Question_and_Answer_A004_IBM15-22.pdf

PDF 21 KB Posted

Attached to
Structure Assessments Within the Lower Rio Grande Flood Control Project Federal contract opportunity
Solicitation number
IBM15-22
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

Q A Amendment A004 IBM15-22

View the file

Other files for this federal contract opportunity

Other files attached to Structure Assessments Within the Lower Rio Grande Flood Control Project, newest first.
File Type Posted
Question_and_Answer_A003_IBM15-22.pdf PDF
Question_and_Answer_A002_IBM15-22.pdf PDF
Question_and_Answer_A001.pdf PDF
Structures_by_Patrol-2015.xlsx XLSX spreadsheet
WD_05-2519_(Rev.-19).pdf PDF
Compensation_and_Liability_Insurance_--_IBWC.docx DOCX document
LRGFCP_Structure_Inspection_PWS_08-31-2015.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer Amendment A004

Solicitation Number IBM15-22 Structure Assessments within the

Lower Rio Grande Flood Control Project

Q) In order fill in the pricing for CLIN 001 please advise what the definition is for “SV” under “Unit” above. Do we place the same lump sum price under “Unit Price” and “Total Price”?

A) The abbreviation “SV” stands for Service. The lump sum price is to be placed under

Unit Price and Total Price.

Q) Also, under Amendment 003, the last statement is posed as a question (Q) but reads like an answer – please clarify.

A) The last statement is part of the answer and not a question as shown below.

“Q) In order to bid on the cost, could you please explain how to go about it? Should we bid on the cost of each location inspection and final report, that is including travel time and labor (overhead and burden etc.) for all 485 structures?

A) The format for the proposal is outlined in the synopsis under CLIN Structure. The proposal may be submitted on the Company’s letterhead.

The total cost for CLIN 001 should include the cost per structure, final report, travel time and labor (overhead and burden etc.) for all 485 structures. CLIN 001 should be the total cost for the whole project.”

Q) Will the IBWC consider an extension to the due date based on the additional data/information provided under Amendment 003?

A) The due date of September 11, 2015 will not be extended.