Addendum No. 3 to Contract I-25-2032 is issued by the Illinois State Toll Highway Authority (ISTHA) for roadway reconstruction services on the Tri-State Tollway (I-294) between Milepost 32.4 and Milepost 33.6 in Cook County, Illinois. The addendum revises contract requirements and was issued on March 24, 2026, with an electronic bid submission deadline of March 31, 2026, at 10:30 a.m. local time via BidBuy, the State of Illinois eProcurement System. The work is scheduled to commence on or about June 15, 2026, and be completed by September 30, 2027.
The contract encompasses widening and pavement reconstruction, median retaining wall installation, Intelligent Transportation System (ITS) infrastructure, drainage improvements, temporary and permanent lighting, pavement marking and signing, erosion control, landscaping, and maintenance of traffic. The addendum revises the bid opening date from March 27, 2026, to March 31, 2026, updates the Schedule of Prices with a new pay item (JT154067) for Contract Allowance for ConstructionWorks Apprentices with a quantity of 100,000 units at $1.00 per unit, and adds adjustment items for traffic control equipment and concrete protection methods. Two new Special Provisions are included: J-157A and J-157B establish Extended Maintenance of Traffic Work and Equipment Rates with daily rates for devices ranging from $0.20 for flasher lights to $45.70 for solar-powered changeable message signs, and J-162A and J-162B establish a Contract Allowance for ConstructionWorks Apprentices providing $15.00 per hour reimbursement for approved apprentices working a minimum of 160 hours within a 12-month period. The contract includes a DBE (Disadvantaged Business Enterprise) goal of 23%, and a 5 percent bid guaranty is required. Bidders must be IDOT pre-qualified and registered with the Illinois Department of Human Rights with no exceptions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois State Toll Highway Authority Contract No. I-25-2032 Addendum 3 Page 1 of 4 3/24/2026
ADDENDUM NO. 3
TO
CONTRACT REQUIREMENTS
FOR CONTRACT I-25-2032
ILLINOIS STATE TOLL HIGHWAY AUTHORITY
Date: 3/24/2026
For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30 a.m. local time on March 31, 2026
NOTICE OF REVISION TO CONTRACT
NOTES:
1. The Bid opening date has been revised. Sealed proposals for the above numbered Contract will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy, until 10:30 a.m., local time, March 31, 2026, at which time the Proposals will be opened and the bids read aloud. Replace A-1 with the attached page A-1R.
Replace P-1 with the attached page P-1R.
2. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to pages P-15R and P-16R which have been revised and included as part of the Schedule of Prices.
3. The following new Special Provision pages are included in the Contract with this Addendum: J-157A - J-157B, J-162A – J-162B.
4. A DBE Program Goal Setting and Administration – Request for Clarification are included in this Addendum.
Addendum 3 Page 2 of 4 3/24/2026
CHANGES TO THE CONTRACT REQUIREMENTS
CHANGES TO THE ADVERTISEMENT FOR SEALED BID
Change #1 Contract Requirements, Volume 1, Advertisement, replace page A-1 with page A-1R (attached) and
Contract Requirements, Volume I, Proposal, replace page P-1 with Page P-1R (attached). These replacements contain the following revision:
1.1. Revised the Bid opening date from March 27, 2026 to March 31, 2026.
CHANGES TO THE SCHEDULE OF PRICES
SP
PAY
ITEM NO.
DESCRIPTION UNIT
ORIGINAL
QUANTITY +
ADDENDUMS
CHANGE NEW
QUANTITY
RATE
PER
DAY
* JT154067
CONTRACT ALLOWANCE FOR
CONSTRUCTIONWORKS
APPRENTICES
UNIT
+100,000
100,000 $1.00
* 999ADJ20
PROTECTION METHOD I FOR
CONCRETE IN SUBSTRUCTURES,
CULVERTS, PUMP HOUSES AND
RETAINING WALLS AS PER IDOT
Article 503.22
CU YD
SEE
NOTE 1
* 999ADJ21
PROTECTION METHOD II FOR
CONCRETE IN SUBSTRUCTURES,
CULVERTS, PUMP HOUSES, AND
RETAINING WALLS AS PER IDOT
Article 503.22
999ADJ22
PROTECTION METHOD I FOR
CONCRETE IN
SUPERSTRUCTURES AS PER
IDOT Article 503.22
* 999ADJ25
PROTECTION METHOD I FOR
CONCRETE IN SLOPE WALLS AS
PER IDOT Article 503.22
SQ YD
999ADJ26
PROTECTION METHOD IA FOR
CONCRETE IN
SUPERSTRUCTURES AS PER
999ADJ27
PROTECTION METHOD IB FOR
CONCRETE IN
SUPERSTRUCTURES AS PER
* 999ADJ45
CONSTRUCTIONWORKS
APPRENTICES WAGE RATE
PAYMENT
HOUR
$15.00
* 999ADJ46 ARROW BOARD EACH $13.32
* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH $1.00
* 999ADJ50 TYPE III BARRICADE EACH $2.35
* 999ADJ52 PLASTIC DRUM EACH $1.25
* 999ADJ54 FLASHER LIGHT EACH $0.20
Addendum 3 Page 3 of 4 3/24/2026
* TOLLWAY SPECIAL PROVISION
NOTE 1 – THE CONTRACTOR SHALL LEAVE THE UNIT PRICE VALUE BLANK. THE UNIT PRICE WILL BE
ENTERED BY THE TOLLWAY AFTER RECEIPT OF BIDS.
Change #2 Contract Requirements, Volume I, pages P-15 and P-16 replaced with pages P-15R and P-16R
This replacement contains the following revision (attached):
2.1. Item JT154067 was added.
2.2. The adjustment items were added as listed in the Summary of Revisions to Pay Item Quantities in
Changes to the Schedule of Prices table above.
* 999ADJ56 STEADY BURN LIGHT EACH $0.30
* 999ADJ58 HI-INTENSITY LIGHT, SIGN
MOUNTED
EACH
$1.70
* 999ADJ60 CMS, SOLAR POWERED EACH $45.70
* 999ADJ62 SIGNS, WORK ZONE EACH $2.00
999ADJ64
TEMPORARY MODULAR GLARE
SCREEN (12.5 FT. SECTION)
UNIT
$0.60
999ADJ65
TEMPORARY CONCRETE
BARRIER (12.5 FT. SECTION)
UNIT
$0.83
999ADJ66
TEMPORARY CONCRETE
BARRIER (10.0 FT. SECTION)
$0.50
999ADJ67
TEMPORARY CONCRETE
BARRIER, CROSS BOLT
CONNECTION (12.5 FT. SECTION)
$1.47
999ADJ68
TEMPORARY SAND MODULE
ATTENUATOR
EACH $18.33
999ADJ69
IMPACT ATTENUATOR,
TEMPORARY
(SEVERE USE, NARROW), TEST
LEVEL 3
EACH
$18.33
999ADJ70
IMPACT ATTENUATOR,
TEMPORARY
(SEVERE USE, WIDE), TEST
LEVEL 3
EACH
$18.33
999ADJ71
TEMPORARY INFORMATION
SIGNING-GROUND MOUNTED, 24
SQ FT IN AREA OR LESS
SQ FT
$0.25
999ADJ72
TEMPORARY INFORMATION
SIGNING-GROUND MOUNTED,
GREATER THAN 24 SQ FT IN
AREA
999ADJ73
TEMPORARY INFORMATION
SIGNING-OVERHEAD,
24 SQ FT IN AREA OR LESS
999ADJ74
TEMPORARY INFORMATION
SIGNING-OVERHEAD, GREATER
THAN 24 SQ FT IN AREA
Addendum 3 Page 4 of 4 3/24/2026
CHANGES TO THE CONTRACT SPECIAL PROVISIONS
Change #3 Contract Requirements, Volume II, added J-157A and J-157B (attached)
This addition contains the following revision:
3.1. Added an SP for Extended Maintenance of Traffic Work and Equipment Rates (Illinois Tollway).
Change #4 Contract Requirements, Volume II, added J-162A and J-162B (attached)
This addition contains the following revision:
4.1. Added an SP for Contract Allowance For Constructionworks Apprentices (Illinois Tollway).
END OF ADDENDUM CHANGES
A-1
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ADVERTISEMENT FOR BIDS
Bid Schedule and information for
CONTRACT NO: I-25-2032
Electronic submissions for the above numbered contract as described below will be received by the Illinois Tollway via BidBuy, the State of Illinois eProcurement System, until 10:30:00 a.m. local time on March , 2026. The Illinois State Tollway Highway Authority (ISTHA) will no longer accept manual, hard copy bid submissions. All bidders are strongly encouraged to submit bids timely as the system will not accept late bid submittals. Bid results will be posted on the Tollway’s on-line plan room: www.illinoistollwaybidding.com.
For assistance with registration in BidBuy or submitting electronic bids, please contact the BidBuy Vendor Help Desk at:
il.bidbuy@illinois.gov and /or phone: 866-455-2897.
The optional pre-bid meeting will be held through Microsoft Teams on February 25, 2026, at 2:00 p.m. The meeting information is listed on A-2 page.
The work to be done under this contract shall be started on or about June 15, 2026. All work under this contract shall be completed by September 30, 2027. The location of services to be performed is the Tri-State Tollway (I-294) between Mile Post 32.4 and Mile Post 33.6 in Cook County, Illinois. The scope of the work shall consist of widening and pavement reconstruction, median retaining wall, Intelligent Transportation System (ITS) infrastructure, drainage improvements, temporary and permanent lighting, pavement marking and signing, erosion control and landscaping, maintenance of traffic, and other miscellaneous work.
Bidders may be required to be pre-qualified by the Illinois Department of Transportation (IDOT).
IDOT Prequalification required: YES NO If ‘NO’, ignore any reference to IDOT Prequalification within the remainder of this document.
Joint Ventures shall be limited to no more than three (3) individually IDOT pre-qualified members.
Bidders are also required to be registered, or submit evidence of application, with the Illinois Department of Human Rights (IDHR). There are NO EXCEPTIONS.
Please note that written or oral communications received by the Illinois Tollway in connection with this solicitation may be required to be reported to the Procurement Policy Board as required by law. This provision is not intended to prohibit communications with State employees regarding a procurement matter, but rather only requires reporting of those communications when they occur.
All bids must be on forms prescribed by the Illinois Tollway and must comply with the terms and conditions set forth in the contract documents. Copies of the plan’s special provisions bid forms and other contract documents for this contract are available from BHFX Digital Imaging and can be viewed and/or ordered for purchase by visiting the On-line Plan Room via www.illinoistollwaybidding.com.
Copies of the current Illinois Tollway Supplemental Specifications to the Illinois Department of Transportation Standard Specifications for Road and Bridge Construction can be purchased directly from BHFX Digital Imaging. The current Illinois Tollway Supplemental Specifications may also be viewed in the ‘Doing Business’ section on the Tollway website. Current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction, Supplemental Specifications and Recurring Special Provisions can be viewed and purchased from the IDOT website. Electronic copies of the contract documents are also available on compact disk (CD) from BHFX Digital Imaging. Copies are in a portable document format (PDF). Bidders with questions or in need of assistance in purchasing contract documents are to contact a BHFX Digital Imaging, Customer Service Representative at 630-393-0777, ask for the Plan Room.
Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4301D.2032_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on March 5, 2026.
A completed Questionnaire and a statement of current contractual obligations on forms supplied by the Illinois Tollway will be required from the apparent low bidder once the apparent low bidder is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier's check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority.
Award of the above contract, if any award be made, will be to the lowest responsive and responsible bidder or bidders. The Tollway reserves the right to reject any and all bids, to waive technicalities, or cancel the solicitation.
COPIES OF PLANS, SPECIAL PROVISIONS, BID FORMS, CONTRACT DOCUMENTS, STANDARD SPECIFICATIONS AND SUPPLEMENTAL SPECIFICATIONS ARE NOT AVAILABLE AT THE TOLLWAY CENTRAL ADMINISTRATION BUILDING.
DATE: February 13, 2026
ADDENDUM 3 MARCH 24, 2026R
P-1
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
BID
CONTRACT NO. I-25-2032
Bids will be received electronically via BidBuy, the State of Illinois eProcurement system. All Bids must be received by 10:30:00 a.m., local time on March , 2026. The system will not accept Bids after the deadline. Bids will be immediately thereafter publicly opened online and read aloud.
TO THE CHAIR OF THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY:
The undersigned hereby proposes to perform: Widening and pavement reconstruction, median retaining wall, Intelligent Transportation System (ITS), infrastructure, drainage improvements, temporary and permanent lighting, pavement marking and signing, erosion control and landscaping, maintenance of traffic and other miscellaneous work.
The services will be performed within the: Tri-state Tollway (I-294) between Mile Post 32.4 and Mile Post 33.6 in Cook County, Illinois.
The undersigned declares that the Advertisement for Bids, Instructions to Bidders, this Bid Form, IDOT Standard Specifications, Tollway Supplemental Specifications, Special Provisions, Plans, Addenda to the foregoing (if any), form of Agreement, forms of Contract Bonds, and other exhibits (if any), on file at the office of The Illinois State Toll Highway Authority have been carefully examined, and that the undersigned has inspected in detail the site of the proposed Work, and familiarized itself with all of the conditions affecting the contract, and that has satisfied itself as to The Work to be done and the conditions under which it must be carried out, and understands that in submitting this bid waives all rights to plead any misunderstanding regarding the same.
The undersigned hereby tenders this bid to construct and complete said Work in accordance with the Plans, IDOT Standard Specifications, Tollway Supplemental Specifications and the accompanying Special Provisions now on file in the office of The Illinois State Toll Highway Authority, and the following addenda issued thereto:
Addendum No. ________ Date _______________
Addendum No. ________ Date _______________
Addendum No. ________ Date _______________
Addendum No. ________ Date _______________
The undersigned further agrees to furnish all necessary transportation, machinery, equipment, tools, labor and other means of construction; and to do all the work and to furnish all of the materials specified in the contract in the manner and at the times prescribed under the supervision and direction of the Tollway or its authorized representatives, for the lump sums and unit prices quoted in the following Schedule of Prices:
RADDENDUM 3 MARCH 24, 2026
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
* 20200100 EARTH EXCAVATION CU YD 845
* 20201200
REMOVAL AND DISPOSAL OF
UNSUITABLE MATERIAL
CU YD 37,110
* 20400800 FURNISHED EXCAVATION CU YD 4,818
20800150 TRENCH BACKFILL CU YD 38
25000400 NITROGEN FERTILIZER NUTRIENT POUND 75
25000600 POTASSIUM FERTILIZER NUTRIENT POUND 225
28000250
TEMPORARY EROSION CONTROL
SEEDING
POUND 161
28001100
TEMPORARY EROSION CONTROL
BLANKET
SQ YD 14,474
28100205 STONE RIPRAP, CLASS A3 TON 7,100
28200200 FILTER FABRIC SQ YD 5,200
40600985
PORTLAND CEMENT CONCRETE
SURFACE REMOVAL - BUTT JOINT
SQ YD 224
42101300 PROTECTIVE COAT SQ YD 17,962
44000100 PAVEMENT REMOVAL SQ YD 20,089
44000500
COMBINATION CURB AND GUTTER
REMOVAL
FOOT 67
44004250 PAVED SHOULDER REMOVAL SQ YD 2,191
50102400 CONCRETE REMOVAL CU YD 52.9
50104400 CONCRETE HEADWALL REMOVAL EACH 1
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
Contract I-25-2032 P - 5RR March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* 50300225 CONCRETE STRUCTURES CU YD 36.8
* 50300255 CONCRETE SUPERSTRUCTURE CU YD 2.4
50300300 PROTECTIVE COAT SQ YD 1,918
* 50800205 REINFORCEMENT BARS, EPOXY COATED POUND 134,130
51603000 DRILLED SHAFT IN SOIL CU YD 19
52200900
CONCRETE STRUCTURES (RETAINING
WALL)
CU YD 1,123.2
550A0410 STORM SEWERS, CLASS A, TYPE 2 24" FOOT 126
55100700 STORM SEWER REMOVAL 15" FOOT 23
55101200 STORM SEWER REMOVAL 24" FOOT 124
60221100
MANHOLES, TYPE A, 5'-DIAMETER, TYPE
1 FRAME, CLOSED LID
EACH 1
60255500 MANHOLES TO BE ADJUSTED EACH 1
60500050 REMOVING CATCH BASINS EACH 4
60603800
COMBINATION CONCRETE CURB AND
GUTTER, TYPE B-6.12
FOOT 67
63200310 GUARDRAIL REMOVAL FOOT 75
* 66900530 SOIL DISPOSAL ANALYSIS EACH 3
70600280
IMPACT ATTENUATORS, TEMPORARY
(SEVERE USE,NARROW), TEST LEVEL 3
EACH 6
70600370
IMPACT ATTENUATORS, RELOCATE
(SEVERE USE,NARROW), TEST LEVEL 3
EACH 11
P - 6RR March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
72400100
REMOVE SIGN PANEL ASSEMBLY - TYPE
A
EACH 2
72400200
REMOVE SIGN PANEL ASSEMBLY - TYPE
B
EACH 5
72400310 REMOVE SIGN PANEL - TYPE 1 SQ FT 16
72400320 REMOVE SIGN PANEL - TYPE 2 SQ FT 16
72800100 TELESCOPING STEEL SIGN SUPPORT FOOT 116
73000100 WOOD SIGN SUPPORT FOOT 99
78005110 EPOXY PAVEMENT MARKING - LINE 4" FOOT 105,769
78005140 EPOXY PAVEMENT MARKING - LINE 8" FOOT 2,453
81800450
AERIAL CABLE, 4-1/C NO. 8 WITH
MESSENGER WIRE
FOOT 2,020
89502350
REMOVE AND REINSTALL ELECTRIC
CABLE FROM CONDUIT
FOOT 1,050
* X1200160
CONNECTION TO EXISTING DRAINAGE
STRUCTURE
EACH 2
* X1400410
RELOCATE EXISTING TEMPORARY
LIGHTING UNIT
EACH 2
GBSP X5030250
BRIDGE DECK GROOVING
(LONGITUDINAL)
SQ YD 6
* X5427602
REMOVE EXISTING FLARED END
SECTION
EACH 1
* Z0018400
DRAINAGE STRUCTURES TO BE
ADJUSTED
EACH 3
* JI211126 TOPSOIL FURNISH AND PLACE, 6" SQ YD 12,702
* JI251010
EROSION CONTROL BLANKET,
BIODEGRADABLE NETTING
SQ YD 8,788
* JI251015
HEAVY DUTY EROSION CONTROL
BLANKET, BIODEGRADABLE NETTING
SQ YD 15,016
* JI282010 SUBGRADE FILTER FABRIC SQ YD 18,573
Contract I-25-2032 P - 7R March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JI312022 STABILIZED SUBBASE – WMA, 3” SQ YD 10,520
* JI406002 TEMPORARY ASPHALT WEDGE SQ YD 200
* JI406035 TEST STRIP (STONE MATRIX ASPHALT) EACH 6
* JI406037 MATERIAL TRANSFER DEVICE TON 4,012
* JI406039
STONE MATRIX WARM MIX ASPHALT
SHOULDER COURSE, IL-12.5, N80
TON 225
* JI406041
STONE MATRIX WARM MIX ASPHALT
BINDER COURSE, IL-9.5, N80
TON 1,401
* JI406048
STONE MATRIX WARM MIX ASPHALT
SURFACE FRICTION COURSE, IL12.5 N80
TON 2,386
* JI406108 ASPHALT TACK COAT (NON-TRACKING) POUND 29,908
* JI406900
CONSTRUCTING WARM MIX ASPHALT
TEST STRIP
EACH 6
* JI420041 TRANSITION APPROACH SLAB SQ YD 162.5
* JI420046
TRANSITION APPROACH SHOULDER
SLAB
SQ YD 488
* JI420906 LONGITUDINAL JOINT SEALANT FOOT 9,737
* JI440010
CONCRETE MEDIAN BARRIER AND BASE
REMOVAL
FOOT 251
* JI440015
HOT-MIX ASPHALT REMOVAL, VARIABLE
DEPTH
SQ YD 3,321
* JI481130
AGGREGATE SHOULDERS WITH FILTER
FABRIC, TYPE B 4"
SQ YD 1,736
* JI482104 WARM-MIX ASPHALT SHOULDERS (6 IN.) SQ YD 1,451
* JI482128
WARM-MIX ASPHALT SHOULDERS,
SPECIAL (9 IN.)
SQ YD 7,191
Contract I-25-2032 P - 8R March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JI485020 TEMPORARY PAVEMENT, CLASS 2 SQ YD 2,908
* JI503006
REMOVAL OF EXISTING TRANSITION
APPROACH SLABS
SQ YD 147
* JI503007
REMOVAL OF EXISTING TRANSITION
APPROACH SHOULDER SLABS
SQ YD 133
* JI503010
HIGH PERFORMANCE CONCRETE
SUPERSTRUCTURE
CU YD 3.5
* JI551010 SLOTTED DRAIN REMOVAL FOOT 400
* JI593030
ABANDON AND FILL EXISTING STORM
SEWER
CU YD 11
* JI602518
DRAINAGE STRUCTURES TO BE
ADJUSTED WITH TYPE 20A FRAME AND
GRATE
EACH 12
* JI602519
DRAINAGE STRUCTURES TO BE
ADJUSTED WITH TWO TYPE 20A FRAME
AND GRATE
EACH 8
* JI606050 CONCRETE GUTTER (SPECIAL) FOOT 255
* JI638020
TEMPORARY MODULAR GLARE SCREEN
SYSTEM REMOVAL
FOOT 4,100
* JI642014
ASPHALT SHOULDER RUMBLE STRIP, 16
INCH
FOOT 9,275
* JI642030 MOMENT SLAB RUMBLE STRIP FOOT 872
* JI669016
REGULATED SUBSTANCES MONITORING
AND FIELD SCREENING
CAL DAY 30
* JI680125 SLOPED HEADWALL TYPE III, 24", 1:3 EACH 1
* JI680220
DOUBLE SLOPED HEADWALL TYPE III, 2-
6”,1:3
EACH 6
* JI701001 DETOUR SIGNING, LOCATION 1 L SUM 1
* JI704001
TEMPORARY CONCRETE BARRIER,
CROSS-BOLT CONNECTION
FOOT 7,175
P - 9RR March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JI704005
RELOCATE TEMPORARY CONCRETE
BARRIER
FOOT 17,975
* JI704006
RELOCATE TEMPORARY CONCRETE
BARRIER, CROSS-BOLT CONNECTION
FOOT 5,738
* JI706400
REMOVE TEMPORARY IMPACT
ATTENUATOR
EACH 2
** JS251115 MULCH, METHOD 2 ACRE 3.25
** JS280050 SILT FENCE FOOT 1,169
** JS280070 STABILIZED CONSTRUCTION ENTRANCE SQ YD 1,956
** JS601300 PIPE UNDERDRAINS, 6" (SPECIAL) FOOT 369
** JS601320
PIPE UNDERDRAINS, FABRIC LINED
TRENCH 6"
FOOT 1,636
** JS635010 ROADWAY DELINEATORS EACH 22
** JS670CM0 FIELD OFFICE, TYPE C (MODIFIED) CAL MO 16
** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1
* JS701010 MAINTENANCE OF TRAFFIC L SUM 1
** JS701052
TEMPORARY INFORMATION SIGNING-
GROUND MOUNT, GREATER THAN 24 SQ
FT IN AREA
SQ FT 620
** JS720110 SIGN INSTALLATION, TYPE 2 SQ FT 129
** JS720120 SIGN INSTALLATION, TYPE 3 SQ FT 60
** JS726020
MILEPOST MARKERS ASSEMBLY,
BARRIER WALL MOUNTED
EACH 4
P - 10RR March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
** JS726030
MILEPOST MARKERS ASSEMBLY, POLE
MOUNTED
EACH 1
** JS726050 MILEPOST MARKER INSTALLATION SQ FT 32
** JS734G10 FOUNDATION FOR ITS GANTRY FRAME CU YD 72.2
** JS780JC1
GROOVING FOR RECESSED PAVEMENT
MARKING LINES, 7" GROOVE
FOOT 39,806
** JS780JE1
GROOVING FOR RECESSED PAVEMENT
MARKING LINES, 11" GROOVE
FOOT 2,735
** JS782022 BARRIER WALL REFLECTORS, TYPE C EACH 344
** JS810822
UNDERGROUND CONDUIT, GALVANIZED
STEEL, 3" DIA.
FOOT 21
** JS812023
CONDUIT EMBEDDED IN STRUCTURE, 2"
DIA., PVC
FOOT 1,036
** JS812027
CONDUIT EMBEDDED IN STRUCTURE, 4"
DIA., PVC
FOOT 643
** JS812028
CONDUIT EMBEDDED IN STRUCTURE, 1
1/4" DIA., PVC
FOOT 4,938
** JS813001
JUNCTION BOX, STAINLESS STEEL,
EMBEDDED IN STRUCTURE, 20" X 12" X 8"
EACH 1
** JS813010
JUNCTION BOX, STAINLESS STEEL,
EMBEDDED IN STRUCTURE, 32" X 12" X 8"
EACH 2
** JS816074
UNIT DUCT, WITH 2-1/C NO. 4 AND 1/C
NO. 6 GROUND, 600V (XLP-TYPE USE), 2"
DIA. CNC
FOOT 223
** JS816078
UNIT DUCT, WITH 4-1/C NO. 4 AND 1/C
NO. 6 GROUND, 600V (XLP-TYPE USE), 2"
DIA. CNC
FOOT 1,282
** JS817213
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 6
FOOT 1,185
** JS817214
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 4
FOOT 6,440
** JS817215
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 2
FOOT 6,208
Contract I-25-2032 P - 11R March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JS821010 TEMPORARY FLOOD LIGHTING UNIT EACH 8
** JS830025
TEMPORARY WOOD POLE, 40 FT., CLASS
EACH 9
** JS836001
LIGHT POLE FOUNDATION (ROADWAY)
STEEL HELIX (7 FT) OR CONCRETE
EACH 8
** JS836005
LIGHT POLE FOUNDATION (ROADWAY)
MEDIAN, TYPE 1
EACH 3
** JS836006
LIGHT POLE FOUNDATION (ROADWAY)
MEDIAN, TYPE 2
EACH 4
** JS842080
REMOVAL OF EXISTING LIGHTING UNIT,
SALVAGE
EACH 1
** JS842105 POLE FOUNDATION, REMOVED EACH 1
* JT202009 NON-SPECIAL WASTE DISPOSAL, TYPE 1 CU YD 37,110
* JT211A08 SUBGRADE AGGREGATE 9 IN. CU YD 677
* JT211A11 SUBGRADE AGGREGATE 12 IN. CU YD 6,193
* JT250432
SEEDING, CLASS 2E SALT TOLERANT
ROADSIDE MIX (SPECIAL)
ACRE 2.50
* JT250446 SEEDING, GRASS-FORB MIX 2 (SPECIAL) ACRE 2.75
* JT301010 GRANULAR SUBBASE, SPECIAL CU YD 67
* JT311040
AGGREGATE SUBGRADE
IMPROVEMENT, SPECIAL
CU YD 2,050
* JT320200
GEOGRID FOR SUBGRADE SOIL
STABILIZATION
SQ YD 18,573
* JT420103
JOINTED PLAIN CONCRETE PAVEMENT
FOR COMPOSITE PAVEMENT 10.25"
SQ YD 1,743
* JT420104
JOINTED PLAIN CONCRETE PAVEMENT
FOR COMPOSITE PAVEMENT 11"
SQ YD 8,196
* JT421510 SLEEPER SLAB SQ YD 26
* JT486010
SAWED / SEALED ASPHALT EXPANSION
JOINTS, 1"
FOOT 18
Contract I-25-2032 P - 12R March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JT486100
COLD MILLING CONCRETE SURFACE,
VARIABLE DEPTH
SQ YD 1,646
* JT503041
STRUCTURAL REPAIR OF CONCRETE
(DEPTH GREATER THAN 5 IN.)
SQ FT 2
* JT525125 BONDED PREFORMED JOINT SEAL, 2 IN. FOOT 18
* JT637015
CONCRETE MEDIAN BARRIER
TRANSITION, TYPE V-DF
FOOT 104
* JT637800
CONCRETE BARRIER DOUBLE FACE, TL-
5, 44 INCH
FOOT 901
* JT637801
BASE FOR CONCRETE BARRIER DOUBLE
FACE, TL-5, 44 INCH
FOOT 901
* JT637810
CONCRETE BARRIER DOUBLE FACE, TL-
5, VARIABLE HEIGHT
FOOT 304
* JT637811
BASE FOR CONCRETE BARRIER DOUBLE
FACE, TL-5, VARIABLE HEIGHT
FOOT 49
* JT637816
BASE FOR CONCRETE BARRIER DOUBLE
FACE, TL-5, VARIABLE HEIGHT, 5 FEET
FOOT 255
* JT669030 EARTHWORK CONSTRUCTION PLAN L SUM 1
* JT669040
EARTHWORK FINAL CONSTRUCTION
REPORT
L SUM 1
* JT704040
EXISTING TEMPORARY CONCRETE
BARRIER, REMOVED
FOOT 12,556
* JT740210
ITS GANTRY FRAME (STEEL), TWO SPAN
(INSTALL ONLY)
EACH 2
* JT780310
MULTI-POLYMER PAVEMENT MARKING -
LINE 6"
FOOT 59,598
* JT780320
MULTI-POLYMER PAVEMENT MARKING -
LINE 10"
FOOT 10,259
* JT780325
MULTI-POLYMER PAVEMENT MARKING -
LINE 12"
FOOT 3,155
* JT780340
MULTI-POLYMER PAVEMENT MARKING -
LETTERS (8 FT.)
SQ FT 147
Contract I-25-2032 P - 13R March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JT780355
MULTI-POLYMER PAVEMENT MARKING -
SYMBOLS (LARGE)
SQ FT 80
* JT783005
WATERBLAST PAVEMENT MARKING
REMOVAL WITH VACUUM RECOVERY
SQ FT 36,781
* JT810876
UNDERGROUND CONDUIT, COILABLE
NONMETALLIC CONDUIT, SDR 11, 2" DIA.
FOOT 88
* JT830036 LIGHTING UNIT (INSTALL ONLY) EACH 18
* JT842130
REMOVE EXISTING TEMPORARY
LIGHTING UNIT
EACH 19
* JT901130 DEWATERING L SUM 1
TOTAL AMOUNT OF CORE WORK
Contract I-25-2032 P - 14R March 20, 20263,4
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 340,000.00 340,000.00
* JT151500
CONTRACT ADJUSTMENT ALLOWANCE FOR
TEMPERATURE CONTROL OF CONCRETE
UNIT 100,000 1.00 100,000.00
* JT154008
UNFORESEEN ADDITIONAL MAINTENANCE
OF TRAFFIC
UNIT 150,000 1.00 150,000.00
* JT154015
ALLOWANCE FOR UNFORESEEN DRAINAGE
WORK
UNIT 75,000 1.00 75,000.00
* JT154049
CONTRACT ALLOWANCE FOR INCENTIVE
PAYMENT OF PAVEMENT SURFACE
UNIT 25,000 1.00 25,000.00
* JT154067
CONTRACT ALLOWANCE FOR
CONSTRUCTIONWORKS APPRENTICES
UNIT 100,000 1.00 100,000.00
* JT154095
CONTRACT ALLOWANCE FOR MAINTAIN
LIGHTING SYSTEMS
UNIT 30,000 1.00 30,000.00
* JT154207
ALLOWANCE FOR TESTING OF
UNCLASSIFIED SOIL
UNIT 250,000 1.00 250,000.00
NEGATIVE
999NEG04
NON-COMPLIANCE WITH TOLLWAY
MAINTENANCE OF TRAFFIC PER TOLLWAY
SUPPL. SPEC. 701.08(a)
INC/DAY (2,500.00)
999NEG05
FAILURE TO RESPOND TO RE-ESTABLISH
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(b)
OCCUR (2,500.00)
999NEG06
FAILURE TO REPAIR IMPACT ATTENUATORS,
TEMPORARY PER TOLLWAY SUPPL. SPEC.
701.08 (c )
OCCUR (2,500.00)
999NEG20
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITITES PER S.P. 115.5 -
TRI-STATE
OCCUR (10,000.00)
999NEG31
DAMAGE TO ELECTRICAL FACILITIES PER
TOLLWAY SUPPL. SPEC. 107.30 (b)
INC/DAY (1,000.00)
999NEG32
LIQUIDATED DAMAGES FOR DELAY IN
SUBMITTAL OF PROGRESS SCHEDULE PER
TOLLWAY SUPPL. SPEC. 108.02 (e)
DAY (300.00)
999NEG33
NON-COMPLIANCE WITH EROSION AND
SEDIMENT CONTROL PER TOLLWAY SUPPL.
SPEC. 280.02 (2)(1)
INC/DAY (1,000.00)
999NEG34
NON-COMPLIANCE WITH RESPONSIBILITY
FOR CONSTRUCTION HAULING EQUIPMENT
PER TOLLWAY SUPPL. SPEC. 105.15
DAY (1,000.00)
999NEG35
FAILURE TO RESPOND TO REGULATORY
AGENCY REQUESTS, PER TOLLWAY SUPPL.
SPEC. 280.02 (2)(2)
OCCUR (25,000.00)
999NEG36
FAILURE TO COMPLY WITH OCCUPANCY
DATE OR PROVIDE COMPLETE FACILITIES.
FIELD OFFICE OR LAB PER TOLLWAY SUPPL.
SPEC. 670.01 (b)
DAY (500.00)
ADDENDUM 3 P - 15R March 2 , 20264
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
CONTRACT I-25-2032
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
ROADWAY RECONSTRUCTION
NORTH OF ST. CHARLES TO NORTH AVENUE
SCHEDULE OF PRICES
TRI-STATE TOLLWAY (I-294)
MILEPOST 32.4 TO MILEPOST 33.6
999NEG42
NON-COMPLIANCE WITH MAINTAIN LIGHTING SYSTEM, PER
TOLLWAY SUPPL. SPEC. 846.06 (a)
INC/DAY (1,000.00)
999NEG43
FAILURE TO RESPOND TO MAINTAIN LIGHTING SYSTEM, PER
TOLLWAY SUPPL. SPEC. 846.06 (b)
OCCUR (1,000.00)
999NEG44
LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.
105.1.1
CAL DAY (7,500.00)
999NEG45
LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.
105.1.2
CAL DAY (15,000.00)
999NEG46
LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.
105.1.3
CAL DAY (6,000.00)
999NEG47
LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.
105.1.4
CAL DAY (12,000.00)
999NEG49 DAMAGE TO FIBER OPTIC UTILITIES PER S.P. 115.3 OCCUR (10,000.00)
999NEG53
NON-COMPLIANCE WITH CONTRACTOR QUALITY PROGRAM
SPECIAL PROVISION
OCCUR (1,000.00)
ADJUSTMENTS
* 999ADJ20
PROTECTION METHOD I FOR CONCRETE IN
SUBSTRUCTURES, CULVERTS, PUMP HOUSES AND
RETAINING WALLS AS PER IDOT Article 503.22
CU YD SEE NOTE 1
* 999ADJ21
PROTECTION METHOD II FOR CONCRETE IN
SUBSTRUCTURES, CULVERTS, PUMP HOUSES, AND
RETAINING WALLS AS PER IDOT Article 503.22
CU YD SEE NOTE 1
* 999ADJ22
PROTECTION METHOD I FOR CONCRETE IN
SUPERSTRUCTURES AS PER IDOT Article 503.22
CU YD SEE NOTE 1
* 999ADJ25
PROTECTION METHOD I FOR CONCRETE IN SLOPE WALLS
AS PER IDOT Article 503.22
SQ YD SEE NOTE 1
* 999ADJ26
PROTECTION METHOD IA FOR CONCRETE IN
SUPERSTRUCTURES AS PER IDOT Article 503.22
CU YD SEE NOTE 1
* 999ADJ27
PROTECTION METHOD IB FOR CONCRETE IN
SUPERSTRUCTURES AS PER IDOT Article 503.22
CU YD SEE NOTE 1
* 999ADJ45
CONSTRUCTIONWORKS APPRENTICES WAGE RATE
PAYMENT
HOUR 15.00
* 999ADJ46 ARROW BOARD EACH 13.32
* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH 1.00
* 999ADJ50 TYPE III BARRICADE EACH 2.35
* 999ADJ52 PLASTIC DRUM EACH 1.25
* 999ADJ54 FLASHER LIGHT EACH 0.20
* 999ADJ56 STEADY BURN LIGHT EACH 0.30
* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH 1.70
* 999ADJ60 CMS, SOLAR POWERED EACH 45.70
* 999ADJ62 SIGNS, WORK ZONE EACH 2.00
* 999ADJ64 TEMPORARY MODULAR GLARE SCREEN (12.5 FT. SECTION) UNIT 0.60
* 999ADJ65 TEMPORARY CONCRETE BARRIER (12.5 FT. SECTION) UNIT 0.83
* 999ADJ66 TEMPORARY CONCRETE BARRIER (10.0 FT. SECTION) UNIT 0.50
* 999ADJ67
TEMPORARY CONCRETE BARRIER, CROSS BOLT
CONNECTION (12.5 FT. SECTION)
UNIT 1.47
* 999ADJ68 TEMPORARY SAND MODULE ATTENUATOR EACH 18.33
* 999ADJ69
IMPACT ATTENUATOR, TEMPORARY (SEVERE USE,
NARROW), TEST LEVEL 3
EACH 18.33
* 999ADJ70
IMPACT ATTENUATOR, TEMPORARY (SEVERE USE, WIDE),
TEST LEVEL 3
EACH 18.33
* 999ADJ71
TEMPORARY INFORMATION SIGNING-GROUND MOUNTED,
24 SQ FT IN AREA OR LESS
SQ FT 0.25
* 999ADJ72
TEMPORARY INFORMATION SIGNING-GROUND MOUNTED,
GREATER THAN 24 SQ FT IN AREA
SQ FT 0.25
* 999ADJ73
TEMPORARY INFORMATION SIGNING-OVERHEAD, 24 SQ FT
IN AREA OR LESS
SQ FT 0.25
* 999ADJ74
TEMPORARY INFORMATION SIGNING-OVERHEAD, GREATER
THAN 24 SQ FT IN AREA
SQ FT 0.25
TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (QCP) 1,070,000.00
ECP BID CREDIT
AWARD CRITERIA
S.P. COLUMN LEGEND
* INDICATES SPECIAL PROVISION
** INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS
NOTE 1 - THE CONTRACTOR SHOULD LEAVE THE UNIT PRICE VALUE BLANK. THE UNIT PRICE WILL BE ENTERED BY THE TOLLWAY AFTER RECEIPT OF BIDS.
TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM = TOTAL AMOUNT OF BASE
BID
ADDENDUM 3 P - 16R March 2 , 20264
ADDENDUM 3 J-157A March 2 , 2026
EXTENDED MAINTENANCE OF TRAFFIC WORK AND EQUIPMENT RATES (ILLINOIS
TOLLWAY)
Effective: September 1, 2021 Revised: March 20,2026
Description. This work shall consist of performing work zone traffic control and protection work as specified in the Contract Documents beyond the original Substantial Completion Date. In addition, maintenance of traffic related equipment rates are established that apply to extra work.
Method of Measurement & Basis of Payment.
Payment will be made on a force account basis in accordance with Article 109.04 of the Illinois Tollway Supplement Specifications. Payment rates for devices will be made at the unit Rate Per Day in the below table.
Should the Contractor qualify for such payment, a corresponding adjustment amount will then be made to UNFORESEEN ADDITIONAL MAINTENANCE OF TRAFFIC.
In all cases, payment for devices will be made for a maximum of 180 days beyond the original Substantial Completion Date shown in the approved baseline schedule.
The below rates reflect equipment usage only. Additional costs for realignment, repairs, maintenance, or replacement of these devices shall be reimbursed according to Illinois Tollway Supplemental Specifications Article 109.04, Payment for Extra Work.
Item number Device Description Unit Rate Per Day
999ADJ46 Arrow Board Each $13.32
999ADJ48 Type I or Type II Barricade Each $1.00
999ADJ50 Type III Barricade Each $2.35
999ADJ52 Plastic Drum Each $1.25
999ADJ54 Flasher Light Each $0.20
999ADJ56 Steady Burn Light Each $0.30
999ADJ58 Hi-intensity Light, Sign Mounted Each $1.70
999ADJ60 CMS, Solar Powered Each $45.70
999ADJ62 Signs, Work Zone Each $2.00
999ADJ64
Temporary Modular Glare Screen (12.5 Ft.
Section)
Unit $0.60
999ADJ65 Temporary Concrete Barrier (12.5 Ft. Section) Unit $0.83
999ADJ66 Temporary Concrete Barrier (10.0 Ft. Section)
Unit
$0.50
ADDENDUM 3 J-157B March 2 , 2026
999ADJ67
Temporary Concrete Barrier, Cross Bolt Connection (12.5 Ft. Section)
Unit $1.47
999ADJ68 Temporary Sand Module Attenuator Each $18.33
999ADJ69
Impact Attenuator, Temporary (Severe Use, Narrow), Test Level 3
Each $18.33
999ADJ70
Impact Attenuator, Temporary (Severe Use, Wide), Test Level 3
Each $18.33
999ADJ71
Temporary Information Signing-Ground Mounted, 24 Sq Ft in area or less
Sq Ft $0.25
999ADJ72
Temporary Information Signing-Ground Mounted, Greater than 24 Sq Ft in area
Sq Ft $0.25
999ADJ73
Temporary Information Signing-Overhead, 24 Sq Ft in area or less
Sq Ft $0.25
999ADJ74
Temporary Information Signing-Overhead, Greater than 24 Sq Ft in area
Sq Ft $0.25
ADDENDUM 3 J-162A March 2 , 2026
CONTRACT ALLOWANCE FOR CONSTRUCTIOWORKS APPRENTICES (Illinois Tollway)
Effective: January 22, 2019 Revised: August 27, 2020
Description. In addition to the Contractor's equal employment opportunity efforts undertaken as elsewhere required by this Contract, the Contractor is encouraged to participate in this Special Provision for reimbursement of qualifying ConstructionWorks (CW) Eligible Apprentices. This incentive will provide wage reimbursement to contractors who employ ConstructionWorks (CW) participants within the following skilled trades: (i.e., Operating Engineers, Electricians, Iron workers, Carpenters, Cement Masons, etc.) The CW wage reimbursement Incentive promotes the employment and retention of CW Eligible Apprentices in their acquisition of the prerequisite skills needed to achieve journey worker status in the top skilled trades predominately utilized within Tollway heavy highway and related transportation construction industries. CW encourages retention and utilization of historically underrepresented individuals such as minorities, women, veterans, ex-offenders and economically disadvantaged individuals on Tollway projects.
CW Eligible Apprentices are defined as a CW program participant placed into a USDOL-registered apprenticeship and/or other suitable construction related employment for not less than 160 hours within a 12 consecutive month period with the objective of gaining the necessary on-the job experiences to fulfil the task competency requirements of an apprenticeship program to achieve journey worker status as evidenced by certified payroll.
The Contractor shall submit each CW Eligible Apprentice for Tollway approval through the Tollways web-based project management system. The Contractor is not eligible for the incentive payment until the CW Apprentices are approved by the Tollway through the web-based project management system.
Prior to payment, the Contractor shall submit to the Tollway the CONSTRUCTIONWORKS COMMUNITY HIRING INITIATIVE ALLOWANCE REPORT detailing the hours which the Contractor is requesting reimbursement incentive for CW Eligible Apprentices. This report shall be submitted to the Engineer with every pay estimate that the ConstructionWorks wage reimbursement is applied.
A SAMPLE REPORT is included as part of this Special Provision. The Contractor will also need to provide records documenting hours worked by each CW Eligible Apprentice to the engineer.
The Contractor will be reimbursed at $15 per hour worked by a Tollway approved CW Eligible Apprentice. This reimbursement will be made even though the Contractor may receive additional Tollway incentives such as the CW Bid Credit incentive. However, the hourly incentive payment in this special provision may not be combined with the hourly incentive payment in the Special Provision for Community Hiring Initiative, if applicable, for any one individual.
For purposes of this Special Provision, the Contractor is not relieved of requirements under the Illinois Prevailing Wage Act or other applicable laws and regulations.
The Tollway’s CW Administrator, Chicago-Cook Workforce Partnership upon request, will provide the Contractor with assistance via a network of CW service providers serving the project area in order to facilitate the Contractor’s hiring of CW Eligible Apprentices.
The initial maximum contract allowance is specified within the contract quantities. During the course of performance of the Contract, the Contractor may request that the Tollway provide additional funds to increase the maximum allowance for the incentive and the Tollway may do so under its sole
ADDENDUM 3 J-162B March 2 , 2026 discretion. The Contractor shall also ensure that this Special Provision is made applicable to each subcontract if CW Eligible Apprentices are to be employed by a subcontractor and that the incentive payment earned by such subcontractor is passed on to each participating subcontractor.
Method of Measurement. This work will not be measured for payment.
Basis of Payment. Should the Contractor qualify for such a wage rate reimbursement; payment will be made under item number 999ADJ45. A corresponding adjustment amount will then be made to CONTRACT ALLOWANCE FOR CONSTRUCTIONWORKS APPRENTICES. Payment for this work will not exceed the costs incurred by the Contractor and approved by the Engineer as described elsewhere in the Special Provision.
Pay Item Number Designation Unit of
Measure
JT154067 CONTRACT ALLOWANCE FOR
CONSTRUCTIONWORKS APPRENTICES
FOR CONTRACT I-25-2032
ILLINOIOS STATE TOLL HIGHWAY AUTHORITY
DBE Program Goal Setting and Administration – Request for Clarification
The Tollway has determined that the DBE goals for this contract will remain at 23%.
The DBE goals for this contract were set based upon review of the scope of the work involved, estimated availability of DBE firms for those scopes of work from the current disparity study, the location of the work and history with similar projects, and other factors. The special provisions provide for award of contracts to bidders who either meet the established DBE goals or demonstrate good faith efforts to do so. If a potential bidder cannot obtain sufficient DBE participation to meet the contract goals, the bidder must document its efforts via the DBE Form
2023 Demonstration of Good Faith Efforts. For further assistance, please refer to the DBE
Special Provisions regarding the good faith efforts/waiver process. Note that the Tollway’s DBE
Program is separate from the Federal DBE Program and separate from the IDOT DBE Program.
Bidders should consult the Illinois Unified Certification Program (“ILUCP”) DBE Directory as a reference source for DBEs, the City of Chicago and the County of Cook M/WBE directories as reference sources for M/WBEs in construction certified by the City of Chicago or the County of
Cook, or the Small Business Administration SBA 8(a) directory for SBA 8(a)s certified by the
Small Business Administration. Only firms certified by the ILUCP, the City of Chicago, the
County of Cook, or the Small Business Administration at the time of bid opening are eligible to be considered for contract award to either meet the contract goal or establish the Bidder’s good faith efforts to do so. Directory links are as follows:
IL UCP - https://webapps.dot.illinois.gov/UCP/ExternalSearch
City of Chicago M/WBE - https://chicago.mwdbe.com/
Cook County M/WBE - https://cookcounty.diversitycompliance.com/
Small Business Administration SBA 8(a) – https://www.sba.gov/federal-contracting/contracting-assistance-programs/8a-business-development-program
Companies that were listed in either the IL UCP, the City of Chicago M/WBE, the Cook County
M/WBE or the Small Business Administration SBA 8(a) directories at the time of bid opening and were subsequently removed from the directory would be addressed in accordance with
Section 7.2 and Section 12 of the Special Provisions for Disadvantaged Business Enterprise
Participation located in Volume I.
I-25-2032
ADDENDUM 3 PAGE 1 OF 1 MARCH 24, 2026