AttJ.1_Exe_DS_Spec(08R6BX415).pdf

PDF 1 MB Posted

Attached to
POLAR CLASS ICEBREAKER MULTI-SHIP MULTI-OPTION MAINTENANCE CONTRACT Federal contract opportunity
Solicitation number
HSCG85-08-R-6BX415
Issued by
Department of Homeland Security US Coast Guard

About this file

03 Attachment J.1 Dockside Specification

View the file

Other files for this federal contract opportunity

Other files attached to POLAR CLASS ICEBREAKER MULTI-SHIP MULTI-OPTION MAINTENANCE CONTRACT, newest first.
File Type Posted
Amendment0005.doc DOC document
Amendment0004.doc DOC document
Amendment0003.pdf PDF
AttJ.4_Clarification_Form(08R6BX415)(Amd 0002).doc DOC document
Amendment0002.doc DOC document
Amendment0001.pdf PDF
AttJ.2_KR_Raw_Cost_Element_Breakdown(08R6BX415).xls XLS spreadsheet
AttJ.1_Exe_DD_Spec(08R6BX415).pdf PDF
AttJ.4_Clarification_Form(08R6BX415).doc DOC document
Solicitation_Sched_A-M(08R6BX415).doc DOC document
AttJ.1a_Pln_DD_DS_Pkg(08R6BX415).doc DOC document
AttJ.3_Tech_Eval_Criteria(08R6BX415).doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications for the Dockside Repair of

USCGC POLAR STAR (WAGB 10)

Notional Package Draft 0

UNITED STATES COAST GUARD

MAINTENANCE AND LOGISTICS COMMAND PACIFIC

NAVAL ENGINEERING DIVISION

RONALD V. DELLUMS FEDERAL BUILDING

1301 CLAY STREET, SUITE 807N

OAKLAND, CALIFORNIA 94612-5249

Specifications for the Dockside Repair of

USCGC POLAR STAR (WAGB 10) Draft 0

Table Of Contents

VESSEL DESCRIPTION

CONSOLIDATED LIST OF REFERENCES

GENERAL REQUIREMENTS

DEFINITE ITEMS

ITEM DESCRIPTION

D-01 PRODUCTION CONTROL, GANTT BAR CHART PROVIDE

D-02 WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS

D-03 SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING

D-04 FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS

D-05 TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT

D-06 ELECTRIC METER CALIBRATION

D-07 VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN

D-08 COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO

D-09 FLIGHT DECK PRESERVE

D-10 PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING

D-11 NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION

OVERHAUL

D-12 NO. 2B MDE TURBOCHARGER MODIFICATION

D-13 TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY

CUTTER DESCRIPTION -- USCGC POLAR STAR (WAGB 10)

[Design Class: 400 WAGB]

Dimensions:

Length Overall 399' 0" Length Between Perpendiculars 352' 0" Beam, Extreme 83' 7" Depth amidships to Main Deck 43' 2-7/8" Draft to Bottom of Keel @ Full Load Displacement 31.81' (est) Displacement @ Full Load 12,844 long tons Effective keel length 273' Mast height above DWL @ 28' draft 138' 1-1/8" Frame spacing 16"

Material:

Hull (except as noted): CG A537 M Flight Deck: HY 80 Superstructure (except as noted): ASTM-A-131

Propulsion:

6 ALCO 16-251 diesels 3 FT4A GT Pratt & Whitney gas turbines 3 Escher-Wyss CP propellers, 16' diameter

Generators:

3 ALCO Diesel, 750 kW, 440V AC, 3 phase 1 GM Diesel, 400 kW, 440V AC, 3 phase (Emergency)

Sewage Equipment:

4 Holding Tanks with pumps 4 (2 P & 2 S) deck discharge stations

Rudder: One

Anchor & Chain:

Two 9,000 lb. Navy Stockless, 165 fathom chain each

Tank Capacities (gallons):

Diesel Oil or JP-5 (@ 95%) 1,359,739 JP-5 (Helo) (@ 95%) 45,983 9250 Lube Oil (@ 95%) 23,000 Fresh Water (@ 95%) 26,000

CONSOLIDATED LIST OF REFERENCES

1. Coast Guard Drawings:

400-WAGB 103-03, Rev N; BOOKLET OF GENERAL PLANS 1/8 SCALE (POLAR STAR), 10/8/99

400-WAGB 103-11, Rev J; OUTBOARD PROFILE 400-WAGB 103-14, Rev Q; BOOKLET OF GENERAL PLANS (POLAR SEA), 8/28/99 400-WAGB 1101-2, Rev R; SHELL PLATING FWD 400-WAGB 1101-3, Rev P; SHELL PLATING AFT 400-WAGB 1105-11, Rev D; CHAIN LOCKER BHDS 400-WAGB 1106-8, Rev J; MN DK PLAT AFT FR 143 1/2 400-WAGB 1112-13, Rev A; FDNS FOR GAS TURB SILENCERS 400-WAGB 1112-3, Rev P; AUX FOUNDATIONS DIESEL GEN RM 1 & 2 400-WAGB 1112-46, Rev A; TOWING BITT ARRG AND STRUCT DETS 400-WAGB 1201-2, Rev C; HAWSE PIPE DK & SHELL BOLSTERS 400-WAGB 1201-3, Rev G; CHAIN PIPE BELLMOUTH DK BOLST & COVER 400-WAGB 1203-1, Rev S; WINDOW & FIXED LIGHTS 400-WAGB 1203-3, Rev -; PILOTHSE BRIDGE WINDOWS & DOOR MOD 400-WAGB 1602-5, Rev P; INTERIOR JOINER DOOR & LOCK SCHEDULE 400-WAGB 1906-1, Rev H; ZINC PROTECTORS A&D 400-WAGB 2200-10, Rev -; RUDDER STOCK LOWER & UPPER BEARINGS (THIS DWG

SUPERSEDES DWG 400-WAGB-2200-6)

400-WAGB 2200-2, Rev D; RUDDER A&D 400-WAGB 2200-4, Rev L; RUDDER STOCK A&D 400-WAGB 2200-8, Rev F; RUDDER STOCK REMOVAL A&D 400-WAGB 2601-1, Rev R; ANCHOR HDLG A&D 400-WAGB 2901-1, Rev B; CURVES OF FORM 400-WAGB 2906-1, Rev E; STRUCTURAL WELDING DESIGN & SEQUENCE 400-WAGB 3803-1, Rev M; VENT & A/C DIAG 400-WAGB 3901-1, Rev Z; INSULATION A&D 400-WAGB 3902-1, Rev B; MACH INSULATION SCHED 400-WAGB 3902-2, Rev E; PIPING INSULATION 400-WAGB 4107-10, Rev P; GAS TURBINE STARTING ARRG 400-WAGB 4107-2, Rev F; GAS TURB STARTING DIAG 400-WAGB 4107-4, Rev H; LIFTING GEAR IN GAS TURB RM A&D 400-WAGB 4107-5, Rev C; GAS TURB INTK TRNK ABOVE 03 LVL 400-WAGB 4107-6, Rev AC; GAS TURB INTK & EXH PIP ARRG 400-WAGB 4107-8, Rev D; GAS TURB INTK & EXH & BOIL EXH SYS 400-WAGB 4301-1, Rev W; ARRG OF SHAFTING 400-WAGB 4301-11, Rev 4; PROPELLER TAILSHAFT ASSY 400-WAGB 4301-12, Rev 6; OIL TRANSFER SHAFT ASSY 400-WAGB 4301-14, Rev 3; OUTER OIL PIPE ASSY (WING SHAFT) 400-WAGB 4301-17, Rev 1; INNER OIL PIPE ASSY (WING SHAFT) 400-WAGB 4301-2, Rev F; BULKHEAD SEAL A&D 400-WAGB 4301-3, Rev H; SHAFT TUBES A&D 400-WAGB 4301-4, Rev 11; CENTER TAILSHAFT 400-WAGB 4301-5, Rev 9; WING TAILSHAFT 400-WAGB 4302-1, Rev Q; STERN TUBE BEARG & SHAFT SEAL ARRG 400-WAGB 4400-13, Rev A; CONTROL DIAG 400-WAGB 4400-18, Rev -; CONNECT PROCED FOR OPERATING ROD 400-WAGB 4501-10, Rev B; DIA OF SLUDGE TRANSFER SYS RIP (POLAR SEA) 400-WAGB 4501-11, Rev A; ARRGT OF SLUDGE TRANS SYS RIP (POLAR SEA)

400-WAGB 4800-12, Rev AD; ARRGT OF HYD PIPING FOR CONTROL 400-WAGB 4800-18, Rev C; DIAG OF HYDRAULIC PWR SYS 400-WAGB 4800-27, Rev F; DIAG HYD SYSTEM 400-WAGB 4800-5, Rev AE; ARRGT OF HYDRAU PIP IN PWR RMS 400-WAGB 4801-33, Rev B; RIP-DIAGRAM OF BILGE SYSTEM POLAR SEA (WAGB-11) 400-WAGB 4801-34, Rev A; RIP-ARRGT OF BILGE SYSTEM AFT FR 113 POLAR SEA

(WAGB-11)

400-WAGB 4801-35, Rev A; RIP-ARRGT OF BILGE SYSTEM FWD FR 113 POLAR SEA

(WAGB-11)

400-WAGB 4801-36, Rev B; RIP-DIAGRAM OF DEWATERING SYSTEM POLAR SEA

(WAGB-11)

400-WAGB 4801-37, Rev A; RIP-ARRANGEMENT OF DEWATERING SYSTEM POLAR

SEA (WAGB-11)

400-WAGB 4803-17, Rev -; AFF DIAGRAMMATIC ARRANGEMENT 400-WAGB 4803-18, Rev A; AFF PIPING SYSTEM SCHEMATIC 400-WAGB 4803-9, Rev T; DIAG OF FLUSHING & SPRINKLING SYS 400-WAGB 4805-1, Rev AF; ARRGT OF SALT WTR COOL FOR GAS TURB 400-WAGB 4805-2, Rev T; DIAG OF SALT WTR COOLING SYS 400-WAGB 4808-23, Rev P; ARRGT OF PIPG IN SEW TREATMNT RM 1 400-WAGB 4808-24, Rev M; ARRGT OF PIPG IN SEW TREATMNT RM 2 400-WAGB 4808-4, Rev W; ARRGT OF PLUMB & INTER DK DRNS 2ND DK 400-WAGB 4808-5, Rev Z; ARRGT OF PLUM & INTER DK DRNS 2ND DK 400-WAGB 4808-6, Rev Z; ARRGT OF PLUMB DRNS 3RD DK & BELOW 400-WAGB 4808-8, Rev L; DIAG OF PLUMB & INTER DK DRNS 400-WAGB 4823-1, Rev D; SEACHEST & STRAIN COMPTS FWD 400-WAGB 4823-2, Rev H; SEACHEST & STRAIN COMPTS AFT 400-WAGB 5101-1, Rev G; ARRGT & DETS OF BOILER 400-WAGB 5200-1, Rev J; DIESEL STACK ARRGT & DET 400-WAGB 5200-2, Rev H; TURBINE STACK ARRGT & DET 400-WAGB 5200-4, Rev P; ARRGT & DETS OF HANGERS FOR GAS TURB 400-WAGB 6000-14, Rev A; ELECTRICAL DIST SYS-1 LINE DIA (WAGB-11) 400-WAGB 6202-16, Rev N; WIREWAYS GAS TURB RM UL+LL 400-WAGB 700-1, Rev J; DOCKING PLAN 400-WAGB 700-2, Rev F; DOCKING PLAN (POLAR STAR)

2. Enclosed Figures:

D-02-A; List of Inaccessible Voids and Appendages, Polars D-03-A; List of Inaccessible Voids and Appendages, Polars D-04-A; Polar Shaft Disconnect Coupling Layout D-05-A; Centerline Shaft Liner Inspection Report D-05-B; Ovako Hydraulic Bolt D-05-C; Allis Chalmers Corp. Coupling Bolt Prestress D-05-D; Cooper Double Split Roller Brg D-05-E; Polar Class Shaft and Propeller Handling Equipment D-05-F; Procedure For Machining & Fitting Dowel Pins D-05-G; Propeller Packaging & Shipping Instructions D-05-H; Split Spacer Ring Arrangement D-06-A; Ovako Hydraulic Bolt D-06-B; Port Shaft Liner Inspection Report D-06-C; Allis Chalmers Corp. Coupling Bolt Prestress D-06-D; Polar Class Shaft and Propeller Handling Equipment D-06-E; Procedure For Machining & Fitting Dowel Pins

D-06-F; Propeller Packaging & Shipping Instructions D-06-G; Split Spacer Ring Arrangement D-07-A; Ovako Hydraulic Bolt D-07-B; Starboard Shaft Liner Inspection Report D-07-C; Allis Chalmers Corp. Coupling Bolt Prestress D-07-D; Polar Class Shaft and Propeller Handling Equipment D-07-E; Procedure For Machining & Fitting Dowel Pins D-07-F; Propeller Packaging & Shipping Instructions D-07-G; Split Spacer Ring Arrangement D-12-A; Bearing Shell OD vs Stern Tube Land ID D-12-B; Bearing Shell ID Measurement D-13-A; 400' WAGB Electric Meter Calibration List D-13-A; Insulation Resistance Temperature Correction Nomograph D-16-A; Typical Waster Piece D-16-B; Polar Sea, B-List of Sea Valves for Overhaul D-17-A; Typical Waster Piece D-17-B; Polar Sea, B-List of Sea Valves for Renewal D-19-A; Rudder Bearing Clearances (400') D-20-A; Rudder Bearing Clearances (400') D-21-A; Anchor Chain Paints and Markings--Red D-27-A; Temporary Service Requirements, Drydock D-28-A; Pre-Docking Check List (400') D-28-B; Pre-Floating Check List (400')

3. Applicable Documents:

A-A-59323, Rev -; CLOTHS, CLEANING, LOW-LINT , 6/30/99 Allis Chalmers Corporation (DWG) 9016-T-3, Dowel Pin Allis Chalmers Corporation (DWG) 9024-F-1, Outer Oil Pipe Detail (Center Shaft) Allis Chalmers Corporation (DWG) 9024-H-1, Outer Oil Pipe Detail (Wing Shaft) Allis Chalmers Corporation (DWG) 9024-J-2, Outer Oil Pipe Assy (Center Shaft) Allis-Chalmers Corporation (DWG) 9025-AG-3, Spacer Ring Rev.( 02) American National Standards Institute (ANSI) B16.11-2002, Forged Steel Fittings, Socket-

Welding and Threaded, 2/1/02 American National Standards Institute (ANSI) B16.9-86, Fittings, Factory-Made Wrought Steel

Buttwelding - 15 June 87 American Society for Nondestructive Testing (ASNT) ASNT-TC-1A, Personnel Qualification and

Certification in Nondestructive Testing, 10/1/96 CG Tech Pub 2029, PROP SHFT,SW,FO & LO VOL 1 (SWBS 243,256,262,262) CG Tech Pub 2033, PMPS, INST, CLIMATE CNTRL VOL 5 (SWBS 503,504,510) CG Tech Pub 2034, HVAC VOL 6 (SWBS 511, 512, 514) CG Tech Pub 2035, REFR, AUX BLR, FIREMN VOL 7 (SWBS 516, 517, 521) CG Tech Pub 3205, OPERATING & MAINTENANCE MANUAL FOR HD-50-2 CAPSTAN CG Tech Pub 3255A, Turbo Power FT4, Vol 1 Manufacturers Instruction Book SWBS Group(s)

234, 2/18/98 CG Tech Pub 3255B, Turbo Power FT4, Vol 2 Manufacturers Instruction Book SWBS Group(s)

234, 2/18/98 CG Tech Pub 3255C, Turbo Power FT4, Vol 3 Manufacturers Instruction Book SWBS Group(s)

234, 5/2/97 CG Tech Pub 3255D, Turbo Power FT4, Vol 4 Manufacturers Instruction Book SWBS Group(s)

234, 2/18/98 CG Tech Pub 3255E, Turbo Power FT4, Vol 5 Manufacturers Instruction Book SWBS Group(s)

234, 2/18/98

CG Tech Pub 3255F, Turbo Power FT4, Vol 6 Manufacturers Instruction Book SWBS Group(s) 234, 2/18/98

CG Tech Pub 3255G, Turbo Power FT4, Vol 7 Manufacturers Instruction Book SWBS Group(s) 234, 2/18/98

CG Tech Pub 3255H, Turbo Power FT4, Vol 8 Manufacturers Instruction Book SWBS Group(s) 234, 2/18/98

CG Tech Pub 4390, PROP GAS TURB SVC MAN VOLUME I (OLD TP 234-0100), TP 4390 &

TP 4390A, 12/4/00

CG Tech Pub 4391, PROP GEN & MTRS, (OLD TP 235-0200) CG Tech Pub 4392, PROP SETUP SWTCH RECTIFIERS & EXC ITERS A & B (TP 235-0201) CG Tech Pub 4395, PROPULSION SHAFTING & CPP SYSTEM - VOL 1 (OLD TP 243-0100) CG Tech Pub 4397, SS GEN SET VOLS 1 & 2 (OLD TPS 311-0200 & 0300) CG Tech Pub 4409, CENT HYD SYSS & HEEL PUMP (OLD TP 556-0101) CG Tech Pub 4411, STEERING GEAR & CNTRL SYS (OLD TP 561-0200) CG Tech Pub 4414, 3 TON & 15 TON CRANE (OLD TP 573-0200) CG Tech Pub 4415, ANCHOR WINDLAS & TOWING WNCH SYS (OLD TP 581-0100) COMDTINST M10360.3B, Coatings and Colors Manual, 6/12/01 COMDTINST M6260.16A, CH-1, Asbestos Exposure Control Manual, 2/27/96 COMDTINST M9000.6D, Naval Engineering Manual (NEM), 9/20/00 DOD-STD-2182, Rev -; Engineering Chromium Plating (Electrodeposited) For Repair of

Shafting, 1/29/85 FED-STD-595, Rev B; Colors Used in Government Procurement, 1/11/94 HH-P-151, Notice 1, Rev F; Synthetic Rubber Cloth Insertion, 3/27/91 International Standard Organization (ISO) 4406, Hydraulic Fluid Power-Fluids-Method for

Coding Level of Contamination by Solid Particles, 12/15/87 MIL-A-18001, Notice 1, Rev K; Anodes, Sacrificial Zinc Alloy, 9/17/93 MIL-A-22262, Rev B; Abrasive Blasting Media Ship Hull Blast Cleaning, 3/21/96 MIL-DTL-15024, Rev F; Plates, Tags, and Bands for Identification of Equipment , 11/28/97 MIL-DTL-15024F, Rev F; Detail Specification Plates, Tags and Bands for Identification of

Equipment, General Specification for - (THIS MIL SUPERSEDES MIL-P-15024E

DATED 01/29/1993), 11/28/97

MIL-F-1183, Rev J; Fittings, Pipe Cast Bronze Silver-Brazing, 5/5/87 MIL-F-24702, Rev -; USE FOR REPLACEMENT ONLY - Filter Elements, Hydraulic

Disposable - MIL-F-24702 INCLUDING AMENDMENT 2, 11/28/94 IS INACTIVE

FOR NEW DESIGN AND IS NO LONGER USED, EXCEPT FOR REPLACEMENT

PURPOSES., 11/28/94

MIL-F-24702/1, Rev A; Filter Elements, Hydraulic Disposable, 4/5/93 MIL-G-18997, Rev E; Pressure Gauge, Dial Indicating (Naval Shipboard Use), 6/1/95 MIL-G-22050, Rev D; Gasket and Packing Material, Rubber, for use with Polar Fluids, Steam, and Air at Moderately High temperatures, 5/24/95 MIL-G-23549, Rev C (1); Grease, General Purpose, 4/30/97 MIL-HDBK-291, Rev -; Cargo Tank Cleaning, 9/26/86 MIL-PRF-1149, Rev D; Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness, 6/10/98 MIL-PRF-16173, Rev E; Corrosion Preventative Compound, Solvent Cutback, Cold Application, 1/6/93 MIL-PRF-17672, Rev D; Hydraulic Fluid Petroleum Inhibited, 5/31/95 MIL-PRF-2105, Rev E; Lubricating Oil, Gear, Multipurpose (Metric), 8/22/95 MIL-PRF-24647, Rev C; Paint System, Anticorrosive and Antifouling, Ship Hull, 9/24/01 MIL-R-21252, Notice 1, Rev B; Rubber Sheet, Solid, Synthetic, Shipboard Water Evaporator

Gasketing, 5/8/91 MIL-R-23461, Rev A; Resin Compound, Thermosetting, Room Temperature Curing, For Metal

Coating, 6/26/87 MIL-S-1222, Rev H; Studs, Bolts, Hex Cap Screws, Socket Head Cap Screws and Nu,, 9/30/94

MIL-S-22473 , Rev E(8); Sealing, Locking, and Retaining Compounds: (Single Component), 11/18/93

MIL-STD-1627, Rev C; Bending of Pipe or Tube for Ship Piping System, 9/30/94 MIL-STD-1689, Rev A; Fabrication, Welding and Inspection of Ships Structure, 11/23/90 MIL-STD-2035(SH), Rev A; Nondestructive Testing Acceptance Criteria, 5/15/95 MIL-STD-2197(SH), Rev -; Brush Electroplating on Marine Machinery, 2/28/89 MIL-STD-2199 , Rev -(1); Glass Reinforced Plastic Covering for Propeller Shafting (METRIC), 10/5/93 MIL-STD-22, Notice 3, Rev D; Welded Joint Design, 3/21/91 MIL-T-16420, Rev K; Tube, Copper-Nickel Alloy, Seamless and Welded (Copper Alloys 715

&706), 9/16/88 MLCPac Instruction 9000.6B, Naval Engineering Organization and Operating Procedures, 5/1/96 MLCPAC Standard Specification 041, Production Control, Gantt Bar Chart, 1/1/00 MLCPAC Standard Specification 074, Welding and Allied Processes, 5/1/99 MLCPAC Standard Specification 085.1, General Requirements for Drawing Preparation, 3/1/00 MLCPAC Standard Specification 304.1, Shipboard Electrical Cable Test, 3/1/00 MLCPAC Standard Specification 304.2, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation, 3/1/00 Naval Ships' Technical Manual, Chapter 074, Volume 3, Gas Free Engineering, 4/23/98 Naval Ships' Technical Manual, Chapter 221, Boilers, 12/31/00 Naval Ships' Technical Manual, Chapter 234, Marine Gas Turbines, 12/1/01 Naval Ships' Technical Manual, Chapter 241, Propulsion Shafts, Couplings, Clutches, and

Associated Components Naval Ships' Technical Manual, Chapter 243, Propulsion Shafting Naval Ships' Technical Manual, Chapter 244, Propulsion Bearings and Seals, 12/11/97 Naval Ships' Technical Manual, Chapter 254, Condensers, Heat Exchangers and Air Ejectors Naval Ships' Technical Manual, Chapter 491, Electrical Measuring and Test Instruments, 9/1/99 Naval Ships' Technical Manual, Chapter 504, Pressure, Temperature and other Mechanical and

Electrical Measuring Instruments, 12/1/01 Naval Ships' Technical Manual, Chapter 505, Piping Systems, 12/1/01 Naval Ships' Technical Manual, Chapter 510, Heating, Ventilating and Air Conditioning Systems for Surface Ships, 12/1/01 Naval Ships' Technical Manual, Chapter 541, Ship Fuel and Fuel Systems Naval Ships' Technical Manual, Chapter 556, Hydraulic Equipment Power Transmission and

Control Naval Ships' Technical Manual, Chapter 581, Anchoring, 11/24/97 Naval Ships' Technical Manual, Chapter 589, Cranes, 12/1/01 Naval Ships' Technical Manual, Chapter 593, Pollution Control Naval Ships' Technical Manual, Chapter 631, Volume 1, Preservation of Ships in Service -

General, 12/1/01 Naval Ships' Technical Manual, Chapter 635, Thermal, Fire and Acoustic Insulation NAVSEA 0900-LP-001-7000, Fabrication and Inspection of Brazed Piping Systems NAVSEA Dwg 803-1385664, Bearings, Stern Tube & Strut NAVSEA Dwg 803-1385850, PIPING, INSTRUMENT PRESSURE FOR ALL SERVICE, 7/1/90 NAVSEA Dwg 803-1385866, Penetrations; Bulkhead and Deck NAVSEA Dwg 803-6397256, Access, Covers, Ventilation Quick Acting NAVSEA Dwg 803-921865, Cathodic Protection Hull Zinc Anodes NAVSEA Dwg 804-1385781, Pipe Hangers for Surface Ships (Superseding NAVSEA DWG.

810-1385781) NAVSEA Dwg 810-1385880, Fittings, Cu-Ni Alloy, Slip on sleeve

NAVSEA S6430-AE-TED-020, PIPING DEVICES, FLEXIBLE; VOL. 2

NAVSEA S9074-AQ-GIB-010/248, Welding and Brazing Procedure and Performance

Qualification

NAVSEA S9074-AR-GIB-010/278, Requirements for Fabrication Welding & Inspection & Casting Inspection & Repair for Machinery, Piping & Pressure Vessels

NAVSEA S9243-AW-TRS-011, Surface Ships Main Propulsion Shafting Refurbishment Procedures, Volume I, Part 1

NAVSEA S9243-AW-TRS-012, Surface Ships Main Propulsion Shafting Examination, Test and Repair Action Record, Volume 1, Part 2

NAVSEA S9AA0-AB-GOS-010/GSO, General Specifications for Overhaul of Surface Ships NAVSEA Standard Item 009-15, Rotating Machinery Balance NAVSEA Standard Item 009-17, Rotating Electrical Equipment Repair NAVSEA T9074-AS-GIB-010/271, Requirements for Non-Destructive Testing Methods QQ-N-281 , Rev D(2); Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings. and

Structural and Special Shaped Sections, 10/23/85 SAE-AMS-C-6183, Rev -; Cork and Rubber Composition Sheet for Aromatic Fuel and Oil

Resistant Gaskets, 12/18/98 SAE-AMS-QQ-S-763, Rev -; Steel Bars, Wire Shapes, and Forgings; Corrosion Resistant, 10/5/98 Seattle Boiler Works 2185-6, Bare Boiler Design Arrangement Steel Structures Painting Council, SSPC-SP 1, Solvent Cleaning, 9/1/00 Steel Structures Painting Council, SSPC-SP 10, Near White Blast Cleaning, 9/1/00 Steel Structures Painting Council, SSPC-SP 11, Power Tool Cleaning to Bare Metal - Surface

Preparation Specification No. 11 , 9/1/00 Steel Structures Painting Council, SSPC-SP 12, (Joint Surface Preparation Standard NACE No. 5)

Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh-Pressure Water Jetting Prior to Recoating, 1/1/95

Steel Structures Painting Council, SSPC-SP 2, Hand Tool Cleaning, 9/1/00 Steel Structures Painting Council, SSPC-SP 3, Power Tool Cleaning, 9/1/00 Steel Structures Painting Council, SSPC-SP 6, Commercial Blast Cleaning, 10/1/94 Steel Structures Painting Council, SSPC-SP 7, Brush Off Blast Cleaning, 9/1/00 Steel Structures Painting Council, SSPC-SP VIS-1-89, Visual Standards For Abrasive Blast

Cleaned Steel, 1/1/89 Steel Structures Painting Council, SSPC-SP VIS3-93, Visual Standard for Power and Hand Tool

Cleaned Steel, 1/1/93 Todd Shipyard ( ) 400-WAGB-4400-13, Preliminary Version of Coast Guard Drawing, 1/1/03

GENERAL REQUIREMENTS — DOCKSIDE, CONTRACTOR’S FACILITY

GR_00000_JMS_0606_Fleet

1 INTENT

This document invokes general requirements applicable to cutter repair contracts dockside (floating alongside a pier) at a ship repair Contractor’s facility. The items discussed in the General Requirements are an amplification of, or are in addition to, the specific items of the Specification.

Other sections of the contract establish requirements for work on Coast Guard cutters. The General Requirements are a part of the contract and, as such, compliance is a contractual requirement. The Contractor is responsible for understanding and complying with all requirements established in the Specifications.

Government Furnished Property: NONE

2 REFERENCES

Coast Guard Drawings: NONE

Applicable Documents:

COMDTINST M6260.16A, Asbestos Exposure Control Manual, Ch-1 COMDTINST 6260.21, Hazard Communications For Work Place Materials COMDTINST 9077.1, Equipment Tag-Out Procedure, Revision C COMDTINST M16478.1, Hazardous Waste Management Manual COMDTINST M16478.2, Procurement, Handling and Disposal of Polychlorinated Biphenyls COMDTINST M10360.3, Coatings and Colors Manual, Revision C MIL-A-22262B(2), Abrasive Blasting Media Ship Hull Blast Cleaning, 3/21/1996 MLCPAC Standard Specification 074, Welding and Allied Processes, 3/21/2003 MLCPAC Standard Specification 085.1, General Requirements for Drawing Preparation, 3/1/2000 National Fire Protection Association NFPA 51 Standard for the Design and Installation of

Oxygen-Fuel Gas Systems for Welding, Cutting, and Allied Processes Nondestructive Testing Handbook, American Society for Non-Destructive Testing, Volume

1, Section 7 7 USC §136 to 136(y), Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) 15 USC §2601 to 2692, Toxic Substance Control Act (TSCA) 33 USC §1251 to 1387, Federal Water Pollution Control Act 33 USC §1342, National Pollutant Discharge Elimination System 33 USC §2701 to 2761, Oil Pollution Control Act of 1990 42 USC §4851 to 4852, Residential Lead-Based Paint Hazard Reduction Act 42 USC §4901 to 4918, Noise Control Act (NCA) 42 USC §6901 to 6991(i), Resource Conservation and Recovery Act (RCRA) 42 USC §7401 to 7671(q), Clean Air Act 42 USC §9601 to 9675, Comprehensive Environmental Response, Compensation, and

Liability Act (CERCLA) 16 CFR §1303, Ban of Lead-Containing Paint and Certain Consumer Products Bearing Lead-

Containing Paint 29 CFR §1910, Occupational Safety and Health Standards 29 CFR §1926, Safety and Health Regulations for Construction

29 CFR §1915, Occupational Health and Safety Standards for Shipyard Employment 33 CFR §154, Facilities Transferring Oil or Hazardous Materials in Bulk 40 CFR §61, National Emission Standards for Hazardous Air Pollutants 40 CFR §112, Oil Pollution Prevention 40 CFR §204, Noise Emission Standards for Construction Equipment 40 CFR §261, Identification and Listing of Hazardous Waste 40 CFR §262, Standards Applicable to Generators of Hazardous Waste 40 CFR §263, Standards Applicable to Transporters of Hazardous Waste 40 CFR §279, Used Oil Management Standards 40 CFR §300, National Oil and Hazardous Substances Pollution Contingency Plan 40 CFR §761, Polychlorinated Biphenyls (PCB) Manufacturing, Processing, Distribution in

Commerce, and Use Prohibitions 49 CFR §100-199, Hazardous Materials Transportation, Handling, and Storage Regulations California Code of Regulations, Title 22, Division 4, Environmental Health and 4.5, Environmental Health Standards For The Management Of Hazardous Waste California Code of Regulations, Title 23, Waters California Health and Safety Code, Divisions 20, Miscellaneous Health And Safety

Provisions, 26, Air Resources, 37, Regulation Of Environmental Protection, 103, Disease Prevention And Health Promotion, 104, Environmental Health.

Chapter 173-303, Washington Administrative Code Chapter 340, Oregon Administrative Rules Title 18, Alaska Administrative Code Title 11, Hawaii Administrative Code

3 ADMINISTRATION

3.1 DEFINITIONS

3.1.1 Unless otherwise stated, the phrase as shown, as indicated, as detailed, or words of similar import refer to the contractual documents including drawings referenced in the specification.

3.1.2 The phrase as directed, as required, as permitted, approved, acceptance, or words of similar import refer to the direction, requirements, permission, approval, or acceptance by the Contracting Officer or a properly designated Contracting Officer’s Representative (COR).

3.1.3 Remove/Reinstall – To remove the original item and then later install the same original item back in its place after performing specified work on it.

3.1.4 Renew or renewal - To remove the original item and to install a new item in new condition, identical or of like size, material and quality to that removed (i.e. “Renew-in-Kind”).

3.1.5 Replace – To remove the original item and to install in its place a different item as described in the specification.

3.1.6 Restore – To bring back to the former, original or normal condition before alteration or removal.

3.1.7 Underwater body includes the external hull, all appendages, and sea chests from the keel up to and including the upper edge of the boot-top area.

3.1.8 The Contracting Officer’s Representative (COR) is the person delegated by the Contracting Officer as the on-scene representative for matters concerning performance of work. This includes technical correctness, timeliness, and quality of the Contractor’s work. Normally the Commanding Officer of the vessel is designated as the COR.

3.1.9 The Coast Guard Inspector is the COR or the individual designated by the COR to perform Coast Guard Inspector duties.

3.1.10 Condition Found Report (CFR) – See paragraph 3.8 below.

3.1.11 Vessel – Either a Coast Guard cutter (sixty-five feet or greater) or a Coast Guard boat (less than sixty-five feet.)

3.2 REFERENCES

3.2.1 All references shall be of the issue and/or revision indicated in the consolidated list of references. It is incumbent on the Contractor to maintain current MLCPAC Standard Specifications. In many instances, the references will be available for review locally aboard the vessel or at the cognizant Naval Engineering Support Unit (NESU). U. S. Government issued Standardization Documents can be found at:

http://stinet.dtic.mil/str/dodiss4_fields.html.

3.2.2 Detail and dimensioned drawings for precision equipment are generally accurate and will give sufficient information for estimating. However, allowance for changes in dimensions should be taken into consideration due to changes of equipment and to the structure and arrangement of the vessel. Actual installations shall conform to the specifications. When it is required that drawings or sketches be prepared, the Contractor shall meet the requirements of MLCPAC Standard Specification 085.1.

3.2.3 All referenced drawings and each piece or page of data that is marked with a Limited Rights Legend is a part of this specification and shall not be used for any purpose other than that contemplated by the specifications or item of work. The Contractor is prohibited from further use, release, or disclosure of this information.

3.2.4 Unless otherwise noted within this specification, hierarchy, priority, or order of precedence of requirements shall be as follows:

Specification Definite Item or Optional Item Specification General Requirements Coast Guard Drawings Coast Guard Technical Manuals Commercial Drawings Commercial Technical Manuals Coast Guard Standards and Instructions Military and Navy Standards, Specifications, and Technical Manuals Commercial or Industrial Standards Commercial practices

3.2.5 Drawing discrepancies found in performance of work associated with this specification which may adversely affect work in this or future specifications shall be reported using “DRAWING DEFICIENCY ACTION FORM.” This drawing feedback form, designed to be used by Contractor and Coast Guard personnel alike, may be downloaded from the Procurement section of the following Coast Guard web site:

http://www.uscg.mil/mlcpac/mlcp/Eng%20Support/mlcpv/files/procurement/Drawing_Deficiency_Action_ Form_editable.pdf. The form shall be downloaded, duplicated and completed, as necessary, to inform MLCP(vs) technical personnel of drawing & configuration problems, as well as, suggested recommendations which may correct them.

3.3 ARRIVAL CONFERENCE

3.3.1 Within two days of the arrival of the vessel, and usually prior to the start of work, the Contracting Officer or the Contracting Officer’s designated representative will meet with the Contractor at either the

Contractor’s conference facilities near the vessel or aboard the vessel (location to be at the sole discretion of the COR).

3.3.2 Normally this conference will be attended by the COR, designated Coast Guard Inspectors, representatives of the cognizant MLCPAC Naval Engineering Support Unit (NESU) and MLCPAC Support Branch (vr). For availabilities at Coast Guard facilities, the facility Hazardous Waste Coordinator will be invited to attend. A sample Arrival Conference Agenda can be found at http://www.uscg.mil/mlcpac/mlcp/Eng%20Support/mlcpv/files/platform_support/Arrival_Agenda_Pkg_Fo rm.doc

3.4 CONTRACTOR’S SUBMITTALS

3.4.1 The Contractor shall provide the following at the arrival conference:

Subcontractor List Technical Representatives List Marine Chemist & “Competent Persons” List Welders’ Qualification List List of Qualified Sil-Brazers Material Safety Data Sheets List of Key Personnel List of Emergency Phone Numbers Contractor’s Inspection And Quality Control System Contractor’s Property Administration System for GFE Certificate of Insurance Sample Copy of the Condition Found Report Contractor’s Fire Emergency Response Plan (For cutters having fuel capacity greater than 10,500 gallons) Contractor’s Oil Spill Response Plan per 33 CFR 154 et seq for bulk oil transfers Spill Prevention and Countermeasures Plan, in accordance with 40 CFR 112 et seq.

Environmental Submittals required by paragraph 6.7 Contractor Security Requirements

3.5 VESSEL’S SUBMITTALS

3.5.1 The vessel will provide the following at the arrival conference:

List of Key Personnel List of Emergency Phone Numbers List of designated Coast Guard Inspectors

3.6 WORKING HOURS

3.6.1 Except for items specifically authorized by COR, Contractor work shall normally be accomplished between the hours of 7:30 a.m. to 10 p.m. Monday through Friday, except Federal Holidays.

3.6.2 If the Contractor desires to accomplish work outside of normal working hours, request shall be made to the COR at least 24 hours in advance. Approval will be the sole discretion of the Contracting Officer or the COR.

3.7 PROGRESS MEETINGS

3.7.1 Weekly progress meetings will be held at either the Contractor’s conference facilities near the vessel or aboard the vessel, at the sole discretion of the COR. The day of the week and time of day for the weekly progress meeting will be set by the COR at the arrival conference. Representatives for the COR and the Contractor will meet before each progress meeting to review the percentage of completion for each work item and change. Each progress meeting will result in the COR producing a Contract Status Report documenting the percentage completion and documenting areas needing attention by the Contractor in order to complete the contract on time. The COR will transmit the Contract Status Report to the Contracting Officer, the NESU Representative, and MLCPAC(vr) the same day. Additional reports/charts shall be presented at each meeting as required by Definite Item “Production Control, Gantt Bar Chart Provide”.

3.8 REPORTS/READINGS/AS FOUND CONDITIONS

3.8.1 All readings and inspections are to be taken within twenty-four hours after the machinery or system is opened. The Contractor shall notify the COR of the time and location of inspections requiring Coast Guard verification 24 hours prior to such inspections, unless such inspections need to be conducted more than 50 road miles from the primary place of contact performance, in which case 3 working days notice is required, in order to make travel arrangements for the Coast Guard inspectors. Measurements and readings shall be taken with calibrated measurement and test instrumentation. All reports of readings, operational tests and inspections required by the specifications shall be submitted to the COR in writing, using a “Condition Found Report (CFR)”, within twenty-four hours after the readings and/or inspections are made. Promptness in taking and reporting readings is particularly important for underbody work items such as shaft bearing or rudder bearing clearances. Often during the progress of a work item, conditions are discovered by the Contractor which are considered abnormal for reasons of safety, expected reliability, health, or habitability. These conditions must be brought to the attention of the Coast Guard using a CFR.

Details provided by the Contractor in a CFR are important because the CFR may result in a contract change. To speed the contract change process, the Contractor should include in the CFR the following details as a minimum:

3.8.1.1 A sequential number.

3.8.1.2 The contract item which the “CFR” relates to (i.e. D-XX).

3.8.1.3 A clear statement, definition, and description of the condition found, including but not limited to frame numbers, part numbers, materials, and dimensions as appropriate.

3.8.1.4 A proposed or recommended repair to correct the defective condition, including but not limited to frame numbers, part numbers, materials, and dimensions as appropriate.

3.8.1.5 Indicate whether the report requires Coast Guard action or if it is provided “for info” only. If action is required, indicate the time and date when the Coast Guard response is required in order to complete the action within the specified contract performance period. If the action cannot be completed within the specified contract period, so state.

3.8.1.6 A space on the form for the Coast Guard designated representative to make comments.

3.8.1.7 All CFRs shall be signed, dated and submitted by the Contractor’s Ship Superintendent.

3.9 GOVERNMENT FURNISHED MATERIAL/EQUIPMENT

3.9.1 The Contractor shall furnish all equipment, staging, materials, fittings, tools, etc., necessary for proper completion of each item of work unless the specifications indicate the Coast Guard will provide

GFM/GFE.

3.9.2 If GFM/GFE is to be furnished by the Coast Guard, it will be indicated in the specification for the specified work item. Unless otherwise noted in the specifications, GFM/GFE will be delivered by the Government to pierside/dockside of the vessel (at the place the vessel is located for the performance of work under this contract). Unless otherwise noted in the specifications, delivery date will be at the Coast Guard’s discretion between the start of the contract and up to 5 working days after the start of the contract.

3.9.3 The Contractor shall perform sufficient receipt inspection of the GFM/GFE and then sign for custody of the GFM/GFE by a Coast Guard form DD1149 or comparable Contractor’s form. The Contractor assumes the risk of, and shall be responsible for, any loss or destruction of, or damage to Government property upon its delivery to the Contractor. However, the Contractor is not responsible for reasonable wear and tear to Government property properly consumed in performing this work.

3.9.4 It shall be the Contractor’s responsibility to move or rig all GFM/GFE from the point of delivery to the point of storage (if necessary) and then to the point of use.

3.9.5 At the end of the contract, the Contractor shall turn over to the Coast Guard any and all GFM/GFE which was not installed under the terms of the contract.

3.10 SANITARY FACILITIES

3.10.1 Sanitary facilities for Contractor personnel shall be Contractor’s responsibility; Contractor’s sanitary facilities shall be separate & distinct from sanitary facilities used by vessel personnel. During any period that any or all of the vessel’s head facilities are unavailable for use due to Contractor’s performance under this contract, the Contractor shall provide clean, sanitary replacement facilities.

3.10.2 If at any time during the performance of the contract, Contractor work will place vessel sanitary facilities out of service, the Contractor shall provide temporary replacement facilities. The minimum replacement facility for up to 18 crew members displaced shall be hot and cold running water with a minimum of 2 showers, 2 sinks, 2 toilets, and 1 urinal located no further than two hundred feet from the vessel’s gangway. Facility shall be equipped with electrical lighting and power outlets (110 VAC with ground fault circuit interrupters, GFCI’s) for powering of electrical appliances (e.g., blow dryers). If more crew members are displaced, the replacement facilities shall be increased in direct proportion to this ratio.

If the crew contains members of both sexes, suitable separate facilities shall be provided for men and women in proportion to their numbers in the crew. The Contractor shall maintain the facilities in a clean and sanitary condition at all times.

3.11 SMOKING AND TOBACCO PRODUCTS

3.11.1 Smoking and use of tobacco products aboard the Vessel or in Vessel office space is prohibited.

Exceptions may be permitted if in strict compliance with Vessel rules and regulations (which may include designated smoking time/area).

3.12 CONTRACTOR SERVICES

3.12.1 The Contractor shall provide all services required by the Contractor for the completion of work.

These services include but are not limited to electrical power, compressed air, steam, crane services, garbage and refuse, phones, office space, and portable toilet facilities. These services are for the Contractor’s use only. Services required by the vessel are found in the “Temporary Services” item of the specification.

4 WORK CONTROL

4.1 TAG-OUT PROCEDURES

4.1.1 To prevent injury to personnel and/or damage to ship systems equipment tag-outs must be properly conducted. Ship’s force will work closely with the Contractor to ensure tag-outs are done in a thorough and efficient manner as outlined below and in more detail in COMDTINST 9077.1, Equipment Tag-out Procedure.

4.1.2 Tag-Out Establishment

4.1.2.1 Prior to start of work on this Item, notify the Coast Guard Inspector in writing of equipment, systems, circuits, components, piping, and valves that require isolation so that tag-outs can be accomplished as required by COMDTINST 9077.1, Equipment Tag-out Procedure.

4.1.2.2 Ship’s Force personnel will position equipment and install tags when tag-out of equipment, systems, circuits, components, piping, or valves as required.

4.1.2.3 The Ship’s Authorizing Officer (normally the Engineer of the Watch) and the Repair Activity (Contractor’s) Representative shall each verify that the tag-out is sufficient to prevent operation of equipment, systems, circuits, components, piping, or valves from all stations that could exercise control.

Tags shall also be hung as required by COMDTINST 9077.1, Equipment Tag-out Procedure, paragraph 1.d to control the status of non-permanent jumpers, locking devices, seals, blank flanges, relief valve gags, or similar safety devices.

4.1.2.4 A Contractor’s representative shall also verify that each tag is attached to the proper component and that it is in the condition required by the tag-out record sheet. This verification shall be made by witnessing the actions of the Ship’s Force member posting or checking the tags and observing devices such as valve position indicators, operating handles, etc.

4.1.2.5 A Contractor’s designated representative shall sign and identify his company on each ship’s tag-out record sheet and tag prepared to support the Contractor’s work.

4.1.3 Tag-Out Clearance

4.1.3.1 To facilitate prompt removal of tags, the Contractor shall notify the Coast Guard Inspector immediately when the Contractor’s work is complete and the affected system, piping, or circuit is ready for activation.

4.1.3.2 Tags shall be cleared and removed in accordance with COMDTINST 9077.1, Equipment Tag-out Procedure, before the equipment is operationally tested or operated.

4.1.3.3 The Ship’s Authorizing Officer and the Repair Activity (Contractor’s) Representative shall each verify that the work necessary to clear a tag-out has been completed prior to authorizing removal of the tags. Both parties shall concur to clearing the tag-out by signing the ship’s tag-out record sheet.

4.1.3.4 Ship’s Force personnel will remove the tags so authorized for clearance.

4.2 SAFETY REQUIREMENTS

4.2.1 The Contractor shall comply with and ensure compliance to the following for operations which may affect Government personnel or property: 29 CFR Part 1915, “Occupational Safety and Health Standards for Shipyard Employment”, 29 CFR Part 1910, “Occupational Safety and Health Standards”, and 29 CFR Part 1926 “Safety and Health Requirements for Construction”.

4.2.2 The following are deficiencies commonly encountered on safety inspections and are therefore emphasized here:

4.2.2.1 Anti-backflash control valves are required on all welding rigs (NFPA 51).

4.2.2.2 Scaffolds and/or lifelines are required when working above five feet. 29 CFR 1910 and 1915 cover this in detail. The following are commonly encountered problem areas:

4.2.2.2.1 Scaffolds require standard 42” high rails & midrails and 4” toeboards.

4.2.2.2.2 Planking must be scaffold-grade and completely cover the area between the railings and the ship.

4.2.2.3 Lifelines, body harnesses and lanyards are required wherever standard rails are not feasible. Lines must be kept taut, never allowing a fall of greater than six feet.

4.2.2.4 Lifelines must be attached above the worker.

4.2.3 Gear and equipment for rigging and lifting shall be in good working condition and operated according to the regulations set forth in 29 CFR 1915.111-116 and 29 CFR 1910.184. Proper safety precautions shall be practiced in the use of tag lines, mousing of hooks, and moving loads. In addition to the above requirements, all cranes used for work on the vessel or for handling GFM/GFE shall have a current weight handling certification in accordance with local, state and federal laws.

4.2.4 Tools and related equipment are addressed in 29 CFR 1915 Subpart H. Of particular concern is the use of ground fault circuit interrupters (GFCI) with power tools and the use of double insulated power tools. All shore supplied power circuits shall be protected by GFCI’S and have a grounding circuit back to shore. In addition, all power tools shall be approved by Underwriters’ Laboratories, or by other testing laboratories approved by the Contracting Officer and either be double insulated or have a grounded circuit.

4.2.5 Personnel protective equipment must be maintained and used in accordance with 29 CFR 1915.151- 160.

4.2.5.1 Where personnel exposures can not be maintained below the PEL using appropriate engineering controls, the Contractor shall provide all Contractor personnel with appropriate respiratory protective equipment or other protective equipment specified by the manufacture or where the Contractor/Contractor’s industrial hygienist has determined that exposures could exceed the PEL. The Contractor shall also ensure personnel are properly protected from sensitizing agents/conditions reported by the manufacturer in the Material Safety Data Sheets. These operations include, but are not limited to spray painting and grinding. Selection of respiratory protective equipment should be based on sound industrial hygiene sampling data for the material being worked. Airline hose masks or Self Contained Breathing Apparatus (SCBA) shall be provided to all personnel conducting abrasive blasting or confined space operations, unless an industrial hygienist has determined that exposures can be maintained below the PEL. In addition, respiratory protection for all work which could be immediately dangerous to life and health must consist of either an SCBA or a airline hose mask with an escape bottle as a designed component of the mask assembly.

4.2.5.2 Air line respirators shall be fitted with a pressure regulating valve, a filter which will remove oil, water, and rust particles, and a carbon monoxide alarm. The air intake shall be from a source free from all contaminants, such as the exhaust from internal combustion engines, and air must meet Grade D.

4.2.5.3 Safety harnesses shall be equipped with lifelines which are secured with a minimum of slack when in use. Lifelines must not permit a drop of greater than six feet or contact with any lower level.

4.2.6 Confined space entry requires initial gas free certification by a Marine Chemist in accordance with 29 CFR 1915 (59 FR 37816 of 25 Jul 94). The Contractor shall be responsible for monitoring and maintaining the “safe” condition during the entire time work is being performed. Monitoring shall be conducted by a NFPA certified Marine Chemist or a Competent Person. As a minimum, test/certification shall be made before each work shift or daily, whichever is more frequent, and duly recorded on all required certificates.

4.2.7 The Contractor shall provide to the vessel Material Safety Data Sheets for all hazardous materials used under this contract (including petroleum products), at least two working days prior to its use, if not previously submitted per paragraph 3.3. These include, but are not limited to, paints, solvents, cleaners, and abrasive blasting grits.

4.2.8 The Contractor shall ensure paints, solvents, etc., used in, on or around the vessel are used in a manner which prevents personnel exposure to concentrations of vapors exceeding Permissible Exposure Limits (PELs), or Threshold Limit Values (TLVs) for chemicals for which PELs are not listed in OSHA standards.

4.2.9 Each fuel and gas system supplied from shore shall be arranged to be secured by a valve located off the ship and marked to show its purpose. When not in use, fuel and gas hose valves shall be secured at the manifolds and the hoses pulled back to the open deck. Unused manifold valves shall be capped.

4.2.10 The Contractor shall control abrasive blast grit sufficiently to prevent exposure to personnel at or greater than Permissible Exposure Limits (as defined by OSHA). Ensure abrasive blast grit does not contain free silica.

4.2.11 Diving operations must be accomplished in accordance with the requirements of 29 CFR 1910.401 to 440 including appendices. No person may fill more than one assignment if it an emergency response or other incident may require complete dedication to one of the tasks.

4.3 QUALITY CONTROL

4.3.1 The Contractor shall implement the quality control (QC) program submitted in paragraph 3.4.9.

Quality assurance is the sole responsibility of the Contractor. The COR may delegate inspection responsibilities to members of the vessel’s crew. The designated inspectors monitor the progress of work done by the Contractor. If, during the performance of work the Coast Guard Inspectors witness work that fails to meet the specifications, work that is otherwise unsatisfactory, or conditions which may lead to an unsatisfactory end product, the inspectors will alert the COR who will advise the Contractor informally of the deficiency. If the deficient work is not corrected within a reasonable period of time (as approved by the COR), the COR will officially alert the Contractor via a Contract Deficiency Report. The COR will initiate the report (a sample report may be found at http://www.uscg.mil/mlcpac/mlcp/Eng%20Support/mlcpv/files/platform_support/Arrival_Agenda_Pkg_Fo rm.doc) and submit it to the Contracting Officer with copies to the cognizant NESU and MLCPAC(vr).

The Contracting Officer will forward the original to the Contractor.

4.4 INTERFERENCES

4.4.1 The prices offered shall include the cost of performing all the necessary removal, relocation, and/or reinstallation of ship’s structure, materials, and equipment in connection with the work. The fact that an interference is not shown on a plan or specifically identified in the specification item is not justification for a contract change. A physical check of each job aboard the vessel prior to bidding is strongly encouraged.

4.4.2 Removal and Reinstallation of Interferences. The Contractor shall remove and reinstall all interferences and obstructions necessary to complete the required work without regard to whether interferences are indicated under specification work items. This may include the removal of machinery, piping, ducts, wiring, insulation, structure and anything else which interferes with the proper accomplishment of a work item. Prior to being disturbed or removed and in the presence of the Coast Guard Inspector, the Contractor shall operationally test each interference reporting by Condition Found Report any existing operational defects or deficiencies. While awaiting reinstallation and restoration, the Contractor shall maintain and protect interferences. When determined to be in the best interest of the Coast Guard & the Contractor and upon Coast Guard approval, interferences may be modified or altered and returned to essentially the same configuration and condition. They are then to be retested in the presence of the Coast Guard Inspector to verify proper operation. Otherwise, upon completion of required work, the Contractor shall restore interferences to their original configuration and condition, and in the presence of the Coast Guard Inspector retest for proper operation.

4.5 EXTERIOR/COMPARTMENT PRESERVATION/PROTECTION

4.5.1 To prevent damage arising from the performance of the contracted work, it shall be the responsibility of the Contractor to provide adequate protection to the vessel or any government property in areas where the work under items of these specifications is to be accomplished. Any damage resulting from the Contractor’s failure to adequately protect the vessel or government property shall be repaired by the Contractor at no charge to the government.

4.5.2 Compartment Cleaning and Finishing – When the Contractor enters a compartment for the accomplishment of work, the Contractor is to notify the Coast Guard Inspector and jointly inspect the compartment prior to starting the work. All areas in way of the Contractor’s work, whether or not directly repaired or altered, are to be restored to as clean and ship shape condition on completion of the work as when work was started. For example, the decks leading to work areas are to be cleaned and, if required due to unusual wear by the Contractor’s crew, the work sections are to be either refinished or renewed so that they match the original condition of the decks.

4.5.3 Protective Coverings – All machinery, equipment, deck covering, insulation, and open vent terminals exposed to dust or drifting particles resulting from work under this contract shall be adequately protected. Methods of protection include, but are not limited to fire-retardant blanket (if required due to sparks or slag), canvas, or plastic coverings. All open vent intakes shall be completely covered with air intake screens fitted with 20 pores per inch polyester or polyurethane foam filtering material and shall be maintained by the Contractor to prevent excessive air restriction and/or damage to ventilation motors.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .