AttJ.2_KR_Raw_Cost_Element_Breakdown(08R6BX415).xls
XLS spreadsheet 114 KB Posted
- Attached to
- POLAR CLASS ICEBREAKER MULTI-SHIP MULTI-OPTION MAINTENANCE CONTRACT Federal contract opportunity
- Solicitation number
- HSCG85-08-R-6BX415
About this file
05 Attachment J.2 Raw Cost Element Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment0005.doc | DOC document | |
| Amendment0004.doc | DOC document | |
| Amendment0003.pdf | ||
| Amendment0002.doc | DOC document | |
| AttJ.4_Clarification_Form(08R6BX415)(Amd 0002).doc | DOC document | |
| Amendment0001.pdf | ||
| AttJ.4_Clarification_Form(08R6BX415).doc | DOC document | |
| AttJ.1_Exe_DS_Spec(08R6BX415).pdf | ||
| Solicitation_Sched_A-M(08R6BX415).doc | DOC document | |
| AttJ.1_Exe_DD_Spec(08R6BX415).pdf | ||
| AttJ.1a_Pln_DD_DS_Pkg(08R6BX415).doc | DOC document | |
| AttJ.3_Tech_Eval_Criteria(08R6BX415).doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 Pln DS Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | " | 40 | 0 | $0 | $0 |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | " | 40 | 0 | $0 | $0 |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | " | 40 | 0 | $0 | $0 |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-06 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | " | 40 | 0 | $0 | $0 |
| D-09 | FLIGHT DECK PRESERVE | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING | " | 40 | 0 | $0 | $0 |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | " | 40 | 0 | $0 | $0 |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | " | 40 | 0 | $0 | $0 |
| Totals | 520 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0004 Pln DD Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | " | 40 | 0 | $0 | $0 |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | " | 40 | 0 | $0 | $0 |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | " | 40 | 0 | $0 | $0 |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | " | 40 | 0 | $0 | $0 |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | " | 40 | 0 | $0 | $0 |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | " | 40 | 0 | $0 | $0 |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-13 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-15 | RE-TUBE NUMBER 2 BOILER | " | 40 | 0 | $0 | $0 |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | " | 40 | 0 | $0 | $0 |
| D-18 | STEERING SYSTEM REPAIRS | " | 40 | 0 | $0 | $0 |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | " | 40 | 0 | $0 | $0 |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-24 | CHAIN LOCKERS PRESERVE | " | 40 | 0 | $0 | $0 |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | " | 40 | 0 | $0 | $0 |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | " | 40 | 0 | $0 | $0 |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | " | 40 | 0 | $0 | $0 |
| D-28 | DRYDOCKING ACCOMPLISH | " | 40 | 0 | $0 | $0 |
| Totals | 1,120 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0005 Exe DS Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 53 | $250 | $1,500 | |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | 90 | $330 | $0 | |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | 1,711 | $10,975 | $0 | |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | 792 | $1,890 | $0 | |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | 119 | $1,200 | $300 | |
| D-06 | ELECTRIC METER CALIBRATION | 47 | $24,395 | $0 | |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | 282 | $1,550 | $0 | |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | 139 | $2,580 | $0 | |
| D-09 | FLIGHT DECK PRESERVE | 1,657 | $24,805 | $0 | |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING | 1,709 | $7,140 | $0 | |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | 7,431 | $44,265 | $152,000 | |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | 492 | $13,810 | $12,500 | |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | 744 | $159,245 | $3,500 | |
| Totals | 15,266 | $292,435 | $169,800 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0006 Exe DD Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 71 | $150 | $0 | |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | 732 | $10,790 | $0 | |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | 102 | $575 | $0 | |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | 764 | $4,216 | $150 | |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,813 | $19,898 | $54,800 | |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,874 | $13,698 | $39,668 | |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 3,731 | $31,615 | $35,370 | |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | 541 | $14,730 | $225 | |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | 488 | $32,330 | $8,000 | |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | 488 | $32,330 | $8,000 | |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | 532 | $32,330 | $8,000 | |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | 675 | $1,200 | $0 | |
| D-13 | ELECTRIC METER CALIBRATION | 64 | $9,860 | $0 | |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | 158 | $2,100 | $0 | |
| D-15 | RE-TUBE NUMBER 2 BOILER | 2,974 | $77,780 | $4,650 | |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | 2,300 | $9,845 | $0 | |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | 167 | $8,950 | $0 | |
| D-18 | STEERING SYSTEM REPAIRS | 543 | $5,090 | $21,700 | |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | 1,676 | $6,400 | $9,050 | |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | 304 | $700 | $4,200 | |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | 867 | $12,365 | $150 | |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | 836 | $14,690 | $20,100 | |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | 176 | $3,000 | $7,000 | |
| D-24 | CHAIN LOCKERS PRESERVE | 326 | $1,600 | $300 | |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | 2,911 | $82,760 | $0 | |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | 628 | $17,930 | $0 | |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | 4,278 | $61,480 | $10,000 | |
| D-28 | DRYDOCKING ACCOMPLISH | 999 | $251,632 | $10,300 | |
| Totals | 37,018 | $760,044 | $241,663 |
&L&12DTCG85-03-R-625936
&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0007 Pln DD Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | " | 40 | 0 | $0 | $0 |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | " | 40 | 0 | $0 | $0 |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | " | 40 | 0 | $0 | $0 |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | " | 40 | 0 | $0 | $0 |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | " | 40 | 0 | $0 | $0 |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | " | 40 | 0 | $0 | $0 |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-13 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-15 | RE-TUBE NUMBER 2 BOILER | " | 40 | 0 | $0 | $0 |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | " | 40 | 0 | $0 | $0 |
| D-18 | STEERING SYSTEM REPAIRS | " | 40 | 0 | $0 | $0 |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | " | 40 | 0 | $0 | $0 |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-24 | CHAIN LOCKERS PRESERVE | " | 40 | 0 | $0 | $0 |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | " | 40 | 0 | $0 | $0 |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | " | 40 | 0 | $0 | $0 |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | " | 40 | 0 | $0 | $0 |
| D-28 | DRYDOCKING ACCOMPLISH | " | 40 | 0 | $0 | $0 |
| Totals | 1,120 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0008 Pln DS Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | " | 40 | 0 | $0 | $0 |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | " | 40 | 0 | $0 | $0 |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | " | 40 | 0 | $0 | $0 |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-06 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | " | 40 | 0 | $0 | $0 |
| D-09 | FLIGHT DECK PRESERVE | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING | " | 40 | 0 | $0 | $0 |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | " | 40 | 0 | $0 | $0 |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | " | 40 | 0 | $0 | $0 |
| Totals | 520 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0009 Exe DD Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 71 | $150 | $0 | |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | 732 | $10,790 | $0 | |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | 102 | $575 | $0 | |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | 764 | $4,216 | $150 | |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,813 | $19,898 | $54,800 | |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,874 | $13,698 | $39,668 | |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 3,731 | $31,615 | $35,370 | |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | 541 | $14,730 | $225 | |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | 488 | $32,330 | $8,000 | |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | 488 | $32,330 | $8,000 | |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | 532 | $32,330 | $8,000 | |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | 675 | $1,200 | $0 | |
| D-13 | ELECTRIC METER CALIBRATION | 64 | $9,860 | $0 | |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | 158 | $2,100 | $0 | |
| D-15 | RE-TUBE NUMBER 2 BOILER | 2,974 | $77,780 | $4,650 | |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | 2,300 | $9,845 | $0 | |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | 167 | $8,950 | $0 | |
| D-18 | STEERING SYSTEM REPAIRS | 543 | $5,090 | $21,700 | |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | 1,676 | $6,400 | $9,050 | |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | 304 | $700 | $4,200 | |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | 867 | $12,365 | $150 | |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | 836 | $14,690 | $20,100 | |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | 176 | $3,000 | $7,000 | |
| D-24 | CHAIN LOCKERS PRESERVE | 326 | $1,600 | $300 | |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | 2,911 | $82,760 | $0 | |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | 628 | $17,930 | $0 | |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | 4,278 | $61,480 | $10,000 | |
| D-28 | DRYDOCKING ACCOMPLISH | 999 | $251,632 | $10,300 | |
| Totals | 37,018 | $760,044 | $241,663 |
&L&12DTCG85-03-R-625936
&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0010 Exe DS Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 53 | $250 | $1,500 | |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | 90 | $330 | $0 | |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | 1,711 | $10,975 | $0 | |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | 792 | $1,890 | $0 | |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | 119 | $1,200 | $300 | |
| D-06 | ELECTRIC METER CALIBRATION | 47 | $24,395 | $0 | |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | 282 | $1,550 | $0 | |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | 139 | $2,580 | $0 | |
| D-09 | FLIGHT DECK PRESERVE | 1,657 | $24,805 | $0 | |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING | 1,709 | $7,140 | $0 | |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | 7,431 | $44,265 | $152,000 | |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | 492 | $13,810 | $12,500 | |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | 744 | $159,245 | $3,500 | |
| Totals | 15,266 | $292,435 | $169,800 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0011 Pln DS Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | " | 40 | 0 | $0 | $0 |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | " | 40 | 0 | $0 | $0 |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | " | 40 | 0 | $0 | $0 |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-06 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | " | 40 | 0 | $0 | $0 |
| D-09 | FLIGHT DECK PRESERVE | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING | " | 40 | 0 | $0 | $0 |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | " | 40 | 0 | $0 | $0 |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | " | 40 | 0 | $0 | $0 |
| Totals | 520 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0012 Pln DD Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | " | 40 | 0 | $0 | $0 |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | " | 40 | 0 | $0 | $0 |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | " | 40 | 0 | $0 | $0 |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | " | 40 | 0 | $0 | $0 |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | " | 40 | 0 | $0 | $0 |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | " | 40 | 0 | $0 | $0 |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-13 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-15 | RE-TUBE NUMBER 2 BOILER | " | 40 | 0 | $0 | $0 |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | " | 40 | 0 | $0 | $0 |
| D-18 | STEERING SYSTEM REPAIRS | " | 40 | 0 | $0 | $0 |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | " | 40 | 0 | $0 | $0 |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-24 | CHAIN LOCKERS PRESERVE | " | 40 | 0 | $0 | $0 |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | " | 40 | 0 | $0 | $0 |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | " | 40 | 0 | $0 | $0 |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | " | 40 | 0 | $0 | $0 |
| D-28 | DRYDOCKING ACCOMPLISH | " | 40 | 0 | $0 | $0 |
| Totals | 1,120 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0013 Exe DS Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 53 | $250 | $1,500 | |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | 90 | $330 | $0 | |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | 1,711 | $10,975 | $0 | |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | 792 | $1,890 | $0 | |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | 119 | $1,200 | $300 | |
| D-06 | ELECTRIC METER CALIBRATION | 47 | $24,395 | $0 | |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | 282 | $1,550 | $0 | |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | 139 | $2,580 | $0 | |
| D-09 | FLIGHT DECK PRESERVE | 1,657 | $24,805 | $0 | |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING | 1,709 | $7,140 | $0 | |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | 7,431 | $44,265 | $152,000 | |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | 492 | $13,810 | $12,500 | |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | 744 | $159,245 | $3,500 | |
| Totals | 15,266 | $292,435 | $169,800 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0014 Exe DD Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 71 | $150 | $0 | |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | 732 | $10,790 | $0 | |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | 102 | $575 | $0 | |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | 764 | $4,216 | $150 | |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,813 | $19,898 | $54,800 | |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,874 | $13,698 | $39,668 | |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 3,731 | $31,615 | $35,370 | |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | 541 | $14,730 | $225 | |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | 488 | $32,330 | $8,000 | |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | 488 | $32,330 | $8,000 | |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | 532 | $32,330 | $8,000 | |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | 675 | $1,200 | $0 | |
| D-13 | ELECTRIC METER CALIBRATION | 64 | $9,860 | $0 | |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | 158 | $2,100 | $0 | |
| D-15 | RE-TUBE NUMBER 2 BOILER | 2,974 | $77,780 | $4,650 | |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | 2,300 | $9,845 | $0 | |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | 167 | $8,950 | $0 | |
| D-18 | STEERING SYSTEM REPAIRS | 543 | $5,090 | $21,700 | |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | 1,676 | $6,400 | $9,050 | |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | 304 | $700 | $4,200 | |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | 867 | $12,365 | $150 | |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | 836 | $14,690 | $20,100 | |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | 176 | $3,000 | $7,000 | |
| D-24 | CHAIN LOCKERS PRESERVE | 326 | $1,600 | $300 | |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | 2,911 | $82,760 | $0 | |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | 628 | $17,930 | $0 | |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | 4,278 | $61,480 | $10,000 | |
| D-28 | DRYDOCKING ACCOMPLISH | 999 | $251,632 | $10,300 | |
| Totals | 37,018 | $760,044 | $241,663 |
&L&12DTCG85-03-R-625936
&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0015 Pln DD Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | " | 40 | 0 | $0 | $0 |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | " | 40 | 0 | $0 | $0 |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | " | 40 | 0 | $0 | $0 |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | " | 40 | 0 | $0 | $0 |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | " | 40 | 0 | $0 | $0 |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | " | 40 | 0 | $0 | $0 |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-13 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-15 | RE-TUBE NUMBER 2 BOILER | " | 40 | 0 | $0 | $0 |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | " | 40 | 0 | $0 | $0 |
| D-18 | STEERING SYSTEM REPAIRS | " | 40 | 0 | $0 | $0 |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | " | 40 | 0 | $0 | $0 |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-24 | CHAIN LOCKERS PRESERVE | " | 40 | 0 | $0 | $0 |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | " | 40 | 0 | $0 | $0 |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | " | 40 | 0 | $0 | $0 |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | " | 40 | 0 | $0 | $0 |
| D-28 | DRYDOCKING ACCOMPLISH | " | 40 | 0 | $0 | $0 |
| Totals | 1,120 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0016 Pln DS Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | " | 40 | 0 | $0 | $0 |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | " | 40 | 0 | $0 | $0 |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | " | 40 | 0 | $0 | $0 |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-06 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | " | 40 | 0 | $0 | $0 |
| D-09 | FLIGHT DECK PRESERVE | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING | " | 40 | 0 | $0 | $0 |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | " | 40 | 0 | $0 | $0 |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | " | 40 | 0 | $0 | $0 |
| Totals | 520 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0017 Exe DD Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 71 | $150 | $0 | |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | 732 | $10,790 | $0 | |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | 102 | $575 | $0 | |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | 764 | $4,216 | $150 | |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,813 | $19,898 | $54,800 | |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,874 | $13,698 | $39,668 | |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 3,731 | $31,615 | $35,370 | |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | 541 | $14,730 | $225 | |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | 488 | $32,330 | $8,000 | |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | 488 | $32,330 | $8,000 | |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | 532 | $32,330 | $8,000 | |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | 675 | $1,200 | $0 | |
| D-13 | ELECTRIC METER CALIBRATION | 64 | $9,860 | $0 | |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | 158 | $2,100 | $0 | |
| D-15 | RE-TUBE NUMBER 2 BOILER | 2,974 | $77,780 | $4,650 | |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | 2,300 | $9,845 | $0 | |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | 167 | $8,950 | $0 | |
| D-18 | STEERING SYSTEM REPAIRS | 543 | $5,090 | $21,700 | |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | 1,676 | $6,400 | $9,050 | |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | 304 | $700 | $4,200 | |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | 867 | $12,365 | $150 | |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | 836 | $14,690 | $20,100 | |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | 176 | $3,000 | $7,000 | |
| D-24 | CHAIN LOCKERS PRESERVE | 326 | $1,600 | $300 | |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | 2,911 | $82,760 | $0 | |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | 628 | $17,930 | $0 | |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | 4,278 | $61,480 | $10,000 | |
| D-28 | DRYDOCKING ACCOMPLISH | 999 | $251,632 | $10,300 | |
| Totals | 37,018 | $760,044 | $241,663 |
&L&12DTCG85-03-R-625936
&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0018 Exe DS Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 53 | $250 | $1,500 | |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | 90 | $330 | $0 | |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | 1,711 | $10,975 | $0 | |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | 792 | $1,890 | $0 | |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | 119 | $1,200 | $300 | |
| D-06 | ELECTRIC METER CALIBRATION | 47 | $24,395 | $0 | |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | 282 | $1,550 | $0 | |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | 139 | $2,580 | $0 | |
| D-09 | FLIGHT DECK PRESERVE | 1,657 | $24,805 | $0 | |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING | 1,709 | $7,140 | $0 | |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | 7,431 | $44,265 | $152,000 | |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | 492 | $13,810 | $12,500 | |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | 744 | $159,245 | $3,500 | |
| Totals | 15,266 | $292,435 | $169,800 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0019 Pln DS Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | " | 40 | 0 | $0 | $0 |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | " | 40 | 0 | $0 | $0 |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | " | 40 | 0 | $0 | $0 |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-06 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | " | 40 | 0 | $0 | $0 |
| D-09 | FLIGHT DECK PRESERVE | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING | " | 40 | 0 | $0 | $0 |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | " | 40 | 0 | $0 | $0 |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | " | 40 | 0 | $0 | $0 |
| Totals | 520 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0020 Pln DD Est
| Item | Description | Planning Objective | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | See below * | 40 | 0 | $0 | $0 |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | " | 40 | 0 | $0 | $0 |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | " | 40 | 0 | $0 | $0 |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | " | 40 | 0 | $0 | $0 |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | " | 40 | 0 | $0 | $0 |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | " | 40 | 0 | $0 | $0 |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | " | 40 | 0 | $0 | $0 |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | " | 40 | 0 | $0 | $0 |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | " | 40 | 0 | $0 | $0 |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-13 | ELECTRIC METER CALIBRATION | " | 40 | 0 | $0 | $0 |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | " | 40 | 0 | $0 | $0 |
| D-15 | RE-TUBE NUMBER 2 BOILER | " | 40 | 0 | $0 | $0 |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | " | 40 | 0 | $0 | $0 |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | " | 40 | 0 | $0 | $0 |
| D-18 | STEERING SYSTEM REPAIRS | " | 40 | 0 | $0 | $0 |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | " | 40 | 0 | $0 | $0 |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | " | 40 | 0 | $0 | $0 |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | " | 40 | 0 | $0 | $0 |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | " | 40 | 0 | $0 | $0 |
| D-24 | CHAIN LOCKERS PRESERVE | " | 40 | 0 | $0 | $0 |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | " | 40 | 0 | $0 | $0 |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | " | 40 | 0 | $0 | $0 |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | " | 40 | 0 | $0 | $0 |
| D-28 | DRYDOCKING ACCOMPLISH | " | 40 | 0 | $0 | $0 |
| Totals | 1,120 | 0 | $0 | $0 | ||
| * Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0021 Exe DS Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 53 | $250 | $1,500 | |
| D-02 | WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS | 90 | $330 | $0 | |
| D-03 | SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING | 1,711 | $10,975 | $0 | |
| D-04 | FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS | 792 | $1,890 | $0 | |
| D-05 | TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT | 119 | $1,200 | $300 | |
| D-06 | ELECTRIC METER CALIBRATION | 47 | $24,395 | $0 | |
| D-07 | VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN | 282 | $1,550 | $0 | |
| D-08 | COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO | 139 | $2,580 | $0 | |
| D-09 | FLIGHT DECK PRESERVE | 1,657 | $24,805 | $0 | |
| D-10 | PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING | 1,709 | $7,140 | $0 | |
| D-11 | NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL | 7,431 | $44,265 | $152,000 | |
| D-12 | NO. 2B MDE TURBOCHARGER MODIFICATION | 492 | $13,810 | $12,500 | |
| D-13 | TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY | 744 | $159,245 | $3,500 | |
| Totals | 15,266 | $292,435 | $169,800 |
&L&12HSCG85-08-R-6BX415
&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P
CLIN 0022 Exe DD Est
| Item | Description | ST M/H | OT M/H | MATL COST | SUBC COST |
| D-01 | PRODUCTION CONTROL, GANTT BAR CHART PROVIDE | 71 | $150 | $0 | |
| D-02 | APPENDAGES (UNDERWATER) PRESERVE, INTERNAL | 732 | $10,790 | $0 | |
| D-03 | APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST | 102 | $575 | $0 | |
| D-04 | STARBOARD SHAFT DISCONNECT COUPLING RENEWAL | 764 | $4,216 | $150 | |
| D-05 | CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,813 | $19,898 | $54,800 | |
| D-06 | PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 4,874 | $13,698 | $39,668 | |
| D-07 | STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION | 3,731 | $31,615 | $35,370 | |
| D-08 | PROPULSION SHAFT SEAL RENEWAL | 541 | $14,730 | $225 | |
| D-09 | PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD | 488 | $32,330 | $8,000 | |
| D-10 | PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT | 488 | $32,330 | $8,000 | |
| D-11 | PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE | 532 | $32,330 | $8,000 | |
| D-12 | PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES | 675 | $1,200 | $0 | |
| D-13 | ELECTRIC METER CALIBRATION | 64 | $9,860 | $0 | |
| D-14 | VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN | 158 | $2,100 | $0 | |
| D-15 | RE-TUBE NUMBER 2 BOILER | 2,974 | $77,780 | $4,650 | |
| D-16 | SEA VALVE (>2.5 INCHES) OVERHAUL | 2,300 | $9,845 | $0 | |
| D-17 | SEA VALVE (<=2.5 INCHES) RENEWAL | 167 | $8,950 | $0 | |
| D-18 | STEERING SYSTEM REPAIRS | 543 | $5,090 | $21,700 | |
| D-19 | RUDDER REMOVE, INSPECT & REINSTALL | 1,676 | $6,400 | $9,050 | |
| D-20 | RUDDER STOCK BEARINGS CHECK CLEARANCES | 304 | $700 | $4,200 | |
| D-21 | ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR | 867 | $12,365 | $150 | |
| D-22 | ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR | 836 | $14,690 | $20,100 | |
| D-23 | 15-TON AND 3-TON CRANES TEST AND INSPECT | 176 | $3,000 | $7,000 | |
| D-24 | CHAIN LOCKERS PRESERVE | 326 | $1,600 | $300 | |
| D-25 | HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399) | 2,911 | $82,760 | $0 | |
| D-26 | CATHODIC PROTECTION, ZINC ANODE RENEWAL | 628 | $17,930 | $0 | |
| D-27 | TEMPORARY SERVICES, DRYDOCK PROVIDE | 4,278 | $61,480 | $10,000 | |
| D-28 | DRYDOCKING ACCOMPLISH | 999 | $251,632 | $10,300 | |
| Totals | 37,018 | $760,044 | $241,663 |
&L&12DTCG85-03-R-625936
&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P
File details come from the government source that posted it. Updated .