attmt1_IBM10B0002 amend A003 Mesilla_Addendum_SummaryofPlan_Spec_Revisions_12_11.pdf
PDF 18 KB Posted
- Attached to
- RECOVERY- Mesilla Phase 1 Levee Improvements Federal contract opportunity
- Solicitation number
- IBM10B0002
About this file
Attachment 1 to Amendment A003 IBM10B0002 Mesilla
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IBM10B0002-Abstract Spreadsheet.xls | XLS spreadsheet | |
| IBM10B0002 amendment A004.pdf | ||
| attmt2_IBM10B0002_amend A003_MesillaBidderQuestions.pdf | ||
| attmt3_IBM10B0002_amend A003 Hatch_Mesilla_Canutillo_Questions_set1.pdf | ||
| attmt5_IBM10B0002_amend_A003_MesillaQuestions_SET 16_12.pdf | ||
| attmt4_IBM10B0002_amend A003_all3BidderQuestions_set2.pdf | ||
| IBM10B0002 amend A003.pdf | ||
| IBM10B0002_amend A002.pdf | ||
| IBM10B0002_Mesilla-quest ans.pdf | ||
| IBM10B0002 amend A001.doc.pdf | ||
| IBM10B0002_prebidattendees.pdf | ||
| J.6_sf28.pdf | ||
| IBM10B0002.pdf | ||
| J.7_06.Mesilla - 100 Specifications.2009_11_13.pdf | ||
| J.3_IBWC 110.pdf | ||
| J.4_IBWC 116.pdf | ||
| J.5_sf24_f.pdf | ||
| J.2_IBWC 117.pdf | ||
| J.1_wage determination.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated:12-11-09
Specification PDF File Name Summary of Revisions
00.01.15-1&2 00 01 15 List of Drawings_rv1 12_14_09.pdf Revised sheet #'s and description
00.31.24-2 00 31 24 EA Information_rv1 12_10_09.pdf Number 1, Section C-changed contractor to IBWC.
01.19.00-2 01 19 00 ScopeofWorkrv1_12_11_09.pdf
1. Revise wording as follows: 1.3 SEQUENCE OF WORK / TIME FOR COMPLETION OF WORK - A. The Work is to be performed as shown in the plans. B. The Work under this Contract shall be completed as follows:
All levee work, excluding maintenance of seeding shall be completed within X calendar days; and, All maintenance of seeding shall be completed within X calendar days of completion of all other levee work.
01.32.00-1 01 32 00 ConstrProgressDocs_rv1_12_11_09.pdf
Included “1.3 QUALIFICATIONS OF SCHEDULING PERSONNEL: The Contractor shall identify a scheduler who will be dedicated to the Project for the duration of the Project. The Scheduler shall have 4 years or more of verifiable experience with Primavera Project Planner (Primavera P3), and qualifications of the Scheduler shall be submitted to the COR for compliance-confirmation. Should the Contractor require a change in Scheduler during the duration of the Project, the Contractor shall notify the Government immediately and provide qualifications of a replacement Scheduler (with 4 years or more of verifiable experience with CPM Schedules using Primavera P3) to the COR for compliance-confirmation”.
01.32.00-4 01 32 00 ConstrProgressDocs_rv1_12_11_09.pdf
Added following language: "Conditions may develop which require revisions to logic or durations of the original network. If during the progress of the work, events develop which necessitate changes in the original plan, the Contractor shall make such changes so as to depict the current mode of operation and shall provide the GOVERNMENT with a revised network diagram. Any revision to the original logic must be approved by the GOVERNMENT. After approval, logic revisions will be incorporated into the schedule and will be addressed in the monthly narrative report by means of both a description of the revision and a listing of those network elements affected by such change. Revisions and additions to the approved network diagrams and mathematical tabulations shall be submitted in two (2) full size copies, two (2) half size copies and one (1) full size reproducible.
01.32.00-4 01 32 00 ConstrProgressDocs_rv1_12_11_09.pdf
Included the following when applicable: 1. Addition and deletion of activities 2. Addition and deletion of relationships 3. changes to activity descrptions and durations 4. Changes to relationship types and lag codes
5. Changes to contract milestone dates and approved constraint dates 6.
All other revisions to the network logic".
01.32.00-4 01 32 00 ConstrProgressDocs_rv1_12_11_09.pdf
Included “Paragraph M. Recovery Schedule” and added following language: “In the event that the mathematical analysis indicates that the project, or progress towards interim milestone requirement, has fallen 15 or more calendar days behind schedule and there is no excusable delay or change to support a time extension, the Contractor shall prepare and submit a Recovery Schedule for approval by the Government. The Contractor shall revise logic and/or durations to cause the mathematical analysis to show the project on schedule. Upon approval of the Recovery Schedule by the Government, the Contractor shall incorporate the Recovery Schedule in the current schedule.”
01.57.00-12 00 57 00 ErosionControl rv1_12_11_09.pdf Delete the entire Section 3.3, Environmental Commitments.
01.59.00-2 00 59 00 ConstrFacSecurityTempControls_rv1_12_11_09.pdf Item C-5, remove reference to “US Fish and Wildlife Department .
Rehabilitation of Mesilla Levee Rehabilitation Imporvements for the Rio Grande Canalization Protection Levee Mesilla Levee System
Summary of Specification Revisions for Addendum One
Summary of Specification Revisions for Addendum One
34.01.00-1 34 01 00 CleanChannels_rev1_12_10_09.pdf
On 1.2 General, inserted the following statement in this section: “All channel cleaning activities shall remain outside of the Ordinary High Water Mark.” In areas with steep banks, an erosion scour line usually highlights the ordinary high water mark. The ordinary high water mark is typically defined as: The point on a stream bank to which the presence and action of surface water is so continuous as to leave a distinct line marked by erosion; destruction or prevention of woody terrestrial vegetation;
predominance of aquatic vegetation; or other easily recognized characteristic. The ordinary high water mark defines the bed of a river or stream and is also referred to as the active channel. In areas with steep banks such as the Rio Grande, an erosion scour line usually highlights the ordinary high water mark.”
35.41.00-5 35 41 00 Levee.01_rv1_12_11_09.pdf Section 1.7 Subsurface Information: changed developed by Professional Services Industries, Inc. to Raba-Kistner Engineering & Consultants
35.41.00-7 35 41 00 Levee.01_rv1_12_11_09.pdf Part 2, Section 2.1 Materials-changed Letter A. Fill Materials, Number 1 to corrected text.
35.41.00-23 35 41 00 Levee.01_rv1_12_11_09.pdf
Part 4, Section 4.1 Measurement-deleted (The measurement will consist of deducting the existing levee to the enlarged levy.) to The volume is computed between the original ground surface or the surface upon which the embankment is to be constructed and the lines, grades, and slopes of the embankment.
Updated:12-11-09
Sheet NoPDF File Name Summary of Revisions
1.01 01.01.0450MESGNCO.PDF REVISED INDEX OF SHEETS TO REMOVE SHEET 12.51 AND ADDED
SHEETS 05.05, 08.210, 08.211 AND 11.02
3.01 3.01.0450MESGNGN01_SEALED.PDF REVISED GENERAL NOTE FOR ITEMS 34 41
4.01 4.01.0450MESSGNEQ01_SEALED.PDF REVISED QUANTITIES
5.04 5.04.0450MESSGNEQ02_SEALED.PDF REVISED QUANTITIES
5.05 5.05.0450MESSGNEQ05C_SEALED.PDF ADDED SHEET FOR SUMMARY OF QUANTITIES FOR ACCESS
ROADS AND DRIVEWAYS
8.001 8.001.0450MW1SLVPP01_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.002 8.002.0450MW1SLVPP02_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.003 8.003.0450MW1SLVPP03_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.004 8.004.0450MW1SLVPP04_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.005 8.005.0450MW1SLVPP05_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.006 8.006.0450MW1SLVPP06_SEALED.PDF ADDED ACCESS DRIVEWAY CALL-OUT
8.012 8.012.0450MW1SLVPP12_SEALED.PDF ADDED ACCESS DRIVEWAY CALL-OUT
8.014 8.014.0450MW1SLVPP14_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.017 8.017.0450MW1SLVPP17_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.020 8.020.0450MW1SLVPP20_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.021 8.021.0450MW1SLVPP21_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.022 8.022.0450MW1SLVPP22_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.023 8.023.0450MW1SLVPP23_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.024 8.024.0450MW1SLVPP24_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
ROAD CALL-OUT
8.025 8.025.0450MW1SLVPP25_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.026 8.026.0450MW1SLVPP26_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.028 8.028.0450MW1SLVPP28_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.029 8.029.0450MW1SLVPP29_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.030 8.030.0450MW1SLVPP30_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.031 8.031.0450MW1SLVPP31_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
ROAD CALL-OUT
8.032 8.032.0450MW1SLVPP32_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.033 8.033.0450MW1SLVPP33_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.034 8.034.0450MW1SLVPP34_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.035 8.035.0450MW1SLVPP35_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.036 8.036.0450MW1SLVPP36_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.037 8.037.0450MW1SLVPP37_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.038 8.038.0450MW1SLVPP38_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.039 8.039.0450MW1SLVPP39_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.040 8.040.0450MW1SLVPP40_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.041 8.041.0450MW1SLVPP41_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.045 8.045.0450MW1SLVPP45_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.046 8.046.0450MW1SLVPP46_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.057 8.057.0450ME2SLVPP11_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.060 8.060.0450ME2SLVPP14_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.061 8.061.0450ME2SLVPP15_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.062 8.062.0450ME2SLVPP16_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.063 8.063.0450ME2SLVPP17_SEALED.PDF ADDED ACCESS DRIVEWAY CALL-OUT
8.066 8.066.0450ME2SLVPP20_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.067 8.067.0450ME2SLVPP21_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.068 8.068.0450ME2SLVPP22_SEALED.PDF ADDED ACCESS DRIVEWAY CALL-OUT
Rehabilitation of Mesilla Levee Rehabilitation Imporvements for the Rio Grande Canalization Protection Levee Mesilla Levee System
Summary of Plan Revisions for Addendum One
Summary of Plan Revisions for Addendum One
8.071 8.071.0450ME2SLVPP25_SEALED.PDF ADDED ACCESS ROAD CALL-OUT
8.073 8.073.0450ME2SLVPP27_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.074 8.074.0450ME2SLVPP28_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.075 8.075.0450ME2SLVPP29_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.076 8.076.0450ME2SLVPP30_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.077 8.077.0450ME2SLVPP31_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.078 8.078.0450ME2SLVPP32_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.079 8.079.0450ME2SLVPP33_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.080 8.080.0450ME2SLVPP34_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.081 8.081.0450ME2SLVPP35_SEALED.PDF ADDED ACCESS DRIVEWAY CALL-OUT
8.083 8.083.0450ME21SLVPP37_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.084 8.084.0450ME21SLVPP38_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.089 8.089.0450ME21SLVPP43_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.090 8.090.0450ME21SLVPP44_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.091 8.091.0450ME21SLVPP45_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.093 8.093.0450ME21SLVPP47_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.095 8.095.0450ME21SLVPP49_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.096 8.096.0450ME21SLVPP50_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.097 8.097.0450ME21SLVPP51_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.098 8.098.0450MW2SLVPP01_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT, ADDED ACCESS ROAD CALL-OUT
8.100 8.100.0450MW2SLVPP03_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.125 8.125.0450MW2SLVPP28_SEALED.PDF ADDED ACCESS DRIVEWAY CALL-OUT
8.130 8.130.0450MW2SLVPP33_SEALED.PDF ADDED ACCESS DRIVEWAY CALL-OUT
8.135 8135.0450MW2SLVPP38_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.136 8.136.0450MW2SLVPP39_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.140 8.140.0450MW2SLVPP43_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.142 8.142.0450MW2SLVPP45_SEALED.PDF
8.143 8.143.0450MW2SLVPP46_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS, ADDED ACCESS
DRIVEWAY CALL-OUT
8.145 8.145.0450MW2SLVPP48_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.146 8.146.0450MW2SLVPP49_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.147 8.147.0450MW2SLVPP50_SEALED.PDF REVISED TO INCLUDE TREE ENCROACHMENTS
8.210 8.210.0450MW1MLVIL19_SEALED.PDF ADDED PLAN AND PROFILES FOR ACCESS ROADS
8.211 8.211.0450MW1MLVIL20_SEALED.PDF ADDED PLAN AND PROFILES FOR ACCESS ROADS
11.02 11.02.0450MESTOE DRAIN_SEALED.PDF ADDED SHEET
12.10 12.10.0450MW1SDRCV01_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.12 12.12.0450MW1SDRCV03_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.14 12.14.0450MW1SDRCV05_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.15 12.15.0450MW1SDRCV06_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.16 12.16.0450MW1SDRCV07_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.18 12.18.0450MW1SDRCV09_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.19 12.19.0450MW1SDRCV10_SEALED.PDF REVISED TOPO
12.20 12.20.0450ME2SDRCV01_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMAIN
12.21 12.21.0450ME2SDRCV02_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMAIN
12.25 12.25.0450ME2SDRCV06_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.26 12.26.0450ME2SDRCV07_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.28 12.28.0450MW2SDRCV01_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.30 12.30.0450MW2SDRCV03_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.33 12.33.0450MW2SDRCV06_SEALED.PDF REVISED STRUCTURE FROM PLUG TO REMOVE
12.50 12.50.0450MESSDRCD17_SEALED.PDF REVISED SHEET NUMBER
12.51 REMOVED FROM SET
14.01 14.01.MESILLA_EPIC_0450CSEVEC01.01_SEALED.PDF UPDATED SECTIONS II AND III