Atch_7_Qatar_SRTS_Amend_01_Summary_of_Changes_27Apr15.pdf

PDF 21 KB Posted

Attached to
Solicitation - Qatar Stevedoring and Related Terminal Services (S&RTS)
Solicitation number
HTC711-15-R-R016
Issued by

About this file

Atch 7 Amendment 0001 Summary of Changes

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HTC711-15-R-R016

ATTACHMENT 7

QATAR Stevedoring and Related Terminal Services (S&RTS) AMENDMENT 01 – Summary of Changes

AMENDMENT SUMMARY: The purpose of this amendment is to revise the Performance Work Statement (PWS), Pricing Schedule (Schedule), and Provision 52.212-1 resulting from questions submitted in response to this solicitation. The following is a summary of the changes:

52.212-1

− 52.212.1(b)(4)(A)(6)(b): Changed documentary evidence from “proof of a valid port license” to “authorization to operate within the Port of Mesaieed as a registered agent”.

− 52.212.1(b)(4)(A)(6)(c): Changed documentary evidence from “proof of a valid Customs Broker License” to “capability to perform customs clearance through a licensed customs broker or clearing agency”.

PWS

− Performance Requirement Summary (PRS) #22: Corrected PWS reference from ¶

6.2.2.11 to ¶ 6.2.11.

− PRS #22: Removed covered storage from this objective as it does not apply in Qatar.

− ¶ 3.0: Removed “due 30 days after contract award”, relating to the written safety plan to align with the written safety plan being an evaluation factor.

− ¶ 3.6.1: Added compensation for inspecting cargo to be at the applicable Schedule 1 commodity rate.

− ¶ 3.7.4: Added ¶ 3.7.4.5, stating that compensation for Secondary Containment will be as an out-of-pocket expense under Schedule 8.

− ¶ 6.2.2.4: Clarified compensation for lashing and securing cargo on vessel is included within commodity rate in Schedule 1A.

− ¶ 6.2.2.7: Clarified compensation for staging will be under Schedules 2 & 4, where applicable.

− ¶ 6.2.8: Added Compensation for Inland Transportation shall be at the rates in Schedule

9, unless otherwise noted. Inserted ¶ 6.2.8.3, stating that compensation for unloading equipment at inland destination shall be at Schedule 4 rates.

− ¶ 6.2.13: Clarified compensation for in-stow inspections is included in commodity rate in Schedules 1A and B.

− ¶ 6.4.1.1: Added compensation for exclusive staging area shall be at the rates in Schedule 6.

− ¶ 6.4.1.2: Added “high speed” as the type of internet connection required.

− ¶ 6.4.2.1.4: Added “smart” and “email and internet capabilities” to description of cell phone. Clarified compensation for unit is under Schedule 6 and service is under Schedule 8.

− ¶ 6.4.2.1.5: Added paragraph for Fax machine, with basic functionality description.

− ¶ 6.6.2: Changed “obtain clearance of vessel” to “obtain cargo clearance”.

− Removed or corrected inconsistent use of unit of measure “Measurement Ton”, “M/T” and “MT”.

Pricing Schedule

− Schedule 6: Added line item 8 for Exclusive Use Hardstand Staging Area and line item 9 for Dunnage and Lashing Materials.

− Schedule 6: Added mobilization/demobilization to the description of line item 2 to highlight that rate should include that cost.

− Schedule 6: Changed unit of measure for line items 3 – 7 from “each” to “each per month”.

− Schedule 5: Removed “including reefers” from description of line items 1 – 17. Inserted line items 18 – 21 specifically for reefer containers storage.

− Schedule 4: Added “MOB/DEMOB” to the note to clarify equipment rates should include that cost.