Contract I-25-2032 Summary
This is Addendum No. 2 to the contract requirements for Contract I-25-2032 issued by the Illinois State Toll Highway Authority for roadway reconstruction on the Tri-State Tollway (I-294) between North of St. Charles and North Avenue, specifically between Milepost 32.4 and Milepost 33.6. The addendum was issued on March 20, 2026, with proposals to be received through electronic bidding via BidBuy until 10:30 a.m. local time on March 27, 2026. The project involves the State of Illinois and the Illinois State Toll Highway Authority as the contracting authority.
This addendum modifies the schedule of prices and contract requirements through revisions to pay item quantities and contract drawings. Key quantity changes include concrete removal increasing from 5.9 to 52.9 cubic yards, protective coat increasing from 1,772 to 1,918 square yards, reinforcement bars (epoxy coated) increasing from 123,600 to 134,130 pounds, concrete structures (retaining wall) increasing from 1,076.2 to 1,123.2 cubic yards, and temporary concrete barrier relocation increasing from 15,875 to 17,975 feet. One sloped headwall type III unit decreased from 2 to 1 unit. The addendum includes revised Contract Drawings 71, 95, 97, 104, 107, and 108, with additional revised drawings 6-9 to be issued to the successful bidder. Changes address relocated temporary concrete barrier limits, median barrier reconstruction from Station 11755+37.73 to Station 11756+39.96, and revised drainage schedules for coordination with Contract I-20-4533, including drainage layout adjustments between NB I-294 and Ramp J.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois State Toll Highway Authority Contract No. I-25-2032 Addendum 2 Page 1 of 2 3/20/2026
ADDENDUM NO. 2
TO
CONTRACT REQUIREMENTS
FOR CONTRACT I-25-2032
ILLINOIS STATE TOLL HIGHWAY AUTHORITY
Date: 3/20/2026
For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30 a.m. local time on March 27, 2026
NOTICE OF REVISION TO CONTRACT
NOTES:
1. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to pages P-5RR, P-6RR, P-9RR, and P-10RR which have been revised and included as part of the Schedule of Prices.
2. The following revised Contract Drawings are included in this Addendum:
Drawings 71, 95, 97, 104, 107, 108
3. Revised Contract Drawings 6-9 will be issued to the successful Bidder. The revised drawings will reflect the quantity changes shown in the “Summary of Revisions to Pay Item Quantities” table included in this addendum.
Illinois State Toll Highway Authority Contract No. I-25-2032 Addendum 2 Page 2 of 2 3/20/2026
CHANGES TO THE CONTRACT REQUIREMENTS
CHANGES TO THE SCHEDULE OF PRICES
SUMMARY OF REVISIONS TO PAY ITEM QUANTITIES
SP
PROV
PAY ITEM
NO.
DESCRIPTION UNIT
ORIGINAL
QUANTITY +
ADDENDUMS
CHANGE
NEW
QUANTITY
50102400 CONCRETE REMOVAL CU YD 5.9 +47.0 52.9
50300300 PROTECTIVE COAT SQ YD 1,772 +146 1,918
* 50800205
REINFORCEMENT BARS, EPOXY
COATED
POUND 123,600 +10,530 134,130
52200900
CONCRETE STRUCTURES (RETAINING
WALL)
CU YD 1,076.2 +47.0 1,123.2
* JI680125 SLOPED HEADWALL TYPE III, 24", 1:3 EACH 2 -1 1
* JI704005
RELOCATE TEMPORARY CONCRETE
BARRIER
FOOT 15,875 +2,100 17,975
* Indicates Special Provision
Change #1 Contract Requirements, Volume I, pages P-5R, P-6R, P-9R and P-10R replaced with pages P-5RR, P-6RR, P-9RR and P-10RR. These replacements contain the following revisions (attached):
1.1. The quantities for various pay items were revised as listed in the Summary of Revisions to Pay Item
Quantities in Changes to the Schedule of Prices table above.
CHANGES TO THE CONTRACT DRAWINGS
Change #2 Contract Plans, Drawings 6 through 9. Summary of Quantities.
These drawings contain the following revision (issued to successful Bidder):
2.1. Revised quantities for pay items as noted in the Summary of Revisions to Pay Item Quantities table.
Change #3 Contract Plans Revised Drawing 71.
This revised drawing contains the following revision (attached):
3.1. Revised limits of relocated TCB to extend work zone. This allows for existing median barrier to be removed and reconstructed from Sta 11755+37.73 to Sta 11756+39.96.
Change #4 Contract Plans, Revised Drawings 95 and 97.
These drawings contain the following revisions (attached):
4.1. Added limits of median barrier from Sta 11755+37.73 to Sta 11756+39.96.
4.2. Added median barrier details from Sta 11755+37.73 to Sta 11756+39.96.
Change #5 Contract Plans, Revised Drawings 104, 107, and 108.
These revised drawings contain the following revisions (attached):
5.1. Revised Drainage Schedules for coordination between Contracts I-20-4533 and I-25-2032.
5.2. Revised drainage layout between NB I-294 and Ramp J.
END OF ADDENDUM CHANGES
S.P.
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
* 20200100 EARTH EXCAVATION CU YD 845
* 20201200
REMOVAL AND DISPOSAL OF
UNSUITABLE MATERIAL
CU YD 37,110
* 20400800 FURNISHED EXCAVATION CU YD 4,818
20800150 TRENCH BACKFILL CU YD 38
25000400 NITROGEN FERTILIZER NUTRIENT POUND 75
25000600 POTASSIUM FERTILIZER NUTRIENT POUND 225
28000250
TEMPORARY EROSION CONTROL
SEEDING
POUND 161
28001100
TEMPORARY EROSION CONTROL
BLANKET
SQ YD 14,474
28100205 STONE RIPRAP, CLASS A3 TON 7,100
28200200 FILTER FABRIC SQ YD 5,200
40600985
PORTLAND CEMENT CONCRETE
SURFACE REMOVAL - BUTT JOINT
SQ YD 224
42101300 PROTECTIVE COAT SQ YD 17,962
44000100 PAVEMENT REMOVAL SQ YD 20,089
44000500
COMBINATION CURB AND GUTTER
REMOVAL
FOOT 67
44004250 PAVED SHOULDER REMOVAL SQ YD 2,191
50102400 CONCRETE REMOVAL CU YD 52.9
50104400 CONCRETE HEADWALL REMOVAL EACH 1
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
Contract I-25-2032
ADDENDUM 2 P - 5RR March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* 50300225 CONCRETE STRUCTURES CU YD 36.8
* 50300255 CONCRETE SUPERSTRUCTURE CU YD 2.4
50300300 PROTECTIVE COAT SQ YD 1,918
* 50800205 REINFORCEMENT BARS, EPOXY COATED POUND 134,130
51603000 DRILLED SHAFT IN SOIL CU YD 19
52200900
CONCRETE STRUCTURES (RETAINING
WALL)
CU YD 1,123.2
550A0410 STORM SEWERS, CLASS A, TYPE 2 24" FOOT 126
55100700 STORM SEWER REMOVAL 15" FOOT 23
55101200 STORM SEWER REMOVAL 24" FOOT 124
60221100
MANHOLES, TYPE A, 5'-DIAMETER, TYPE
1 FRAME, CLOSED LID
EACH 1
60255500 MANHOLES TO BE ADJUSTED EACH 1
60500050 REMOVING CATCH BASINS EACH 4
60603800
COMBINATION CONCRETE CURB AND
GUTTER, TYPE B-6.12
FOOT 67
63200310 GUARDRAIL REMOVAL FOOT 75
* 66900530 SOIL DISPOSAL ANALYSIS EACH 3
70600280
IMPACT ATTENUATORS, TEMPORARY
(SEVERE USE,NARROW), TEST LEVEL 3
EACH 6
70600370
IMPACT ATTENUATORS, RELOCATE
(SEVERE USE,NARROW), TEST LEVEL 3
EACH 11
ADDENDUM 2 P - 6RR March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
72400100
REMOVE SIGN PANEL ASSEMBLY - TYPE
A
EACH 2
72400200
REMOVE SIGN PANEL ASSEMBLY - TYPE
B
EACH 5
72400310 REMOVE SIGN PANEL - TYPE 1 SQ FT 16
72400320 REMOVE SIGN PANEL - TYPE 2 SQ FT 16
72800100 TELESCOPING STEEL SIGN SUPPORT FOOT 116
73000100 WOOD SIGN SUPPORT FOOT 99
78005110 EPOXY PAVEMENT MARKING - LINE 4" FOOT 105,769
78005140 EPOXY PAVEMENT MARKING - LINE 8" FOOT 2,453
81800450
AERIAL CABLE, 4-1/C NO. 8 WITH
MESSENGER WIRE
FOOT 2,020
89502350
REMOVE AND REINSTALL ELECTRIC
CABLE FROM CONDUIT
FOOT 1,050
* X1200160
CONNECTION TO EXISTING DRAINAGE
STRUCTURE
EACH 2
* X1400410
RELOCATE EXISTING TEMPORARY
LIGHTING UNIT
EACH 2
GBSP X5030250
BRIDGE DECK GROOVING
(LONGITUDINAL)
SQ YD 6
* X5427602
REMOVE EXISTING FLARED END
SECTION
EACH 1
* Z0018400
DRAINAGE STRUCTURES TO BE
ADJUSTED
EACH 3
* JI211126 TOPSOIL FURNISH AND PLACE, 6" SQ YD 12,702
* JI251010
EROSION CONTROL BLANKET,
BIODEGRADABLE NETTING
SQ YD 8,788
* JI251015
HEAVY DUTY EROSION CONTROL
BLANKET, BIODEGRADABLE NETTING
SQ YD 15,016
* JI282010 SUBGRADE FILTER FABRIC SQ YD 18,573
Contract I-25-2032 P - 7R March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JI312022 STABILIZED SUBBASE – WMA, 3” SQ YD 10,520
* JI406002 TEMPORARY ASPHALT WEDGE SQ YD 200
* JI406035 TEST STRIP (STONE MATRIX ASPHALT) EACH 6
* JI406037 MATERIAL TRANSFER DEVICE TON 4,012
* JI406039
STONE MATRIX WARM MIX ASPHALT
SHOULDER COURSE, IL-12.5, N80
TON 225
* JI406041
STONE MATRIX WARM MIX ASPHALT
BINDER COURSE, IL-9.5, N80
TON 1,401
* JI406048
STONE MATRIX WARM MIX ASPHALT
SURFACE FRICTION COURSE, IL12.5 N80
TON 2,386
* JI406108 ASPHALT TACK COAT (NON-TRACKING) POUND 29,908
* JI406900
CONSTRUCTING WARM MIX ASPHALT
TEST STRIP
EACH 6
* JI420041 TRANSITION APPROACH SLAB SQ YD 162.5
* JI420046
TRANSITION APPROACH SHOULDER
SLAB
SQ YD 488
* JI420906 LONGITUDINAL JOINT SEALANT FOOT 9,737
* JI440010
CONCRETE MEDIAN BARRIER AND BASE
REMOVAL
FOOT 251
* JI440015
HOT-MIX ASPHALT REMOVAL, VARIABLE
DEPTH
SQ YD 3,321
* JI481130
AGGREGATE SHOULDERS WITH FILTER
FABRIC, TYPE B 4"
SQ YD 1,736
* JI482104 WARM-MIX ASPHALT SHOULDERS (6 IN.) SQ YD 1,451
* JI482128
WARM-MIX ASPHALT SHOULDERS,
SPECIAL (9 IN.)
SQ YD 7,191
Contract I-25-2032 P - 8R March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JI485020 TEMPORARY PAVEMENT, CLASS 2 SQ YD 2,908
* JI503006
REMOVAL OF EXISTING TRANSITION
APPROACH SLABS
SQ YD 147
* JI503007
REMOVAL OF EXISTING TRANSITION
APPROACH SHOULDER SLABS
SQ YD 133
* JI503010
HIGH PERFORMANCE CONCRETE
SUPERSTRUCTURE
CU YD 3.5
* JI551010 SLOTTED DRAIN REMOVAL FOOT 400
* JI593030
ABANDON AND FILL EXISTING STORM
SEWER
CU YD 11
* JI602518
DRAINAGE STRUCTURES TO BE
ADJUSTED WITH TYPE 20A FRAME AND
GRATE
EACH 12
* JI602519
DRAINAGE STRUCTURES TO BE
ADJUSTED WITH TWO TYPE 20A FRAME
AND GRATE
EACH 8
* JI606050 CONCRETE GUTTER (SPECIAL) FOOT 255
* JI638020
TEMPORARY MODULAR GLARE SCREEN
SYSTEM REMOVAL
FOOT 4,100
* JI642014
ASPHALT SHOULDER RUMBLE STRIP, 16
INCH
FOOT 9,275
* JI642030 MOMENT SLAB RUMBLE STRIP FOOT 872
* JI669016
REGULATED SUBSTANCES MONITORING
AND FIELD SCREENING
CAL DAY 30
* JI680125 SLOPED HEADWALL TYPE III, 24", 1:3 EACH 1
* JI680220
DOUBLE SLOPED HEADWALL TYPE III, 2-
6”,1:3
EACH 6
* JI701001 DETOUR SIGNING, LOCATION 1 L SUM 1
* JI704001
TEMPORARY CONCRETE BARRIER,
CROSS-BOLT CONNECTION
FOOT 7,175
ADDENDUM 2 P - 9RR March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JI704005
RELOCATE TEMPORARY CONCRETE
BARRIER
FOOT 17,975
* JI704006
RELOCATE TEMPORARY CONCRETE
BARRIER, CROSS-BOLT CONNECTION
FOOT 5,738
* JI706400
REMOVE TEMPORARY IMPACT
ATTENUATOR
EACH 2
** JS251115 MULCH, METHOD 2 ACRE 3.25
** JS280050 SILT FENCE FOOT 1,169
** JS280070 STABILIZED CONSTRUCTION ENTRANCE SQ YD 1,956
** JS601300 PIPE UNDERDRAINS, 6" (SPECIAL) FOOT 369
** JS601320
PIPE UNDERDRAINS, FABRIC LINED
TRENCH 6"
FOOT 1,636
** JS635010 ROADWAY DELINEATORS EACH 22
** JS670CM0 FIELD OFFICE, TYPE C (MODIFIED) CAL MO 16
** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1
* JS701010 MAINTENANCE OF TRAFFIC L SUM 1
** JS701052
TEMPORARY INFORMATION SIGNING-
GROUND MOUNT, GREATER THAN 24 SQ
FT IN AREA
SQ FT 620
** JS720110 SIGN INSTALLATION, TYPE 2 SQ FT 129
** JS720120 SIGN INSTALLATION, TYPE 3 SQ FT 60
** JS726020
MILEPOST MARKERS ASSEMBLY,
BARRIER WALL MOUNTED
EACH 4
ADDENDUM 2 P - 10RR March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
** JS726030
MILEPOST MARKERS ASSEMBLY, POLE
MOUNTED
EACH 1
** JS726050 MILEPOST MARKER INSTALLATION SQ FT 32
** JS734G10 FOUNDATION FOR ITS GANTRY FRAME CU YD 72.2
** JS780JC1
GROOVING FOR RECESSED PAVEMENT
MARKING LINES, 7" GROOVE
FOOT 39,806
** JS780JE1
GROOVING FOR RECESSED PAVEMENT
MARKING LINES, 11" GROOVE
FOOT 2,735
** JS782022 BARRIER WALL REFLECTORS, TYPE C EACH 344
** JS810822
UNDERGROUND CONDUIT, GALVANIZED
STEEL, 3" DIA.
FOOT 21
** JS812023
CONDUIT EMBEDDED IN STRUCTURE, 2"
DIA., PVC
FOOT 1,036
** JS812027
CONDUIT EMBEDDED IN STRUCTURE, 4"
DIA., PVC
FOOT 643
** JS812028
CONDUIT EMBEDDED IN STRUCTURE, 1
1/4" DIA., PVC
FOOT 4,938
** JS813001
JUNCTION BOX, STAINLESS STEEL,
EMBEDDED IN STRUCTURE, 20" X 12" X 8"
EACH 1
** JS813010
JUNCTION BOX, STAINLESS STEEL,
EMBEDDED IN STRUCTURE, 32" X 12" X 8"
EACH 2
** JS816074
UNIT DUCT, WITH 2-1/C NO. 4 AND 1/C
NO. 6 GROUND, 600V (XLP-TYPE USE), 2"
DIA. CNC
FOOT 223
** JS816078
UNIT DUCT, WITH 4-1/C NO. 4 AND 1/C
NO. 6 GROUND, 600V (XLP-TYPE USE), 2"
DIA. CNC
FOOT 1,282
** JS817213
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 6
FOOT 1,185
** JS817214
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 4
FOOT 6,440
** JS817215
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 2
FOOT 6,208
Contract I-25-2032 P - 11R March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JS821010 TEMPORARY FLOOD LIGHTING UNIT EACH 8
** JS830025
TEMPORARY WOOD POLE, 40 FT., CLASS
EACH 9
** JS836001
LIGHT POLE FOUNDATION (ROADWAY)
STEEL HELIX (7 FT) OR CONCRETE
EACH 8
** JS836005
LIGHT POLE FOUNDATION (ROADWAY)
MEDIAN, TYPE 1
EACH 3
** JS836006
LIGHT POLE FOUNDATION (ROADWAY)
MEDIAN, TYPE 2
EACH 4
** JS842080
REMOVAL OF EXISTING LIGHTING UNIT,
SALVAGE
EACH 1
** JS842105 POLE FOUNDATION, REMOVED EACH 1
* JT202009 NON-SPECIAL WASTE DISPOSAL, TYPE 1 CU YD 37,110
* JT211A08 SUBGRADE AGGREGATE 9 IN. CU YD 677
* JT211A11 SUBGRADE AGGREGATE 12 IN. CU YD 6,193
* JT250432
SEEDING, CLASS 2E SALT TOLERANT
ROADSIDE MIX (SPECIAL)
ACRE 2.50
* JT250446 SEEDING, GRASS-FORB MIX 2 (SPECIAL) ACRE 2.75
* JT301010 GRANULAR SUBBASE, SPECIAL CU YD 67
* JT311040
AGGREGATE SUBGRADE
IMPROVEMENT, SPECIAL
CU YD 2,050
* JT320200
GEOGRID FOR SUBGRADE SOIL
STABILIZATION
SQ YD 18,573
* JT420103
JOINTED PLAIN CONCRETE PAVEMENT
FOR COMPOSITE PAVEMENT 10.25"
SQ YD 1,743
* JT420104
JOINTED PLAIN CONCRETE PAVEMENT
FOR COMPOSITE PAVEMENT 11"
SQ YD 8,196
* JT421510 SLEEPER SLAB SQ YD 26
* JT486010
SAWED / SEALED ASPHALT EXPANSION
JOINTS, 1"
FOOT 18
Contract I-25-2032 P - 12R March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JT486100
COLD MILLING CONCRETE SURFACE,
VARIABLE DEPTH
SQ YD 1,646
* JT503041
STRUCTURAL REPAIR OF CONCRETE
(DEPTH GREATER THAN 5 IN.)
SQ FT 2
* JT525125 BONDED PREFORMED JOINT SEAL, 2 IN. FOOT 18
* JT637015
CONCRETE MEDIAN BARRIER
TRANSITION, TYPE V-DF
FOOT 104
* JT637800
CONCRETE BARRIER DOUBLE FACE, TL-
5, 44 INCH
FOOT 901
* JT637801
BASE FOR CONCRETE BARRIER DOUBLE
FACE, TL-5, 44 INCH
FOOT 901
* JT637810
CONCRETE BARRIER DOUBLE FACE, TL-
5, VARIABLE HEIGHT
FOOT 304
* JT637811
BASE FOR CONCRETE BARRIER DOUBLE
FACE, TL-5, VARIABLE HEIGHT
FOOT 49
* JT637816
BASE FOR CONCRETE BARRIER DOUBLE
FACE, TL-5, VARIABLE HEIGHT, 5 FEET
FOOT 255
* JT669030 EARTHWORK CONSTRUCTION PLAN L SUM 1
* JT669040
EARTHWORK FINAL CONSTRUCTION
REPORT
L SUM 1
* JT704040
EXISTING TEMPORARY CONCRETE
BARRIER, REMOVED
FOOT 12,556
* JT740210
ITS GANTRY FRAME (STEEL), TWO SPAN
(INSTALL ONLY)
EACH 2
* JT780310
MULTI-POLYMER PAVEMENT MARKING -
LINE 6"
FOOT 59,598
* JT780320
MULTI-POLYMER PAVEMENT MARKING -
LINE 10"
FOOT 10,259
* JT780325
MULTI-POLYMER PAVEMENT MARKING -
LINE 12"
FOOT 3,155
* JT780340
MULTI-POLYMER PAVEMENT MARKING -
LETTERS (8 FT.)
SQ FT 147
Contract I-25-2032 P - 13R March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JT780355
MULTI-POLYMER PAVEMENT MARKING -
SYMBOLS (LARGE)
SQ FT 80
* JT783005
WATERBLAST PAVEMENT MARKING
REMOVAL WITH VACUUM RECOVERY
SQ FT 36,781
* JT810876
UNDERGROUND CONDUIT, COILABLE
NONMETALLIC CONDUIT, SDR 11, 2" DIA.
FOOT 88
* JT830036 LIGHTING UNIT (INSTALL ONLY) EACH 18
* JT842130
REMOVE EXISTING TEMPORARY
LIGHTING UNIT
EACH 19
* JT901130 DEWATERING L SUM 1
TOTAL AMOUNT OF CORE WORK
Contract I-25-2032 P - 14R March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 340,000.00 340,000.00
* JT151500
CONTRACT ADJUSTMENT ALLOWANCE FOR
TEMPERATURE CONTROL OF CONCRETE
UNIT 100,000 1.00 100,000.00
* JT154008
UNFORESEEN ADDITIONAL MAINTENANCE
OF TRAFFIC
UNIT 150,000 1.00 150,000.00
* JT154015
ALLOWANCE FOR UNFORESEEN DRAINAGE
WORK
UNIT 75,000 1.00 75,000.00
* JT154049
CONTRACT ALLOWANCE FOR INCENTIVE
PAYMENT OF PAVEMENT SURFACE
SMOOTHNESS
UNIT 25,000 1.00 25,000.00
* JT154095
CONTRACT ALLOWANCE FOR MAINTAIN
LIGHTING SYSTEMS
UNIT 30,000 1.00 30,000.00
* JT154207
ALLOWANCE FOR TESTING OF
UNCLASSIFIED SOIL
UNIT 250,000 1.00 250,000.00
999NEG04
NON-COMPLIANCE WITH TOLLWAY
MAINTENANCE OF TRAFFIC PER TOLLWAY
SUPPL. SPEC. 701.08(a)
INC/DAY (2,500.00)
999NEG05
FAILURE TO RESPOND TO RE-ESTABLISH
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(b)
OCCUR (2,500.00)
999NEG06
FAILURE TO REPAIR IMPACT ATTENUATORS,
TEMPORARY PER TOLLWAY SUPPL. SPEC.
701.08 (c )
OCCUR (2,500.00)
999NEG20
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITITES PER S.P. 115.5 -
TRI-STATE
OCCUR (10,000.00)
999NEG31
DAMAGE TO ELECTRICAL FACILITIES PER
TOLLWAY SUPPL. SPEC. 107.30 (b)
INC/DAY (1,000.00)
999NEG32
LIQUIDATED DAMAGES FOR DELAY IN
SUBMITTAL OF PROGRESS SCHEDULE PER
TOLLWAY SUPPL. SPEC. 108.02 (e)
DAY (300.00)
999NEG33
NON-COMPLIANCE WITH EROSION AND
SEDIMENT CONTROL PER TOLLWAY SUPPL.
SPEC. 280.02 (2)(1)
INC/DAY (1,000.00)
999NEG34
NON-COMPLIANCE WITH RESPONSIBILITY
FOR CONSTRUCTION HAULING EQUIPMENT
PER TOLLWAY SUPPL. SPEC. 105.15
DAY (1,000.00)
999NEG35
FAILURE TO RESPOND TO REGULATORY
AGENCY REQUESTS, PER TOLLWAY SUPPL.
SPEC. 280.02 (2)(2)
OCCUR (25,000.00)
999NEG36
FAILURE TO COMPLY WITH OCCUPANCY
DATE OR PROVIDE COMPLETE FACILITIES.
FIELD OFFICE OR LAB PER TOLLWAY SUPPL.
SPEC. 670.01 (b)
DAY (500.00)
Contract I-25-2032 P - 15 March 20, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
999NEG42
NON-COMPLIANCE WITH MAINTAIN LIGHTING
SYSTEM, PER TOLLWAY SUPPL. SPEC.
846.06 (a)
INC/DAY (1,000.00)
999NEG43
FAILURE TO RESPOND TO MAINTAIN
LIGHTING SYSTEM, PER TOLLWAY SUPPL.
SPEC. 846.06 (b)
OCCUR (1,000.00)
999NEG44
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.1
CAL DAY (7,500.00)
999NEG45
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.2
CAL DAY (15,000.00)
999NEG46
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.3
CAL DAY (6,000.00)
999NEG47
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.4
CAL DAY (12,000.00)
999NEG49
DAMAGE TO FIBER OPTIC UTILITIES PER S.P.
115.3
OCCUR (10,000.00)
999NEG53
NON-COMPLIANCE WITH CONTRACTOR
QUALITY PROGRAM SPECIAL PROVISION
OCCUR (1,000.00)
TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (QCP) 970,000.00
ECP BID CREDIT
AWARD CRITERIA
S.P. COLUMN LEGEND
* INDICATES SPECIAL PROVISION
** INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS
TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK +
CONTRACTOR'S QUALITY PROGRAM = TOTAL AMOUNT OF BASE BID
Contract I-25-2032 P - 16 March 20, 2026
0 50 100 150
SCALE IN FEET
XX
PR C TRI-STATE TOLLWAY (I-294)L
11'-4"
91.50' LT
11757+64.82
3 21
3 1B
11'-4"
$D49
$B49
$C49
$E49
$F49
XX
$A49
REMOVED WHEN OVERLAY IS CONSTRUCTED
1. TEMPORARY HMA WEDGE TO BE
NOTES:
SEE NOTE 1
12'
12'
12'
12'
12'
R
R
12'
12'
12'
12'
12'
24:1 TAPER
S E
S H
E
T
M O
T
M A
T C
H L I N
A
.0
S
H
E
T
M A
T C
H L I
A
.0
11'-4"
11'-4"
11'-4"
11'-4"
11'-4"
24:1 TAPER
B
2 03/20/2026 ADDENDUM 2
RETAINING WALL
RETAINING WALL
RETAINING WALL
11755+00 11760+00
01/22/2026
01/22/2026 155
P L
D A
T E
P L
I
M E
:5
:3
P L
C
A L
E
.0 i n
F I L
M E p w b e n e s c h p w .b e n t l e y .c o m :b e n e s c h p w
D o c u m e n t s s .0
C o n t r a c t
R
M P
J
S h t
R a m p
J
S
H T
M O
T S
T .d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO. I-25-2032
OF
DRAWING NO.
MOT PLAN LEGEND
KEY MAP
ST CHARLES RD
RAMP S
UP RR
I-294
UP RR
LAKE ST
NORTH AVE
EX RAMP F
EX RAMP J
PR RAMP J
EB EISENHOWER EXPWAY (I-290)
WB EISENHOWER EXPWAY (I-290)
UP RR
UP RR
WORK ZONE
TEMPORARY PAVEMENT
(PREVIOUSLY COMPLETED)
TEMPORARY PAVEMENT
COMPLETED PAVEMENT
NARROW), TEST LEVEL 3 (70600280)
IMPACT ATTENUATORS, TEMPORARY (SEVERE USE,
(25' CENTERS ALONG TAPERS AND RAMPS)
BURNING MONO-DIRECTIONAL LIGHT @ 50' CENTERS
TYPE II BARRICADES OR DRUMS WITH STEADY
(25' CENTERS ALONG TAPERS AND RAMPS)
MONO-DIRECTIONAL LIGHT @ 50' CENTERS
VERTICAL PANELS WITH STEADY BURNING
EXISTING PAVEMENT MARKING
IN PREVIOUS STAGE
PAVEMENT MARKING PLACED
CONSTRUCTION SIGN A
B
EXISTING IMPACT ATTENUATOR
EXISTING TEMPORARY CONCRETE BARRIER
EPOXY PAVEMENT MARKING - LINE 12" (SOLID WHITE) (78005150)
EPOXY PAVEMENT MARKING - LETTERS AND SYMBOLS (SOLID WHITE) (78005100)
EPOXY PAVEMENT MARKING - LINE 8" (SOLID WHITE) (78005140)
EPOXY PAVEMENT MARKING - LINE 4" (DOTTED WHITE, 3' LINE - 9' GAP) (78005110)
EPOXY PAVEMENT MARKING - LINE 4" (25' SKIP - 25' DASH WHITE) (78005110)
EPOXY PAVEMENT MARKING - LINE 4" (SOLID WHITE) (78005110)
EPOXY PAVEMENT MARKING - LINE 4" (SOLID YELLOW) (78005110)
(JS280070)
STABILIZED CONSTRUCTION ENTRANCE
TEMPORARY ASPHALT WEDGE
(PREVIOUSLY COMPLETED)
TEMPORARY ASPHALT WEDGE
DIRECTION OF TRAFFIC
TYPE III BARRICADE
CROSS-BOLT CONNECTION (JI704001)
TEMPORARY CONCRETE BARRIER,
CROSS-BOLT CONNECTION (JI704006)
RELOCATE TEMPORARY CONCRETE BARRIER,
RELOCATE TEMPORARY CONCRETE BARRIER (JI704005)
17.13' RT
11763+22.97
MOT-36
MAINTENANCE OF TRAFFIC - STAGE 4
STA 11752+00 TO STA 11765+00 71 155
CONTRACT NO. I-25-2032
OF
DRAWING NO.
TA
M A
TC
H L
IN
E S
TA
.0
M A
TC
H L
IN
E S
TA
.0
S
TA
.0
STA 1768+25.00 PR ¡ I-294
STA 11768+31.65 PR ¡ I-294
XX
$D74
$B74
$C74
$E74
$F74
XX
$A74
S
TA
.7
STA 11756+39.96
EXIST WALL
1770+00
1775+00
01/22/2026
01/22/2026 155
P L
T E
P L
M E
:4
:4
P L
A L
E
.0 i n
F I
M E p w b e n e s c h p w .b e n t l e y .c o m :b e n e s c h p w
D o c u m e n t s s .0
C o n t r a c
M P
J
S h t
R a m p
J
S
H T
R D
Y
D E
T .d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO. I-25-2032
OF
DRAWING NO.
NB 1-294 LANE 1
SB 1-294 LANE 1
.2
.5
.2
.7
TYPE V-DF (JT637015)
BARRIER TRANSITION,
CONCRETE MEDIAN
STANDARD C13-07
TYPE V-DF (JT637015)
BARRIER TRANSITION,
CONCRETE MEDIAN
STANDARD C13-07
STANDARD C5-08*
TL-5, 44 INCH (JT637801)
BASE FOR CONCRETE BARRIER DOUBLE FACE,
TL-5, 44 INCH (JT637800)
CONCRETE BARRIER DOUBLE FACE,
TL-5, 44 INCH (JT637801)
BASE FOR CONCRETE BARRIER DOUBLE FACE,
TL-5, 44 INCH (JT637800)
CONCRETE BARRIER DOUBLE FACE,
TL-5, 44 INCH (JT637801)
BASE FOR CONCRETE BARRIER DOUBLE FACE,
TL-5, 44 INCH (JT637800)
CONCRETE BARRIER DOUBLE FACE,
NB 1-294 LANE 1
SB 1-294 LANE 1
STANDARD C5-08*
STANDARD C5-08*
STA 1773+96.00
EXISTING LIGHT POLE
SEE RDY-17
STA 11766+70.00
LIGHT POLE FOUNDATION
SEE RDY-20
STA 11767+70.00
ATM GANTRY FOUNDATION
DRAINAGE PLANS
S-301, SEE
S-309, SEE DRAINAGE PLANS
S-308, SEE DRAINAGE PLANS
S-307, SEE DRAINAGE PLANS
SEE RDY-17
STA 1769+36.00
LIGHT POLE FOUNDATION
S-306, SEE DRAINAGE PLANS
S-305, SEE DRAINAGE PLANS
SEE RDY-17
STA 1771+86.00
LIGHT POLE FOUNDATION
S-302, SEE DRAINAGE PLANS
DRAINAGE PLANS
S-304, SEE
ROADWAY STANDARD C5-08, SEE LTG-09.
*LIGHT POLE FOUNDATION DOES NOT FOLLOW
DRAINAGE PLANS
S-303, SEE
2 03/20/2026 ADDENDUM 2
RDY-14
ROADWAY DETAILS
MEDIAN BARRIER DETAILS 95 155
CONTRACT NO. I-25-2032
01/22/2026
01/22/2026 155
P L
T E
P L
M E
:1
P L
A L
E
:4 i n
F I
M E p w b e n e s c h p w .b e n t l e y .c o m :b e n e s c h p w
D o c u m e n t s s .0
C o n t r a c
M P
J
S h t
R A
M P
J
S
H T
R D
Y
D E
T .d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO. I-25-2032
ELEVATION
OF GUTTER
SB EDGE
ELEVATION
OF GUTTER
NB EDGE
JOINT TYPE
DOUBLE FACE, VARIABLE HEIGHT TABLE
NORTH REINFORCED CONCRETE BARRIER
¡ JOINT
STATION AT
MARK
BARRIER
1N
2N
(IN.)
DIFF.
HEIGHT
SHAPELENGTHSIZE
BARS
NO. OF
LENGTHS
NO. OF
MARK
BARRIER
BAR
ROWS
NO. OF
REINFORCEMENT BARS, EPOXY COATED
PROTECTIVE COAT
POUND
CU YD
SQ YD
(RETAINING WALL)
CONCRETE STRUCTURES
2'-0'' 1'-6'' ''8 11'-7 ''8
71'-10
F O
O T
IN
G
C
"8
7'-0"
EXPANSION JOINT
B.F.
b(E) BAR
V A
R
IE
S
T/ROADWAY
CONST. JT.
MIN.
" CL.2
" CL.2
u200(E)
¡ I-294 w(E) BAR t200(E)
JOINT SEALER
1" PREFORMED
" PJF2
V A
R
IE
S F.F.
T
O
T
O
CONCRETE GUTTER (SPECIAL) FOOT
COST INCLUDED WITH "CONCRETE STRUCTURES (RETAINING WALL)"
TOP OF BARRIER WALL
''2 19 ''2
19''2 18 ''2
LINE ELEV.
NB GUTTER
v(E) BAR
NOTE 8
(SPECIAL), SEE
CONC. GUTTER
GUTTER EL.
NB EDGE OF
n(E) BAR
LINE ELEV.
SB GUTTER
WITH BACKER ROD
POLYURETHANE SEALANT
ELASTOMERIC GUN GRADE
COMPONENT NON-SAG
NON-STAINING GRAY ONE
" CHAMFER (TYP.)2
" P.J.F (TYP.)2
" CHAMFER (TYP.)2
EXPANSION JOINT DETAIL
WATER SEAL
NON-METALLIC
DUMBBELL TYPE
6" HOLLOW BULB *
VERTICAL (TYP.)
LONG AT 12" CTS.
(FLAT HEAD C.S.)
CONCRETE NAILS
BARRIER WALL
FACE OF CONCRETE
1'-3"
4"
'A
BAR n(E)
BAR 'A'
1'-4"
6'-8" t200(E) u200(E) t2 (E u (E
AND BAR u200(E)
BAR t200(E)
B A
R R
IE
W
L L
(IT REDUNDANT)
EMBEDDED
PVC CONDUIT
"� SCHEDULE 804
GUTTER EL.
SB EDGE OF
DETAILS
PLANS FOR
SEE LIGHTING
FOR LIGHTING
PVC CONDUIT
4"� SCHED. 40
NOTES:
1N
2N
BARRIER WALL
CONCRETE
FACE OF
TYPICAL SECTION
CONTRACTION JOINT DETAIL
(TYP.)
CHAMFER
"X45° 4
BARRIER BILL OF MATERIAL
NORTH REINFORCED CONCRETE
XXXX
$D76
$B76
$C76
$E76
$F76
XX
$A76
3N
5N
3N
5N n205(E) n203(E) n202(E) n201(E)
6'-2"
6'-1"
5'-9"
5'-6"
ELEVATION
LINE
SB GUTTER
ELEVATION
LINE
NB GUTTER
SLIPFORMING OF THE MEDIAN CONCRETE BARRIER, VARIABLE HEIGHT, IS NOT ALLOWED.10.
WALL AND TOP FACE OF THE GUTTER.
PROTECTIVE COAT SHALL BE APPLIED TO THE TRAFFIC AND TOP FACES OF THE BARRIER 9.
SEE ROADWAY PLANS FOR LIMITS OF REVERSE PITCHED GUTTER AND TRANSITIONS.8.
MINIMUM ALLOWABLE SOIL BEARING PRESSURE = 2000 PSF. 7.
ILLINOIS TOLLWAY STANDARD C5.
FOR BARRIER HEIGHT VERTICAL DIFFERENTIAL LESS THAN OR EQUAL TO 12", SEE 6.
THE ENGINEER PRIOR TO PLACEMENT. SEE ITS PLANS FOR REDUNDANT FIBER DETAILS.
OF THE CONDUIT. ALTERNATE ROUTING TO AVOID CONFLICTS SHALL BE APPROVED BY
CLEARANCE TO THE TOP OF THE CONDUIT AND 2" (MIN.) CLEARANCE TO THE BOTTOM
" (MIN.) 2
1PVC CONDUIT IN THE FOOTING, AS SHOWN IN THE SECTION. PROVIDE 1
" DIA. SCHEDULE 80 PVC CONDUITS AND ONE 4" DIA. SCHEDULE 40
1PROVIDE TWO 15.
POSITIVE DRAINAGE AND AVOID PONDING.
SHALL BE CARFULLY CONTROLLED AND FIELD ADJUSTED IF NECESSARY TO ENSURE
GUTTER PROFILE IN THE VICINITY OF SAG VERTICAL CURVES, ALONG FLAT GRADES 4.
TOOL OR BY SAWING SUBJECT TO THE SATISFACTORY CONTROL OF CRACKING.
THE FORMING OF CONTRACTION JOINTS SHALL BE DONE WITH AN APPROVED FINISHING 3.
CONSTRUCTED AT BOTH SIDES OF ALL DRAINAGE STRUCTURES.
CONCRETE BARRIER WALL AND FOOTING. CONTRACTION JOINTS SHALL ALSO BE
1" DEEP CONTRACTION JOINTS SHALL BE CONSTRUCTED IN BOTH THE REINFORCED 2.
FOR PLAN AND ELEVATION DETAILS, SEE SHEET RDY-14.1.
7N
7N w207(E) v207(E) u200(E) t200(E) n207(E) b207(E) w205(E) v205(E) u200(E) t200(E) n205(E) b205(E) w203(E) v203(E) u200(E) t200(E) n203(E) b203(E) w202(E) v202(E) u200(E) t200(E) n202(E) b202(E) w201(E) v201(E) u200(E) t200(E) n201(E) b201(E)
#5
#6
#5
#6
#6
#6
#5
#6
#5
#6
#6
#6
#5
#6
#5
#6
#6
#6
#5
#6
#5
#6
#6
#6
#5
#6
#5
#6
#6
#6
27'-0"
5'-0"
2'-4"
8'-8"
6'-10"
27'-4"
29'-3"
5'-6"
2'-4"
8'-8"
7'-5"
29'-8"
30'-9"
5'-6"
2'-4"
8'-8"
7'-4"
31'-3"
22'-5"
5'-2"
2'-4"
8'-8"
7'-0"
22'-10"
23'-6"
4'-11"
2'-4"
8'-8"
6'-9"
23'-6"
2 03/820/2026 ADDENDUM 2
1,190
84,880
684.3
11756+39.96
11756+14.40
11755+88.84
11755+63.29
11755+37.73
11751+19.96
11750+92.76
11750+65.57
11750+38.37
11750+11.18
11749+83.98
11749+56.79
11749+29.59
11749+02.40
11748+75.21
11747+68.87
11747+40.12
11747+11.34
11746+82.59
11742+92.22
11742+71.90
11742+51.53
11742+31.17
11742+10.81
11741+90.45
11741+70.09
11741+49.72
11741+29.36
11741+09.04
11741+00.96
11740+80.00
11740+59.00
11740+38.00
11740+17.00
11739+96.00
11739+75.00
11739+54.00
11739+33.00
11739+12.04
1" PJF
CONTRACTION
1/2" PJF
CONTRACTION
1" PJF
1" PJF
CONTRACTION
CONTRACTION
½ " PJF
CONTRACTION
CONTRACTION
½ " PJF
CONTRACTION
CONTRACTION
1" PJF
1" PJF
CONTRACTION
CONTRACTION
1" PJF
1" PJF
CONTRACTION
CONTRACTION
½ " PJF
CONTRACTION
CONTRACTION
½ " PJF
CONTRACTION
CONTRACTION
1" PJF
1" PJF
CONTRACTION
CONTRACTION
½ " PJF
CONTRACTION
CONTRACTION
½ " PJF
CONTRACTION
CONTRACTION
1" PJF
709.62
709.93
710.20
710.46
710.68
710.65
710.40
710.13
709.81
709.49
709.16
708.83
708.50
708.16
707.83
706.55
706.19
705.84
705.50
700.75
700.50
700.26
700.00
699.76
699.51
699.28
699.04
698.79
698.54
698.44
698.17
697.90
697.62
697.33
697.04
696.75
696.45
696.16
695.86
709.53
709.84
710.12
710.37
710.60
710.56
710.32
710.05
709.73
709.40
709.08
708.75
708.42
708.08
707.75
706.46
706.11
705.76
705.42
700.66
700.42
700.18
699.92
699.68
699.43
699.20
698.96
698.71
698.46
698.36
698.09
697.82
697.54
697.25
696.96
696.66
696.37
696.07
695.78
711.22
711.59
711.92
712.24
712.52
713.44
713.25
713.04
712.79
712.52
712.22
711.89
711.53
711.15
710.78
709.35
708.95
708.56
708.18
702.88
702.61
702.34
702.06
701.78
701.49
701.19
700.89
700.56
700.24
700.11
699.77
699.41
699.05
698.69
698.31
697.93
697.55
697.17
696.79
711.14
711.51
711.84
712.16
712.43
713.35
713.17
712.96
712.71
712.44
712.13
711.80
711.44
711.06
710.70
709.26
708.87
708.48
708.10
702.80
702.53
702.26
701.97
701.70
701.41
701.11
700.81
700.48
700.16
700.03
699.68
699.33
698.97
698.60
698.23
697.85
697.47
697.09
696.71
20.28
21.00
21.60
22.44
23.04
34.56
35.16
35.88
36.72
37.44
37.68
37.68
37.32
36.84
36.36
34.68
34.08
33.60
33.12
26.64
26.28
25.92
25.68
25.20
24.72
23.88
23.16
22.20
21.36
21.00
20.16
19.08
18.12
17.28
16.20
15.24
14.16
13.20
12.12
CONTRACT NO. I-25-2032
RDY-16
MEDIAN CONCRETE BARRIER, VAR. HEIGHT
N. MEDIAN BARRIER SECTION & DETAILS 97
XX
PROPOSED ADJUSTMENTS
$E205
$F205
$B205
$C205
$D205
$A205
UNDERDRAIN STRUCTURES
UNDERDRAIN PIPES
2 03/20/2026 ADDENDUM 2
01/22/2026
01/22/2026 155
P L
T E
P L
M E
:1
P
P L
A L
E
.0 i n
F I
M E p w b e n e s c h p w .b e n t l e y .c o m :b e n e s c h p w
D o c u m e n t s s .0
C o n t r a c
M P
J
S h t
R a m p
J
S
H T
D R
N .d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO. I-25-2032
DRAWING NO.DRAINAGE SCHEDULE
DRN-01
104 155
CONTRACT NO. I-25-2032
670670
670670670
685685
11765+00
40+00 45+00
55+00
1770+00 1775+00
10+00
15+00
25+00
J
J
01/22/2026
01/22/2026 155
P L
T E
P L
M E
:1
:4
P L
A L
E
.0 i n
F I
M E p w b e n e s c h p w .b e n t l e y .c o m :b e n e s c h p w
D o c u m e n t s s .0
C o n t r a c
M P
J
S h t
R a m p
J
S
H T
D R
N
A D
D .d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO. I-25-2032
OF
DRAWING NO.
KEY MAP
ST CHARLES RD
RAMP S
UP RR
I-294
UP RR
LAKE ST
NORTH AVE
EX RAMP F
EX RAMP J
PR RAMP J
0 50 100 150
SCALE IN FEET
LPR B RAMP J
LEX B RAMP F
XX
LPR C TRI-STATE TOLLWAY (I-294)
STA 1768+25.00 PR ¡ I-294 I-19-4458
STA 11768+31.65 PR ¡ I-294 I-20-4533
LEX B RAMP J
S T
A
.0
S T
A
.0
$D83
$B83
$C83
$E83
$F83
XX
$A83
S302
ADJ
S303
ADJ
S304
ADJ
S305
ADJ
S306
ADJ
S307
ADJ
S308
ADJ
S309
ADJ
S301
ADJ
S322
S321
P320 P321
2 03/20/2026 ADDENDUM 2
N INV 668.58
BY OTHERS
STA 10+52.09
RAMP J
BEGIN RESURFACING
STA 16+67.82
RAMP J
BEGIN RECONSTRUCTION
END RESURFACING
STA 1176+01.00
I-294
END IMPROVEMENT
CONTRACT NO. I-25-2032
OF
DRAWING NO.
DRN-04
DRAINAGE PLAN
STA 1765+00 TO STA 1778+00 107
J
J
670670
670670670
685685
11765+00
40+00 45+00
55+00
1765+00 1770+00
1770+00 1775+00
10+00
15+00
25+00
01/22/2026
01/22/2026 155
P L
T E
P L
M E
:2
:1
P L
A L
E
.0 i n
F I
M E p w b e n e s c h p w .b e n t l e y .c o m :b e n e s c h p w
D o c u m e n t s s .0
C o n t r a c
M P
J
S h t
R a m p
J
S
H T
D R
N
A D
D .d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO. I-25-2032
OF
DRAWING NO.
KEY MAP
ST CHARLES RD
RAMP S
UP RR
I-294
UP RR
LAKE ST
NORTH AVE
EX RAMP F
EX RAMP J
PR RAMP J
XX
NOTES
THE DRAINAGE STRUCTURE.
PIPE UNDERDRAIN IS TAKEN AT
STATION AND OFFSET OF THE2.
SEE TOLLWAY STANDARD B24-9.
FOR UNDERDRAIN INSTALLATION, 1
$E213
$F213
$B213
$C213
$D213
$A213
0 50 100 150
SCALE IN FEET
130 131 132 133
STA 1768+25.00 PR ¡ I-294
STA 11768+31.65 PR ¡ I-294
134 135 136
122121
101 120 100
104103 105
PR C TRI-STATE TOLLWAY (I-294)
XXX
XXX PROPOSED PIPE UNDERDRAIN HEADWALL NUMBER
PIPE UNDERDRAIN NUMBER
PROPOSED PIPE UNDERDRAIN HEADWALL (JI680220)
PROPOSED PIPE UNDERDRAIN (JS601300) (JS601320)
EXISTING PIPE UNDERDRAIN
LEGEND
S T
A
.0
S T
A
.0
L
2 03/20/2026 ADDENDUM 2
CONTRACT NO. I-25-2032
DRAWING NO.SUBSURFACE DRAINAGE PLAN
DRN-05