Solicitation_Sched_A-M(08R6BX415).doc
DOC document 691 KB Posted
- Attached to
- POLAR CLASS ICEBREAKER MULTI-SHIP MULTI-OPTION MAINTENANCE CONTRACT Federal contract opportunity
- Solicitation number
- HSCG85-08-R-6BX415
About this file
01 Solicitation Schedule Sections A-M
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment0005.doc | DOC document | |
| Amendment0004.doc | DOC document | |
| Amendment0003.pdf | ||
| AttJ.4_Clarification_Form(08R6BX415)(Amd 0002).doc | DOC document | |
| Amendment0002.doc | DOC document | |
| Amendment0001.pdf | ||
| AttJ.4_Clarification_Form(08R6BX415).doc | DOC document | |
| AttJ.1_Exe_DS_Spec(08R6BX415).pdf | ||
| AttJ.1a_Pln_DD_DS_Pkg(08R6BX415).doc | DOC document | |
| AttJ.3_Tech_Eval_Criteria(08R6BX415).doc | DOC document | |
| AttJ.2_KR_Raw_Cost_Element_Breakdown(08R6BX415).xls | XLS spreadsheet | |
| AttJ.1_Exe_DD_Spec(08R6BX415).pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POLAR CLASS MSMO
HSCG85-08-R-6BX415
NOTICE TO OFFERORS
1.
This competitive negotiated best value procurement is being issued as a Total Small Business Set-Aside. This procurement is geographically restricted by the USCG Pacific Area Commander to contractor facilities within 200 road miles of the POLAR class cutters’ homeport in Seattle, WA.
2.
A multi-ship, multi-option, Cost Plus Incentive Fee supply contract is anticipated for award. Place of performance will be the contractor’s facility.
3.
In order to be considered for award, offerors will be required to submit written proposals consistent with the requirements of this solicitation. Source selection will be based on a best value determination outlined in Section M. Cost or pricing data and a cost proposal is required by this solicitation. When this solicitation uses the term “price proposal,” that term shall also refer to the “cost proposal” required by Section L.
4.
In addition to the requirement to submit price and technical proposals, offerors must complete and submit all applicable items of this solicitation, with particular emphasis on Sections A through K.
5.
See Section L.2 for ship check opportunities. Potential offerors are urged to take advantage of ship checking opportunities for proposal development purposes.
6.
It is the offerors’ responsibility to ensure their written proposals meet all of the requirements stated in this solicitation. Failure to provide all necessary information may result in a proposal being rejected or not receiving full consideration since the Coast Guard reserves the right to award a contract based upon initial proposals.
7.
As stated in Section M of this solicitation, the Coast Guard reserves the right to award this contract to other than the lowest priced offeror.
8.
Offerors are advised that some of the drawings, diagrams, and reports that are provided with this solicitation are for informational use only. The Coast Guard does not warrant the accuracy of this information. This is the best information available to the Coast Guard and is provided to the offerors to assist them in preparing their competitive proposals.
9.
All questions will be directed only to the following individuals:
Jim Altice (206) 217-6815 e-mail: James.S.Altice@uscg.mil
Linda Cho, at (510) 637-5965 e-mail: Linda.C.Cho@uscg.mil (DRAWINGS WILL BE PROVIDED ON COMPACT DISK AND MAILED UPON REQUEST (Phone number and email in block 10 of the SF33 or in item 9 above.)
NOTICE FOR FILING AGENCY PROTESTS
It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the Coast Guard as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman.
Informal forum with the Ombudsman. Interested parties who believe that a Coast Guard procurement is unfair or otherwise defective should first direct their concerns to the cognizant contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest to either the contracting officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be forwarded to the address below:
Commandant (CG-913)
U.S. Coast Guard Headquarters
Acquisition Planning and Performance Measurement
1900 Half St. SW, Room 11-0402
Washington, DC 20593
Telephone: (202) 372-3692
Fax: (202) 475-3904
| SOLICITATION, OFFER AND AWARD |
| 1. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700) |
| RATING |
DO-A3
Page of Pages
| 1 |
| 53 |
| 2. CONTRACT NO. |
| 3. SOLICITATION NO. |
HSCG85-08-R-6BX415
4. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP
5. DATE ISSUED
28 APR 08
6. REQUISITION/PURCHASE NO.
21-08-8586BX415
7. ISSUED BY
CODE
| HSCG85 |
| 8. ADDRESS OFFER TO (If other than Item 7) |
COMMANDER (VPL)
MAINTENANCE & LOGISTICS COMMAND, PACIFIC
1301 CLAY ST. STE 807N
OAKLAND, CA 94501
JIM ALTICE
NESU SEATTLE BLDG 8
1519 ALASKAN WY. S.
SEATTLE, WA 98134
NOTE: In sealed bid solicitations, “offer” and “offeror” mean “bid” and “bidder.”
SOLICITATION
9. Sealed Offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if Handcarried, in the depository located in BLDG 3 until 11:00 a.m. local time 20 AUG 08
(Hour) (Date) CAUTION–LATE Submissions, Modifications, and Withdrawals:See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
| 10. FOR |
| A. NAME |
| B. TELEPHONE (NO COLLECT CALLS) |
| C. E-MAIL ADDRESS |
INFORMATION
CALL:
| JIM ALTICE |
| AREA CODE |
NUMBER
217-6815
| EXT. |
| James.S.Altice@uscg.mil |
11. TABLE OF CONTENTS
| (x) |
| SEC. |
| DESCRIPTION |
| PAGE(S) |
| (x) |
| SEC. |
| DESCRIPTION |
| PAGE(S) |
| PART I – THE SCHEDULE |
| PART II – CONTRACT CLAUSES |
| X |
| A |
| SOLICITATION/CONTRACT FORM |
| X |
| I |
| CONTRACT CLAUSES |
| X |
| B |
| SUPPLIES OR SERVICES AND PRICES/COSTS |
PARTIII – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
| X |
| C |
| DESCRIPTION/SPECS./WORK STATEMENT |
| X |
| J |
| LIST OF ATTACHMENTS |
| X |
| D |
| PACKAGING AND MARKING |
PART IV – REPRESENTATIONS AND INSTRUCTIONS
| X |
| E |
| INSPECTION AND ACCEPTANCE |
| X |
| K |
| REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS |
| X |
| F |
| DELIVERIES OR PERFORMANCE |
| X |
| G |
| CONTRACT ADMINISTRATION DATA |
| X |
| L |
| INSTRS., CONDS., AND NOTICES TO OFFERORS |
| X |
| H |
| SPECIAL CONTRACT REQUIREMENTS |
| X |
| M |
| EVALUATION FACTORS FOR AWARD |
OFFER
(Must be fully completed by offeror)
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
| ( |
| 10 CALENDAR DAYS |
20 CALENDAR DAYS
30 CALENDAR DAYS
CALENDAR DAYS
14. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
| AMENDMENT NO. |
| DATE |
| AMENDMENT NO. |
| DATE |
15A.NAME
AND
ADDRESS
OF
OFFEROR
CODE
FACILITY
16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
| 15B. TELEPHONE NUMBER |
| FORMCHECKBOX |
15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE – ENTER SUCH ADDRESS IN SCHEDULE
| 17. SIGNATURE |
| 18. OFFER DATE |
| AREA CODE |
| NUMBER |
EXT
AWARD (To be completed by Government)
| 19. ACCEPTED AS TO ITEMS NUMBERED |
| 20. AMOUNT |
| 21. ACCOUNTING AND APPROPRIATION |
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
FORMCHECKBOX
10 U.S.C. 2304 (c)(
FORMCHECKBOX
41 U.S.C. 253(c)(
23. SUBMIT INVOICES TO ADDRESS
SHOWN IN (4 copies unless otherwise pecified)
| ( |
| ITEM |
See Block 7
24. ADMINISTERED BY (If other than Item 7)
CODE
25. PAYMENT WILL BE MADE BY
CODE
COMMANDING OFFICER
USCG FINANCE CENTER, 1430 KRISTINA WAY
CHESAPEAKE, VA 23326-1224
| 26. NAME OF CONTRACTING OFFICER (Type or print) |
| 27. UNITED STATES OF AMERICA |
(Signature of Contracting Officer)
28. AWARD DATE
IMPORTANT – Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33
Prescribed by GSA – FAR (48 CFR) 53.214(c)
SECTION B: SUPPLIES OR SERVICES AND PRICES
In addition to completing Section B, the Contractor is required to submit additional pricing as part of its price proposal (See Sections L.9 and L.10 and subsidiary paragraphs).
BASE ITEM
| CLIN |
| DESCRIPTION |
AMOUNTS
| 0001 |
| Planning for FY09 DS of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
MULTI-YEAR OPTION ITEMS
| 0002 |
| Non-scheduled Repairs and Alterations |
| 0003 |
| Provisioned Items Orders (Matl/Eqpt Purchases) |
FY09 OPTION ITEMS
| 0004 |
| Planning for FY09 DD of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0005 |
| Execution of FY09 DS of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0006 |
| Execution of FY09 DD of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
FY10 OPTION ITEMS
| 0007 |
| Planning for FY10 DD of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0008 |
| Planning for FY10 DS of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0009 |
| Execution of FY10 DD of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0010 |
| Execution of FY10 DS of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
FY11 OPTION ITEMS
| 0011 |
| Planning of FY11 DS of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0012 |
| Planning for FY11 DD of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0013 |
| Execution of FY11 DS of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0014 |
| Execution of FY11 DD of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
FY12 OPTION ITEMS
| 0015 |
| Planning for FY12 DD of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0016 |
| Planning for FY12 DS of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0017 |
| Execution of FY12 DD of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0018 |
| Execution of FY12 DS of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
FY13 OPTION ITEMS
| 0019 |
| Planning for FY13 DS of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0020 |
| Planning for FY13 DD of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0021 |
| Execution of FY13 DS of POLAR SEA |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
| 0022 |
| Execution of FY13 DD of POLAR STAR |
| Target Cost |
| $ |
| FCCOM |
| $ |
| Fee-Bearing Cost |
| $ |
| Target Fee (10%) |
| $ |
| Total |
| $ |
| Min Fee (1%) |
| $ |
| Max Fee (15%) |
| $ |
SECTION C - DESCRIPTION AND SPECIFICATION
C.1
DESCRIPTION OF WORK:
PART 1 – OVERVIEW AND OBJECTIVES
The scope of this procurement is to accomplish planning and execution of scheduled maintenance and alterations on the U.S. Coast Guard’s POLAR class icebreakers, POLAR STAR (WAGB 10) and POLAR SEA (WAGB 11). These two vessels are home ported in Seattle, WA. The Maintenance and Logistics Command, Pacific, Vessels Division (hereinafter "MLC”), manages all vessel maintenance for the two ships.
The contractor’s efforts under the contract will be integrated into MLC’s A-Team process, outlined in the Naval Engineering Organization and Operating Procedures, MLCINST M9000 6E. As a member of the A-Team, the contractor will participate at specifically identified points in MLC’s planning process. Planning will be conducted during a discrete period of performance prior to a given vessel availability and will not run year-round. Most execution phase repair/alteration efforts will occur during the scheduled annual drydocking and dockside (DD/DS) maintenance availabilities. However, execution of work may also occur during other inport periods, depending upon need.
PART 2‑ CONTRACT LINE ITEM DESCRIPTION
The Contractor, under the written direction of the MLC, shall furnish the labor, material, technical resources and facilities (except those furnished by the Government under express provisions of this contract) necessary for the accomplishment of the following work on POLAR Class cutters.
ITEM 0001 AND (IF EXERCISED) OPTION ITEM(S) 0004, 0007, 0008, 0011, 0012, 0015, 0016, 0019 and 0020 - PLANNING FOR DOCKSIDE (DS) AND DRY DOCKING (DD) MAINTENANCE AVAILABILITIES FOR POLAR CLASS ICEBREAKERS
The Contractor shall accomplish planning within the performance period specified in Section F for the specific CLIN outlined in this Item. The Government reserves the right to perform these functions internally, or order these supplies and services elsewhere at its discretion.
The Contractor shall participate with other A-Team members in the 1st A-Team meeting to familiarize itself with the work and to offer technical recommendations. A Draft Worklist will be provided prior to the 1st A-Team meeting, and an Approved Work Package after the meeting. As assigned by the Contracting Officer via the Approved Worklist, and using existing standard MLC specifications as its baseline or by developing entirely new specifications, the contractor will accomplish initial planning and produce a draft specification for review at the 2nd A-Team meeting. Following that meeting, the contractor will incorporate all agreed changes, finalize the specification, complete document preparation and submit a cost proposal and production schedule for conduct of each scheduled DS/DD. In accomplishing its assigned planning role, the contractor shall to the maximum extent practicable, utilize existing standard MLC specifications. See Table C-1 for planning milestones. All work shall be coordinated with MLC to ensure that planning efforts previously performed by MLC or any other Government activity are not duplicated. Following are representative aspects of the planning function that the contractor shall be prepared to accomplish, subject to authorization by MLC.
a.
Accomplish assigned planning for the repair and alteration of the specific POLAR Class cutter in accordance with the contract schedule, work specifications, drawings, test procedures and other detailed data provided by the Government. The Contractor will be required to accomplish assigned planning functions including, but not limited to: specification development, identification of and procurement of materials, performance of ship checks, prefabrication and other work necessary to prepare for repair and alteration of the vessel in a timely manner. All work specifications generated must be in standard MLC format utilizing Attachment J.1 as a guide.
b.
During the planning process the contractor shall utilize standard specifications from MLC’s library of recurring maintenance items as its baseline. The contractor shall furthermore submit for review recommendations that may improve the quality of repairs and alterations. Reliability and service life improvements shall also serve as a basis for making such recommendations. To the extent possible, the contractor shall provide condition-based recommendations in generating the specification package.
c.
The contractor shall complete assigned planning functions and produce a draft specification for review at the 2nd A-Team meeting, which will normally be conducted at the vessels’ homeport in Seattle, WA.
d.
As authorized, the Contractor shall provide limited ILS support during the conduct of work under this contract. Such Logistics support includes but is not limited to the following items, and specifics of the support will be clearly identified in the CLIN execution document:
Provisioning Technical Documentation
Technical Documentation
Redline markups of Selected Drawings e.
Apply stringent change control procedures to ensure timely identification and incorporation of additional work (beyond that generated from the Approved Worklist). Growth work is work identified after authorization of a given CLIN (whether planning or execution). Growth work will stem directly from an approved worklist item. New work is work unrelated to an approved worklist item, and shall be incorporated into planning separately.
(1) GROWTH WORK - The contractor shall include an anticipated amount of growth work in its execution phase (DS/DD) cost proposal. The parties shall negotiate a Growth Pool into the execution CLIN to process growth requirements. The incorporation of these negotiated Pools into DS/DD sub-Line Items will result in changes to the negotiated CLIN contract values (Target Cost, Target Fee, Minimum and Maximum Fees). MLC representatives will evaluate growth work requirements during the execution phase. The Contracting Officer will authorize Growth Pool expenditures only after the growth work in question has been negotiated. Growth work will be subject to the Limitation of Cost clause. During the execution phase, decreases in funding requirements due to cost underruns, and increases in funding requirements due to cost overruns (or to accommodate growth work beyond the negotiated Growth Pool amount), shall result in no change to negotiated CLIN contract values (Target Cost, Target Fee, Minimum and Maximum Fees).
(2) NEW WORK – The contracting officer has sole authority to engage the contractor with new work requirements (whether for planning or execution phase). Upon authorization, the Contractor shall develop and price the new work before submitting it for MLC review. The parties may then negotiate a change in CLIN contract values. Only the contracting officer shall grant authorization to proceed with new work. Once authorized, such work will be subject to the Limitation of Cost clause.
f.
When authorized, develop specifications for growth and new work. These specifications shall be written in a format similar to the basic specifications, describing the additional work to be accomplished.
g.
Engineering drawings requiring correction shall be brought to the attention of MLC. Written notification of drawing problems with proposed solutions shall be provided via a Condition Found Report.
h.
Identify, procure, receive and store Long Lead-Time Material (LLTM) as authorized by the contracting officer.
i.
Provide an integrated milestone plan for the planning and execution phases of the availability. These milestones will include a schedule of key events necessary to meet the dates specified for the execution phase performance period.
j.
Develop and utilize a progress measurement system to determine the physical progress of the planning and execution phases. The progressing system shall permit a direct comparison of the physical progress of completed work to the integrated milestone plan that is to be developed in subparagraph i. above.
k.
Apply internal quality assurance procedures and those required by the Naval Engineering Manual to ensure that procured material, engineering and production work meets required quality standards.
l.
The Contractor cannot modify the basic design features of the engineering data provided by the Government. If the Contractor deems modifications necessary, the Contractor shall submit a Condition found Report with a detailed problem identification and proposed solution. The Condition found Report will be reviewed by MLC and may be incorporated into the authorized planning effort.
m.
Work specifications shall be based on a cutter’s Long Range Maintenance Plan (LRMP), Cutter Class Maintenance Plan (CCMP), submitted Current Ship’s Maintenance Projects (CSMP), completed work specifications previously developed by MLC, and other data derived from ship checks and technical information provided by MLC. If authorized, specifications created by the Contractor or reapplied from previous maintenance efforts shall be examined prior to submission to ensure applicability and compliance with technical and format requirements specified herein. In preparing the specifications and in accomplishing the work, it is mandatory that repairs be based on the ships’ actual material condition. Work specifications shall be stored and organized electronically so as to permit re-use.
n.
All required engineering, drawing modifications and other illustrative material shall be prepared to interpret and define the repair and alterations to the ship.
o.
When authorized by MLC, all drawings and other data developed by the Contractor shall represent a practical engineering solution based on the best trade‑off between total cost, reliability, maintainability, availability of material, labor skill and industrial capability, state‑of‑the‑art, and timely accomplishment of the task. Such design work will meet the requirement of the General Specifications for Overhaul of Surface Ships, NAVSEA S9AA0-AB-GOS-010, and be formatted as indicated in the Naval Engineering Manual (085).
p. The Contractor shall develop and submit test procedures in support of work specifications as applicable in accordance with GSO Section 092 and shipyard procedures.
q.
The Contractor shall provide material required for the availability only upon authorization by MLC.
r.
Upon DS/DD option award, the notional specification contained in Section J for the specific availability will be superseded by the specification identified in the option award document. Likewise, the Section B costs and fees for the specific CLIN will be superseded by the costs and fees negotiated for the actual work package.
s.
The following documents or their subsequent revisions in effect at time of contract award and/or option exercise, as well as applicable current instructions, general specifications, type plans, naval ship technical manuals and directives from the Naval Sea Systems Command shall be used in the technical requirements of work under the Contract:
NAVAL INSTRUCTIONS AND PUBLICATIONS
| MLCPACINST M9000.6E |
| Naval Engineering Organization |
| MLC NAV ENG PROCEDURES |
| Functions of Acquisition Teams |
| NAVSEA S9AA0-AB-GOS-010 & 020 |
| General Specifications for Overhaul of Surface Ships |
TABLE C-1 - ADVANCE PLANNING SCHEDULE FOR POLAR CLASS DS/DD
| ACTION |
| AVAILABILITY - |
| Approved Worklist provided to Contractor. |
| A-195 Days |
| 1st A-Team Meeting, including contractor. Review of cutter condition and available maintenance information. |
| A-180 Days |
| MLC forwards Approved Work Package, based on results of 1st A-Team Meeting, for contractor to develop proposal for accomplishment of planning |
| A-175 |
| Contractor submits proposal for accomplishment of planning |
| A-160 Days |
| Government awards Line Item for Advance Planning & identifies shipcheck opportunities |
| A- 130 Days |
| Government authorizes prefabrication effort and LLTM procurement |
| A-130 ~ 30 Days |
| Contractor provides draft specification to MLC electronically |
| A-90 |
| 2nd A-Team meeting, including contractor, to review draft specification package. |
| A-75 |
| Contractor submits completed specification package, integrated production schedule and final cost proposal for DS/DD |
| A-60 Days |
| Government awards Line Item for execution of DS/DD |
| A-30 Days |
| DS/DD commences |
| A-0 |
ITEM 0002 -- NON-SCHEDULED REPAIRS AND ALTERATIONS FOR POLAR CLASS ICEBREAKERS IN THE GREATER PUGET SOUND AREA
1. General
a. The Contractor shall accomplish the non-scheduled repairs and alterations of POLAR Class cutters upon receiving written authorization from the contracting officer and in accordance with the work item specifications, drawings, test procedures and other detailed data provided by the Government. The Government reserves the right to order these supplies and services elsewhere at its discretion.
b. Such work will occur outside of scheduled availabilities, prior to or after mission deployments and exercises, and shall usually be conducted in the general Puget Sound area or while the cutters are moored in their homeport at Pier 37 in Seattle, WA.
c. The Contractor shall furnish such supplies or services related to emergent type work and interim availabilities as may be ordered by the Government in accordance with the procedures specified herein. The Contractor shall not begin work on these supplies or services prior to the placement of orders therefore by the Contracting Officer.
2. Typical Work To Be Accomplished
a. Representative items to be accomplished are contained in Attachment J.1, but may include voyage or emergency repairs.
3. Planning
a. In most cases, the Contractor, will be required to evaluate information submitted by the Government, develop a specification based upon shipcheck, and submit a cost proposal for the work in question.
4. Authorization
a. The Contractor shall not take action on any such work prior to receiving written authorization from the Contracting Officer. Authorization under CLIN 0002 will be accomplished on a bilateral basis to the maximum extent practicable.
b. In the event that time does not permit negotiation of a bilateral modification, the Contracting Officer may issue a change order under the provisions of contract clause FAR 52.243-2 “Changes – Cost Reimbursement” and shall establish a price threshold for the action contemplated by the change. Failure to bilaterally adjudicate such a change order shall be considered a dispute within the meaning of the "Disputes" Clause.
ITEM 0003 - PROVISIONED ITEMS ORDERS (MATERIAL/EQUIPMENT PURCHASES)
1. General
a. The Contractor shall accomplish the procurement of material or equipment purchases for support of repairs and alterations of POLAR Class cutters upon receiving written authorization from the contracting officer and in accordance with the work item specifications, drawings, test procedures and other detailed data provided by the Government. The Government reserves the right to order these supplies elsewhere at its discretion.
b. Such procurement may occur at any time during contract performance and may be the result of LLTM recommendations made by the Contractor during the planning phase.
c. The Contractor shall not take action on such procurement prior to receiving written authorization from the Contracting Officer. Written authorization under CLIN 0003 will, to the maximum extent practicable, be accomplished on a bilateral basis.
d. In the event that time does not permit negotiation of a bilateral modification, the Contracting Officer may issue a change order under the provisions of contract clause FAR 52.243-2 “Changes – Cost Reimbursement” and shall establish a price threshold for the action contemplated by the change. Failure to bilaterally adjudicate a change order shall be considered a dispute within the meaning of the "Disputes" Clause.
OPTION ITEM 0005 AND (IF EXERCISED) OPTION ITEM(S) 0006, 0009, 0010, 0013, 0014, 0017, 0018, 0021, and 0022 - EXECUTION OF THE DOCKSIDE (DS) AND DRYDOCKING (DD) MAINTENANCE AVAILABILITIES FOR POLAR CLASS ICEBREAKERS a.
The Contractor shall accomplish preparatory planning, document preparation, engineering, procurement, prefabrication, and any other work necessary to prepare for and accomplish the DD or DS. The Government reserves the right to order these supplies and services elsewhere at its discretion.
b.
For designated dry docking availabilities the Contractor shall make certified dry docking facilities available for accomplishment of work items below the ship’s waterline. Certification requirements are outlined in the DD dry docking specification in Attachment J.1. In addition, the Contractor shall make messing and berthing facilities for ship’s crew available for ship’s force use when required.
c.
Provide the management, technical, procurement, production, testing, quality assurance and facility resources necessary to prepare for and accomplish the repair and alteration of either cutter in accordance with the requirements outlined in Sections C through J.
d.
Ensure a rational, integrated and timely plan for procurement, receipt, storage and installation of both Contractor and Government Furnished Material.
e.
Provide a performance management baseline and biweekly reports for the execution CLIN in accordance with Section H.1 to ensure timely accomplishment of work within negotiated budgets.
f.
Apply stringent change control procedures to ensure timely identification and incorporation of emergent work.
g.
Recommend growth work changes. Such recommendations shall be submitted simultaneously with the pertinent condition found report. Technical format shall be consistent with the baseline work item specification. A detailed cost proposal shall accompany the recommendation.
h.
The MLC intends that all authorized growth work be compatible with the duration of the scheduled performance periods. The contractor shall inform MLC as soon as practical if it appears that any growth work will involve extending the performance period.
i.
The Contractor shall be responsible for ensuring that interference-free, technically accurate drawings are used and shall be responsible for calling to the attention of MLC, orally and in writing, any interface and interference problems.
j.
Apply approved quality assurance procedures as required by this contract and the associated specifications to ensure that procured material and performed production work will achieve and maintain the required quality standards.
k.
The documents identified below, or their subsequent revisions in effect at time of contract award or option exercise as well as applicable current instructions, general specifications, type plans, naval ship technical manuals and directives, shall be used in the technical requirements of work under the contract.
SPECIFICATIONS/ STANDARDS / TECHNICAL REQUIREMENTS
| COMDINST M9000.6D |
| Naval Engineering Manual |
| MLCINST 9000.6E |
| Naval Engineering Organization and Operating Procedures |
| NAVSEA S9AA0-AB-GOS-010/GSO |
| General Specifications for Overhaul of Surface Ships |
| General Requirements - Dockside, Contractor’s Facility |
| See Attachment J.1 |
| General Requirements - Drydock |
| See Attachment J.1 |
Page Not Used
SECTION D - PACKAGING AND MARKING
Packaging and Marking shall be indicated in the specifications.
SECTION E - INSPECTION AND ACCEPTANCE
E.1
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The full text of a clause may be accessed electronically at the following address: http://farsite.hill.af.mil/VFFARa.htm
FEDERAL ACQUISITION REGULATION (48 CFR, CHAPTER 1), CLAUSES
FAR 52.246-3
Inspection of Supplies -- Cost-Reimbursement
(MAY 2001)
E.2
THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY
FOR CONTRACT ADMINISTRATION
A.
Contracting Officer: The Contracting Officer has the overall responsibility for the administration of this contract. He or she alone is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements, details or delivery schedules.
B.
Contracting Officer’s Technical Representative (COTR): The COTR will be designated by letter to administer technical aspects of this contract, limited to technical review and approval of work. Wherever the terms "Authorized Representative of the Contracting Officer", "Inspector", or "Commanding Officer" appear in the Contract or referenced documents, it shall be taken as reference to the COTR. The COTR is not authorized to change the scope, price, delivery or other terms and conditions of the contract. Any disputes regarding performance of the contract shall be brought promptly to the attention of the Contracting Officer.
E.3
PLACE OF ACCEPTANCE
Acceptance of all deliverable items will take place at NESU Seattle.
E.4
ADDITIONAL PROVISIONS RELATING TO CORRECTION OF DEFECTS
In the event that any work done or materials or supplies furnished by the Contractor under this contract for any vessel, or the equipment thereof, shall within sixty (60) days of delivery of the vessel to the Government, or the date of final acceptance, whichever occurs first, prove defective or deficient, such defects or deficiencies shall, as required by the Government, be corrected or repaired by the Contractor to the satisfaction of the Contracting Officer; provided, however, that with respect to any individual work item which is incomplete or deficient at the time of delivery or acceptance, the Contractor's obligation under this requirement to correct or repair such deficiency shall extend sixty (60) days from the date of such correction or repair, whichever occurs first. The Contractor shall be entitled to allowable costs for corrections or repairs performed in accordance with this requirement but shall not be entitled to any additional fee for such work.
SECTION F - DELIVERIES OR PERFORMANCE
F.1
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The full text of a clause may be accessed electronically at the following address: http://farsite.hill.af.mil/VFFARa.htm
FEDERAL ACQUISITION REGULATION (48 CFR, CHAPTER 1), CLAUSES
FAR 52.242-15
Stop-Work Order (AUG 1989) & Alt I (APR 1984)
F.2
GOVERNMENT PROPERTY
The Government Furnished Property to be utilized during performance of this contract has an estimated value of $2,000,000 (Elwell-Parker Shaft Handling Device). The government Property Administrator for this contract will be established post-award.
F.3
PLACE OF PERFORMANCE
Dockside and Drydocking work under this contract shall be performed at the contractor’s facility, identified below:
(Name of Facility)
(Street Address)
(City, State, Zip Code) F.4
PERIOD OF PERFORMANCE
The following table provides the forecast Commencement and Completion Dates for all Base and Option Items. The following dates represent the best information available to the Government at this time. Dates may be require bilateral adjustment due to changes in the vessels’ operational commitments.
| Items |
| Description |
| Start |
| Complete |
| 0001 |
| Planning for FY09 DS of POLAR SEA |
| 12/26/2008 |
| 5/5/2009 |
Options
| 0002 |
| Non-scheduled Repairs and Alterations; See Section C and Section F.5 |
| Section C |
| 0003 |
| Provisioned Items Orders (Matl/Eqpt Purchases) |
| Section C |
| FY09 Options |
| Description |
| 0004 |
| Planning for FY09 DD of POLAR STAR |
| 1/22/2009 |
| 6/1/2009 |
| 0005 |
| Execution of FY09 DS of POLAR SEA |
| 5/5/2009 |
| 8/3/2009 |
| 0006 |
| Execution of FY09 DD of POLAR STAR |
| 6/1/2009 |
| 8/30/2009 |
| FY10 Options |
| Description |
| Start |
| Complete |
| 0007 |
| Planning for FY10 DD of POLAR SEA |
| 12/24/2009 |
| 5/3/2010 |
| 0008 |
| Planning for FY10 DS of POLAR STAR |
| 1/21/2010 |
| 5/31/2010 |
| 0009 |
| Execution of FY10 DD of POLAR SEA |
| 5/3/2010 |
| 8/1/2010 |
| 0010 |
| Execution of FY10 DS of POLAR STAR |
| 5/31/2010 |
| 8/29/2010 |
| FY11 Options |
| Description |
| Start |
| Complete |
| 0011 |
| Planning of FY11 DS of POLAR SEA |
| 12/23/2010 |
| 5/2/2011 |
| 0012 |
| Planning for FY11 DD of POLAR STAR |
| 1/20/2011 |
| 5/30/2011 |
| 0013 |
| Execution of FY11 DS of POLAR SEA |
| 5/2/2011 |
| 7/31/2011 |
| 0014 |
| Execution of FY11 DD of POLAR STAR |
| 5/30/2011 |
| 8/28/2011 |
| FY12 Options |
| Description |
| Start |
| Complete |
| 0015 |
| Planning for FY12 DD of POLAR SEA |
| 12/20/2011 |
| 4/28/2012 |
| 0016 |
| Planning for FY12 DS of POLAR STAR |
| 1/4/2012 |
| 5/13/2012 |
| 0017 |
| Execution of FY12 DD of POLAR SEA |
| 4/28/2012 |
| 7/27/2012 |
| 0018 |
| Execution of FY12 DS of POLAR STAR |
| 5/13/2012 |
| 8/11/2012 |
| FY13 Options |
| Description |
| Start |
| Complete |
| 0019 |
| Planning for FY13 DS of POLAR SEA |
| 12/28/2012 |
| 5/7/2013 |
| 0020 |
| Planning for FY13 DD of POLAR STAR |
| 1/25/2013 |
| 6/4/2013 |
| 0021 |
| Execution of FY13 DS of POLAR SEA |
| 5/7/2013 |
| 8/5/2013 |
| 0022 |
| Execution of FY13 DD of POLAR STAR |
| 6/4/2013 |
| 9/2/2013 |
F.5 DELIVERY SCHEDULE FOR NON-SCHEDULED REPAIR AND ALTERATION REQUIREMENTS (ITEM 0002)
When authorized by bilateral modification, the contractor’s performance will conform to the delivery schedule established in the modification.
When authorized by unilateral modification, performance shall conform as closely as possible to the delivery schedule specified in the modification. Section I clause FAR 52.243-2 shall govern settlement of the modification.
F.6
DELIVERY SCHEDULE FOR PROVISIONED ITEM ORDER (MATL/EQPT PURCHASES) ITEM 0003
When authorized by bilateral modification, the contractor’s performance will conform to the delivery schedule established in the modification.
When authorized by unilateral modification, performance shall conform as closely as possible to the delivery schedule specified in the modification. Section I clause FAR 52.243-2 shall govern settlement of the modification.
Unless otherwise expressed in the unilateral or bilateral modifications, the supplies shall be F.O.B. destination (whether the contractor’s facility or a government destination).
SECTION G - CONTRACT ADMINISTRATION DATA
Enter below the address (street and number, city, county, state and zip code) of the Government agency which will administer the contract if such address is different from the address shown on the SF 26 or SF 33, as applicable.
LINDA CHO
Maintenance and Logistics Command, Pacific
Vessels, Procurement and Logistics
1301 Clay St. Suite 807N Oakland, CA 94612-5249
(510) 637-5965 Linda.C.Cho@uscg.mil
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 EARNED VALUE MANAGEMENT (ANSI/EIA Std 748-98)
Based upon the inability to correct adverse cost performance trends within the narrow performance periods outlined in Section F, MLC considers that the cost to establish and maintain an approved EVM system (under ANSI/EIA Std 748-98) would not provide the government favorable return on investment.
As an alternative, the contractor at a minimum, and to the satisfaction of the contracting officer, shall accomplish the following to manage and report on integrated cost and schedule performance for each CLIN.
Organization of EVMS for Execution CLINs
a. Utilize a work breakdown structure (WBS) to identify each authorized work item in the CLIN. Tailor an appropriate amount of indenture and size of control accounts for effective internal management control.
b. Define the CLIN organizational breakdown structure (OBS) for controlling the authorized work items at the control account level.
c. Integrate the CLIN WBS and OBS in a manner that permits cost and schedule performance measurement by elements of either or both structures.
Planning, Scheduling and Budgeting
d. Schedule the authorized work in a manner which describes the sequence of work and identifies significant task interdependencies required to meet the requirements of the CLIN.
e. Identify physical products, milestones, technical performance goals, or other indicators that will be used to measure progress.
f. Establish budgets for authorized work with identification of significant cost elements (labor, material, subcontracts, etc.) at the control account level, against which program performance can be measured. Budgets established for performance measurement will be the negotiated target cost.
g. Identify and control level-of-effort activity by time-phased budgets. Only those efforts that are unmeasurable or for which measurement is impractical may be classified as level-of-effort (i.e. CLIN project administration).
Accounting Considerations
h. Record direct costs in a manner consistent with the budgets estimated and established for the WBS element. Ensure that direct costs from a given control account are not allocated to two or more WBS elements (duplication).
i. Record and distribute to the CLIN all allowable and allocable indirect costs.
j. Identify unit costs, equivalent units costs, or lot costs when needed.
k. The material accounting system will:
Provide accurate cost accumulation and allocation to control accounts consistent with the manner in which such budgets were estimated and established.
Permit performance measurement at the point when most suitable for the category of material involved (for material, when discrete portions of material are installed/used, or in the case of subcontracts, when discrete segments of the subcontract work are accomplished).
Permit accountability of all material/subcontracted work procured for the CLIN.
Analysis and Management Reports
l. Two weeks after negotiation of the CLIN, submit the Performance Management Baseline (PMB), containing the following independent variables for each top-level WBS item (work item): BCWS, BCWP, ACWP, BAC, EAC, SPI, CPI, CV, SV
m. On a biweekly basis during performance of the CLIN, generate reports containing the independent variables for each top-level WBS item (work item): BCWS, BCWP, ACWP, BAC, EAC, SPI, CPI, CV, SV in the following report formats:
Direct cost report by top level WBS (segregate labor hours, direct labor cost, raw material costs and raw subcontract costs)
Total cost report by top level WBS (fully burdened costs)
Revisions and Data Maintenance
n. Develop revised EAC estimates based on performance to date, commitment values for material, and estimates of future conditions. Compare this information with the PMB to identify variances at completion important to company management and any applicable customer reporting requirements including statements of funding requirements.
o. Incorporate authorized changes in a timely manner, recording the effects of such changes in budgets and schedules.
p. Reconcile current budgets to prior budgets in terms of changes to the authorized work and internal replanning in the detail needed by management for effective control.
q. Prevent revisions to the program budget except for authorized changes.
r. Document changes to the performance measurement baseline.
H.2
EMERGENT WORK
a. If the need for emergent work develops, either under a planning or execution CLIN, the Contractor must obtain authority in writing from the Contracting Officer before proceeding with such work.
b. To the extent requested by the Contracting Officer, the Contractor shall prepare and submit electronic proposals for proposed changes that will include:
(1) A complete breakdown of labor hours and costs by labor category and phase of work;
(2) A complete breakdown of material costs showing material required, source (with point of contact), part number, unit price, extended cost and contractor's material handling charge/profit; and
(3) A complete breakdown of labor and material as described above for each proposed subcontractor.
c. The contractor shall submit electronic proposals and breakdowns to the Contracting Officer via email.
H.3
INSURANCE REQUIREMENTS
a.
The contractor shall be required to procure and thereafter maintain the following insurance:
1) Ship repairer's legal liability insurance to insure the risks described in HSAR 3052.217-95 Liability and Insurance (DEC 2003), in the amount of $300,000.00.
2) Comprehensive general liability insurance to insure the risks described in HSAR 3052.217-95 Liability and Insurance (DEC 2003), in the amount of $300,000.00 on account of any one accident or occurrence with respect to each vessel, boat and barge upon which work is to be performed under this solicitation and the contract resulting there from:
3) Full insurance coverage in accordance with the applicable State Workmen's Compensation law; and
4) Full insurance coverage in accordance with the United States Longshore and Harbor Workers' Compensation Act.
b.
As evidence that the offeror has obtained the insurance specified in this schedule, the contractor shall furnish the contracting officer with a certificate or certificates executed by an agent of the insurer authorized to execute such certificates. Such certificate shall be furnished before commencement of work. Each certificate shall state that (NAME OF INSURER) has insured (NAME OF CONTRACTOR), in accordance with the Liability and Insurance clause and the Insurance Requirements clause contained herein. Each certificate shall set forth that each policy of insurance represented thereby will expire on (DATE) and that each such policy contains the following clause:
"It is agreed that in the event of cancellation, or any material change in the policy adversely affecting the interest of the Government in this insurance, thirty (30) days' prior written notice will be given to the Contracting Officer."
c.
An Offeror who proposes to self-insure for any of the risks set forth in the Liability and Insurance clause and in the Insurance Requirements clause contained herein shall submit satisfactory evidence to permit the Contracting Officer to determine that the Offeror's assets are sufficient for the risks set forth in such clauses. The Offeror shall submit with his Offer two (2) certified copies of documents listing his assets and liabilities and such other information as deemed necessary by the Offeror or as required by the Contracting Officer. For approval of self-insurance under the State Workmen's Compensation Law and the United States Longshore and Harbor Workers' Compensation Act, evidence of qualifications as a self-insurer under the applicable compensation statute must be furnished to the contracting officer.
H.4
ACCESS TO VESSEL:
a.
A reasonable number of officers, employees, and associates of the Government, or other prime contractors with the Government, and their subcontractors, shall, as authorized by the Contracting Officer, have at all reasonable times, admission to the contractor’s facility, and access to the cutter to perform and fulfill their respective obligations to the government on a noninterference basis. All such above personnel shall comply with all contractor rules and regulations governing personnel at its facility, including those relative to safety and security.
b.
The contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of other offerors when inspecting contemplated work, the same privileges of admission to the contractor’s facility and access to the cutter on a noninterference basis, subject to all contractor rules governing personnel at its facility, including those relating to safety and security.
H.5
OPTION WORK ITEMS
The Contracting Officer may unilaterally exercise any or all of the options specified in Section B at any time after contract award. Pricing for Option Items 0002 though 0022 will be subject to negotiation on the basis of up-to-date planning and execution packages as established by MLC. The negotiated pricing shall supersede pricing of the notional requirements in the awarded contract.
The Contract award will be made for Item 0001. All Option Items shall be exercised at the sole discretion of the Government. The evaluation of Option Items does not guarantee that the Government will authorize any Option Items.
H.6
CONTRACTOR PERFORMANCE EVALUATION
A. In accordance with FAR Subpart 42.15, Contractor Performance Information, the contractor's performance will be evaluated throughout the contract period. The results of this evaluation will be complied in a report, generated by the Contracting Officer with assistance from the COTR and the Port Engineer, at the conclusion of the contract. The report will be supplied to the contractor for review and comment. The areas to be evaluated are:
Quality of Product or Service Business Relations
Timeliness Cost Control
B. Each area will be evaluated using the following ratings: Outstanding (5), Excellent (4), Good (3), Fair (2), Poor (1) and Unsatisfactory (0).
C. The National Institute of Health (NIH) Contractor Performance System (CPS) shall be used for all MLC performance evaluations.
D. Contractors will review and comment on the supplied report using the online CPS system. If not yet accomplished, contractors should register their firm’s (single) Principal Investigator. Registration may be accomplished on-line at https://cpscontractor.nih.gov/. By registering the contractor will receive automatic notification when it is time to respond to the government report.
E. The government report will be provided to the contractor who will be given a period of thirty (30) days to review and comment. All comments will be considered by the Contracting Officer and be reviewed in accordance with FAR 42.1503. The report will be marked "Source Selection Information" and safeguarded for official use only in accordance with Federal Acquisition Regulation Part 3.104. Comments for by both the Government and Contractors shall be strictly limited to 2000 characters for each area evaluated.
F. The Contractor will be able to access the report from CPS once complete. Completed reports will be used in future source selection.
H.7
TRAVEL COSTS
(a) The Contractor shall not charge, and the Government shall not pay, as an allowable cost under this contract, any man-hour (labor) costs (whether straight-time or overtime) for Contractor personnel or subcontractor personnel traveling to or from work sites, including work sites other than the Contractor’s facility for performance of contract work.
(b) Workers being paid under this contract, as prime contractor personnel or subcontractor personnel will complete a full shift at the work site, and no compensation will be paid for travel time before or after the shift.
This is the start of the file's text. The full file is on GovTribe.