Atch_2_Qatar_SRTS_Pricing_Schedule_27Apr15.xlsx
XLSX spreadsheet 45 KB Posted
- Solicitation number
- HTC711-15-R-R016
About this file
Atch 2 Pricing Schedule updated 27Apr15
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised Schedule
| Commodity Descriptions | |
| HTC711-15-R-R016 QATAR SOLICITATION ATTACHMENT 2 |
REVISED 27 APRIL 2015
20 Hazardous / Explosive / Ammo cargo bulk or palletized or unitized
25 Hazardous / Explosive / Ammo Cargo Containerized
40 GENERAL CARGO OR BULK CARGO OR CARGO NOT OTHERWISE SPECIFIED,
45 CARGO TRANSPORTERS- Containers, Flatracks, MILVANS, SEAVAN AND LEASED VAN, all types and sizes (loaded /empty)
60 VEHICLES, UNBOXED
Note MT = Measurement Ton
Note All Cargo will be direct delivery
| INPUT UNIT PRICES |
| INPUT ESCALATION RATE |
QATAR
| EXPORT LOADING VESSELS SCHEDULE 1A | ||||||||||||||||
| Line Item | Commodity Number | Commodity Name | Unit of Measure | LOLO | RORO | |||||||||||
| FROM LAND TRANSPORT | FROM QUAY/SHED | OPERATIONAL | TOW AWAY | |||||||||||||
| A | C | K | L | |||||||||||||
| LINE ITEM | COMMODITY NUMBER | COMMODITY NAME | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | |
| 40 | 40A | General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) | MT | 84 | $0.00 | $ - 0 | 84 | $0.00 | $ - 0 | |||||||
| 40B | General Cargo Loose Cargo | MT | 84 | $0.00 | $ - 0 | 84 | $0.00 | $ - 0 | ||||||||
| 60 | 60A | Vehicles up to 5 Metric ton | EA | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | |
| 60B | Vehicles 5 Metric ton up to 10 Metric ton | EA | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | ||
| 60C | Vehicles over 10 Metric ton | MT | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | ||
| 20 | 20 | Hazardous / Explosive / Ammo Cargo Breakbulk | MT | 42 | $0.00 | $ - 0 | 42 | $0.00 | $ - 0 | |||||||
| 25 | 25 | Hazardous / Explosive / Ammo Cargo Containerized | MT | 2400 | $0.00 | $ - 0 | 2400 | $0.00 | $ - 0 | |||||||
| 45 | 45 | Container 20FT / 40FT | MT | 3200 | $0.00 | $ - 0 | 3200 | $0.00 | $ - 0 | |||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| NOTE: ALL COMMODITY RATES IN SCHEDULE 1A INCLUDES LABOR, EQUIPMENTS AND ALL PORT CHARGES |
| IMPORT UNLOADING VESSELS SCHEDULE 1B | ||||||||||||||||
| Line Item | Commodity Number | Commodity Name | Unit of Measure | LOLO | RORO | |||||||||||
| TO LAND TRANSPORT | TO QUAY/SHED | OPERATIONAL | TOW AWAY | |||||||||||||
| A | C | K | L | |||||||||||||
| LINE ITEM | COMMODITY NUMBER | COMMODITY NAME | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | |
| 40 | 40A | General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) | MT | 84 | $0.00 | $ - 0 | 84 | $0.00 | $ - 0 | |||||||
| 40B | General Cargo Loose Cargo | MT | 84 | $0.00 | $ - 0 | 84 | $0.00 | $ - 0 | ||||||||
| 60 | 60A | Vehicles up to 5 Metric ton | EA | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | |
| 60B | Vehicles 5 Metric ton up to 10 Metric ton | EA | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | ||
| 60C | Vehicles over 10 Metric ton | MT | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | ||
| 20 | 20 | Hazardous / Explosive / Ammo Cargo Breakbulk | MT | 42 | $0.00 | $ - 0 | 42 | $0.00 | $ - 0 | |||||||
| 25 | 25 | Hazardous / Explosive / Ammo Cargo Containerized | MT | 2400 | $0.00 | $ - 0 | 2400 | $0.00 | $ - 0 | |||||||
| 45 | 45 | Container 20FT / 40FT | MT | 3200 | $0.00 | $ - 0 | 3200 | $0.00 | $ - 0 | |||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| NOTE: ALL COMMODITY RATES IN SCHEDULE 1B INCLUDES LABOR, EQUIPMENTS AND ALL PORT CHARGES |
| EXPORT UNLOADING TRUCKS / RECEIPT SCHEDULE 1C | ||||||||||||||||
| Line Item | Commodity Number | Commodity Name | Unit of Measure | LOLO | RORO | |||||||||||
| FROM LAND TRANSPORT | TO QUAY/SHED | OPERATIONAL | TOW AWAY | |||||||||||||
| A | C | K | L | |||||||||||||
| LINE ITEM | COMMODITY NUMBER | COMMODITY NAME | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | |
| 40 | 40A | General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) | MT | 84 | $0.00 | $ - 0 | ||||||||||
| 40B | General Cargo Loose Cargo | MT | 84 | $0.00 | $ - 0 | |||||||||||
| 60 | 60A | Vehicles up to 5 Metric ton | EA | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | ||||
| 60B | Vehicles 5 Metric ton up to 10 Metric ton | EA | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | |||||
| 60C | Vehicles over 10 Metric ton | MT | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | |||||
| 20 | 20 | Hazardous / Explosive / Ammo Cargo Breakbulk | MT | 42 | $0.00 | $ - 0 | ||||||||||
| 25 | 25 | Hazardous / Explosive / Ammo Cargo Containerized | MT | 2400 | $0.00 | $ - 0 | ||||||||||
| 45 | 45 | Container 20FT / 40FT | MT | 3200 | $0.00 | $ - 0 | ||||||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| NOTE: ALL COMMODITY RATES IN SCHEDULE 1C INCLUDES LABOR, EQUIPMENTS AND ALL PORT CHARGES |
| IMPORT LOADING TRUCKS / DISPOSITION SCHEDULE 1D | ||||||||||||||||
| Line Item | Commodity Number | Commodity Name | Unit of Measure | LOLO | RORO | |||||||||||
| TO LAND TRANSPORT | TO QUAY/SHED | OPERATIONAL | TOW AWAY | |||||||||||||
| A | C | K | L | |||||||||||||
| LINE ITEM | COMMODITY NUMBER | COMMODITY NAME | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | |
| 40 | 40A | General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) | MT | 84 | $0.00 | $ - 0 | ||||||||||
| 40B | General Cargo Loose Cargo | MT | 84 | $0.00 | $ - 0 | |||||||||||
| 60 | 60A | Vehicles up to 5 Metric ton | EA | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | ||||
| 60B | Vehicles 5 Metric ton up to 10 Metric ton | EA | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | |||||
| 60C | Vehicles over 10 Metric ton | MT | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | |||||
| 20 | 20 | Hazardous / Explosive / Ammo Cargo Breakbulk | MT | 42 | $0.00 | $ - 0 | ||||||||||
| 25 | 25 | Hazardous / Explosive / Ammo Cargo Containerized | MT | 2400 | $0.00 | $ - 0 | ||||||||||
| 45 | 45 | Container 20FT / 40FT | MT | 3200 | $0.00 | $ - 0 | ||||||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| NOTE: ALL COMMODITY RATES IN SCHEDULE 1D INCLUDES LABOR, EQUIPMENTS AND ALL PORT CHARGES |
| STUFFING/UNSTUFFING SCHEDULE 1E | ||||||||||||||||
| Line Item | Commodity Number | Commodity Name | Unit of Measure | LOLO | RORO | |||||||||||
| STUFFING | UNTUFFING | OPERATIONAL | TOW AWAY | |||||||||||||
| A | C | K | L | |||||||||||||
| LINE ITEM | COMMODITY NUMBER | COMMODITY NAME | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | |
| 40 | 40A | General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) | MT | 84 | $0.00 | $ - 0 | 84 | $0.00 | $ - 0 | |||||||
| 40B | General Cargo Loose Cargo | MT | 84 | $0.00 | $ - 0 | 84 | $0.00 | $ - 0 | ||||||||
| 60 | 60A | Vehicles up to 5 Metric ton | EA | 12 | $0.00 | $ - 0 | 12 | $0.00 | $ - 0 | |||||||
| 60B | Vehicles 5 Metric ton up to 10 Metric ton | EA | 28 | $0.00 | $ - 0 | 28 | $0.00 | $ - 0 | ||||||||
| 60C | Vehicles over 10 Metric ton | MT | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | ||||||||
| 20 | 20 | Hazardous / Explosive / Ammo Cargo Breakbulk | MT | 84 | $0.00 | $ - 0 | 84 | $0.00 | $ - 0 | |||||||
| 25 | 25 | Hazardous / Explosive / Ammo Cargo Containerized | ||||||||||||||
| 45 | 45 | Container 20FT / 40FT | ||||||||||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| NOTE: ALL COMMODITY RATES IN SCHEDULE 1E INCLUDES LABOR, EQUIPMENTS AND ALL PORT CHARGES |
| TRANSFER OF CARGO WITH IN PORT SCHEDULE 1F | ||||||||||||||||
| Line Item | Commodity Number | Commodity Name | Unit of Measure | LOLO | RORO | |||||||||||
| DIFFERENT AREAS IN PORT | UNTUFFING | OPERATIONAL | TOW AWAY | |||||||||||||
| A | C | K | L | |||||||||||||
| LINE ITEM | COMMODITY NUMBER | COMMODITY NAME | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | QTY | UNIT PRICE | TOTAL | |
| 40 | 40A | General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) | MT | 84 | $0.00 | $ - 0 | ||||||||||
| 40B | General Cargo Loose Cargo | MT | 84 | $0.00 | $ - 0 | |||||||||||
| 60 | 60A | Vehicles up to 5 Metric ton | EA | 22 | $0.00 | $ - 0 | 24 | $0.00 | $ - 0 | |||||||
| 60B | Vehicles 5 Metric ton up to 10 Metric ton | EA | 120 | $0.00 | $ - 0 | 36 | $0.00 | $ - 0 | ||||||||
| 60C | Vehicles over 10 Metric ton | MT | 210 | $0.00 | $ - 0 | 210 | $0.00 | $ - 0 | ||||||||
| 20 | 20 | Hazardous / Explosive / Ammo Cargo Breakbulk | MT | 84 | $0.00 | $ - 0 | ||||||||||
| 25 | 25 | Hazardous / Explosive / Ammo Cargo Containerized | MT | 2400 | $0.00 | $ - 0 | ||||||||||
| 45 | 45 | Container 20FT / 40FT | MT | 3200 | $0.00 | $ - 0 | ||||||||||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| NOTE: ALL COMMODITY RATES IN SCHEDULE 1F INCLUDES LABOR, EQUIPMENTS AND ALL PORT CHARGES |
| MAN HOUR SCHEDULE SCHEDULE 2 | |||||||||||||||
| LINE ITEM | LINE ITEM | DESCRIPTION | IIA | IIB | IIC | IID | |||||||||
| Labor Type ( All Labor Per Hour) | Extra Labor (Straight Time) | Extra Labor (Overtime) Differential Hours | Extra Labor (Overtime) to include Friday's, Saturday's Holiday's & Night Overtime after 2200 | Extra Labor (Overtime) Ammo & Hazardous Material Handling to include (Friday's, Saturday's Holiday's & Night Overtime after 2200) | |||||||||||
| Basic Labor | Quantity | Rate | Total | Quantity | Rate | Total | Quantity | Rate | Total | Quantity | Rate | Total | |||
| 1 | 1 | Longshoremen / Gang (Per Hour) | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | |
| 2 | 2 | Checker/Clerk (Per Hour) | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | |
| Skilled Labor | |||||||||||||||
| 3 | 3 | Mechanic (Per hour) | 8 | $0.00 | $ - 0 | 8 | $0.00 | $ - 0 | 8 | $0.00 | $ - 0 | 8 | $0.00 | $ - 0 | |
| 4 | 4 | Flagman / Signalman (Per hour) | 8 | $0.00 | $ - 0 | 8 | $0.00 | $ - 0 | 8 | $0.00 | $ - 0 | 8 | $0.00 | $ - 0 | |
| 5 | 5 | Host Nation Transportation Specialist (Per Hour) | 1728 | $0.00 | $ - 0 | 144 | $0.00 | $ - 0 | 96 | $0.00 | $ - 0 | 8 | $0.00 | $ - 0 | |
| 6 | 6 | Customs Broker (Per hour) | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 0 | $0.00 | $ - 0 | 8 | $0.00 | $ - 0 | |
| 7 | 7 | Transportation Coordinator (Per hour) | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 0 | $0.00 | $ - 0 | 8 | $0.00 | $ - 0 | |
| Supervisory | |||||||||||||||
| 8 | 8 | Supervisor (Per hour) | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | |
| 9 | 9 | Manager (Per hour) | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | 72 | $0.00 | $ - 0 | |
| Total | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| EQUIPMENT RENTAL SCHEDULE 4 | ||
| OPERATING TIME | STANDBY TIME |
| LINE ITEM | LINE ITEM | COMMODITY NAME | UOM | QTY | UNIT PRICE | TOTAL | UOM | QTY | UNIT PRICE | TOTAL | |
| 1 | 1 | Forklift 3 -7 tons | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 2 | 2 | Forklift 10 tons | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 3 | 3 | Forklift 20 ton | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 4 | 4 | Forklift 25 ton | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 5 | 5 | Container Handler | Per Hour | 48 | $0.00 | $ - 0 | Per Hour | 48 | $0.00 | $ - 0 | |
| 6 | 6 | Container Handler Hazardous materials | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 7 | 7 | Yard Tractor/Tug Master | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 8 | 8 | 40FT Trailer Lowbed | Per Hour | 48 | $0.00 | $ - 0 | Per Hour | 48 | $0.00 | $ - 0 | |
| 9 | 9 | 40FT Trailer Flatbed | Per Hour | 48 | $0.00 | $ - 0 | Per Hour | 48 | $0.00 | $ - 0 | |
| 10 | 10 | Mobile Crane 80 Ton | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 11 | 11 | Mobile Crane 100Ton | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 12 | 12 | Mobile Crane 120 Ton | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 13 | 13 | Mobile Crane 200 Ton | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| 14 | 14 | Grantry Crane | Per Hour | 14 | $0.00 | $ - 0 | Per Hour | 14 | $0.00 | $ - 0 | |
| Total | Total | $ - 0 | $ - 0 | $ - 0 | |||||||
| NOTE: ALL ABOVE EQUIPMENTS WILL INCLUDE DRIVERS, FUELS, MOB/DEMOB, LUBRICANTS AND NECESSARY SLINGS AND ACCESSORIES. |
| DETENTION / STORAGE SCHEDULE 5 | |||||||
| Line Item | LINE ITEM | DESCRIPTION | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | |
| 1 | 1 | 20FT & smaller First 7 days Import Full | Per Day | 12 | FREE | $ - 0 | |
| 2 | 2 | 20FT & smaller days 8-14 days Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 3 | 3 | 20FT & smaller days 15-21 days Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 4 | 4 | 20FT & smaller days 22-29 days Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 5 | 5 | 20FT & smaller Days 30 and beyond, up to 1 year Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 6 | 6 | 40FT First 7 days Export Full | Per Day | 12 | FREE | $ - 0 | |
| 7 | 7 | 40FT days 8 - 14 days Export Full | Per Day | 12 | $0.00 | $ - 0 | |
| 8 | 8 | 40FT days 15 - 29 days Export Full | Per Day | 12 | $0.00 | $ - 0 | |
| 9 | 9 | 40FT days 30 and beyond, up to 1 year Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 10 | 10 | 20FT First 7 days trans-shipment storage Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 11 | 11 | 20FT days 8-14 trans-shipment storage Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 12 | 12 | 20FT days 15-21 trans-shipment storage Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 13 | 13 | 20FT days 22 and beyond, up to 1 year Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 14 | 14 | 40FT First 7 days trans-shipment storage Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 15 | 15 | 40FT days 8-14 trans-shipment storage Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 16 | 16 | 40FT days15-21 trans-shipment storage Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 17 | 17 | 40FT days 22 and beyond, up to 1 year Import Full | Per Day | 12 | $0.00 | $ - 0 | |
| 18 | 18 | Reefer container First 7 days | Per Day | 12 | $0.00 | $ - 0 | |
| 19 | 19 | Reefer container 8 - 14 days | Per Day | 12 | $0.00 | $ - 0 | |
| 20 | 20 | Reefer container 15 - 21 days | Per Day | 12 | $0.00 | $ - 0 | |
| 21 | 21 | Reefer container 22 days and beyond, up to a year | Per Day | 12 | $0.00 | $ - 0 | |
| 22 | 22 | First 7 days Flatrack | Per Day | 12 | $0.00 | $ - 0 | |
| 23 | 23 | Days 8-14 days Flatrack | Per Day | 12 | $0.00 | $ - 0 | |
| 24 | 24 | Days 15-21 daysFlatrack | Per Day | 12 | $0.00 | $ - 0 | |
| 25 | 25 | Days 22-29 days Flatrack | Per Day | 12 | $0.00 | $ - 0 | |
| 26 | 26 | Days 30 and beyond up to 1 year Flatrack | Per Day | 12 | $0.00 | $ - 0 | |
| 27 | 27 | First 7 days Vehicles | Per Day | 12 | $0.00 | $ - 0 | |
| 28 | 28 | Days 8-14 days Vehicles | Per Day | 12 | $0.00 | $ - 0 | |
| 29 | 29 | Days 15-21days Vehicles | Per Day | 12 | $0.00 | $ - 0 | |
| 30 | 30 | Days 22-29 days Vehicles | Per Day | 12 | $0.00 | $ - 0 | |
| 31 | 31 | Days 30 and beyond up to 1 year Vehicles | Per Day | 12 | $0.00 | $ - 0 | |
| 32 | 32 | First 7 days Break Bulk | Per Day | 12 | $0.00 | $ - 0 | |
| 33 | 33 | Days 8-14 days Break Bulk | Per Day | 12 | $0.00 | $ - 0 | |
| 34 | 34 | Days 15-21 days Break Bulk | Per Day | 12 | $0.00 | $ - 0 | |
| 35 | 35 | Days 22-29 days Break Bulk | Per Day | 12 | $0.00 | $ - 0 | |
| 36 | 36 | Days 30 and beyond up to 1 year Break Bulk | Per Day | 12 | $0.00 | $ - 0 | |
| Total | Total | 0 | $ - 0 | $ - 0 |
| UTILIZATION OF FACILITIES SCHEDULE 6 | |||||||
| Line Item | LINE ITEM | DESCRIPTION | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | |
| 1 | 1 | OFFICE SPACE (PERMANENT) w/Electrical connections, Furnitures, Internet and sanitary facilities | PER SQM | 144 | $0.00 | $ - 0 | |
| 2 | 2 | OFFICE SPACE (PORTABLE) w/Electrical connections, Furnitures, Internet and sanitary facilities, including Mob/Demob | PER SQM | 288 | $0.00 | $ - 0 | |
| 3 | 3 | Landline Telephone(s) (international) (hire) | Each per month | 3 | $0.00 | $ - 0 | |
| 4 | 4 | Cellular Telephone (3 max) p/telephone (hire) | Each per month | 3 | $0.00 | $ - 0 | |
| 5 | 5 | Handheld Radio (6 max) with 1 Base Station, per radio | Each per month | 6 | $0.00 | $ - 0 | |
| 6 | 6 | Facsimile machine | Each per month | 1 | $0.00 | $ - 0 | |
| 7 | 7 | Portable latrine (2 max) p/latrine, w/daily cleaning | Each per month | 2 | $0.00 | $ - 0 | |
| 8 | 8 | Exclusive Use Hardstand Staging Area | Invoice | Actuals | Actuals | $ - 0 | |
| 9 | 9 | Dunnage and Lashing | Invoice | Actuals | Actuals | $ - 0 | |
| Total | Total | $ - 0 | $ - 0 |
| LUMBER AND RELATED SERVICES SCHEDULE 7 | |||||||
| LINE ITEM | DESCRIPTION | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | ||
| LUMBER SUPPLIED BY CONTRACTOR | |||||||
| LENGTH 400 cm - 450 cm | |||||||
| Actual Thickness Ordering Thickness | |||||||
| 1 | 40 x 40 mm 4 X 4 cm | Each | 24 | $0.00 | $ - 0 | ||
| 2 | 23 x 160 mm 2.4 x 20 cm | Each | 24 | $0.00 | $ - 0 | ||
| 3 | 40 x 240 mm 4 x 24 cm | Each | 24 | $0.00 | $ - 0 | ||
| 4 | 46 x 96 mm 5 x 10 cm | Each | 24 | $0.00 | $ - 0 | ||
| 5 | 96 x 96 mm 10 x 10 cm | Each | 24 | $0.00 | $ - 0 | ||
| 6 | 98 x 148 mm 10 x 15 cm | Each | 24 | $0.00 | $ - 0 | ||
| 7 | 148 x 148 mm 15 x 15 cm | Each | 24 | $0.00 | $ - 0 | ||
| 8 | 148 x 198 mm 15 x 20 cm | Each | 24 | $0.00 | $ - 0 | ||
| 9 | 198 x 198 mm 20 x 20 cm | Each | 24 | $0.00 | $ - 0 | ||
| PLYWOOD | |||||||
| 10 | 9.5 mm X 122 cm X 244 | Each | 48 | $0.00 | $ - 0 | ||
| 11 | 12.5 mm x 122 cm x 244 | Each | 48 | $0.00 | $ - 0 | ||
| 12 | 18.5 mm x 122 cm x 244 | Each | 48 | $0.00 | $ - 0 | ||
| Total | $ - 0 | $ - 0 |
| MISCELLANEOUS SUPPORT SERVICE SCHEDULE 8 | |||||||
| LINE ITEM | DESCRIPTION | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | ||
| 1 | Diver (only for military vessels) | Per Dive | 36 | $0.00 | $ - 0 | ||
| 2 | Bayan Charges | Per Document | 260 | $0.00 | $ - 0 | ||
| 3 | Border Crossing Documents | Per Shipment | 6 | $0.00 | $ - 0 | ||
| 4 | Customs Broker clearence fees | Per shipment | 26 | $0.00 | $ - 0 | ||
| 5 | EPC Charges | Per Shipment | 24 | $0.00 | $ - 0 | ||
| 6 | Visas & Port Passes for Deployment Support Team (per person) | Each | 12 | $0.00 | $ - 0 | ||
| 7 | Reefer connect/disconnect | Each | 12 | $0.00 | $ - 0 | ||
| 8 | Reefer power charges & daily monitoring | Per Day | 6 | $0.00 | $ - 0 | ||
| 9 | Cable/Metal Seals | Each | 6 | $0.00 | $ - 0 | ||
| 10 | Schedule VIII - Out of Pocket | Invoice | Actuals | Actuals | |||
| Total | $ - 0 | $ - 0 |
| INLAND TRANSPORTATION SCHEDULE 9 | ||
| REGULAR TIME | DETENTION TIME |
| LINE ITEM | DESCRIPTION | UNIT OF MEASURE | QTY | UNIT PRICE | TOTAL | UOM | QTY | UNIT PRICE | TOTAL | ||
| 1 | Tractor/ 40' Flatbed Trailer | Per 8 Hours | 100 | $0.00 | $ - 0 | Per Hour | 100 | $0.00 | $ - 0 | ||
| 2 | Tractor/40ft - 30 Ton Capacity Low Bed | Per 8 Hours | 70 | $0.00 | $ - 0 | Per Hour | 70 | $0.00 | $ - 0 | ||
| 3 | Tractor/up to100 Ton Capacity Wide Lowbed up to 15 meter | Per 8 Hours | 10 | $0.00 | $ - 0 | Per Hour | 10 | $0.00 | $ - 0 | ||
| Total | $ - 0 | $ - 0 | $ - 0 | ||||||||
| NOTE: ALL TRUCKS WILL INCLUDE DRIVERS, FUELS, LUBRICANTS, TARPING AND ALL LASHING MATERIALS. |
BASE PERIOD SCHEDULE TOTALS $ - 0
SCH IA LOAD VESSELS $ - 0
SCH 1B DISCHARGE VESSELS $ - 0
SCHEDULE 1C TRUCKS UNLOAD - RECEIPT $ - 0
SCHEDULE 1D TRUCKS LOADING - DISPOSITION $ - 0
SCHEDULE 1E STUFFING/UNSTUFFING $ - 0
SCHEDULE 1F TRANSFER $ - 0
SCH II MAN HOUR SCHEDULE $ - 0
SCH IV EQUIPMENT RENTAL $ - 0
SCH V DETENTION / STORAGE $ - 0
SCH VI UTILIZATION OF FACILITIES $ - 0
SCH VII LUMBER AND RELATED SERVICES $ - 0
SCH VIII MISCELLANEOUS SUPPORT $ - 0
SCHEDULE IX INLAND TRANSPORTATION $ - 0
TOTAL: $ - 0
| BASE + 4 YEARS + 6 MONTH SCHEDULE TOTALS | |||
| ESCALATION RATE (%) | |||
| SCH IA | LOAD VESSELS | $ - 0 |
SCH 1B DISCHARGE VESSELS $ - 0
SCHEDULE 1C TRUCKS UNLOAD - RECEIPT $ - 0
SCHEDULE 1D TRUCKS LOADING - DISPOSITION $ - 0
SCHEDULE 1E STUFFING/UNSTUFFING $ - 0
SCHEDULE 1F TRANSFER $ - 0
SCH II MAN HOUR SCHEDULE $ - 0
SCH IV EQUIPMENT RENTAL $ - 0
SCH V DETENTION / STORAGE $ - 0
SCH VI UTILIZATION OF FACILITIES $ - 0
SCH VII LUMBER AND RELATED SERVICES $ - 0
SCH VIII MISCELLANEOUS SUPPORT $ - 0
SCHEDULE IX INLAND TRANSPORTATION $ - 0
TOTAL: $ - 0
Sheet1
File details come from the government source that posted it. Updated .