAP YEAR)CONTRACTOR NAME:
Contract Level KEY PersonnelSolicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program ManagerON-SITE1880$0.00$0.00$0.00
Chief Engineer / Engineer 5ON-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE1880$0.00$0.00$0.00
OPTION PERIOD THREE KEY PERSONNEL SUBTOTAL$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Project ManagerON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE7520$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Engineer 4ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Engineer 3ON-SITE20680$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Engineer 2ON-SITE45120$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Engineer 1ON-SITE22560$0.00$0.00$0.00
OFF-SITE5640$0.00$0.00$0.00
Scientist 3ON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scientist 2ON-SITE18800$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Scientist 1ON-SITE9400$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Technician 3ON-SITE24440$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 2ON-SITE5640$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 1ON-SITE5640$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 2ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 1ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Administrative AssistantON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scheduler 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 1ON-SITE0$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Technical WriterON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Program Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Program Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
OPTION PERIOD THREE ESTIMATED WAR LABOR SUBTOTAL$0.00$0.00$0.00
OPTION PERIOD THREE LABOR TOTAL$0.00$0.00$0.00
TRAVEL$100,000.00$0.00$0.00
Other Direct Costs (ODC)$100,000.00$0.00$0.00
TOTAL OPTION PERIOD THREE$0.00
Please use formulas in calculating costs, rates & fees above, so that the Government evaluators are better able to understand your pricing.
* The J1 has been pre-populated with estimated quantities of each labor category. These estimated quantities are being used for evaluation purposes only, and are not a guarantee of the specific labor category quantities that may be required over the course of performance. As WARs are issued, the awarded Contractor will be expected to propose the labor mix required to perform the specific work.
The prices proposed by the Offeror on the J1 create a ceiling rate for each category. The awarded Contractor is welcome, and encouraged, to propose lower rates than their awarded J1 for individual WARs, as appropriate.
**A stipulated amount for Travel and ODC has been provided for evaluation purposes only. This is not a budget number and may not represent what will be required or provided in the actual award.

ID01150067 - NOAA SETS

Option Four

OPTION PERIOD FOUR: July 1, 2020 through June 30, 2021CONTRACTOR NAME:
Contract Level KEY PersonnelSolicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program ManagerON-SITE1880$0.00$0.00$0.00
Chief Engineer / Engineer 5ON-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE1880$0.00$0.00$0.00
OPTION PERIOD FOUR KEY PERSONNEL SUBTOTAL$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Project ManagerON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Subject Matter ExpertON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Systems ArchitectON-SITE7520$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Engineer 4ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Engineer 3ON-SITE20680$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Engineer 2ON-SITE45120$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Engineer 1ON-SITE22560$0.00$0.00$0.00
OFF-SITE5640$0.00$0.00$0.00
Scientist 3ON-SITE13160$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scientist 2ON-SITE18800$0.00$0.00$0.00
OFF-SITE7520$0.00$0.00$0.00
Scientist 1ON-SITE9400$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Technician 3ON-SITE24440$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 2ON-SITE5640$0.00$0.00$0.00
OFF-SITE3760$0.00$0.00$0.00
Technician 1ON-SITE5640$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 2ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Financial Analyst 1ON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Administrative AssistantON-SITE3760$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Scheduler 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Scheduler 1ON-SITE0$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Technical WriterON-SITE1880$0.00$0.00$0.00
OFF-SITE1880$0.00$0.00$0.00
Program Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Program Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Work Assignment Level (May be specified as KEY based on individual WARs)Solicitation Labor CategoryOfferor's Labor CategoryCompany (Prime / Sub)On site / Off site RateAnnual Salary ($)Direct Labor Rate ($)Overhead Rate (%)Overhead Cost ($)G&A Rate (%)G&A Cost ($)Total Cost ($)Fee Rate (%)Fee ($)Bill RateHRS/ YREXT Cost ($)EXT Fee ($)EXT Price ($)
Program Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Acquisition Specialist 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 3ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 2ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
Operations Research Analyst 1ON-SITE1880$0.00$0.00$0.00
OFF-SITE0$0.00$0.00$0.00
OPTION PERIOD FOUR ESTIMATED WAR LABOR SUBTOTAL$0.00$0.00$0.00
OPTION PERIOD FOUR LABOR TOTAL$0.00$0.00$0.00
TRAVEL$100,000.00$0.00$0.00
Other Direct Costs (ODC)$100,000.00$0.00$0.00
TOTAL OPTION PERIOD FOUR$0.00
Please use formulas in calculating costs, rates & fees above, so that the Government evaluators are better able to understand your pricing.
* The J1 has been pre-populated with estimated quantities of each labor category and a standarad number of hours per Full Time Equivalent (FTE). These estimated quantities are being used for evaluation purposes only, and are not a guarantee of the specific labor category quantities that may be required over the course of performance. As WARs are issued, the awarded Contractor will be expected to propose the labor mix required to perform the specific work.
The prices proposed by the Offeror on the J1 create a ceiling rate for each category. The awarded Contractor is welcome, and encouraged, to propose lower rates than their awarded J1 for individual WARs, as appropriate.
**A stipulated amount for Travel and ODC has been provided for evaluation purposes only. This is not a budget number and may not represent what will be required or provided in the actual award.

ID01150067 - NOAA SETS

SUMMARY

SUMMARYCONTRACTOR NAME:
LABORTRAVEL **ODCsTOTALS
EXT Cost ($)EXT Fee ($)EXT Price ($)
BASE PERIOD:July 1, 2016 through June 30, 2017$0.00$0.00$0.00$0.00$0.00$0.00
OPTION PERIOD ONE:July 1, 2017 through June 30, 2018$0.00$0.00$0.00$0.00$0.00$0.00
OPTION PERIOD TWO:July 1, 2018 through June 30, 2019$0.00$0.00$0.00$0.00$0.00$0.00
OPTION PERIOD THREE:July 1, 2019 through June 30, 2020$0.00$0.00$0.00$0.00$0.00$0.00
OPTION PERIOD FOUR:July 1, 2020 through June 30, 2021$0.00$0.00$0.00$0.00$0.00$0.00
BASE PLUS ALL OPTIONS:$0.00$0.00$0.00$0.00$0.00$0.00

ID01150067 - NOAA SETS

File details come from the government source that posted it. Updated .