Attachment 5 CDRL-QASP 5-28.doc
DOC document 63 KB Posted
- Attached to
- Personnel Suitability and Adjudication Support
- Solicitation number
- HSTS03-09-R-SEC070
About this file
Contract Data Requirement List 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SEC070 Q A-Question 3.docx | DOCX document | |
| SF30-0001-Signed.pdf | ||
| SEC070 Q A.docx | DOCX document | |
| ATTACHMENT 1-Definitions.doc | DOC document | |
| Attachment 2-PMP DID 5-23.doc | DOC document | |
| Attachment 6-Suitability Processing for Contractors.pdf | ||
| Attachment 4CDRL- Program Management Plan | — | |
| HSTS03-09-R-SEC070 Adjudicator-FINAL.pdf | ||
| Attachment 3QASP DID 5-23.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
A. Contract line Item No.
B. Exhibit
A C. Category (Check appropriate one)
TDP FORMCHECKBOX
TM FORMCHECKBOX
Other FORMCHECKBOX
D. System/Item
QUALITY ASSURANCE PLAN
E. Contract/PR No.
F. Contractor
1. Data Item No.
A002
2. Title of Data Item
Quality Assurance Plan
3. Subtitle
4. Authority
-PM-0002
5. Contact Reference
HSTS03-09-R-SEC070
6. Requiring Office
TSA
| 7. DD 250 Req’d |
| 8. APP Code |
| 9. Distribution Statement Required |
| 10. Frequency |
| 11. As of Date (AOD) |
| LT |
| A |
| R/ASR |
| 0 |
12. Date of First
Submission
| See Block 14 |
| 13. Date of Subsequent |
Submission
| See Block 14 |
| 15. Distribution |
See Block 14
| 14. REMARKS: |
| a. |
| b. Draft |
| c. Final Copies |
Block 8 Quality Review Reports (Adjudicators) will be conducted 20 days after an adjudicator position has been filed. The report will be submitted to the Team Lead and COTR.
Monthly Performance Report & Checklist. The first draft will be submitted 10 days after contract award and the final 30 days after contract award/post award conference and monthly thereafter.
Strength Report. The first report will be provided after the first work day upon award of the contract. Afterwards it is due only upon changes to the strength levels.
Block 10
Review of Completed Work (Adjudicators) will be conducted each week. The number of cases to be reviewed is located within the SOW. The report will be submitted to the Team Lead and the COTR.
Quality Review (Security Assistants) will be provided if requested by the Team lead and/or COTR.
Block 12
Quality Review Reports (Adjudicators) will be submitted to the Team and COTR.
Monthly Performance Report & Checklist. The first draft will be submitted 10 days after contract award and the final 30 days after contract award/post award conference and monthly thereafter.
Block 15
The PMP shall be submitted in electronic form. The "Reg" electronic version shall be compatible with the Windows Office suite and a PDF version shall be provided as the "Repro" copy. A PDF version of the letter of transmittal (see Block 7 - LT) signed by the contractor's authorized approving official shall be provided.
Addressee COTR/Team Lead
COTR
COTR
COTR/Team Lead
COTR/Team Lead
COTR/Team Lead
COTR/Team Lead
COTR/Team Lead
| Copies |
| Reg. |
| Repro |
| 16. Total |
| 2 |
| 1 |
| G. Prepared By: |
| H. Date |
| I. Approved By |
| J. Date |
| 17. Price Group |
| 18. Estimated Total Price |
INSTRUCTIONS FOR COMPLETING FAA Template No. 59 (6/98)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
| CODE |
| FREQUENCY |
| CODE |
| FREQUENCY |
| ANNLY |
| Annually |
| ASGEN |
| As generated |
| ASREQ |
| As required |
| BI-MO |
| Every two months |
| BI-WE |
| Every two weeks |
| CP/RQ |
| Change pages as required |
| DAILY |
| Daily |
| DFDEL |
| Deferred delivery |
| MTHLY |
| Monthly |
| ONE/R |
| One time with revisions |
| OTIME |
| One time (does not include draft submissions |
| QRTLY |
| Quarterly |
| R/ASR |
| Revisions as required |
| SEMIA |
| Every six months |
| WEKLY |
| Weekly |
| “N”TIME |
| Multiple separate submittals (2time, 3time, etc.) |
| See Item #14 |
| Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14. |
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes
| Code |
| Definition |
| Code |
| Definition |
| ASGEN |
| As generated |
| ASREQ |
| As required |
| DFDEL |
| Deferred delivery |
| “N”DAC |
| Days after contract award |
| “N”DACM |
| Days after contract modification |
| “N”DARP |
| Days after reporting period |
| “N”DARC |
| Days after receipt of comments |
| “N”DTC |
| Days after test completion |
| NLT |
| No later than |
| EOC |
| End of contract |
| EOM |
| End of month |
| EOQ |
| End of quarter |
| See item #14 |
| Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14. |
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
16. Total. Total number of draft and final (regular/reproducible) copies required.
17. Price Group. Not used.
18. Estimated Total Price. Not used.
OMB Control No. 2120-0595
(DD Form 1423-1) FAA Template No. 59 (6/98 OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)
File details come from the government source that posted it. Updated .