Asbestos_Lead_Paint_Survey_04.pdf
PDF 23 MB Posted
- Attached to
- New Falcon Dam Administration Building Federal contract opportunity
- Solicitation number
- IBM15R0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-solicitation_Meeting_-_Sign_In_Sheet.pdf | ||
| IBM15R0005_SOW_DB_Falcon_Admin_Bldg_20150730_1.pdf | ||
| Amendment_A001.pdf | ||
| J12_Evaluation_Factors_for_Award_20150804.pdf | ||
| QUESTIONS_ _ANSWERS.pdf | ||
| Evaluation_Factors_for_Award.docx | DOCX document | |
| SOW_Falcon_Admin_Bldg.pdf | ||
| THC_response_on_FRP.pdf | ||
| MOA_with_THC.pdf | ||
| Geotechnical_Report.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Asbestos_Lead_Paint_Survey_2014.pdf | ||
| RFP_IBM15R0005.pdf | ||
| Falcon_Sewer_System.pdf | ||
| Fiber_optic_system.pdf | ||
| Weather_Records.docx | DOCX document | |
| Client_Authorization_Letter.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
501-01 (a) ( 1) CONTRACT IBM04D0005 - - CH2M Hill, Inc .
- CONTRACT ADMINIS TRATION-SUBMITTALS -
TO IBM04T0013-Asbestos and Lead - B a s e d P a i n t Survey
FALCON DAM
ASBESTOS and LEAD-BASED PAINT SURVEY
United States Section, International Boundary and Water Commission Falcon Dam Facility
Prepared For:
CH2M Hill 445 Executive Center, Suite 110
El Paso, Texas 79902
Submitted By:
V I V B ~ - ~ Environmental, Inc.
The Future Is Clear!
VIVA Environmental, Inc.
7201 Stiles
El Paso, Texas 79915 Phone: (915) 779-5395
Fax: (915) 779-5397 VIVA Project No.: CHMH.4.1.36
Issue Date: December 17,2004
Asbestos and Lead-Based Paint Survey United Sates Section, International Boundary and Water Commission
Falcon Dam Faciliiy
Table of Contents
Page ................................................................................................ Executive Summary 1
Introduction
Site Activities
................................................................................. Asbestos Sampling Activities 6
...................................................................... Lead-Based Paint Suwey Activities 7
..... Hazardous Waste Determination and Classification for Lead-Based Paint 7
Lead-Based Paint Management and Disposition Plan
Asbestos Sampling Data Tables
Lead Paint Sampling Data Tables
Appendices
A Asbestos Sample Location Diagrams B Asbestos Containing Material Location Diagrams C Lead-Based Paint Sample Location Diagrams D Lead-Based Paint Location Diagrams E Asbestos Laboratory Analytical Reports and Chain-of-Custody Forms F Certifications
Falcon Dam Facility
Executive Summary
VIVA Environmental, Inc. (VIVA) has completed the asbestos and lead-based paint surveys of eleven (1 1) building structures at the United States Section, International Boundary and Water Commission (USIBWC) Falcon Dam and Power Plant facility located at Falcon Heights, Texas.
Representative samples of suspect asbestos-containing materials (ACM) were collected fi-om each of the eleven building at the facility. Each sample was analyzed to determine if they contained more than one percent asbestos. Materials found to contain asbestos more than one percent asbestos were considered to be asbestos containing materials. Likewise, representative painted surfaces were sampled by an X-Ray Fluorescence (XRF) lead paint analyzer device in the field. Painted surface which were found to contain greater than one milligram per square centimeter (mg/cm2) were considered to be lead-based paint (LBP).
VIVA personnel collected the asbestos samples and analyzed the painted surfaces at the subject facility between September 20 and 24, 2004. The following list summarizes the ACM identified at the subject facility.
Project Office
Floor tile and mastic Exterior window caulking Exterior window glazing
Hydro Office Floor tile and mastic Sheetrock joint compound and texture on interior walls and ceilings
Residential B-3 Floor tile and mastic Sheetrock joint compound on interior walls and ceilings Caulking on interior doors
Residential 201 Floor tile mastic Sheetrock joint compound and texture on interior walls and ceilings
Residential 407 Floor tile and mastic Sheetrock joint compound and texture on interior walls and ceilings Caulking on interiors doors and windows Exterior wall plaster (beneath siding material)
Residential 501 Floor tile and mastic Sheetrock joint compound and texture on interior walls and ceilings Caulking on interior doors and windows Exterior wall plaster (beneath siding material)
Residential 405 Floor tile and mastic Sheetrock joint compound and texture on interior walls and ceilings Caulking on interior doors and windows
Falcon Dam Facility
Residential 207 Floor tile and mastic Sheetrock joint compound and texture on interior walls and ceilings Exterior wall plaster (beneath siding material)
Water Plant Building Window glazing
Power Plant Caulking Transite raceway covers
Dam No ACM identified
VIVA recommends for that the identified ACMs be left in-place until they will be impacted or otherwise disturbed by building renovation or demolition activities. The ACMs must be removed prior to any renovation or demolition activities which may damage them. Removal of ACMs must be performed by a Texas Department of State Health Services (DSHS) licensed asbestos abatement contractor. Current DSHS regulations also require a licensed asbestos consultant be retained to prepare an abatement work plan specification and project management service including air monitoring during the asbestos abatement activities.
Until the identified ACM are removed, a management plan should be developed for the subject facility. The management plan should include provisions for informing building occupants and contractors who may work in the building as to the presence of the ACM and for procedures to be followed to reduce the potential for fiber releases from the ACM.
The following list summarizes the LBP identified at the subject facility.
Project Office
White exterior wood trim Beige Porch ceiling White wood kitchen cabinets
Hydro Office White door jambs
Residential B-3 Brown door jambs Brown doors White drip edge flashing
Residential 201 White doors Beige rain gutter
Residential 407 No LBP identified
Residential 501 Brown door jambs Brown rain gutter White drip edge flashing
Falcon Dam Facility
Residential 405 White and brown doors Brown door jambs White drip edge flashing
Residential 207 White drip edge flashing
Water Plant Building Yellow floor paint Silver pipes Brown handrail Brown tanks Grey handrail
Power Plant Ground level
Yellow crane Yellow ladder Yellow handrails Green door jambs Grey handrail Grey casement windows
Level 3 Grey ladder Yellow handrail Grey electrical raceway Green floor access Green generator housings Grey door jambs Grey structural building frame Green hoist frame Green stairs Green cabinet
Level 2 Grey doors Grey handrails Grey metal fi-ame Green floor access Grey pipe Grey steps
Level 1 Grey turbine covers Silver turbine discharge pipes
Dam Level 1 (Bottom level)
No LBP identified
United Sates Section, International Boundary and Water Commksion
Falcon Dam Facility
Dam Level 2
Grey wall panel Grey floor drain Grey sump pump
Level 3 Grey electrical panel Grey floor drain
Levels 4 and 5 (Structures above dam) Grey handrails Yellow ladder fi-ame Grey beams, joists, and floor access panels Silver electric motor covers, panels, and fiames Red cable frames
Top of Dam Silver handrails Silver chainlink fence Red crane Beige floor access panel
Lead-based paint identified in the residential buildings at the subject facility is regulated by Texas DSHS Lead Program regulations, and by the federal Housing and Urban Development (HUD) regulations. The DSHS and HUD regulations do not apply to the other "non-residential" building at the facility. However, other federal regulations such as OSHA worker protection and EPA RCRA waste management requirements will need to be addressed when renovation or demolition activities at the subject facility affect the LBP. DSHS licensed LBP abatement contractor should be retained to conduct all LBP repair or abatement work at the subject facility since they will be aware of the applicable state and federal requirements for LBP abatement and disposal activities.
Two areas of LBP hazards were identified on the residential buildings at the subject facility;
peeling white paint on exterior roof flashing of building B-3 and flaking and general deterioration of the beige paint on the rain gutters of building 201. Both of the damaged LBP areas identified on these residential buildings should be repaired or removed. No other areas of LBP hazards were observed at the subject facility.
The areas of damaged LBP on the building B-3 and 201 should be repaired or removed in accordance with the DSHS Lead Program rules. The disposal of waste generated fiom the repair work on those buildings should be in accordance with Texas Commission on Environmental Quality municipal solid waste requirements. A LBP management plan should be developed for the LBP materials identified at the subject facility until they are removed by renovation or demolition activities. The management plan should include systems for informing building occupants and contractors who may work in the buildings as to the presence of the LBP and practices to be utilized to reduce the potential for releases of lead dust from the LBP.
Falcon Dam Facility
Introduction
VIVA Environmental, Inc. (VIVA), a Texas Department State Heath Services (DSHS) licensed Asbestos Consultant Agency (License No 10-0252) and DSHS certified Lead Firm (Certification No. 21 1089), has completed the asbestos and lead-based paint surveys of eleven (1 1) building structures at the United State Section, International Boundary and Water Commission (USIBWC) Falcon Dam and Power Plant facility at Falcon Heights, Texas (subject facility). The eleven (1 1) buildings included in this survey were:
1. Project Office (Building A)
2. Hydro Office (Building B)
3. Residential B-3 (Building C)
4. Residential 20 1 (Building D)
5. Residential 407 (Building E)
6. Residential 501 (Building F)
7. Residential 405 (Building G)
8. Residential 207 (Building H)
9. Water Plant Building (Building I)
10. Power Plant (Building J) 1 1. Dam (Building K)
VIVA performed the surveys in general conformitywith the federal, state and local regulations governing asbestos and lead-based paint in public buildings. This report provides a description of the field activities, analytical results, and descriptions of the materials identified as asbestos-containing materials (ACM) and lead-based paint (LBP) in the eleven buildings at the subject facility.
Site Activities
VIVA personnel, Arnulfo Quimiro and Hector Diaz, performed the asbestos and lead-based paint survey of the subject facility on September 20 and 24, 2004. Mr. Quimiro is licensed by the DSHS as an Asbestos Building Inspector (License No. 60-2219) and as a Lead Inspector (License No. 2060769). Mr. Diaz is licensed by the DSHS as an Asbestos Building Inspector (License No. 60-1888). Copies of the licenses for Mr. Quimiro and Mr. Diaz are included in Appendix F of this report.
USIBWC's Civil Engineer for the subject facility, Mr. Scott Mullins, provided VIVA'S personnel with access into each of eleven buildings included in this survey. VIVA'S personnel conducted visual inspections throughout the interior and exterior areas of the eleven buildings to identify suspect asbestos-containing materials (ACMs) and surfaces with different paint coatings.
These surveys included all accessible interior and exterior areas of each of the eleven buildings.
Destructive sampling techniques were not conducted. Therefore, inaccessible areas such as wall cavities and areas within sealed components were not included in this survey.
United Sates Sectwn, International Boundary and Water Commission
Falcon Dam Facility
Asbestos Sampling Activities
VIVA personnel collected a minimum of three (3) material samples from random locations of each homogenous area of suspect ACM identified by visual inspection of the buildings.
Homogenous areas are defined as areas of surfacing material, thermal system insulation, or miscellaneous material that are uniform in texture and color, application date, and general appemance. Each sample location was recorded on a floor plan drawing of the building.
Diagrams of the asbestos sample locations are included in Appendix A of this report. Samples were placed in air tight containers and delivered to Steve Moody Micro Services (SMMS) laboratory in Carrollton, Texas. VIVA directed SMMS to analyze each sample utilizing Polarized Light Microscopy (PLM) analysis to determine the asbestos content of each sample.
SMMS is a DSHS licensed and NVLAP accredited laboratory. A copy of SMMS DSHS license and NVLAP accreditation is provided in Appendix F of this report.
The results of the asbestos survey are summarized on the tables provided on pages 9 through 25.
The tables include a description of the identified suspect asbestos-containing materials, sample numbers, and laboratory results within each of the five buildings at the subject facility.
Locations, quantities, conditions, and the NESHAP Category of materials fomd to contain greater than one-percent asbestos are also provided. NESHAP Category refers to the ''National Emission Standards for Hazardous Air Pollutants" (40 CFR 61, Subpart M), which defines asbestos-containing materials into the following three categories;
Category I nonfiiable ACM is any asbestos-containing packing, gasket, resilient floor covering or asphalt roofing product which contains more than one percent asbestos and is determined to be non-fiiable by physical inspection, Category II nonfiiable ACM is any material, excluding Category I nonfiiable ACM, containing more than one percent asbestos and is determined to be non-fiiable by physical inspection, and Regulated Asbestos Containing Materials (RACM) is any friable ACM or Category I or Category 11 nonfiiable ACM that has become fiiable or has a high probability of becoming fiiable.
Copies of the laboratory analytical reports and chain-of-custody forms are provided in Appendix E.
Each building was assigned an alphabetic code to simplify the sampling numbers. For instance, the 33 asbestos samples collected fkom the Project Office at the Falcon Dam facility were identified as FD-A-01 through FD-A-33. These sample numbers designations are included on the summary tables, sample location diagrams, laboratory reports and chain-of-custody forms.
Asbestos-Containing Material Location Diagrams are provided in Appendix B. These diagrams illustrate the location of the identified asbestos-containing material within each building.
Falcon Dam Facility
Lead-Based Paint Survey Activities
VIVA personnel utilized an X-Ray Fluorescence (XRF) lead analyzer (Niton Model No. 309) to determine the lead content of painted surfaces within each of the eleven subject buildings at the Falcon Dam facility. Field analysis was performed on random areas of different color paints and areas suspected of varying paint histories. The XRF was calibrated to factory provided standards prior to its use each work shift.
Results of the lead-based paint survey are summarized on the Lead-Based Paint Summary table provided on pages 26 through 52. Painted surfaces identified by the XRF analysis to contain greater than one milligram per square centimeter (1.0 mg/cm2) were considered to be "lead-containing paint" according to the EPA Housing and Urban Development (HUD) standards for target housing. Lead-based paint means paint or other surface coatings that contain lead equal to or in excess of 1.0 mglcm2 or 0.5 percent by weight.
The location of each XRF sampling point is shown on diagrams provided in Appendix C.
Diagrams illustrating the surfaces identified as having lead-based paint are provided in Appendix D.
Two areas of LBP hazards were identified on the residential buildings at the subject facility;
peeling white paint on exterior roof flashing of building B-3 and flaking and general deterioration of the beige paint on the rain gutters of building 201. Both of the damaged LBP areas identified on these residential buildings should be repaired or removed. No other areas of LBP hazards were observed at the subject facility.
No other areas of damaged LBP or LBP hazards were observed at the subject facility.
Hazardous Waste Determination and Classification for Lead-Based Paint Materials
The Texas Commission on Environmental Quality (TCEQ) requires that generators of waste classify their waste prior to shipment to a municipal landfill. With regard to buildings containing LBP, the waste determination process requires that a representative sample be collected fiom the material to be disposed of and analyzed by Toxicity Characteristic Leaching Procedure (TCLP) to determine the lead concentration of the waste material. This process can be performed before or after renovation or demolition activities, provided that the materials which will be disposed of are sampled in a manner that is representative of the waste. Typically a composite sample comprised of between 100 and 300 grams of representative pieces of each component to be disposed is collected and submitted to a laboratory for TCLP lead analysis.
If the sample is determined to have a TCLP lead concentration of less than 1.5 milligrams per liter (mg/l), the debris is classified as non-hazardous waste.
If the sample is determined to have TCLP lead concentration of greater than 1.5 mg/l but less than 5 mg/l it is considered by TCEQ waste characteristics to be a Class 1 Industrial Waste despite it not being generated by an industrial process.
United Sates Section, International Boundav and Water Commission
Falcon Dam Facility
If the sample is determined to have lead TCLP lead concentrations equal to or greater than 5 mg/l the material is classified as hazardous waste.
Lead-Based Paint Management and Disposition Plan
Until the identified LBP materials are removed through renovation or demolition activities, a LBP management plan should be developed for the subject facility. The management plan should include provisions for informing building occupants and contractors who may work in the buildings as to the presence of the LBP and for procedures to be followed to reduce the potential for releases of lead dust from the LBP. Debris generated from structures at the subject facility containing LBP should be managed using the following guidelines until transported off site for proper disposal:
Place paint chips, dust, and dirt and rubble in 6-mil polyethylene disposal bags, Store larger LBP architectural debris pieces in roll-off disposal containers, All LBP debris generated during the project should be securely stored so access to the general public is prevented during project and until disposal can be arranged (sealed roll-off containers work well for this purpose), Confirm permitting status and acceptance criteria of local landfill facilities for the LBP debris.
Current TCEQ municipal solid waste regulations (TAC 30 Part 1 Chapter 330 Subchapter D) stipulate the following disposal requirements for waste generated from demolition projects which are suspected to contain lead; construction debris determined to be non-hazardous (less than 1.5 mg/l TCLP lead) can be disposed of at a TCEQ permitted Type I, Type I-AE, or Type IV municipal landfill facility. Construction debris determined to be a Class 1 Industrial Waste (greater than 1.5 mg/l but less than 5 mg/1 TCLP lead) must be disposed of at a TCEQ permitted Class 1 Industrial Waste facility. Construction debris determined to be hazardous waste (5 mg/l or greater TCLP lead) must be disposed in at a TCEQ permitted hazardous waste disposal facility.
Asbestos Sampling Data
FD-A-01 1 5% Chrysotile 9" x 9" Tile I Top Layer - 12" x 12" Floor I I I 5% Black Mastic 3% Chrysotile 12" x 12" Tile
FD-A-02 5% Chrysotile 9" x 9" Tile 5% Black Mastic 3% Chrysotile 12" x 12" Til-
FD-A-03 5% Chrysotile 9" x 9" Tile
~ i 6 White w/Streaks and Yellow Mastic
LI
Bottom Layer - 9" x 9"
Tile and Black Mastic
Throughout Except Restrooms and Storage Room
1 5% Black Mast FD-A-04 None Detected FD-A45 None Detected Plaster FD-A46 None Detected FD-A-07 None Detected FD-A48 None Detected 1 ' x 1 ' Ceiling Tile (Holes) FD-A49 None Detected FD-A- 10 None Detected
Good, No- - Friable, NESHAP
Category: 1 -
FD-A-11
FD-A- 12
Interior Walls
Bathroom and Storage Rooms
None Detected None Detected
Throughout Interior 1 ' x 1 ' Ceiling Tile (Pinholes)
FD-A- 13
FD-A-14
FD-A- 15
FD-A-16
FD-A-17
FD-A-18
None Detected None Detected None Detected None Detected None Detected None Detected
Caulking
Caulking
Bathroom Walls
Interior Door Jambs
Asbestos Sampling Data Falcon Dam Field m e Asbestos And Lead Paint Survey
FD-A-20 , None Detected Caulking FD-A-2 1 I None Detected
Interior Windows 1 I Glazing
I FD-A-28 I None Detected 1 Caulking
:ile
I FD-A-29 I None Detected
I FD-A-33 I None Detected
FD-A30 None Detected
FD-A3 1
FD-A-32
None Detected None Detected
Caulkin, Exterior Door
Blown Insulation Above Ceiling
Asbestos Sampling Data Falcon Dam Field Oflce
Hydro Office (Building B) 7 Sample Number I Asbestos Content Material Description I Material Location I Quantity I Condition I - -mM2 3%- , BkalMWk u*-w FD.z183 3%Cllrpor&
NnmN
- 3
5%ICkrjlcll,-Fkorm 3 % ~ - ~ ~ , Coob,-snCLryr#(ilCc-mmrTP, 9 " x P " B a R r r T L W l m BJ tkrwgb BS ul aQl Pbo5 S b Q m c l -mekMmk B k k w m m - -- -- -
PrlrbS - 1 rn
FD-B-13 lvone uerected FD-B-14 None Detected Blown Insulation Above Ceiling
I FD-B-15 None Detected I
Asbestos Sampling Data Falcon Dam Field 0 ' t Asbestos And Lead Paint Survty
I - 8 1 l l ---A8 -7.
--A'& -in> i l r - ~ * ~ ; 1 _ ? w 4 --?? ,. -
FD-C-04 None Detected FD-C-05 None Detected Caulking Walls FD-C-06 None Detected FD-C-07 None Detected FD-C-08 None Detected Plaster Interior Perimeter and
Restroom Walls FD-C-09 None "-'ected
FD-C-13 None Detected FD-C- 14 None Detected Caulking FD-C- 15 None Detected
Kitchen Countertop I
Asbestos Sampling Data Falcon Dam Field Offike
FD-C- 19 None Detected
FD-C-20
FD-C-2 1
FD-C-22
FD-c-23
FD"-24
FD-C-25
FD-C-26
FD-C-27
None Detected None Detected 4 % Chrysotile - Pink Plaster None Detected - Gray Plaster 4 % Chrysotile - Pink Plaster None Detected - Gray Plaster < 1 % Chrysotile - Pink Plaster None Detected - Gray Plaster None Detected None Detected None Detected
Zaulkin, Plaster
White Blown-in Insulation
Interior Windows
Exterior
Above Ceiling
Asbestos Sampling Data Falcon Dam F W Offwe i ] , ~ " @ & i & i ~ ~ ~ / . . m w I ate!
None betected FD-D-05 None Detected
1 FD-D-06 I None Detected I Caulking Interior Window
FD-D-07 None Detected FD-D-08 None Detected Plaster CD-D-09 IT-ne Pa+ected
Compound a,, Texture 2% Chrysotile - Joint Sheetrock, Joint Compound, m-D-ll Compound and Texture Texture Throughout
FD-D-1 I 2% Chrysotile - Joint /1 3 --3rn__.* ....-
FD-D- 13
FD-D- 14
FD-D-15
FD-D-16
FD-D- 1 7
FD-D- 1 8
FD-D- 19
FD-D-20
FD-D-2 1
FD-D-22
FD-D-23
FD-D-24
None Detected None Detected None Detected None Detected None Detected None Detected None Detected None Detected None Detected None Detected None Detected
Caulking
Sink Coating
Caulking
Blown Insulation
Interior Windows
Kitchen
Interior Door
Above Ceiling
Asbestos Sampling Data Faicon Dam Field Ofice
FD-F-05 None Detected Caulking FD-F-06 None Detected
I
FD-F-07 None Detected FD-F-08 None Detected Plaster Interior Perimet 1
FD-F-09 None Detected cobd, Frhblc, 3% Chry.sotilt - Joint Shectnn:k, Joint Compound, Interior W.lb and %500 SF
NESHAP FDF-l Compmnd ud Texture Texture c d a ~ Category:
3% Chrysotile - Joint RACM mF-12 Compound and Texture F W F - ~ ~ 2% ChrydIe Goad, NOIF FbF-14 2% Clwysatilc Canlldng Interior Doors 400LF -1%
2.h chrysotik NESHAP FD-F-15 Categow: 2
FWF-16 2*% C h ~ y ~ t i l ~ N o 5 FD-F-17 2% CBryrotilt - cmkina: Interb~ V dowr , . ' LF Frf.Me, FD-F-18 2% Chrysotk
Asbestos Sampling Data FaCcon Dam Field 0- Asbestos And Lead Paint Suntcg
FD-F-20 1 None Detected I Sink Coating u
FD-F-2 1 1 None Detected I Kitchen
FD-F-25 None ected FD-F-26 None Detected Blown Insulation FD-F-27 None Detected
FD-F-28
FD-F-29
FD-F-30
None Detected None Detected None Detected
Caulking Exterior Window Siding
Asbestos Sampling Data Falcon Dam F'leZd Oflie
&Ol 5% Chrysotile- Black Mastic 5% Chrysotile - Tile
FD-GO2 5% Chrysotile- Black Mastic 5% Chrysotile - T i e
F: 5% Chrysotile- Black Mastic
I FD-(3-04 I None Detected I
I @m!&s- 9" x 9" Floor Tile / Black Mastic w -a
FD-G-05 None Detected Plaster FD-G-06 None Detected
Interior I dmeter and I Restroom Wall
I FD-G-07 I None Detected I L D-G-08 I None Detected 1 Caulking
FD-GI0 I 3 % C h r y s o t i l ~ ~ o i n t Com~ound and Texture I
Interior Wall I 3% Chrysotile - Joint Sheetrock, Joint Compound, Interior Wall
FD-G1 Compound and Texture Texture I partitions 1 3% Chrysotile - Joint I I
FD-G-13 None Detectec FD-G- 14 None Detected Caulking j 1 ~ - ~ - 1 6 I 270 Chrysotue I
FD-G17 2% Chrysotile Caulking
FD-G-18 2% Chrysotile
Interior Windo'
1 Interior Doors
Gooa, Non- Friable, Asbestos Sampling Data Falcon Dam Field 0ffic;e
FD-G- 1 9 None Detected FD-G-20 None Detected Blown Insulation Above Ceiling FD-G-2 1 None Detected FD-G-22 4 % Chysotile - Finish Plaster FD-G-23 4% Chysotile - Finish Plaster Plaster Exterior Walls FD-G-24 < 1 % Chysotile - Finish Plaster FD-G-25 None Detected FD-G-26 None Detected Caulking Exterior Window Siding FD-G-27 None Detected
Asbestos Sampling Data Falcon Dam Field O f f ~ e
FD-H-20 2% Chysotile - Top Plaster - - . ster
FD-H-21 2% Chysotile - Top Plaster
Exterior Walls - Beneath Siding
I I
FD-H-22 None tected FD-H-23 None Detected Caulkir - FD-H-24 None Detected
I FD-H-28 I None Detected I
FD-H-25
FD-H-26
FD-H-27
FD-H-29 None Detected Blown Insulation FD-H-30 None Detected
Above Ceiling
Exterior Window Siding None Detected None Detected None Detected
Caulking
Asbestos Samplfng Data Falcon Dam Field me
FD-1-04 None ~Tected
FD-1-05
FD-1-06
FD-1-07
FD-1-08
FD-1-09
FD-I- 10
FD-I- 1 1
FD-I- 12
None Detected None Detected None Detected None Detected None Detected None Detected None Detected None Detected
Plaster
Caulking
Caulking
Interior Wall
AIC Window Units
Exterior Door qrta 3n! ldu1~~ sojsaqsy
I=======
93130 Pw WooX 104uo3 la)sE~d p v w a a u o ~ €2-r-a:
)aqaalaa a u o ~ ZZ-1-ad
2 :rCtdCtP; I, m- ~ o o s ' z mqq~qa ( @ l l o a s ~ s ~ & ~ ; -WE 02- 41013p903 ~113w 6l-fdd t-3 qwrd -a m m m 3 4 C S 8TiWd m'qqr(rd acraaaaroruoo lWIm3 W - 4 3 3 6 5 L I - H M -hXWJel -46s 91-z-p3 m'J@&l%S SI-Md 6 I 0 0 9 UDOlIkolrolrI ~ S C E 91-
-Po03 W W ~ ~ % S ai'ud
H~~YII- 9(Rorirrn%S tIiYId dvHmN mow1 9rlnr-w~ - P O m L -96s TIIIC1(16
WmdpeQlmq .Warirl;)%S O l f a d t - I qFS#ab13%5 6ol'ua
- - . - . - -96s - . -gDCICl[JI
I I 1 aoNP003 rg)outtl;)ss LVMa m m 4 3 % s 5mfu!t
I 4alor ROOCl I m a , ~a -%s fakt-ad
3gsaw weal3 pw aIIL LooIiI moJt3 ,,Z I x ,,Z I p a w a a a u o ~ pamlaa a u o ~ palwaa a u o ~ p w w a a u o ~
LZ-r-a:
9z-I-ad sz-r-a:
PZ-r-ad
Asbestos Sampling Data Falcon Dam Field O m e
Dnm(5kiWg iQ
M u a a l D a M M QUIIPM~ Cam&tloa - Caulking Exterior Doors Levels 4
FD-K-03
FD-K-04
FD-K-05
FD-K-06
None Detected None Detected None Detected None Detected
Caulking and 5
Interior Doors Levels 4 and 5
Lead Paint Sampling Data Falcon Dam Facility
37 912012004 9:20 Area 5 Wall Concrte Wall Fair White 0.02 38 912012004 9:21 Area 5 Ceiling Concrte Ceiling Fair White 0.02 39 912012004 9:25 Area 5 Cabinet Wood Wall Fair White 0.19
White n r ea
, Area 2012004 9:30 Area . -
912012004 9:32 Wood
I 47 912012004 9:34 nrea 5 1 I Metal 1 Frame I White 1
Project Office (Building A) Lead
Sample No. DateITime Room Object Material Sample Point Condition Color ,ma,cm2, lamb R Jamb L White
C V20/20(1 . -..
49 1/20/2004 12:45 Area 11 Door Met: ~b Rht Fair Wt 0 50 1 912012004 1 2:45 Area 1 1 Door Metal I Jamb Rht Fair White 0 51 1 912012004 12:46 Area 1 1 Door Metal I Jamb Rht Fair White 0.02
Hydro Ofiice (Building B)
I I
9/2012004 1250 Calibrate 1.47
Lead
912012004 12:51 912012004 13:56 9/20/2004 1357 912012004 1357
Sample No. Condition
Calibrate I Shutter Cal 1
Calibrate 1 Calibrate I
Color Daterrime
1.55
NA
1.51 1.48
Room Object Material Sample Point
Lead Paint Sampling Data falcon Dam Facility
Village House 83 (Building C) I Lead I / sample No. 1 DatelTime I Room Object Material Sample Point Condition Color (mglcm2)
-~ ~ 1 59 ' - 1 2 1 1 2 0 ~ ~ - ' Gutter I Peeling ( Brown I ,& ,,1 ,". ,-.
i5imimf
62 1 912012004 14 1201200~
Door lood I Door
Fai - Brown
1 912012004 16:06 1 Calibrate I I I I I I 1.53 1 912012004 16:06 1 Calibrate I 1.38
I Lead
Sample No. Datemme Room Dbject Material Sample Point Condition Color
51 9/21/2004 12:Ol Area I I Gutter Metal Side Fair Grey 0.02 52 9/21/2004 12:03 Area 11 Flashing Metal Flashing Fair Grey 0.03 53 9/21/2004 12:04 Area 11 Flashing Metal Flashing Fair Grey 0.15
Village House 407 (Building E)
Sample No. I DateITime I Room 3bject Material Sample Point Condition
- I D
Color Leaa
(mm,pm2) 0.02
1.82 1.38
Grey White White
9/21/2004 12:05 9/21/2004 12:07 9/21/2004 12:08 9/21/2004 1231 1 9/21/2004 12:11
Area 1 1 Area 1 1 Area 11 Calibrate Calibrate
Facia Wall Wall
Metal Plaster Plaster
Facia Wall Wall
Fair Fair Fair
Village Housing 501 (Building F) I I I I I I I I Lead ----
$ample No. ( Daterrime I Room I Object I Material I Sample Point (condition1 Color I ,mm,rm2, = = - I 49 9/21/2004 14:55 Area 100 Ceiling 0 Drywall Ceiling Fair Grey 0.1 50 9/21/2004 14:56 Area 100 Ceiling 0 Wood Ceiling Fair Grey 0.14 51 9/21/2004 14:59 Area I00 Closet 0 Wood Shelf Fair Grey 0.1 1
Falcon Dam Facility Lead Paint Sampling Data
Village Housing 405 (Buila~ng G) I Lead 1 Sample No. Datemme Room Object Material Sample Point Condition Color
(malcm2)
Lead Paint Sampling Data Falcon Dam Facildy
Village Housing 207 pullding H) Lead sample No. DateKime Room Object Material Sample Point Condition Color
Flashin White Casing Brown Casing Brown
I I I I I 1.52 I ############ I Calibrate I 1.46
" 1:42 ' 'E Sur I 'Aet: '
. -v I Bro I I
Filt Rrn
1 Water Plant (Building I) Lead
Sample No. Daterrime Room Object Material Sample Point Condition Color ,mn,rm2, I II wcbn
9/23/2004 13: 18 Area 1 1 )r Metal 9/23/2004 13:22 Area 11 Generator Metal Housin
I - -.
135 91231: I Stand . ir Grey 136 9/23/2004 13:42 Area 11 Floor Access Wood Door Fair Green 0.4 137 9/23/2004 13:42 Area 1 1 Floor Access Wood Door Fair Green 0.28 138 9/23/2004 13:43 Area 1 1 -- Floor Access Metal Door Frame Fair Green 0.35
9/23/2004 13:43 I 1 2001- -
153 9/23/2004 IS.,, Area , , ..,,, L,,. , ~ t . -.. 0.01 1 54 1 56
9/23/2004 14:09 9/23/2004 14:lO 9/23/2004 14: 1 2 9/23/2004 14: 1 3
Area 11 Area I I Area 1 1 Area 1 1
Wall Closet
Loft Wall
Concrte Wood Metal Wood
Wall Shelf Shelf Wall
Fair Fair Fair Fair
White Grey White White
0.07 0.1
0.66
Power Plant (Building J) Lead iample No. Datemime Room Object Material Sample Point Condltion Color
175 1 9/23/2004 14:32 1 Area 1 1 I Tank I Concrte I Support I Fair I Grey I 0.0'
Power PI= (Building J) Lead
Sample No. Datenirne Room Object Material Sample Point Condition Color ,-",--2, 1 9/23/2004 1 5 ~ - - ~~ -.
9/23/2004 1552 Area 912312004 15 n'231200~ ̂' letal -letal -
Fai
1 9/23/200~ 1:01 1 Calibrate 1 I I I I I 1 9/23/2004 16:Ol 1 Calibrate I
Lead Sample No. DatelTime Room Object Material Sample Point Condition Color ,cm2 I
I Dam (Building K) I Lead 1 Sample No. Datemime Room Object Material Sample Point Condition Color ,mn,rm2, 9/24/2004 10:08 Level 3 Floor Met; Drain e y 68 9/24/2004 10:08 1 Level 3 Floor Metal 1 Grate 0.23 RQ 9/24/2004 1 P-In I Level ? I Fair I Grey I 0 . p - Panel
112412004 1 ( Level : Elec Grey 7 1 9/24/200410:11 Level3 lnsturment Metal Floor Fair White 0.01 72 9/24/2004 10:12 Level 3 Shelf Wood Shelf Fair Grey 0.02 73 9/24/2004 10:18 Level 2 Wall Drywall Wall Fair White 0
Dam (Building K) Lead iam~le No. Daterrime Room Object I Material I Sample Point Condition Color ,-na,cm2, 1 9/2412004~~:00 Poad Level I Floor Access I Metal I Panel Beige
W E
.VIVA ENVIRONMENTAL,INC.
Falcon House 407
7201 STILES DR. (Bliilding E) TNMvrhW ml STILES EL ~*647n*6~ssls EL PASO, TX.79915 DRAWING NO. SCALE LlTC
VIVA ENVIRONMENTAL,INC.
Falcon House 501 n r M r r b a r 7201 STILES DR. (Building F)
1 8 1 S ~ L E S ELPUO. TFUS r s ~ s EL PASO, TX.79915 DRAWING NO. SCALE: NTS
Vw& VIVA ENVIRONMENTAL~INC. Falcon House 405
~NVIRW;.IWTAL.~NC
kNurlsOm
7201 STILES DR. (Building G) nn nus ~~r*so.mrrm- EL PASO, TX.79915 DMWNG NO. W-
NTS
7201 STILES DR.
Falcon Water Plant Building I kMURkOI!
&I s m s EL PASO.TE&S~- EL PASO, TX.79915 DRAWNG NO. scue NTS
Falcon Power Plant
7201 STILES DR. * C Building 1 Ground Level
MTE.
101 18/04
BY: APPROKD BY:
, M,W, rnckturckmvt 7 2 ~ 1 nus EL P A S ~ T E U S R ~ ~ EL PASO, TX.79915
CHMH 4.1.36
n m
Asbestos Sample Locations
DRAWING NO. SCALE
Level 1 Level 3
Level 5 Level 4
ME
10/13/04
BY: WF'RDMD BY:
, M,W.
VIVA ENVIRONMENTAL,INC.
7201 STILES DR.
The iuluruw 72WSlH.€S ELPUQTEUSM EL PASO, TX.79915
JOB
CHMH 4.1.36
twx Falcon Dam
Building K Level 4 and 5
TITLE:
Asbestos Sample Locations
DRAMK; NO. s w
One Layer Floor and Mastic
TWO Layer Floor and Mastic pa
Exterior Window Caulking
VIVA ENVIRONMENTALJNC.
Legend :
Kq 9"x9" Floor T ....... .-. ........... ;;;:;>.;< .< .... .... ;: ......... : Plaster - -.- .:.-A ........ %.-..
Interior Windows Caulking
~i:-+tk++di:+tt Sheetrock and Joint Compound Texture ---&---
,:,>, ,;, <.;..:,<,'.'>, .. .,. .,. ............ Exterior Plaster
VIVA ENVIRON MENTAL,IIVC.
7201 SnLES DR.
Falcon HOIJS~ 501 (Building F) me rumre 15 m a d 1201 STILES EL PASO. TEXAS 7991s EL PASO, TX.79915 DWWINC NO. SCALE: hlTC
AwiN;, 1 RN~YE" PPT;; 1 JOB NO.
TITLE: MTE:
CHM H 4.1.36 Asbestos Material Locations 10/18/04
V! VIVA ENVIRONPI EIVTAL,INC.
N V I R ~ V M N L. N . 7201 STILES DR.
Falcon Power Plant Building 3 Level 3 heiuBreI5m'
101 STILES EL PASQTUAS W ~ S EL P%O, TX.79915 DRAWNG NO. I SCALE: NTS
Falcon Hydro Office
7201 STILES DR. (Building B) me?",ueLrw ? X I STLS EL PI SO.^^ EL PASO, TX.79915 DRAW~NG NO. sw RITC
7201 STILES DR.
EL PASO, TX.79915
WV- VIVA ENVIRONMENTAL~INC.
Falcon House 501
!NVIRMVIENTAL.~NC. 7201 STILES DR. (Building F) m w e k c a )MI S ~ E S EL PASO. ml091~ EL PASO, TX.79915 MUWINC NO. SCALE: RITC
VIVAEENMRONM ENTALJNC. Falcon House 405
:NVRON~ENTAL.~NC
r n c - b w
7201 STILES DR. (Building G)
I ~ I STREP EL P*SO,TEILI~W~ EL PASO, TX.79915 DWMNC NO. SCALE
EUL(E
VIVA ENWRONMENTAL,INC.
Falcon House 207 iNvmmzNTa. INc . 7201 STILES DR. (Building H) m h I U ( C 1.-
7231 STILES E L F * S ~ T E U . ~ F P ~ ~ EL PASO, TX.79915 DRAWNC NO. SCLILE.
I alLul I V I
7201 STILES DR.
T m M u t e I r W I=t STILES EL P15aWS~5 EL PASO, TX.79915 DRAMNC NO.
VIVA ENVIRONMENTALJNC. Falcon Dam IWIROHIENTAL.M 7201 STILES DR. Building K Level 4 and 5 m-eIsOUI M S N ~ E L I * ~ O . T ~ Y ~ ~ I EL PASO, TX.79915 D- NO. t ~ u ~ : NTS
Level 1 Level 3
Mexico
USA
Legend :
Gutter
Door
Door Jamb
White and Brown Door
VlVA ENVIRONMENTAL,INC.
7201 STILES DR.
Falcon House 405 (Building G) me h e LIM not SREh ELPII(LIUSAOU EL PASO, TX.79915 DRAWIK; NO. SULE: NTS
3 Brown Handrail
I
Y -a
LI
M
I m m Yellow Handrail
I
I
I -m h m m m
Y r r d u m I a All Casement Windows are Lead Location Through Out Building m Building Structural Steel Members Lead --------
Ir
Y d 7201 STILES DR.
mr srn~s EL P A S Q T E U S ~ I -
Identified Materials Contain Lead-Based Paint
Green Generator Housing ypical Gray Electrical Raceway
Grey
~tified Lead
Silver Turbine Discharge Pipe
JRAWN BY: BI: A P P m BY; JOB ITnE MTE:
A.S. E S . I M.W. 1 U l M H 4.1.36 ( Lead Material Locations 101 18/04
' VIVA ENVIRONM ENTAL,INC.
~ ~ V R ~ ~ U E N T * ~ I N C . 7201 STILES DR.
Falcon Power Plant Building J Level I b.Mw.kOl( 'nr STUS ELP*SO,TO*I~~U EL PASO, TX.79915 DRAW~W NO. SCALE: NTS
Dam Main
Building
Dam Storage
Level 1
Grey Hand Rail
Yellow Ladder
-------- +4 Frame )LA!
Silver Paint on Electric Motors
Panels, and Frames
If Red Paint on Cable Frames
Identified Material Contain Lead-Based Paint
DWWN BY: OYa) BY: APPROMD BY: No. n u
AS. ~ A . s . I M.W. I CHMH 4.1.36 1 Lead Material Locations
MTE:
10/18/OL
vlv&@ VIVA ENVIRONMENTAL,INC.
ENVRCN*N~TAL.INC 7201 STILES DR.
'me Fvtw lr Llr
1103 STUS EL V * ~ ~ ~ E C N ~ I S EL PASO, TX.79915
W E Falcon Dam Building K Level 4 and 5
CWMNO NO. sw
PLM REPORT
Steve Moody Micro Services, Inc.
15 10 Randolph, Suite 602 Carrollton, Texas 75006 (972) 446-9482
NVLAP Lab No. 102056 TDH License No., 30-0084
PAT ID # 102577
I client : Viva Environmental, Inc.
Project : IBWC, Falcon Dam
Project # : CHMH.4.1.36 Sample Date : 09/20/2004
(Identification : Asbestos. Bulk Sample Analysis
Test Method : Polarized Light Microscopy / Dispersion Staining (PLMIDS) EPA Method 600 1 R-93 / 1 16
Lab Job No.: x4B-07988
Report Date: 09/28/2004
FD-A-08
FD-A-09
FD-A- 10
FD-A- 1 1
On 9/28/04, thirty-three (33) bulk material samples were submitted by Hector Diaz of Viva Environmental, Inc. for asbestos analysis by P W S .
Copies of the lab data sheets are attached; additional information may be found therein. The results are summarized below:
12" x 12" White with Streaks Floor Tile 9" x 9" Floor Tile underneath
Sample Number
12" x 12" White with Streaks Floor Tile 9" x 9" Floor Tile underneath
12" x 12" White with Streaks Floor Tile 9" x 9" Floor Tile underneath
Client Sample Description I Location
Plaster, Interior Walls
Asbestos Content
Plaster, Interior Walls
Plaster, Interior Walls
1' x 1' Ceiling Tile (Holes), Bathrooms and Storage Room
1' x 1' Ceiling Tile (Holes), Bathrooms and Storage Room
1' x 1' Ceiling Tile (Holes), Bathrooms and Storage Room
1' x 1' Ceiling Tile (Pmholes), Throughout
I' x 1' Ceiling Tile (F'inholes), Throughout
3% Chrysotile - Top Tile None Detected - Yellow Mastic 5% Chrysotile - Bottom Tile 5% ChrysotiIe - Black Mastic
3% Chrysotile - Top Tile None Detected - Yellow Mastic 5% Chrysotile - Bottom Tile 5% Chrysotile - Black Mastic
3% Chrysotile - Top Tile None Detected - Yello~l Mastic.
5% Chrysotile - Bottom Tile 5% Chrysotile - Black Mastic
None Detected - Green Plaster None Detected - Tan Plaster
None Detected - Oreen Plaster
None Detected - Base Plaster None Detected - Finish Plaster
None Detected - Ceiling Tile
None Detected - Ceiling Tile
None Detected - Ceiling Tile
None Detected - Ceiling Tile
None Detected - Ceiling Tile
15 10 Randolph, Suite 602 Carrollton, Texas 75006 (972) 446-9482
PLM REPORT
NVLAP Lab No. 102056 TDH License No. 30-0084
PAT ID # 102577
Client : Viva Environmental, Inc.
1 Project IBWC, Falcon Dam I Project # : CHMH.4.1.36 Sample Date : 09/20/2004
I Identification : Asbestos, Bulk Sample Analysis
Test Method : Polarized Light Microscopy I Dispersion Staining (PLMIDS) EPA Method 600 1 R-93 1 1 16
Lab Job No.: x4B-07988
Report Date: 09/28/2004
On 9/28/04, thirty-three (33) bulk material samples were subrrd'tted by Hector Diaz of Viva Environmental, Inc. for asbestos analysis by PLMIDS.
Copies of the lab data sheets are attached; additional information may be found therein. Tne results are summarized below:
I SarnpleNumber I Client Sample Description / Location I Asbestos Content
FD-A- 12
FD-A- 1 3
FD-A- 14
FD-A- 15
FD-A- 1 6
FD-A-17
FD-A- 18
FD-A- 19
FD-A-20
FD-A-2 1
FD-A-22
FD-A-23
FD-A-24
FD-A-25
ED-A-26
FD-A-27
1' x 1' Ceiling Tile (Pinholes), Throughout
Caulking, Bathroom Walls
Caulking, Bathroom Walls
Caulking, Bathroom Walls
Caulking, Interior Door Jambs
Caulking, Interior Door Jambs
Caulking, Interior DOCIT Jambs
Caulking, Interior Window
Caulking, Interior Window
Caulking, Interior Window
Glazing, Window Exterior
Glazing, Window Exterior
Glazing, Window Exterior
Caulking, Window Exterior
Caulking, Window Exterior
Caulking, Window Exterior
None Detected - Ceiling Tile
None Detected - Caulking
None Detected - Caulking
None Detected - Caulking
None Detected - Caulking
None Detected - Caulking
None Detected - Caulking
None Detected - Caulking
None Detected - Caullcing
None Detected - Caulking
2% Chrysotile - Window Glazing
None Detected - Window Glazing
None Detected - Window Glazing
3% Chrysotile - Caulking
3% Chrysotile - Caulking
3% Chrysotile - Caulking
Brian R. Schmidt
Steve Moody Micro Services, Inc. NVLAP Lab No. 102056 15 10 Randolph, Suite 602 TDH License No. 3 0-0084 Carrollton, Texas 75006 (972) 446-9482 PAT ID # 102577
Client : Viva Environmental, Inc. Lab Job No.: x4B-07988
Project : IBWC, Falcon Dam Report Date: 09/28/2004
Project # : CHMH.4.1.36 Sample Date : 09/20/2004
Identification : Asbestos, Bulk Sample Analysis
Test Method : Polarized Light Microscopy / Dispersion Staining (PLMIDS) EPA Method 600 / R-93 / 1 16 Page 3 of 3
On 9/28/04, thirty-three (33) bulk material samples were submitted by Hector Diaz of Viva Environmental, Inc. for asbestos analysis by P W S .
Copies of the lab data sheets are attached; additional information may be found therein. The results arc summarized below:
Sample Number
FD-A-28
FD-A-29
FD-A30
Blown Insulation, above Ceiling None Detected - Rockwool
Blown Insulation, above Ceiling
Blown Insulation, above Ceiling None Detected - Rockwool
These samples were analyzed by layers. Quantification, unless otherwise noted, is performed by calibrated visual estimate.
Results may not be reproduced except in full. This test report relates only to the samples tested. ' These test results do not imply endorsement by N V W or any agency of the U.S. Government.
Accredited by the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Fiber Analysis under Lab Code 102056.
Lab Director : Steve Moody Approved Signatory :
Client Sample Description / Location
Caulking, Dr Exterior
Caulking, Dr Exterior
Caulking, Dr Exterior
Asbestos Content
None Detected - Caulking
None Detected - Caulking
Steve Moody Micro Services, Inc. NVLAP Lab No. 102056 15 10 Randolph, Suite 602 TDH License No. 30-0084 Carrollton, Texas 75006 (972) 446-9482 PAT ID # 102577
Client : Viva Environmental, Inc. Lab Job No.: x4B-07989
Project : IBWC, Falcon Dam Report Date: 09/28/2004
Project # : CHMH.4.1.36 Sample Date : 09120/2004
Identification : Asbestos, Bulk Sample Analysis
Test Method : Polarized Light Microscopy / Dispersion Staining (PLMIDS) EPA Method 600 1 R-93 1 11 6 Page 1 of 2
On 09/28/2004, fifteen (15) bulk material samples were submitted by Hector Diaz of Viva Enviro~nental, Inc. for asbestos analysis by PLMDS.
Copies of the lab data
Sample Number
FD-B-01
FD-B-03
FD-B-04
FD-B-05
FD-B-06
FD-B-07
FD-B-08
FD-B-09
FD-B-10
FD-B-11
sheets are attached; additional information may be found therein. The results are summarized
Client Sample Description 1 Location
Mastic, under Carpet
Mastic, under Carpet
Mastic, under Carpet
9" x 9" Green Floor Tile, B3 thru B5 & Hall Closet
9" x 9" Green Floor Tile, B3 thru B5 & Hall Closet
9" x 9" Green Floor Tile, B3 thru B5 & Hall Closet
Plaster, Wall Perimeter
Plaster, Wall Perimeter
Plaster; Wall Perimeter
Sheetrock, Joint Compound & Texture, Wall Partitions
Sheetrock, Joint Compound & Texture, Wall Pxtitions below:
Asbestos Content
None Detected - Yellow Mastic 3% Chrysotile - Black Mastic
None Detected - Yellow Mastic 3% Chrysotile - Black Mastic
None Detected - Yellow Mastic 3% Chrysotile - Black Mastic
5% Chrysotile - Floor Tile 3% Chrysotile - Black Mastic
5% Chrysotile - Floor Tile 3% Chrysotile - Black Mastic
5% Chrysotile - Floor Tile 3% Chrysotile - BIack Mastic
None Detected - Plaster
None Detected - Plaster
None Detected - Plaster
None Detected - Drywall Material 2% Chrysotile - Joint Compound None Detected - Paint \ Texture
None Detected - Drywall Materid 2% Chrysotile - Joint Compound None Detected - Paint \ Texture
Steve Moody Micro Services, Inc. NVLAP Lab No. 1 02056
1510 Randolph, Suite 602 TDH License No. 30-0084 Carrollton, Texas 75006 (972) 446-9482 PAT ID # 102577
1 Client : Viva Environmental, Inc. Lab Job No.: x4B-07989
1 Project : IBWC, Falcon Dam
I project # : CHMH.4.1.36 Sample Date : 09/20/2004
I ~dentification : Asbestos, Bulk Sample Analysis
Test Method : Polarized Light Microscopy / Dispersion Staining (PLMIDS) EPA Method 600 1 R-93 1 11 6
Report Date: 09/28/2004
I On 09/28/2004, fifteen (15) bulk material samples were submitted by Hector Diaz of Viva Environmental, Inc. for asbestos analysis by P W S .
Copies of the lab data sheets are attached; additional information may be found therein. The results are summarized below:
I Sample Number I Client Sample Description / Location I Asbestos Content
FD-B- 13 Blown Insulation, above Ceilings
FD-B-12
I FD-B-14 Blown Insulation, above Ceilings
Sheetrock, Joint Compound & Texture, Wall Partitions
FD-B-15 Blown Insulation, above Ceilings
None Detected - Drywall Material 2% Chrysotile - Joint Compound None Detected - Paint 1 Texture
None Detected - Rockwool
None Detected - Rockwool
I These samples were analyzed by layers. Quantification, unless otherwise noted, is performed by calibrated visual estimate.
Results mav not be reproduced except in full. This test report relates only to the samples tested.
Roy Enrico
These test rksults do not imply end&sement by NVLAP or any agency of the U.S. Government.
Accredited by the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Fiber Analysis under Lab
Analyst :
Lab Director : Steve Moody Approved Signatory :
Steve Moody Micro Services, Inc. NVLM Lab No. 102056 15 10 Randolph, Suite 602 TDH License No. 30-0084 Carrollton, Texas 75006 (972) 446-9482 PAT ID # 102577
Client : Viva Environmental, Inc. Lab Job No.: x4B-07990
Project : IBWC, Falcon Dam Report Date: 09/28/2004
Project # : CHMH.4.1.36 SanipIe Date : 09/21 12004
Identification : Asbestos, Bulk Sample Analysis
Test Method : Polarized Light Microscopy I Dispersion Staining (PLMIDS) EPA Method 600 I R-93 / 11 6 Page 1 of 3
On 9/28/2004, twenq-seven (27) bulk material samples were submitted by Hector Diaz of Viva Environmental, Inc. for asbestos analysis by PLMIDS.
Copies of the lab data
Sample Number
FD-C-01
FD-C-02
FD-C-03
FD-C-04
FD-C-05
FD-C-06
FD-C-07
FD-C-08
FD-C-09
FD-C-10
FD-C-11
FD-C-12
FD-C-13
sheets are attached, additional information may be found therein. The results are surmnarized
Client Sample Description / Location
9" x 9" Beige Floor Tile, Throughout
9" x 9" Beige Floor Tile, Throughout
9" x 9" Beige Floor Tile, Throughout
Caulking, Walls
Caulking, Walls
Caulking, Walls
Plaster, Perimeter Interior Walls & Restroom Walls
Plaster, Perimeter Interior Walls & Restroom Walls
Plaster, Perimeter Interior Walls & Restroom Walls
Sheetrock, Joint Compound & Texture, Wall Partitions
Sheetrock, Joint Compound & Texture, Wall Partitions
Sheetrock, Joint Compound & Texture, Wall Partitions
CaulJsing, Countertop - Kitchen below:
Asbestos Content
10% Chrysotile - Floor Tile 10% Chrysotile - Black Mastic
10% Chrysotile - Floor Tile 3% Chrysotile - Black Mastic
10% Chrysotile - Floor Tile 5% Chrysotile - Black Mastic
None Detected - Caulking
None Detected - Caulking
None Detected - Caulking
None Detected - Plaster
None Detected - Plaster
None Detected - Plaster
None Detected - Drywall Material 2% Chrysotile - Joint Compound
None Detected - Drywall Material 2% Chrysotile - Joint Compound
None Detected - Drywall Material
None Detected - Caullcing
15 10 Randolph, Suite 602 Carrollton, Texas 75006 (972) 446-9482
NVLAP Lab No. 102056 TDH License No. 30-0084
PAT ID # 102577
I client : Viva Environmental, Inc.
1 Project : IBWC, Falcon Dam
1 project # : CHMH.4.1.36 Sample Date : 09/21 12004
I Identification : Asbestos, Bulk Sample Analysis
Test Method : Polarized Light Microscopy / Dispersion Staining (PLMtDS) EPA Method 600 I R-93 1 116
Lab Job No.: x4B-07990
Report Date: 09/28/2004
On 9/28/2004, twenty-seven (27) bulk materid samples were submitted by Hector Diaz of Viva Environmental, bc. for asbestos analysis by PLMDS.
Copies of the lab data sheets are attached; additional information may be found therein. The results are summarized below:
Sample Number
I FD-C-15 I Caulking, Countertop - Kitchen
FD-C-14
Client Sample Description 1 Location
Caulking, Countertop - Kitchen
I FD-C-17
I Caulking, Interior Doors
Asbestos Content
FD-C-16
FD-C- 18
FD-C-19
FD-C-20
FD-C-21
FD-C-22
Cadking, Interior Doors
Caulking, Interior Doors
Caulking, Interior Windows
Caulking, Interior Windows
Caulking, Interior Windows
Plaster, Exterior
Plaster, Exterior
I FD-C-25 I Blown Insulation, above Ceiling
FD-C-24
I FD-C-26 I Blown Insulation, above Ceiling
Plaster, Exterior
None Detected - Caulking
I None Detected - Caulking
2% Chrysotile - Caulking
I None Detected - Caulking
None Detected - Caulking
I None Detected - Caulking
I None Detected - Caulking
I None Detected - Caulking
None Detected - Grey Plaster -4% Chrysotile - Pink Plaster
None Detected - Grey Plaster <I% Chrysotile - Pink Plaster
None Detected - Grey Plaster -4% Chrysotile - Pink Plaster
I None Detected - Rockwool
I None Detected - Rochool
FD-C-27 Blown Insulation, above Ceiling None Detected - Rockwool
Carrollton, Texas 75006 (972) 446-9482
PLM REPORT
Client : Viva Environmental, Inc.
Project : IBWC, Falcon Dam
Project # : CHMH.4.1.36 Sample Date : 09/21/2004
Identification : Asbestos, Bulk Sample Analysis
Test Method : Polarized Light Microscopy I Dispersion Staining (PLMIDS) EPA Method 600 1 R-93 / 116
NVLAP Lab No. 102056 TDH License No. 30-0084
PAT ID # 102577
Lab Job No.: x4B-07990
Report Date: 09/28/2004
On 9/28/2004, twenty-seven (27) bulk material samples were submitted by Hector Diaz of Viva Environmental, Inc. for asbestos analysis by PLMIDS.
Copies of the lab data sheets are attached, additional information may be found therein. The results are summarized below:
These samples were analyzed by layers. Quantification, unless otherwise noted, is performed by calibrated visual estimate.
Results may not be reproduced except in full. This test report relates only to the samples tested.
These test results do not imply endorsement by NVLAP or any agency of the U.S. Government Accredited by the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Fiber Analysis under Lab Code 102056.
Robert W. Miracle
Lab Director : Steve Moody
15 10 Randolph, Suite 602 Carrollton, Texas 75006 (972) 446-9482
NVLAP Lab No. 102056 TDH License No. 30-0084
PAT ID # 102577
Viva Environmental, Inc.
Project : IBWC, Falcon Dam
Project # : CHMH.4.1.36 Sample Date : 09/20/2004
Identification : Asbestos, Bulk Sample Analysis
Test Method : Polarized Light Microscopy / Dispersion Staining (PLMIDS)
EPA Method 600 / R-93 1 1 16
Lab Job No.: x4B-07994
Report Date: 09/28/2004
Page l of 3
On 09/28/2004, twenty-four (24) bulk material samples were submitted by Hector Diaz of Viva Environmental, Inc. for asbestos analysis by PLMIDS.
Copies of the lab data sheets are attached; additional information may be found therein. The results are summarized below:
I Sample Number I Client Sample Description / Location I Asbestos Content
FD-D- 1 0
12" x 12" Off-White Floor Tile, Throughout
12" x 12" Off-white Floor Tile, Throughout
12" x 12" Off-white Floor Tile, Throughout
Caulking, Wall Kitchen & Bathrooms
Caulking, Wall Kitchen & Bathrooms
Caulking, Wall Kitchen & Bathrooms
Plaster, Bathroom Walls
Plaster, Bathroom Walls
Plaster, Bathroom Walls
Sheetrock, Joint Compound & Texture, Throughout
None Detected - Floor Tile None Detected - Yellow Mastic None Detected - Black Mastic
None Detected - Floor Tile None Detected - Yellow Mastic 2% Chrysotile - Black Mastic
None Detected - Floor Tile None Detected - Yellow Mastic 2% Chrysotile - Black Mastic
None Detected - Caulking
None Detected - Caulking
None Detected - Caulking
None Detected - Tan Plaster None Detected - White Plaster
None Detected - Tan Plaster None Detected - White Plaster
None Detected - Tan Plaster None Detected - White Plaster
None Detected - Drywall Material 2% Chrysotile - Joint Compound
FD-D-11 Sheetrock, Joint Compound &…