Text version
International Boundary and Water Commission United States and Mexico United States Section
Front Cover
Technical Specifications Rio Grande Rectification Project Rehabilitation of Wasteways 1 and 2 El Paso County, Texas
RFP IBM17R0008
May 11, 2017
United States and Mexico United States Section Engineering Services Division El Paso, Texas
These Technical Specifications may be reprinted after Contract award using the awarded
Contract number instead of the Solicitation number currently shown. The reprint shall have all changes indicated incorporated.
Reissuance of the awarded Technical Specifications with the Contract number will proceed without an amendment or modification.
Reissuance with the Contract number will NOT result in a new date being displayed on the
Technical Specifications.
PLEASE NOTE - Technical Specifications should be printed double sided.
Printing this document single sided will take 311 additional pages of paper and 46 of those pages will be blank to facilitate double sided printing.
USIBWC Rio Grande Rectification Project
May 11, 2017 Division 00
USIBWC RFP IBM17R0008 Procurement and Contracting Requirements-Page 1
TECHNICAL SPECIFICATIONS
DIVISION 00
PROCUREMENT AND CONTRACTING
REQUIREMENTS
Procurement and
Contracting
Requirements
Division 00
Division 00-Procurement and Contracting Requirements
Division 00 May 11, 2017
Procurement and Contracting Requirements-Page 2 USIBWC RFP IBM17R0008
This page intentionally left blank for double sided printing.
May 11, 2017 Project Title
USIBWC RFP IBM17R0008 00.01.01-Page 1
SECTION 00.01.01
PROJECT TITLE
00.01.01 Project Title 00.01.01-Project Title
The title of this project is as follows:
Rio Grande Rectification Project
--End of Section--
Project Title May 11, 2017
00.01.01-Page 2 USIBWC RFP IBM17R0008
May 11, 2017 Table of Contents Governing
USIBWC RFP IBM17R0008 00.01.10-Page 1
SECTION 00.01.10
TABLE OF CONTENTS GOVERNING
00.01.10 Table of Contents Governing 00.01.10-Table of Contents Governing
Table of Contents
DIVISIONS AND SECTIONS
Division 00-Procurement and Contracting Requirements 00.01.01-Project Title 00.01.10-Table of Contents Governing
00.01.15-List of Contract Drawings 00.21.13-Instructions to Bidders 00.31.19-Existing Condition Information 00.31.21-Survey Information
00.31.24-Environmental Information 00.31.26-Existing Hazardous Material Information 00.31.32-Geotechnical Data
00.31.43-Permit Application 00.31.50-Other Project Information
00.60.00-USIBWC Forms and Standard Documents 00.70.00-Delivery of Data to USIBWC 00.73.63-Security Requirements
Division 01-General Requirements 01.11.00-Summary of Work 01.22.00-Measurement and Payment 01.29.00-Payment Procedures
01.29.15-Certified Payroll 01.31.00-Project Coordination
01.32.16-Construction Progress Schedule 01.32.33-Photographic Documentation 01.33.00-Submittal Procedures 01.35.00-Safety
01.42.00-References
01.45.00-Quality Control
01.51.00-Temporary Utilities 01.52.13-Field Offices and Sheds 01.55.00-Vehicular Access and Parking 01.57.00-Temporary Controls for Work Areas 01.57.13-Temporary Environmental Controls
01.61.00-Common Product Requirements 01.74.19-Construction Waste Management and Disposal 01.77.19-Closeout Requirements 01.78.23-Operations and Maintenance Data 01.78.39-Project Record Documents
Table of Contents Governing May 11, 2017
00.01.10-Page 2 USIBWC RFP IBM17R0008
01.78.99-Project Data
Division 02-Existing Conditions 02.02.00-Existing Conditions & Facilities 02.21.00-Surveys 02.21.13-Cultural Resources Surveys 02.41.00-Demolition
Division 03-Concrete 03.11.00-Concrete Forming
03.15.00-Concrete Accessories
03.15.13.00.12-Concrete Joints 03.20.00.00.10-Reinforcing Steel 03.31.00.00.12-Cast-in-Place Concrete 03.35.00-Concrete Finishing
03.39.00-Concrete Curing 03.60.00-Grouting
Division 05-Metal 05.05.23-Welding 05.50.03-Metal Beam Guard Fence
05.50.03.00.12-Metalwork Fabrication, Machine Work, & Miscellaneous Provisions
05.50.04.02.12-Miscellaneous Metalwork
05.52.13-Handrails 05.53.00-Metal Gratings
Division 09-Finishes 09.97.02-Painting: Coal Tar Epoxy 09.97.13-Galvanizing
Division 10-Specialties 10.14.53-Traffic Signage
Division 31-Earthwork 31.05.13-Soil for Earthwork
31.05.16-Crushed Aggregate Base 31.05.19.04.12-Separator Geotextile 31.11..00.00.12-Clearing and Grubbing 31.14.00-Remove Existing Materials 31.23..00.00.12-Excavation
31.23.19.00.12-Dewatering 31.23.23.23-Flowable Backfill 31.24.00.00.12-Embankment 31.41.16.00.12-Steel Sheet Piling 31.81.00-Proof Rolling
May 11, 2017 Table of Contents Governing
USIBWC RFP IBM17R0008 00.01.10-Page 3
Division 32-Exterior Improvements 32.15.00-Flex Base
32.31.00.11-Barrier and Perimeter Security Fence 32.31.13-Chain Link Fences and Gates 32.31.13.13-Temporary Chain Link Fence 32.92.00-Vegetation for Erosion Control
Division 33-Utilities 33.40.01.00.12-Corrugated Metal Pipe
Division 35-Waterway Construction 35.20.16-Fabricated Slide Gates 35.42.00-Riprap 35.42.38.00-Concrete Slope Paving
Technical Specification Tables
Table 1 - Index of Drawings Table 2 - Schedule of Values Table 3 - Quality Control Testing
Table 4 - Permitted Surface Irregularities Table 5 - Epoxy / Adhesive Requirements
Table 6 - Minimum Concrete Cover Variation Table 7 - Minimum Concrete Strength
Table 8 - Maximum Water-Cement Ratio Table 9 - Deviations and Tolerances from Specified Lines, Grades, and Dimensions Table 10 - Acceptance Criteria for Questionable Water Supplies
Table 11 - Chemical Limits for Mix Water Table 12 - Coarse Aggregate Gradation Chart
Table 13 - Fine Aggregate Gradation Chart Table 14 - Standard Deviation Modification Factor Table 15 - Overdesign to Meet Compressive Strength Requirements (1)
Table 16 - Overdesign to Meet Compressive Strength Requirements (2) Table 17 - Air Entrainment
Table 18 - Duration of Curing Table 19 - ASTM C1107 Non-Shrink Grout Requirements
Table 20 - Galvanizing Standards Table 21 - Crushed Aggregate Base Gradation Requirements Table 22 - Geotextile Requirements Table 23 - Aggregate Surfacing Gradation Requirements Table 24 - Plant Varieties and Seeding Rates
Table 25 - Type I Riprap (D50 of 6 inches) Table 26 - Type II Riprap (D50 of 14 inches) Table 27 - Type I Riprap Bedding Gradation Table 28 - Type II Riprap Bedding Gradation
Table of Contents Governing May 11, 2017
00.01.10-Page 4 USIBWC RFP IBM17R0008
Technical Specification Figures
Figure 1-Fabrication Tolerances for Bars Figure 2-Miscellaneous Qualification: Fillet Weld Break Specimen Figure 3-Miscellaneous Qualification: Method of Rupturing Specimen file://///192.168.45.75/ESD-PROJECTS/URG%20Construction%20Files/IBM17Bxxxx%20Wasteways%20%201%20&%202/20-Design%20Data/Specs/Wasteway%20Specs%2020170509%20AG.docm%23_Toc482276245 file://///192.168.45.75/ESD-PROJECTS/URG%20Construction%20Files/IBM17Bxxxx%20Wasteways%20%201%20&%202/20-Design%20Data/Specs/Wasteway%20Specs%2020170509%20AG.docm%23_Toc482276246 file://///192.168.45.75/ESD-PROJECTS/URG%20Construction%20Files/IBM17Bxxxx%20Wasteways%20%201%20&%202/20-Design%20Data/Specs/Wasteway%20Specs%2020170509%20AG.docm%23_Toc482276247
May 11, 2017 List of Contract Drawings
USIBWC RFP IBM17R0008 00.01.15-Page 1
SECTION 00.01.15
LIST OF CONTRACT DRAWINGS
00.01.15 List of Contract Drawings 00.01.15-List of Contract Drawings
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 Drawing Titles
1.4 Drawing Index
1.5 Additional Or Revised Drawings
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used) --End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.3 DRAWING TITLES
A. The Contract Drawings applicable to this Contract are entitled:
Rehabilitation of Wasteways 1 and 2
El Paso County, Texas
1.4 DRAWING INDEX
A. An index of drawings is identified on the drawing title sheet and includes the following:
Table 1 - Index of Drawings
SHEET NO. SHEET TITLE
GI-0001 Cover Sheet
GI-0002 Index of Sheets
GI-0003 Project Location and Vicinity Map
GI-0004 Abbreviations & Legend
GC-0001 General Notes
GC-0002 Estimate of Quantities
GC-0003 Estimate of Quantities Ramps
List of Contract Drawings May 11, 2017
00.01.15-Page 2 USIBWC RFP IBM17R0008
SHEET NO. SHEET TITLE
BL-1101 Soil Boring Logs B-13-14-52 and 53
CS-1000 to CS-1009 Survey Control Map Sheets
CS-1101 to CS-1108 Baseline Alignment Data Sheets
CS-1109 Horizontal Alignment Data
CF-2001 Plan and Profile Sta. 930+00.00 To Sta. 936+50.00
CF-2002 Plan and Profile Sta. 1316+00.00 To Sta. 1322+00.00
CF-3001 & CF-3002 Existing Typical Sections Sheets
CF-3003 & CF-3004 Proposed Typical Sections Sheets
CF-3101 Proposed Levee Cross-Sections Sta. 930+00 To Sta. 935+00
CF-3102 Proposed Levee Cross-Sections Sta. 936+00 To Sta. 936+50
CF-3103 Proposed Levee Cross-Sections Sta. 1316+00 To Sta. 1321+00
CF-3104 Proposed Levee Cross-Sections Sta. 1322+00
CF-4101 & CF-4102 Access Ramp Plan & Profile Sheets
CF-4103 Proposed Ramp Cross-Sections 932+50 Sta.10+50 To Sta.11+75
CF-4104 Proposed Ramp Cross-Sections 932+50 Sta.11+75.73
CF-4105 Proposed Ramp Cross-Sections 934+00 Sta.10+24.53 To Sta.11+25
CF-4106 Proposed Ramp Cross-Sections 934+00 Sta.11+50
CF-4107 Proposed Ramp Cross-Sections 1318+50 Sta.10+50 To Sta.11+75
CF-4108 Proposed Ramp Cross-Sections 1318+50 Sta.11+75.40
CF-4109
Proposed Ramp Cross-Sections 1319+50 Sta.10+23.78 To Sta.11+25
CF-4110 Proposed Ramp Cross-Sections 1319+50 Sta.11+50
CD-1001 & CD-1002 Demolition Plans
CI-1001 & CI-1002 Site Layout and Grading Plans
CI-1003 Chain Link Fence Details
CI-1004 Double Swing Gate Details
CI-3001 & CI-3002 Cross Sections of Culvert Wasteway #1
CI-3003 & CI-3004 Cross Sections of Wasteway #2
CI-7005 Wasteway No.1 and No.2 Typical Details
CI-8001 & CI-8002 Construction Detour Road
ST-0001 Structural Notes And Abbreviations
ST-1001 Wasteway #1 Headwall Plan & Profile
ST-1002 & ST-1003 Wasteway #1 Headwall Sections
May 11, 2017 List of Contract Drawings
USIBWC RFP IBM17R0008 00.01.15-Page 3
SHEET NO. SHEET TITLE
ST-1004 Wasteway #2 Headwall Plan & Profile
ST-1005 & ST-1006 Wasteway #2 Headwall Sections
ST-1007 Typical Wing Wall Details
ST-1008 Gate Details
ST-1009 Wasteway-1 Sliding Gate Fence Re-Installation
ST-1010 Wasteway-2 Sliding Gate Fence Re-Installation
ST-1011 Sliding Gate Fence Re-Installation Details
ST-1012 Wasteway #1 Closure Deck Plan
ST-1013 Wasteway #1 Closure Deck Elevations
ST-1014 Handrail Details
SR-0001 to SR-0016 Sliding Gate Fence Reference Drawing Sheets
SR-0017 to SR-0025 Border Fence Reference Drawing Sheets
CT-4003 & CT-4004 Metal Beam Guard Fence
1.5 ADDITIONAL OR REVISED DRAWINGS
A. Except as provided in these specifications for drawings to be furnished by Contractor, Contract Drawings will be supplemented by additional or revised general and detail drawings as necessary or desirable as work progresses.
B. Additional or revised general and detail drawings will show dimensions and details necessary for construction purposes more completely than are shown on these Contract
Drawings for features of work.
C. Perform work in accordance with additional general and detail drawings or revisions at applicable prices bid in schedule for such work.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
(Not Used)
List of Contract Drawings May 11, 2017
00.01.15-Page 4 USIBWC RFP IBM17R0008
May 11, 2017 Instructions to Bidders
USIBWC RFP IBM17R0008 00.21.13-Page 1
SECTION 00.21.13
INSTRUCTIONS TO BIDDERS
00.21.13 Instructions to Bidders 00.21.13-Instructions to Bidders
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Reference Standards
1.3 Measurement and Payment
1.4 Definitions
1.5 Duty to Inquire
1.6 Bid Submission
Part 2 - Products (Not Used) Part 3 - Execution
3.1 Requests for Interpretation
--End of Section--
1.2 REFERENCE STANDARDS
A. Federal Acquisition Regulation (FAR)
1. FAR 52.236-3, Site Investigation and Conditions Affecting the Work
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.4 DEFINITIONS
A. Within this section, the following terms are used interchangeably.
1. Bid - Offer - Proposal
2. Solicitation - Request for Proposal - RFP
3. Bidder - Offeror
4. Contractor - Bidder - Offeror
1.5 DUTY TO INQUIRE
A. Contractors shall review the full Solicitation including Technical Specifications, Contract
Drawings, attachments, etc. to determine the full scope of work required.
Instructions to Bidders May 11, 2017
00.21.13-Page 2 USIBWC RFP IBM17R0008
B. If during review of these items, the Contractor finds discrepancies, omissions, conflicts, defects, errors, or ambiguities, they have a duty to inquire. The Contractor shall also inquire about items that are unclear or open to interpretation.
C. The Contractor shall take no advantage of any item of which they have a duty to inquire.
1.6 BID SUBMISSION
A. Submission of a bid shall be conclusive evidence that the Bidder has reviewed, investigated, and acknowledged all items detailed in FAR 52.236-3.
B. Submission of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality and scope of work to be performed, the quantities of materials to be furnished.
C. Submission of a bid constitutes agreement that Bidders has provided written notice of all conflicts, errors, ambiguities, and discrepancies discovered in the Contract Documents, that responses to these written notices are acceptable to Bidder, and that Contract
Documents are sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing required work.
D. Bidder has the sole responsibility to make such independent instigation and examination as they deem necessary in order to satisfy themselves as to the conditions to be encountered in the performance of work and the quantities required to complete the work in a accordance with the Contract Documents.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
3.1 REQUESTS FOR INTERPRETATION
A. Contractors shall submit requests for interpretation, questions, and other concerns about the Solicitation, Technical Specifications, Contract Drawings, attachments, etc. to the
Contracting Officer identified on SF-1442.
B. Such requests shall be made even if the question and answer period identified in the
Solicitation has passed.
C. Failure to request interpretation prior to providing a bid shall result in the Contractor being fully responsible for any cost or time impacts involved to perform the work required.
May 11, 2017 Existing Condition Information
USIBWC RFP IBM17R0008 00.31.19-Page 1
SECTION 00.31.19
EXISTING CONDITION INFORMATION
00.31.19 Existing Condition Information 00.31.19-Existing Condition Information
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Measurement and Payment
1.4 General
1.5 Time Limitation
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used) --End of Section--
1.2 RELATED REQUIREMENTS
A. Section 00.31.32-Geotechnical Data
B. Section 01.11.00-Summary of Work
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.4 GENERAL
A. Reports on the Existing Condition Information
1. Field assessment of existing conditions on the levee was performed by the U.S. Army
Engineer Research and Development Center. The findings were included and available in a report, titled "Condition Assessment of US International Boundary &
Water Commission, Texas and New Mexico Levees, Volume I, Main Text," dated June
2004.
2. Field assessment of existing conditions of the project was performed by URS Group, Inc.. The findings were included and available in a report, titled "Design
Documentation Report, Design of Rehabilitation Levee Improvements of the
Rectification Project from Ysleta to Fabens, Texas, El Paso County, Texas," dated
June 23, 2012.
3. Field assessment of existing conditions of the project was performed by URS Group, Inc.. The findings were included and available in a report, titled "Supplement 1 to the
Existing Condition Information May 11, 2017
00.31.19-Page 2 USIBWC RFP IBM17R0008
Design Documentation Report, Rehabilitation of Wasteways 1 and 2 within the Ysleta to Fabens Levee Reach, El Paso County, Texas," dated July 15, 2016.
B. Geotechnical investigations were performed as noted in Section 00.31.32.
1.5 TIME LIMITATION
All work on the wasteway structures must be completed within the non-irrigation season. See
Section 01.11.00 for more details about this time limitation.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
May 11, 2017 Survey Information
USIBWC RFP IBM17R0008 00.31.21-Page 1
SECTION 00.31.21
SURVEY INFORMATION
00.31.21 Survey Information 00.31.21-Survey Information
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Measurement and Payment
1.4 Existing Information
1.5 Survey Control
1.6 Existing Survey Markers
1.7 Topographic Survey
1.8 Existing Structure Survey
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used) --End of Section--
1.2 RELATED REQUIREMENTS
A. Section 02.02.00-Existing Conditions & Facilities
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.4 EXISTING INFORMATION
Field survey was performed by Frank X. Spencer & Associates, Inc. which was used as the basis of design.
1.5 SURVEY CONTROL
A. Horizontal and vertical controls are based on Texas State Plane Coordinate Grid System
Central Zone North American Datum (4203) of 1983 (NAD 83) in US survey feet and
North American Vertical Datum of 1988 (NAVD 88) in US survey feet, respectively.
B. The survey was based on existing monumentation set by USIBWC which is referenced on the Survey Control Maps. Data for these points was provided by USIBWC.
Survey Information May 11, 2017
00.31.21-Page 2 USIBWC RFP IBM17R0008
C. The surveyor prepared the Survey Control Maps for the total length of the reach showing existing levee alignment, existing levee stationing, ROW and survey control points per the USIBWC survey guidelines. The survey is presented at ground distance.
1.6 EXISTING SURVEY MARKERS
The surveyor surveyed and located seventeen (17) existing survey markers.
1.7 TOPOGRAPHIC SURVEY
The surveyor performed a topographic survey along the project reach to include, but not limited to, levee, distances to the ROW, any ramps that enter or exit the levee and any ditches or canals that cross the levee or are immediately adjacent to the levee. The final topographic mappings, including a 3-dimensional surface, were provided in an AutoCAD file, survey point file and a surface TIN file.
1.8 EXISTING STRUCTURE SURVEY
A. The surveyors surveyed and obtained x & y coordinates and elevations of existing surface features of visible structures and utilities, including, but not limited to, Wasteways 1 and
2 and security fencing. These locations are shown on the Plan and Profile sheets of the
Contract drawings.
1. NOTE: It is the Contractor’s responsibility to verify locations of all existing utilities
(shown and not shown) prior to construction.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
May 11, 2017 Environmental Information
USIBWC RFP IBM17R0008 00.31.24-Page 1
SECTION 00.31.24
ENVIRONMENTAL INFORMATION
00.31.24 Environmental Information 00.31.24-Environmental Information
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Reference Standards
1.4 Measurement and Payment
1.5 General
1.6 Preservation of Cultural and Natural Resources and the Environment
1.7 Other Considerations
1.8 Use of Geologic Materials on a Federally Funded Project
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used) --End of Section--
1.2 RELATED REQUIREMENTS
A. Section 01.57.00-Temporary Controls for Work Areas
B. Section 01.57.13-Temporary Environmental Controls
C. Section 02.21.13-Cultural Resources Surveys
1.3 REFERENCE STANDARDS
A. United States Code (USC)
1. Clean Air Act, 42 USC §7401 et seq.
2. Clean Water Act (CWA), 33 USC §1251 et seq.
3. Fish and Wildlife Act of 1956, 16 USC §742a 742j
4. Migratory Bird Treaty Act (MBTA), 16 USC §§703 - 712
5. National Environmental Policy Act (NEPA), 42 USC §§4321-4347
6. National Historic Preservation Act (NHPA), 16 USC §470 et seq.
7. National Wildlife Refuge System Improvement Act of 1997, 16 USC §668dd
8. Native American Graves Protection and Repatriation Act (NAGPRA), 25 USC §3001
et. seq.
Environmental Information May 11, 2017
00.31.24-Page 2 USIBWC RFP IBM17R0008
9. Refuge Recreation Act, 16 USC §§460k - 460k-4
1.4 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.5 GENERAL
A. The Project’s Environmental Assessment (EA), titled "Final Environmental Assessment:
Improvements to the Rio Grande Rectification Project," dated March 2009. The
Contractor shall review and comply with the requirements provided in the EA document.
B. This document list environmentally and culturally sensitive areas that need to be protected from any disturbances of construction activities. The environmentally and culturally sensitive areas that were identified on the document are identified below.
1. Biological Resources
a. Work should be schedule to occur outside of the bird breeding season whenever possible. Migratory birds may be present within the project area; birds, nests, and eggs are to be protected and avoided during construction. The breeding and nesting season is identified in Section 01.57.13. If work continues into the bird breeding/nesting season the areas proposed for disturbance shall be surveyed in order to avoid the inadvertent destruction of nests and eggs.
b. Western burrowing owl (Athene cunicularia hypugaea) is found within this levee reach.
2. Natural Resources
Equipment cannot be parked, staged, or used under large, mature trees. Keeping equipment away from the large, mature trees will prevent incidental damage to the tree and prevent compression of the root ball.
C. Further details of environmental requirements are in Section 01.57.00.
1.6 PRESERVATION OF CULTURAL AND NATURAL RESOURCES AND THE
ENVIRONMENT
A. If the Contractor initiates changes to the Contract and USIBWC approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agencies.
B. Culturally Sensitive Areas
If a site, building, or location of historical, archeological, educational, or scientific interest is discovered within the right of way, cease all work immediately, secure the site from further disturbance and possible vandalism, and notify USIBWC. The site, building, or location will be investigated and evaluated by USIBWC.
May 11, 2017 Environmental Information
USIBWC RFP IBM17R0008 00.31.24-Page 3
1.7 OTHER CONSIDERATIONS
The Contractor is required to ensure that all Environmental Permits, Issues, and Comments
(EPIC), which are included within the Contract Documents are followed and implemented to ensure potential impacts are avoided.
1.8 USE OF GEOLOGIC MATERIALS ON A FEDERALLY FUNDED PROJECT
A. To ensure preservation of historical and archaeological data, prior to use of any soil, rock, or gravel, the source must first be compliance confirmed by the COR to ensure compliance with National Historic Preservation Act (NHPA).
B. Take no action to use or alter the proposed location until written approval for site use is received from the COR.
C. If the quarry or borrow site already provides materials for TxDOT, USACE, or other governmental agency, a copy of the environmental approvals from said agencies may be provided to the COR.
D. Include permission for Government access to any geological source locations.
E. Full details of requirements for geological materials are in Section 02.21.13.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
Environmental Information May 11, 2017
00.31.24-Page 4 USIBWC RFP IBM17R0008
May 11, 2017 Existing Hazardous Material Information
USIBWC RFP IBM17R0008 00.31.26-Page 1
SECTION 00.31.26
EXISTING HAZARDOUS MATERIAL INFORMATION
00.31.26 Existing Hazardous Material Information 00.31.26-Existing Hazardous Material Information
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 General
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.3 GENERAL
Based on the environmental report(s), identified in Section 00.31.24, there are no hazardous material or waste storage, disposal sites, or spill sites, identified within the immediate Project area.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
Existing Hazardous Material Information May 11, 2017
00.31.26-Page 2 USIBWC RFP IBM17R0008
May 11, 2017 Geotechnical Data
USIBWC RFP IBM17R0008 00.31.32-Page 1
SECTION 00.31.32
GEOTECHNICAL DATA
00.31.32 Geotechnical Data 00.31.32-Geotechnical Data
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 Geotechnical Reports
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.3 GEOTECHNICAL REPORTS
A. Geotechnical analysis for this project was performed by Raba-Kistner Consultants, Inc.
1. Two geotechnical reports are included in the report entitled, "Design of Rehabilitation
Levee Improvements of the Rectification Project from Ysleta to Fabens, Texas, El
Paso County, Texas," dated July 23, 2012.
2. The two reports included are:
a. "Geotechnical Analysis and Engineer Evaluation of Rectification Project Levee from Riverside Dam to Fabens," dated November 15, 2010.
b. "Supplemental Geotechnical Analysis for Final Design, Rectification Project
Levee from Riverside Dam to Fabens," dated June 22, 2012.
(1) "Supplemental Geotechnical Analysis for Final Design, Rectification Project
Levee from Riverside Dam to Fabens," was amended on August 20, 2012.
B. "Geotechnical Engineering Services, K-2C Border Fence Project, El Paso, Texas," dated
November 10, 2008 and prepared by Professional Service Industries, Inc. (PSI). Since this report was not used in the design of this project nor was it prepared by or for the
USIBWC, PSI is not excluded from performing engineering testing per Section 01.45.00.
C. "Draft Geotechnical Exploration US-Mexico Border Gate Improvements, El Paso
Section, K-2C Segment, El Paso County, Texas," dated July 1, 2009 and prepared by
Terrane Engineering Corporation. Since this report was not used in the design of this
Geotechnical Data May 11, 2017
00.31.32-Page 2 USIBWC RFP IBM17R0008 project nor was it prepared by or for the USIBWC, Terrane Engineering Corporation is not excluded from performing engineering testing per Section 01.45.00.
D. The data and report are not intended as a representation or warranty of continuity of conditions between soil borings nor of groundwater levels at dates and times other than date and time when measured. The USIBWC neither warrants or guarantees the results of any geotechnical or subsurface investigations as being representative of the site, beyond the actual location of the test specimen(s) nor assumes any responsibility for the manner in which this information may be used or the conclusions reached in utilizing the information contained in the Contract documents. Additional test borings and other exploratory operations may be made by Contractor subsequent to award of the Contract.
E. The Contractor shall consider all geotechnical information including geotechnical reports, bore logs, and site visits as a whole. The Contractor shall consider the limitations of any geotechnical tests performed including the auger size, bore hole spacing and location, consistency of bore hole data, as well as the frequency and results of testing. The
USIBWC will not be responsible for interpretations or conclusions drawn there by the
Contractor.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
May 11, 2017 Permit Application
USIBWC RFP IBM17R0008 00.31.43-Page 1
SECTION 00.31.43
PERMIT APPLICATION
00.31.43 Permit Application 00.31.43-Permit Application
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Reference Standards
1.3 Measurement and Payment
1.4 General
1.5 Work in Waters of the United States
1.6 Responsibilities
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 REFERENCE STANDARDS
A. Environmental Protection Agency (EPA)
1. General Construction Permit 2012
2. National Pollutant Discharge Elimination System (NPDES) Permit Program
B. Texas Commission on Environmental Quality (TCEQ)
1. Texas Pollution Discharge Elimination System (TPDES)
2. TPDES Construction General Permit TXR150000
C. U.S. Army Corps of Engineers (USACE)
1. Section 404 of Clean Water Act, 33 USC §1251 et seq.
1.3 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.4 GENERAL
Prior to the beginning of construction, the Contractor shall be responsible for researching, coordinating, obtaining, and paying all applicable fees for all permits required by Federal, state and local entities, including, but not limited to, a specific or general stormwater permit prepared in accordance with the requirements of Stormwater Pollution Prevention Plan (SWPPP) and
Texas Pollution Discharge Elimination System (TPDES).
Permit Application May 11, 2017
00.31.43-Page 2 USIBWC RFP IBM17R0008
1.5 WORK IN WATERS OF THE UNITED STATES
A. The U.S. Army Corps of Engineers (USACE) has determined that a Section 404 permit will not be required for work within the currently defined Temporary Construction Limits
(TCL).
B. The Contractor must adhere to all agreements, mitigation plans, and standard best management practices required by this permit.
C. If Contractor initiated changes in the construction method result in impacts to waters of the US, the Contractor shall have sole responsibility to obtain all required new or revised
Section 404 permit and shall adhere to all agreements, mitigation plans, and standard best management practices required by these permits.
1.6 RESPONSIBILITIES
A. The Contractor shall be responsible for providing the proposed location of the project staging areas for compliance confirmation of the COR prior to installation of stormwater pollution prevention (SWPP) measures.
B. The Federal Government is not subject to local jurisdictions' building codes, nor is it required to obtain building permits from local jurisdictions for construction on real estate owned or controlled by the USIBWC. However, borrow pits and other offsite locations are subject to local regulations. The Contractor is responsible for researching and obtaining all necessary permits for offsite work.
C. The Contractor shall be responsible for obtaining all necessary permits and rights of entry for all work required under this Contract.
D. The Contractor will also be required to research the need for any other required permits, based on the information available from the Contract Drawings and Technical
Specifications prior to the beginning of construction. For the work under this Contract, the Contractor shall be responsible for coordinating and obtaining all permits required by
Federal, state, and local entities, unless otherwise specified within the Contract
Provisions and these Technical Specifications.
E. The Contractor shall apply and pay for all required permits. The Government is not responsible for any existing or newly introduced permits required before, during and/or after construction.
F. The Contractor shall be responsible for and shall give and maintain any and all notices required by applicable regulations, laws, or permitting authorities pertaining to construction of this project.
May 11, 2017 Permit Application
USIBWC RFP IBM17R0008 00.31.43-Page 3
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
Permit Application May 11, 2017
00.31.43-Page 4 USIBWC RFP IBM17R0008
May 11, 2017 Other Project Information
USIBWC RFP IBM17R0008 00.31.50-Page 1
SECTION 00.31.50
OTHER PROJECT INFORMATION
00.31.50 Other Project Information 00.31.50-Other Project Information
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 DHS Border Fence Construction
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.3 DHS BORDER FENCE CONSTRUCTION
A. The Department of Homeland Security (DHS), U.S. Customs and Border Protection
(CBP), has built a border fence adjacent to this project. Their project to complete the fence in this location, known as K-2C, included both barrier fence and gates.
B. The following documents are provided to the Contractor, for their information only, in bidding, reinstalling slide gates, and replacing removed portions of the barrier fence:
1. "Construction of Approximately 2,510-FT of Primary Border Barrier Fence Closure with Gates Along the US-IBWC Levee Within the K-2C Fence Alignment, El Paso
County, TX," Contract No. W912BV-08D-202 DM07, March 2011.
2. "El Paso Sector K-2C Fence Closures," As-Built Drawings, by Sloan Security Group.
3. "Design Analysis Report for PF 225 Project K-2C (Revised)," prepared by Michael
Baker Jr., Inc. and dated April 28, 2009.
C. For the Contractors' reference, Wasteway #1 in this project relates to Fence Closure 1 in
Contract W912BV-08D-202 DM07, while Wasteway #2 relates to Fence Closure 9.
Other Project Information May 11, 2017
00.31.50-Page 2 USIBWC RFP IBM17R0008
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
May 11, 2017 USIBWC Forms and Standard Documents
USIBWC RFP IBM17R0008 00.60.00-Page 1
SECTION 00.60.00
USIBWC FORMS AND STANDARD DOCUMENTS
00.60.00 USIBWC Forms and Standard Documents 00.60.00-USIBWC Forms and Standard Documents
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 General
1.4 Location of Items
Part 2 - Products (Not Used) Part 3 - Execution
3.1 Printing
--End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.3 GENERAL
A. The USIBWC ftp site is available at:
Address: 63.96.218.8
User Name: ESD_User
Password: 2erAsatu
B. USIBWC's ftp site must be accessed using ftp software. Internet browsers (e.g., Internet
Explorer, Chrome, Firefox, etc.) will not work.
C. Ftp software is available as freeware or as commercial software. Examples of available ftp software include FileZilla, WinSCP, SmartFTP, and Ipswitch.
1.4 LOCATION OF ITEMS
A. All forms are under the directory entitled 'Construction Forms\Forms.'
B. Posters are under the directory entitled 'Construction Forms\Posters.'
USIBWC Forms and Standard Documents May 11, 2017
00.60.00-Page 2 USIBWC RFP IBM17R0008
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
3.1 PRINTING
The Contractor is responsible for printing copies of items provided in electronic format for their own use.
May 11, 2017 Delivery of Data to USIBWC
USIBWC RFP IBM17R0008 00.70.00-Page 1
SECTION 00.70.00
DELIVERY OF DATA TO USIBWC
00.70.00 Delivery of Data to USIBWC 00.70.00-Delivery of Data to USIBWC
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Measurement and Payment
1.3 General
1.4 Adobe PDF Files
Part 2 - Products (Not Used) Part 3 - Execution (Not Used)
--End of Section--
1.2 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.3 GENERAL
A. Delivery shall be accomplished via email or through direct delivery (US Postal Service, FedEx, UPS, etc.).
1. Whenever possible, the electronic copies shall be submitted to the Inspector and COR by email.
2. Placing documents on a cloud server, online drop box, or online management system
(e.g. Owner Insite) is unacceptable as a delivery method.
3. With prior approval of the COR, very large files may be delivered via an ftp system.
a. The US Army Aviation and Missile Research Development and Engineering
Center (AMRDEC) provides a free, safe ftp system which can be used to deliver items up to 2GB. This is available at: https://safe.amrdec.army.mil/safe/.
B. Electronic files shall be provided in their native format (MSWord, Excel, Primavera, etc.)
as well as Adobe pdf.
C. Hard copy delivery packages/boxes shall not exceed forty (40) pounds.
D. Hard copies shall not be provided in 3-ring binders (except for O&M manuals, if required). Large, lengthy hard copies shall be grouped in expandable folders. Folders shall not exceed 3.5 inches in width.
https://safe.amrdec.army.mil/safe/
Delivery of Data to USIBWC May 11, 2017
00.70.00-Page 2 USIBWC RFP IBM17R0008
1.4 ADOBE PDF FILES
A. Pdfs shall be produced directly via software whenever possible and shall include valid electronic signatures or they shall be scans of the original documents.
B. The minimum scanning resolution shall be:
1. Color-400 dpi
2. Grayscale-400 dpi
3. Black and White-600-dpi
C. Color documents shall be scanned in color.
1. NCR pages that are other than white (e.g. all yellow or all pink) are not considered color documents and may be scanned in grayscale or black and white.
D. The Contractor shall ensure that the electronic copy is legible.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
May 11, 2017 Security Requirements
USIBWC RFP IBM17R0008 00.73.63-Page 1
SECTION 00.73.63
SECURITY REQUIREMENTS
00.73.63 Security Requirements 00.73.63-Security Requirements
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Submittals
1.4 Measurement and Payment
1.5 General
1.6 Security
1.7 Insurance
1.8 Department of Homeland Security
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used) --End of Section--
1.2 RELATED REQUIREMENTS
A. Section 01.33.00-Submittal Procedures
1.3 SUBMITTALS
A. Submittals shall be transmitted by the Contractor in accordance with the requirements of
Section 01.33.00. The Contractor Quality Control (CQC) System Manager shall be responsible for certifying that all submittals are in compliance with the Contract requirements.
B. Required submittals in this Section include:
1. Worker's name, social security number, driver's license or state ID number, alien registration number (if applicable), and copy of Government identification card for vetting.
1.4 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
Security Requirements May 11, 2017
00.73.63-Page 2 USIBWC RFP IBM17R0008
1.5 GENERAL
The project site may be exposed to vandalism and theft. The Contractor shall be responsible for providing adequate security of the project site in order to prevent vandalism and theft.
1.6 SECURITY
A. The Contractor is responsible for securing the worksite, equipment, and materials from vandalism and theft.
B. The Contractor shall implement a security program that:
1. Protects the work, the existing premises, and the Government’s operations from theft, vandalism and unauthorized entry.
2. Initiates a security program in coordination with Government’s existing security system at mobilization.
3. Maintains the security program throughout construction duration until Contract
Closeout.
C. The Contractor shall implement entry control to the work area that notifies people of the construction area, of PPE required, and of the dangers of entry.
D. The Government shall not be responsible for the security of any items within the work area and associated PSLs.
1.7 INSURANCE
A. When not required by the Contract clauses, the Contractor has the right to purchase coverage for property insurance, builder's risk insurance (including perils of wind, collapse, vandalism/malicious mischief, and theft, including theft of materials whether or not attached to any structure), and/or flood insurance or to be self-insured for these exposures.
B. The Contractor shall be held liable for all costs associated with losses, deductibles, and self-insurance for coverages not required by the Contract clauses.
1. Losses shall include architects' and engineers' fees that may be necessary to provide drawings and specifications for the repair and/or replacement of damaged property.
2. Losses shall include appropriate supervision and quality control of all work for the repair and/or replacement of damaged property.
C. Any insurance policies purchased for work or property related to this Contract for coverages not required by the Contract clauses shall list the International Boundary and
Water Commission, United States Section, as an additional insured.
May 11, 2017 Security Requirements
USIBWC RFP IBM17R0008 00.73.63-Page 3
1.8 DEPARTMENT OF HOMELAND SECURITY
A. In any event the staff of the U.S. Department of Homeland Security (also known as U.S.
Customs and Border Protection (CBP)) alerts and directs any field crews to stop work in for any security reasons in the area, the Contractor shall consider this as top priority and fully cooperate with the directions of DHS at all times until the security alert is cleared by the DHS. In addition the Contractor shall contact and coordinate with the COR for any additional steps to be taken during and after the security alert from the DHS is cleared.
B. Access to the site is controlled by Border Patrol. All site work is anticipated to take place on the south side of the DHS border fence. Gates through the border fence are located at both ends of the project site. Access through the border fence must be coordinated with
Border Patrol.
C. The Contractor shall provide a list of all workers' names, their social security number, driver's license or state ID number, alien registration number (if applicable), and a copy of a Government issued identification card to the COR. This list shall be provided at least three (3) days prior to the workers arriving onsite. Border Patrol and/or USIBWC will run background checks on all employees working onsite.
1. The Contractor shall provide updates whenever employees are added or deleted from the work crews.
2. Employees must pass the background checks/vetting to be allowed to work onsite.
a. Workers with felony convictions, issues with their immigration paperwork, or outstanding warrants are precluded from working onsite.
3. Background checks are valid for a period not to exceed one (1) year.
D. The Contractor shall ensure that all employees working onsite are identifiable with a project identification card, a special hard hat color, a significantly colored piece of clothing, or another method agreeable to Border Patrol.
E. All on-road vehicles shall have the name of the construction company/Contractor clearly displayed on the side of the vehicle.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
Security Requirements May 11, 2017
00.73.63-Page 4 USIBWC RFP IBM17R0008
May 11, 2017 Division 01
USIBWC RFP IBM17R0008 General Requirements-Page 1
TECHNICAL SPECIFICATIONS
DIVISION 01
GENERAL REQUIREMENTS
General Requirements Division 01
Division 01-General Requirements
Division 01 May 11, 2017
General Requirements-Page 2 USIBWC RFP IBM17R0008
May 11, 2017 Summary of Work
USIBWC RFP IBM17R0008 01.11.00-Page 1
SECTION 01.11.00
SUMMARY OF WORK
01.11.00 Summary of Work 01.11.00-Summary of Work
PART 1 - GENERAL
1.1 SECTION INCLUDES
Part 1 - General
1.1 Section Includes
1.2 Related Requirements
1.3 Reference Standards
1.4 Measurement and Payment
1.5 Work Covered by the Contract Documents
1.6 Sequence of Work/Time for Completion of Work
1.7 Work Under Other Contracts
1.8 Labor and Staffing
1.9 Project Location
1.10 Investigation of Site Conditions
1.11 Other Contractual Requirements
Part 2 - Products
2.1 Government Furnished Materials
2.2 Products to be Furnished by the Contractor
Part 3 - Execution
3.1 Submittals Required Prior to Mobilization
3.2 Use of Right-of-Way
3.3 Occupancy of Right-of-Way
3.4 Work Restrictions
--End of Section--
1.2 RELATED REQUIREMENTS
A. Section 00.31.43-Permit Application
B. Section 01.32.16-Construction Progress Schedule
C. Section 01.32.33-Photographic Documentation
D. Section 01.33.00-Submittal Procedures
E. Section 01.35.00-Safety
F. Section 01.45.00-Quality Control
G. Section 01.51.00-Temporary Utilities
Summary of Work May 11, 2017
01.11.00-Page 2 USIBWC RFP IBM17R0008
H. Section 01.52.13-Field Offices and Sheds
I. Section 01.55.00-Vehicular Access and Parking
J. Section 01.57.13-Temporary Environmental Controls
K. Section 01.57.00-Temporary Controls for Work Areas
L. Section 01.74.19-Construction Waste Management and Disposal
M. Section 02.02.00-Existing Conditions & Facilities
N. Section 02.21.00-Surveys
1.3 REFERENCE STANDARDS
A. United States Code (USC)
1. Davis Bacon Act (DBA), 40 USC 3141-3148
1.4 MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly, but shall be included in the various Bid Items under this Contract.
1.5 WORK COVERED BY THE CONTRACT DOCUMENTS
A. Project Identification
The Project to be constructed under this Contract is identified as follows:
1. Name of Project
"Rio Grande Rectification Project-Rehabilitation of Wasteways 1 and 2"
2. Location of Project
El Paso County, Texas
B. General Description of Work
1. The Work for this project generally consists of removal and replacement of
Wasteways 1 and 2.
2. The major construction efforts include the following tasks:
a. Levee improvements and associated ramps
b. Preparing right-of-way
c. Removing/stockpiling existing excavated material
d. Levee widening of crown in limited areas
e. Erosion control
f. Demolition and removal of two wasteway structures (eight box culverts)
g. Installing two new wasteway structures (eight box culverts)
USIBWC RFP IBM17R0008 01.11.00-Page 3
h. Removing and reinstalling border fence to allow construction
i. Installing three slide gates
j. Backfilling and grading of embankment material
k. Roadway gravel (flex base)
l. Revegetation
3. The final product shall be capable of meeting FEMA 44 CFR 65.10.
C. Utilities
It is the Contractor’s responsibility to identify all existing utilities within the project limits as well as coordinating any work associated with these utilities with the utility company. Refer to 02.02.00 for more information about utilities.
D. Permits
Refer to Section 00.31.43.
1.6 SEQUENCE OF WORK/TIME FOR COMPLETION OF WORK
A. The work is to be performed as shown on the Contract Drawings.
B. The Contractor shall comply with all submittal requirements as covered under these specifications and obtain Government review of each submission.
1. No construction shall be started, until the Government reviews the required submittals and determines they are satisfactory for purposes of beginning construction.
2. The Government will not grant any time extension for any resubmittal required when, in the opinion of the CO, the initial submission failed to meet the minimum quality requirements as set forth in the Contract.
3. If the Government allows the Contractor to proceed with limited construction based on pending minor revisions to the reviewed submittals, no payment will be made for any in-place construction related to the pending revisions until they are completed, resubmitted and are satisfactory to the Government.
4. No payment will be made for any in-place construction until all submittals required for that portion of the work and/or required prior to the start of construction have been made, reviewed, and are satisfactory to the Government.
C. The work under this Contract shall be completed within the timeframe specified in the
Contract Provisions.
1.7 WORK UNDER OTHER CONTRACTS
No construction work is anticipated to be performed at the project site under separate Contract with other Contractors during the Contractor’s performance period.
01.11.00-Page 4 USIBWC RFP IBM17R0008
1.8 LABOR AND STAFFING
A. Contractors are responsible for determining the appropriate staffing necessary to perform the Contract work. Contractors are also responsible for complying with the minimum wage and benefits requirements for each labor classification performing work on the
Contract.
B. If a classification considered necessary by the Contractor for performance of the work is not listed on the applicable wage determination, the Contractor must initiate a request for approval of an additional classification along with the proposed wage and benefit rates for that classification.
C. The Contracting Officer will attach the appropriate Davis-Bacon wage determination to this Contract. The Contractor is responsible for all requirements of the Davis-Bacon Act.
1.9 PROJECT LOCATION
A. The work is within the United States Section of the International Boundary and Water
Commission (USIBWC) Rio Grande Rectification Project, in El Paso County, Texas.
B. The work is located completely within the United States, but is directly adjacent to the international border with Mexico.
1.10 INVESTIGATION OF SITE CONDITIONS
A. The Contractor, as well as their subcontractors, is urged to visit the job site and to become fully aware as to the existing conditions affecting the work to be performed under the Contract documents.
B. The Contractor shall be responsible for ensuring that all of its suppliers, manufactures, and subcontractors have reviewed all applicable Contract documents relative to their work. The Contractor shall provide all labor, material, equipment, and services not provided by the Contractor’s suppliers, manufacturers, fabricators, and/or subcontractors but required for complete and operable facilities as described in the Contract documents.
1.11 OTHER…
This is the start of the file's text. The full file is on GovTribe.