WORK SPECIFICATION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SYCAMORE,_Specification,_Rev_1.pdf | ||
| Amendment_01-Sycamore_DS.doc | DOC document | |
| Attachment_1-_Section_B-Supplies_and_Services.xls | XLS spreadsheet | |
| Attachment_3-_Past_Performance_Information_Form.doc | DOC document | |
| Attachment_4-_Request_for_Clarifications.doc | DOC document | |
| HSCG85-18-Q-P45021_USCGC_Sycamore_DS.pdf | ||
| Attachment_5-_USCG_Ombudsman_Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC SYCAMORE (WLB 209)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2018
Developed By: Bronson L Suyat
(Rev-0, 20 September 2017)
USCGC SYCAMORE (WLB-225B) DOCKSIDE AVAILABILITY FY2018
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ................................................................................. xi Consolidated List of Critical Inspection Items ........................................................................................... xvi Principal Characteristics ........................................................................................................................... xvii General Requirements WORK ITEM 1: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 2: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 3: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 4: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning WORK ITEM 5: Vent Ducts (All Other), Commercial Cleaning WORK ITEM 6: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 7: Hydraulic Chain Stoppers, Inspect And Service WORK ITEM 8: Crossdeck Winches, Inspect and Service WORK ITEM 9: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 10: Mechanical Chain Stoppers, Inspect and Service WORK ITEM 11: Anchor Windlass, Inspect and Service WORK ITEM 12: Warping Capstan, Inspect and Service WORK ITEM 13: Single Point Davit, Inspect and Service WORK ITEM 14: Commissary Hoist, Inspect and Service WORK ITEM 15: Buoy Crane, Appleton EB4806040, Inspect And Service WORK ITEM 16: Sewage Piping, Clean And Flush WORK ITEM 17: Tanks (Grey Water Holding), Preserve “Partial” WORK ITEM 18: Tanks (Sewage Holding), Preserve “Partial” WORK ITEM 19: Tanks (Potable Water), Preserve “Partial” WORK ITEM 20: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 21: Mast Multi-Cable Transit Block, Install WORK ITEM 22: Mechanical Chain Stoppers, Relocate WORK ITEM 23: SSDG Isolation Mount, Renew WORK ITEM 24: SSDG Heat Exchanger, Modify WORK ITEM 25: Exhaust Stacks (Exterior), Preserve - Partial WORK ITEM 26: Non-Machinery Spaces, Preserve and Insulate (Various Compartments) WORK ITEM 27: CPO Stateroom (01-57-2-L) Bulkhead, Inspect and Repair WORK ITEM 28: Buoy Deck Bulwark, Preserve WORK ITEM 29: Buoy Cargo Hold Deck and Bulkheads, Preserve 100% WORK ITEM 30: Buoy Crane Pedestal Interior (3-23-0-Q), Preserve WORK ITEM 31: Fuel Oil Transfer Gage Piping, Renew WORK ITEM 32: Rails, Stanchions and Lifeline Inspect, 100% Preserve WORK ITEM 33: Handrails and Stanchions, Renew WORK ITEM 34: Fo’c’sle Fittings and Components, Preserve WORK ITEM 35: SORS Cargo Hold Deck and Bulkheads, Preserve 100% WORK ITEM 36: Seawater Cooling System Piping, Renew WORK ITEM 37: Reach-In Reefer and Freezer Box, Renew WORK ITEM 38: Buoy Deck Auxiliary Cleat & Snubbing Winch Installation WORK ITEM 39: SORS Cargo Hatch, Inspect and Repair WORK ITEM 40: Grey Water Holding Tank(s), Clean and Inspect WORK ITEM 41: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 42: Temporary Services, Provide - Cutter iii (Rev-0)
WORK ITEM 43: Temporary Messing, Provide WORK ITEM 44: Temporary Berthing, Provide WORK ITEM 45: Main Diesel Engines, Mount Renewal WORK ITEM 46: Fire Pump #2 Discharge Root Valve Piping, Repair WORK ITEM 47: Cargo Hold Padeyes Renew WORK ITEM 48: Deck Plating 04 Level, Repair iv (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
225B-WLB 601-1, Rev J, General Arr Inboard and Outboard Profiles
Coast Guard Drawing
Coast Guard Drawing 225 WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement
Coast Guard Drawing 225B WLB 162-1, Rev G, Stacks and Updates
Coast Guard Drawing 225B WLB 259-001, Rev C, Combustion Intake & Exhaust Diagram
Coast Guard Drawing 225B WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225B WLB 259-006, Rev C, Combustion Intake & Exhaust A&D Hull Blocks 970
& 975
Coast Guard Drawing 225B WLB 505-001, Rev D, General Requirements for Piping Systems
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram
Coast Guard Drawing 225B WLB 512-007, Rev B, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform
Coast Guard Drawing 225B WLB 521-001, Rev E, Firemain System Diagram
Coast Guard Drawing 225B WLB 521-006, Rev C, Firemain System A/D FR 66 Aft, Block 940, 950
Coast Guard Drawing 225B WLB 528-001, Rev E, Plumbing and Interior Deck Drains
Coast Guard Drawing 225B WLB 528-002, Rev D, Weather Deck Drains Diagram
Coast Guard Drawing 225B WLB 549-001, Rev A, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 549-001, Rev C, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 549-1, Rev -, Onboard Lubrication Requirements http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace vi (Rev-0)
Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram
Coast Guard Drawing 225B WLB 573-001, Rev G, Buoy Handling System Arrangement
Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement
Coast Guard Drawing 225B WLB 573-009, Rev E, Bi-Dir Ch Stopper With Retractable Roller Stopper
Coast Guard Drawing 225B WLB 573-11, Rev -, ATON Tie Downs
Coast Guard Drawing 225B WLB 581-001, Rev C, Anchor Handling System Arrangement
Coast Guard Drawing 225B WLB 593-001, Rev D, Sewage and Waste Water System Diagram
Coast Guard Drawing 225B WLB 593-001, Rev D, Sewage and Waste Water System
Coast Guard Drawing 225B WLB 593-009, Rev B, Sewage Holding Tank
Coast Guard Drawing 225B WLB 601-001, Rev F, General Arrangement Inboard & Outboard Profiles
Coast Guard Drawing 225B WLB 601-001, Rev M; General Arrangement Inboard and Outboard Profiles
Coast Guard Drawing 225B WLB 601-002 Rev K, Booklet of General Drawings
Coast Guard Drawing 225B WLB 601-002, Rev G, Booklet of General Drawings
Coast Guard Drawing 225B WLB 601-002, Rev K, Booklet of General Drawings
Coast Guard Drawing 225B WLB 672-001, Rev C, Storerooms, Cargo Stowage and Ship Store
Arrangement and Details
Coast Guard Drawing 225B WLB-256-001, Rev P, Seawater Cooling System Diagram
Coast Guard Drawing 225B WLB-256-004, Rev F, SW Cooling System Fr 66 Aft Block 940, 950 & 970
Coast Guard Drawing 225B WLB-505-001, Rev D, General Requirements for Piping Systems
Coast Guard Drawing 225B WLB-541-001, Rev J, Fuel Oil System Diagram
Coast Guard Drawing 225B WLB-541-004, Rev C, Fuel Oil Transfer Sys A/D Fr 66 Aft Block 940, 950
Coast Guard Drawing 225B WLB-601-002, Rev M, Booklet of General Drawings
Coast Guard Drawing 225B-WLB 180-10, Rev -, Generator Foundations
Coast Guard Drawing 225B-WLB 256-7, Rev -, Heat Exchanger Modifications for CAT 3508 SSDG
Coast Guard Drawing 225B-WLB 549-1, Rev -, Onboard Lubrication Requirements
Coast Guard Drawing 225B-WLB 556-1, Rev B, Hydraulic System Diagram
Coast Guard Drawing 225B-WLB 573-1, Rev -, Buoy Handling System Arrangement
Coast Guard Drawing 225B-WLB 573-2, Rev -, Weight Handling System Arrangement
Coast Guard Drawing 225B-WLB 601-1, Rev F, General Arrangements, Inboard and Outboard Profiles
Coast Guard Drawing 225B-WLB 170-1, Rev H; Mast A & D
Coast Guard Drawing 225B-WLB 180-10, Rev -, Generator Foundations
Coast Guard Drawing 225B-WLB 233-1, Rev D, Propulsion Train Installation Drawing
Coast Guard Drawing 225B-WLB 256-7, Rev -, Heat Exchanger Modifications for CAT 3508 SSDG
Coast Guard Drawing 225B-WLB 573-01, Rev C, Aton Tie Downs
Coast Guard Drawing 225B-WLB 601-001, Rev J, Gen Arr, Inboard and Outboard Profiles
Coast Guard Drawing 225B-WLB 601-001, Rev J, General Arrangements, Inbd & Outbd Profiles
Coast Guard Drawing 225B-WLB 601-1, Rev N, General Arrangements – Inboard & Outboard Profiles
Coast Guard Drawing 225B-WLB 601-2, Rev K; Booklet of General Drawings
Coast Guard Drawing 225B-WLB 601-2, Rev M, Booklet of General Drawings
Coast Guard Drawing 225B-WLB 631-1, Rev G, Painting Schedule
Coast Guard Drawing 225B-WLB 635-1, Rev E, Hull, Thermal, & Acoustic Insulation Schedule
Coast Guard Drawing 225B-WLB 960-4, Rev D, Hull Block 960B - Panels vii (Rev-0)
Coast Guard Drawing 225B-WLB-573-001, Rev K, Buoy Handling System
Coast Guard Drawing 225B-WLB-601-001, Rev M, General Arrangements, Inboard and Outboard
Profiles
Coast Guard Drawing 225B-WLB-612-001, Rev H, Lifelines, Liferails, & Stanchions
Coast Guard Drawing 225B-WLB-631-001, Rev G, Painting Schedule
Coast Guard Drawing 225B-WLB-634-001, Rev F, Deck Covering Schedule
Coast Guard Drawing 225B-WLB-801-17, Rev A, Scantlings, Superstructure
Coast Guard Drawing 225-WLB 597-15, Rev C, SORS Structural Detail
Coast Guard Drawing 225-WLB 601-001, Rev T, Gen Arrangements Inbd & Outboard Profiles
Coast Guard Drawing 225-WLB 601-01, Rev T, Gen Arrangements Inboard & Outboard Profiles
Coast Guard Drawing 225-WLB-573-1, Rev P, Buoy Handling System
Coast Guard Drawing FL 1602-90, Rev -, Flush Cargo Hatch with Scupper Drains
Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain
Coast Guard Drawing FL 2605-034, Rev C, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1-
1/4"
Coast Guard Drawing FL 2605-037, Rev A, Mechanical Chain Stopper Reinstallation
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1
Coast Guard Drawing FL-1702-11, Rev -, Inspection of Sheaves
Coast Guard Fleet Drawing FL-2605-29, Rev H, Chain Stopper System – Rising Sheave Assembly
NAVSEA Drawing 2803-980209, Plates, Label
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Coast Guard (CG) Yard Procedures Manual, Volume VIII, Oct 1999, Procedure 11100.1A, Unaccompanied Personnel Housing Regulations
Coast Guard CMP - WLB-225 M-Q-2197, 04/30/2017
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (CG TP) 3562,SWBS 583, Section B (SWBS 583B), Sep 2013, Davit, Single Point Slewing Armt Model - RAD30 - 15.5
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3518B, 07-MAY-01, Main Diesel Engine (MDE) - Model
3608/1
Coast Guard Technical Publication (TP) 3523B, May 2001; Coupling, Torsional (Flexible), Manufacturer: American Vulkan, Model NO. RATO-S 3321-2100/1070 (Rev B)
Coast Guard Technical Publication (TP) 3524, SWBS 256, Feb 2001, Pump, Harbor-Model 3000DVL
Coast Guard Technical Publication (TP) 3537A, 07-MAY-01, Ship's Service Diesel Generator Set
(SSDG) - Model 3508
Coast Guard Technical Publication (TP) 3537B, 07-MAY-01, Ship's Service Diesel Generator Set
(SSDG) - Model 3508
Coast Guard Technical Publication (TP) 3552-541-A, Fuel Oil Purifier - Model WHPX-405 viii (Rev-0)
Coast Guard Technical Publication (TP) 3557, Section 573-C, Feb 2010, Manufacturer's Instruction
Book-SWBS Group 568-573, Buoy Crane – Model EB-480-60-40 (Hulls 206, 207, 208, 209, 210, 211, 212, 213, 214, 215, 216)
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS
Group(s) 573, Section B, Cross Deck Winch – Model BMD-471
Coast Guard Technical Publication (TP) 3559, SWBS 581B, Jan 1997, Anchor Windlass, P/S - Model
BMD-478
Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-
Coast Guard Technical Publication (TP) 3562, Sep 2013, SWBS 589, Section C, Dumbwaiter, Model –F-
WK-806
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
Coast Guard Technical Publication (TP) 3750, SWBS 573-A, Dec 2012, Rising Sheave Chain Stopper
Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60
(13’-4”)
Coast Guard Technical Publication (TP) 5458, SWBS 573, Oct 2012, Winch, Radial – Model 50.2PT
NAVSEA Dwg 2803-980209, Plates, Label
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General
Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems Installation Details
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Preserve Ship
Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2012, Temporary
Hull Accesses ix (Rev-0)
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
OTHER REFERENCES
AAA/CAA - http://newsroom.aaa.com/diamond-ratings/diamond-rating-definitions
AAA/CAA - http://newsroom.aaa.com/diamond-ratings/diamond-rating-definitions/
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System
Components - Health Effects
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component
Adhesives (AN)
Chockfast® Orange, general Guidelines for Marine Chock Designers Bulletin No. 692D
Christie &Grey Data Sheet DS 094 - Instructions for the measurement of mounting heights using either spring loaded telescopic gauges or a digital DTI set
Christie &Grey Data Sheet DS 096 - Mount Height Data Collection Sheet For New Installations and In
Service Maintenance Checks - Marine Diesel Engines
Christie &Grey Drawing No. 44560 Isolation of Caterpillar 3508 Generator Set
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
FORBES (formerly MOBIL) Travel Guide - http://www.forbestravelguide.com
FORBES (formerly MOBIL) Travel Guide - http://www.forbestravelguide.com/
Harken Installation and Maintenance Manual for Radial Winch 50.2PT, MRW-01
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe
Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)
MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric)
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning x (Rev-0)
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of
Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating xi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
7 N Repair Kit, HYD
Chain Stopper Rising
Sheave (for Para. 3.2, Tasks #2 and #3)
NSN: 2040-01-483-3947 2 ea. 2,631.46
7 N Repair Kit, Cable
Chain (Includes
Pads) (FL-2605-29
PC#36)
NSN: 3020-01-538-0684 16 ea. 257.99
8 N Hand Pump SS NSN: 4320-01-517-1444 1 ea 1,499.66
N Pressure Gauge -
Model BMD-471
NSN: 6685-01-437-2519 4 ea 43.79
N Wire rope Assembly NSN: 4010-01-643-2077 4 ea 900.00
N Hydraulic brake repair kit - Model
BMD-471
NSN: 3950-01-526-9090 4 ea. 913.00
N Counter balance valve - Model BMD-
NSN: 4810-01-353-0586 4 ea. 150.00
N **Shuttle valve -
Model BMD-471
NSN: 4820-01-317-2748 4 ea. 35.00
N Needle valve - Model
BMD-471
NSN: 4820-01-329-0051 4 ea. 82.00
N Hydraulic motor seal kit - Model BMD-
NSN: 5330-01-475-4566 8 ea. 84.00
N Clutch shoe - Model
BMD-471
NSN: 4910-01-475-4125 4 ea. 56.90
N Drum bushing -
Model BMD-471
NSN: 3950-01-631-0884 8 ea. 272.00
N Shaft bushing -
Model BMD-471
NSN: 3950-01-631-0771 4 ea. 298.00
N ** Gear boxSeal kit(for Winch
Gearbox Assemblies)
- Model BMD-471
NIIN: XFC343225 PN:
YMD-8194-R
4 ea. 70.00
N Control Station
Repair Parts. Kit
NSN: 6110-01-644-9898 4 ea. 438.00
N Flag Block Bearing
Kit
NSN: 3940-01-526-5592 2 ea. 180.00 xii (Rev-0)
N Valve, Safety Relief NSN: 4820-01-324-4269
(Included as a Component of
Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 69.19
N Plug, Pipe NSN: 4730-01-426-7736
(Included as a Component of
Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 17.15
N Valve, Globe NSN: 4820-01-329-0051
(Included as a Component of
Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 37.14
N O-Ring NSN: 5331- 00-165-1941
(Included as a Component of
Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 0.34
N Valve, Shuttle NSN: 4820-01-317-2748
(Included as a Component of
Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 18.51
N Flag Block Bearing
Cup, Sheave
NSN: 3110-01-644-9670 2 ea. 231.00
N Flag Block Bearing
Cone, Sheave
NSN: 3110-01-013-4036 2 ea. 182.00
N Seal NSN: 5330-01-287-2826 2 ea. 104.00
N Valve, Globe NSN: 4820-01-329-0051 4 ea. 38.11
9 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00
N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25
N Level wind pivot bushing
NSN: 3120-01-621-2293 1 ea. 1,139.00
N Level wind thrust bearing
NSN: 3120-01-621-2300 2 ea. 483.30
N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29
N Rexroth Sandwich
Flow Control
NSN: 4810-01-505-9289 1 ea. 250.00
N Sun Sandwich Relief
Valves
NSN: 4820-01-439-2451 2 ea. 900.00
N Rexroth Tandem
Center Proportional
Directional Valve
NSN: 4810-01-506-3841 1 ea. 300.00
Y Level Wind
Hydraulic Cylinder
NSN: 3040-01-441-3721 1 ea. 7,423.00
9 N 3:1 Pilot Ratio, Vented
Counterbalance
Valve Assembly
NSN: 4820-01-563-5841 1 ea 98.70 xiii (Rev-0)
N Fully Adjustable
Needle Valve
NSN: 4820-01-416-0579 1 ea 48.75
N Wire Rope Assembly NSN: 4010-01-646-6972 1 ea. 500.00
Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998
N **Pump, Hydraulic
Ram, Hand Driven
NSN: 4320-01-286-4065 1 ea. 419.77
N **Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00
N **Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00
10 N Hardware Kit NSN: 5430-01-494-2479 2 ea. 618.54
10 N Hardware Kit, Mechanical
NSN: 2030-01-485-7215 2 ea. 784.35
N Swing Gear Gearbox
Seal Kit
NSN: 5330-01-434-3776 PN:
YMD-6847-R
5 ea 3,250.00
N Swing Gear Brake O-
Ring Kit
NSN: 5330-01-315-7384 PN:
12-501-002 (Mico Inc)
5 ea 1,235.00
N Swing Gear Brake
Lining Kit
NSN: 2530-01-315-3927 PN:
12-501-004 (Mico Inc)
5 ea 3,085.00
N Swing Gear Brake
Bearing Kit
NSN: 3120-01-320-9669 PN:
12-501-006 (Mico Inc)
5 ea 1,190.00
N Swing Gear Brake
Spring Kit
NSN: 5360-01-316-4410 PN:
12-501-008 (Mico Inc)
5 ea 1,635.00
N Swing Brake, Wet
Type
NSN: 3040-01-536-3596 PN:
YMD-9629
5 ea 3,432.65
N Parts Kit, Hydraulic
Motor
NSN: 4320-01-475-1857 PN:
YMD-6847-R
5 ea 845.00
N Valve, Counterbalance
NSN: 4820-01-478-5117 PN:
CBIH-LJN (Sun Hydraulics)
2 ea 260.93
N Valve, Shuttle NSN: 4820-01-317-2748 PN:
CSAD-XXN (Sun
Hydraulics)
2 ea 18.51
N Valve, Logic (DCV) NSN: 4820-01-478-5149 PN:
DKFC-XHN (Sun
Hydraulics)
1 ea 143.29
N Counterbalance
Valve Cartridge
(Luff & Extension
Cylinder)
NSN: 4820-01-370-5503 PN:
CBGA-LHN (Sun
Hydraulics)
8 ea 694.00
N Seal Kit, Luff
Cylinder
NSN: 5330-01-F16-4854
PN: SK-8690 (HSI Corp)
2 ea 1756.00
N Luff Cylinder Pin NSN: 5315-01-632-8114 PN:
MMD-3214
4 ea 740.00
N Luff Cylinder
Bushing
NSN: 3120-01-424-1044 PN:
MMD-2020
8 ea 344.00
N Seal Kit, Extension
Cylinder
NSN: 5330-01-475-1975 PN:
YMD-8261-R
1 ea 169.00 xiv (Rev-0)
N Extension Cylinder
Bushing
NSN: 5365-01-632-8144 PN:
MMD-2875
4 ea 620.00
N Extension Cylinder
Pin
NSN: 5315-01-632-7973 PN:
MMD-3216
2 ea 655.00
N Heel Pin NSN: 5315-01-631-1699 PN:
MMD-2873
2 ea 1,1410.00
N Main Hoist Block
Repair Kit
NSN: 3940-01-543-9872 PN:
YMD-8267-R
1 ea 2,144.00
N Overhaul Ball Swivel
Assembly
NSN: 2020-01-F16-4853
PN: 2009246 (Crosby
Group)
1 ea 100.00
N Sheave Bearings NSN: 3020-01-507-3247 PN:
YMD-8269-R
3 ea 1,896.75
N Sheave, 24” OD-M/F NSN: 3020-01-506-8814 PN:
YMD-8370
1 ea 2,086.00
N Sheave, 18” OD-A/F NSN: 3020-01-506-9078 PN:
YMD-8371
1 ea 1,949.50
N Replacement Filter
Elements
NSN: 4330-01-346-4729 PN:
KZ3 (Schroeder)
12 ea 44.30
N Anti-Two Block
Limit Switch
NSN: 5930-01-527-7845 PN:
YMD-7378
2 ea 394.00
N Grease Fitting NSN: 4730-00-367-6890 PN:
YMD-6033
18 ea 9.26
N Clamp Seal NSN: 5330-01-640-7138 PN:
MMD-3280
1 ea 30.00
N Clamp Seal NSN: 5330-01-640-7077 PN:
MMD-3279
1 ea 30.00
N Slide Pad/Shim Set
Kit
NSN: 5365-01-506-8728 PN:
YMD-8956
1 ea 2,101.67
N Electrical Connector NSN: 5935-01-640-6747 PN:
YMD-5956
1 ea 19.00
N Emergency Release
Manifold Cartridge
NSN: 4730-01-507-3516 PN:
YMD-6895-R
3 ea 1,145.21
N Pressure Gauge NSN: 6685-01-437-2519 PN:
YMD-6822
2 ea 58.96
N Cab Penetration
Gasket
NSN: 5330-01-524-3389 PN:
MMD-2753
3 ea 14.09
N Winch Seal Kit NSN: 5330-01-372-3524 PN:
YMD-7038-R
1 ea 135.00
N Winch, Hydraulic
Motor
NSN: 4320-01-440-6236 PN:
YMD-8318
1 ea 1,394.68
N Hydraulic Swivel
Repair Kit
NSN: 4320-01-651-9493 PN:
YMD-8273-R
1 ea 2,424.00
N Load Pin (Main) NSN: 6670-01-516-0022 PN:
YMD-8275
1 ea 6,434.00
N Load Pin (Aux Fall) NSN: 6670-01-516-0024 PN:
YMD-8276
1 ea 3,837.25
N Turntable Bearing
Bolt
NSN: 3950-01-516-5810 PN:
YMD-8953
115 ea 35.00 xv (Rev-0)
N Thrust Washer NSN: 3120-01-216-4036 PN:
WMD-1100
8 ea 96.00
N Thrust Washer NSN: 3120-01-632-7953 PN:
MMD-1363
4 ea 504.00
N Snap Ring NSN: 5340-01-F16-4852
PN: WSM-700-S02 (Smalley
Steel Ring Co)
4 ea 500.00
N Sealing Washers NSN: 5310-01-310-5968 PN:
YMD-1828
8 ea 8.00
N Gauge Snubber NSN: 4820-01-193-7276 PN:
YMD-6201
2 ea 33.01
N Shuttle Valve NSN: 4820-01-417-1911 PN:
YMD-1288
2 ea 70.00
N Main Fall Wire Rope NSN: 4010-01-486-0047 PN:
JWCG13001919PL
1 ea 3,000.00
N Aux Fall Wire Rope NSN: 4010-01-594-2228 PN:
JWCG75200637PL
1 ea 2,500.00
22 N Chain Stopper Repair
Kit
NSN: 2030-01-485-7215 2 ea. 795.00
22 N Chain Stopper Pin
Kit
NSN: 2030-01-485-7209 2 ea. 50.00
23 N Christie & Grey
Isolation Mount
PN: T2.S20.45.C0.100 TSC
T2 20/45 (UTS threads)
8 ea. 558
23 N Christie & Grey
Isolation Mount
PN: T2.S20.55.C0.100 TSC
T2 20/55 (UTS threads)
4 ea. 558
23 N Christie & Grey Sole
Plate
PN: 54378 rev A 12 ea. 98
38 N Winch, Drum, Hand
Operated
NSN: 3950-01-614-5150 /
PN: 50.2 PTA
6 ea. $2,181.60
38 N Cleat, 15 in.; Steel NSN: 2040-01-614-2587 /
PN: 7254
8 ea. $135
39 N SORS Cargo Hatch
Gasket
Walz & Krenzer P/N D-WK-
837-1-4 or equivalent
2 $200
45 Y TSC T2 40/60 Unit
IsolatorVERIFY PN
N/A 4 600.00
45 Y TSC T2 50/60 Unit
IsolatorVERIFY PN
N/A 8 600.00
47 Y 2,000LB WLL
ATON Flush Deck
Padeye (Buoy Tie-down)
NSN/PN Schoellhorn-
Albrecht S299
7 $125
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xvi (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars):
Work
Item Title
1 Hydraulically Operated Cargo Hatch, Inspect and Service
7 Hydraulic Chain Stoppers, Inspect And Service
8 Crossdeck Winches, Inspect and Service
9 Hydraulic Inhaul Winch, Inspect And Service
10 Mechanical Chain Stoppers, Inspect and Service
11 Anchor Windlass, Inspect and Service
12 Warping Capstan, Inspect and Service
13 Single Point Davit, Inspect and ServiceCHECK AM
14 Commissary Hoist, Inspect and Service
15 Buoy Crane, Appleton EB4806040, Inspect And Service xvii (Rev-0)
PRINCIPAL CHARACTERISTICS
225' WLB (B-CLASS)
PHYSICAL
Length overall 225' 0"
Length between perpendiculars 206' 0"
Maximum beam 46'
Designed draft 13' 0"
Full load displacement 1905.6 Long Tons SW
Light ship displacement 1500.7 Long Tons SW
Minimum operating displacement 1869.2 Long Tons SW
Mast height (above 12' waterline) 67' 5"
Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-
3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79
Frame spacing
FR 0 to 12 21"
FR 12 to 30 22"
FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction
Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM
Number of propellers 1
Number of blades 4
Diameter 10'
Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW
Emergency diesel generator One Caterpillar 3406 DITA, 280 KW
Shore tie Two 450 VAC, 400 Amp, 3-wire
Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL
Shaft bearing, aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
18 (Rev-0)
00000_1216_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard
Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and
Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
19 (Rev-0)
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with
SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors
Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec
6310) and colors and color schemes (provided in Chapter 6 of
COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for
Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable
Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast
Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG
20 (Rev-0)
Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or
Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge
Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan;
ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous
Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB).
This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met;
inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental
Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for
HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as
0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The
Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF
35870" with FED-STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE
BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W)
BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3: SSPC-SP 10/NACE NO. 2 using grit
21 (Rev-0) conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL
(Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec
6310 (Critical drying time requirements)).”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec
6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
22 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area
(max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
23 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER
COAT, BARRIER COAT,
TOP COAT, ETC…)
LOCATION (FRAME
& DECK,
RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DE
W
PT.
SURFA
CE
AMBIE
NT
ΔT
| DP -
SURFAC
E |
24 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE
MANUFACTURER:
ABRASIVE SIEVE
SIZE:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15
READINGS:
25 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE
MANUFACTURER:
ABRASIVE SIEVE
SIZE:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Mean
(mils)
Mean Reading (mils) IAW ASTM DD4417).
26 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY
(MICROSIEMENS/CM)
27 (Rev-0)
28 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM SEQUENCE
(PRIMER/TOUCHUP/3RD COAT,
ETC.)
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If
Magnetic Pull-Off (Type
I/Banana) Gauge Is Used.
LOCATION (FRAME
REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATIO
N
3 BEFORE
ADJUSTMENTS
AFTER
ADJUSTMENTS
AVG.
N
3 BEFORE
ADJUSTMENTS
AFTER
N
3 BEFORE
ADJUSTMENTS
AFTER
APPLICATION METHOD (AIRLESS, CONVENTIONAL
SPRAY, ROLLED)
AVERAGE DFT
29 (Rev-0)
16700_MWC_0815_IBCT
REC_16700_CrgHtchInspctSrvc_IBCT_225’ WLB (‘B’ Class: Hulls 206-216)(0815)
WORK ITEM 1: Hydraulically Operated Cargo Hatch, Inspect and Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform inspections and service for the hydraulically-operated cargo hatch.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 528-002, Rev D, Weather Deck Drains Diagram
Coast Guard Drawing 225B WLB 549-001, Rev C, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram
Coast Guard Drawing 225B WLB 601-001, Rev M; General Arrangement Inboard and
Outboard Profiles
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
30 (Rev-0)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.2 (Tasks to be accomplished) – Task #1.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Electrical and hydraulic switches.
Dogs.
Toggles.
Hydraulic cylinders.
Hydraulic lines.
Electrical cables.
Hoses.
Overhead insulation.
3.2 Tasks to be accomplished. The Contractor shall perform the following tasks:
ADDITION REQUIREMENTS
# TASK
TYPE
QTY COMPONENT
OR
ASSEMBLY
APPENDIX
AND PARA.
FROM
5000_STD
OTHER
1 Operate and
Inspect
1 Cargo Hatch 3.2.1 (Operate and inspect)
1. Check for hatch proper operation of all indicators, switches, dogging un-dogging and overall operation.
2. Check entire coaming and drains for signs or debris or clogging of drains.
3. Conduct a visual inspection of the hatch. Check all linkage.
4. Inspect both inner and outer knife edges for proper height and evenness of wear.
31 (Rev-0)
ADDITION REQUIREMENTS
# TASK
TYPE
QTY COMPONENT
OR
ASSEMBLY
APPENDIX
AND PARA.
FROM
5000_STD
OTHER
5. Inspect entire hatch structure, for signs of paint wear and corrosion.
6. Inspect gasket channels for corrosion. 7. Take a total of 10 UT measurements of gasket channel surfaces, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C.
8. Perform NDI of all welds in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR.
9. Inspect hydraulic hose condition.
10. Check condition of dogs and wedges.
Submit A CIR.
2 Remove and reinstall
1 Cargo Hatch N/A Remove hatch, to facilitate inspections and service tasks, and reinstall hatch, upon completion of work.
3 Service and
Inspect
1 Hydraulic hatch lift cylinder
3.2.2 (Service and inspect)
Submit CFR
4 NDE 1 Cargo Hatch 3.2.5 (NDE) Components designated for NDE: All welds.
Submit a CFR.
5 Renew 1 Cargo hatch gasket
N/A See…