AttJ.2_KR_Raw_Cost_Element_Breakdown(08R6BX415).xls

XLS spreadsheet 114 KB Posted

Attached to
POLAR CLASS ICEBREAKER MULTI-SHIP MULTI-OPTION MAINTENANCE CONTRACT Federal contract opportunity
Solicitation number
HSCG85-08-R-6BX415
Issued by
Department of Homeland Security US Coast Guard

About this file

05 Attachment J.2 Raw Cost Element Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to POLAR CLASS ICEBREAKER MULTI-SHIP MULTI-OPTION MAINTENANCE CONTRACT, newest first.
File Type Posted
Amendment0005.doc DOC document
Amendment0004.doc DOC document
Amendment0003.pdf PDF
Amendment0002.doc DOC document
AttJ.4_Clarification_Form(08R6BX415)(Amd 0002).doc DOC document
Amendment0001.pdf PDF
AttJ.4_Clarification_Form(08R6BX415).doc DOC document
AttJ.1_Exe_DS_Spec(08R6BX415).pdf PDF
Solicitation_Sched_A-M(08R6BX415).doc DOC document
AttJ.1_Exe_DD_Spec(08R6BX415).pdf PDF
AttJ.1a_Pln_DD_DS_Pkg(08R6BX415).doc DOC document
AttJ.3_Tech_Eval_Criteria(08R6BX415).doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 Pln DS Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS"400$0$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING"400$0$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS"400$0$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT"400$0$0
D-06ELECTRIC METER CALIBRATION"400$0$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN"400$0$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO"400$0$0
D-09FLIGHT DECK PRESERVE"400$0$0
D-10PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING"400$0$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL"400$0$0
D-12NO. 2B MDE TURBOCHARGER MODIFICATION"400$0$0
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY"400$0$0
Totals5200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0004 Pln DD Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL"400$0$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST"400$0$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL"400$0$0
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-08PROPULSION SHAFT SEAL RENEWAL"400$0$0
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD"400$0$0
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT"400$0$0
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE"400$0$0
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES"400$0$0
D-13ELECTRIC METER CALIBRATION"400$0$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN"400$0$0
D-15RE-TUBE NUMBER 2 BOILER"400$0$0
D-16SEA VALVE (>2.5 INCHES) OVERHAUL"400$0$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL"400$0$0
D-18STEERING SYSTEM REPAIRS"400$0$0
D-19RUDDER REMOVE, INSPECT & REINSTALL"400$0$0
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES"400$0$0
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR"400$0$0
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR"400$0$0
D-2315-TON AND 3-TON CRANES TEST AND INSPECT"400$0$0
D-24CHAIN LOCKERS PRESERVE"400$0$0
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)"400$0$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL"400$0$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE"400$0$0
D-28DRYDOCKING ACCOMPLISH"400$0$0
Totals1,1200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0005 Exe DS Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE53$250$1,500
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS90$330$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING1,711$10,975$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS792$1,890$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT119$1,200$300
D-06ELECTRIC METER CALIBRATION47$24,395$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN282$1,550$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO139$2,580$0
D-09FLIGHT DECK PRESERVE1,657$24,805$0
D-10PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING1,709$7,140$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL7,431$44,265$152,000
D-12NO. 2B MDE TURBOCHARGER MODIFICATION492$13,810$12,500
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY744$159,245$3,500
Totals15,266$292,435$169,800

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0006 Exe DD Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE71$150$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL732$10,790$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST102$575$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL764$4,216$150
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,813$19,898$54,800
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,874$13,698$39,668
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION3,731$31,615$35,370
D-08PROPULSION SHAFT SEAL RENEWAL541$14,730$225
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD488$32,330$8,000
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT488$32,330$8,000
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE532$32,330$8,000
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES675$1,200$0
D-13ELECTRIC METER CALIBRATION64$9,860$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN158$2,100$0
D-15RE-TUBE NUMBER 2 BOILER2,974$77,780$4,650
D-16SEA VALVE (>2.5 INCHES) OVERHAUL2,300$9,845$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL167$8,950$0
D-18STEERING SYSTEM REPAIRS543$5,090$21,700
D-19RUDDER REMOVE, INSPECT & REINSTALL1,676$6,400$9,050
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES304$700$4,200
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR867$12,365$150
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR836$14,690$20,100
D-2315-TON AND 3-TON CRANES TEST AND INSPECT176$3,000$7,000
D-24CHAIN LOCKERS PRESERVE326$1,600$300
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)2,911$82,760$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL628$17,930$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE4,278$61,480$10,000
D-28DRYDOCKING ACCOMPLISH999$251,632$10,300
Totals37,018$760,044$241,663

&L&12DTCG85-03-R-625936

&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0007 Pln DD Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL"400$0$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST"400$0$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL"400$0$0
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-08PROPULSION SHAFT SEAL RENEWAL"400$0$0
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD"400$0$0
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT"400$0$0
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE"400$0$0
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES"400$0$0
D-13ELECTRIC METER CALIBRATION"400$0$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN"400$0$0
D-15RE-TUBE NUMBER 2 BOILER"400$0$0
D-16SEA VALVE (>2.5 INCHES) OVERHAUL"400$0$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL"400$0$0
D-18STEERING SYSTEM REPAIRS"400$0$0
D-19RUDDER REMOVE, INSPECT & REINSTALL"400$0$0
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES"400$0$0
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR"400$0$0
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR"400$0$0
D-2315-TON AND 3-TON CRANES TEST AND INSPECT"400$0$0
D-24CHAIN LOCKERS PRESERVE"400$0$0
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)"400$0$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL"400$0$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE"400$0$0
D-28DRYDOCKING ACCOMPLISH"400$0$0
Totals1,1200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0008 Pln DS Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS"400$0$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING"400$0$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS"400$0$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT"400$0$0
D-06ELECTRIC METER CALIBRATION"400$0$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN"400$0$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO"400$0$0
D-09FLIGHT DECK PRESERVE"400$0$0
D-10PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING"400$0$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL"400$0$0
D-12NO. 2B MDE TURBOCHARGER MODIFICATION"400$0$0
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY"400$0$0
Totals5200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0009 Exe DD Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE71$150$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL732$10,790$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST102$575$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL764$4,216$150
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,813$19,898$54,800
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,874$13,698$39,668
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION3,731$31,615$35,370
D-08PROPULSION SHAFT SEAL RENEWAL541$14,730$225
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD488$32,330$8,000
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT488$32,330$8,000
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE532$32,330$8,000
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES675$1,200$0
D-13ELECTRIC METER CALIBRATION64$9,860$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN158$2,100$0
D-15RE-TUBE NUMBER 2 BOILER2,974$77,780$4,650
D-16SEA VALVE (>2.5 INCHES) OVERHAUL2,300$9,845$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL167$8,950$0
D-18STEERING SYSTEM REPAIRS543$5,090$21,700
D-19RUDDER REMOVE, INSPECT & REINSTALL1,676$6,400$9,050
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES304$700$4,200
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR867$12,365$150
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR836$14,690$20,100
D-2315-TON AND 3-TON CRANES TEST AND INSPECT176$3,000$7,000
D-24CHAIN LOCKERS PRESERVE326$1,600$300
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)2,911$82,760$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL628$17,930$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE4,278$61,480$10,000
D-28DRYDOCKING ACCOMPLISH999$251,632$10,300
Totals37,018$760,044$241,663

&L&12DTCG85-03-R-625936

&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0010 Exe DS Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE53$250$1,500
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS90$330$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING1,711$10,975$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS792$1,890$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT119$1,200$300
D-06ELECTRIC METER CALIBRATION47$24,395$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN282$1,550$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO139$2,580$0
D-09FLIGHT DECK PRESERVE1,657$24,805$0
D-10PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING1,709$7,140$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL7,431$44,265$152,000
D-12NO. 2B MDE TURBOCHARGER MODIFICATION492$13,810$12,500
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY744$159,245$3,500
Totals15,266$292,435$169,800

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0011 Pln DS Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS"400$0$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING"400$0$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS"400$0$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT"400$0$0
D-06ELECTRIC METER CALIBRATION"400$0$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN"400$0$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO"400$0$0
D-09FLIGHT DECK PRESERVE"400$0$0
D-10PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING"400$0$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL"400$0$0
D-12NO. 2B MDE TURBOCHARGER MODIFICATION"400$0$0
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY"400$0$0
Totals5200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0012 Pln DD Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL"400$0$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST"400$0$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL"400$0$0
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-08PROPULSION SHAFT SEAL RENEWAL"400$0$0
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD"400$0$0
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT"400$0$0
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE"400$0$0
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES"400$0$0
D-13ELECTRIC METER CALIBRATION"400$0$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN"400$0$0
D-15RE-TUBE NUMBER 2 BOILER"400$0$0
D-16SEA VALVE (>2.5 INCHES) OVERHAUL"400$0$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL"400$0$0
D-18STEERING SYSTEM REPAIRS"400$0$0
D-19RUDDER REMOVE, INSPECT & REINSTALL"400$0$0
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES"400$0$0
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR"400$0$0
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR"400$0$0
D-2315-TON AND 3-TON CRANES TEST AND INSPECT"400$0$0
D-24CHAIN LOCKERS PRESERVE"400$0$0
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)"400$0$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL"400$0$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE"400$0$0
D-28DRYDOCKING ACCOMPLISH"400$0$0
Totals1,1200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0013 Exe DS Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE53$250$1,500
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS90$330$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING1,711$10,975$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS792$1,890$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT119$1,200$300
D-06ELECTRIC METER CALIBRATION47$24,395$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN282$1,550$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO139$2,580$0
D-09FLIGHT DECK PRESERVE1,657$24,805$0
D-10PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING1,709$7,140$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL7,431$44,265$152,000
D-12NO. 2B MDE TURBOCHARGER MODIFICATION492$13,810$12,500
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY744$159,245$3,500
Totals15,266$292,435$169,800

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0014 Exe DD Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE71$150$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL732$10,790$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST102$575$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL764$4,216$150
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,813$19,898$54,800
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,874$13,698$39,668
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION3,731$31,615$35,370
D-08PROPULSION SHAFT SEAL RENEWAL541$14,730$225
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD488$32,330$8,000
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT488$32,330$8,000
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE532$32,330$8,000
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES675$1,200$0
D-13ELECTRIC METER CALIBRATION64$9,860$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN158$2,100$0
D-15RE-TUBE NUMBER 2 BOILER2,974$77,780$4,650
D-16SEA VALVE (>2.5 INCHES) OVERHAUL2,300$9,845$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL167$8,950$0
D-18STEERING SYSTEM REPAIRS543$5,090$21,700
D-19RUDDER REMOVE, INSPECT & REINSTALL1,676$6,400$9,050
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES304$700$4,200
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR867$12,365$150
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR836$14,690$20,100
D-2315-TON AND 3-TON CRANES TEST AND INSPECT176$3,000$7,000
D-24CHAIN LOCKERS PRESERVE326$1,600$300
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)2,911$82,760$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL628$17,930$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE4,278$61,480$10,000
D-28DRYDOCKING ACCOMPLISH999$251,632$10,300
Totals37,018$760,044$241,663

&L&12DTCG85-03-R-625936

&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0015 Pln DD Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL"400$0$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST"400$0$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL"400$0$0
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-08PROPULSION SHAFT SEAL RENEWAL"400$0$0
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD"400$0$0
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT"400$0$0
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE"400$0$0
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES"400$0$0
D-13ELECTRIC METER CALIBRATION"400$0$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN"400$0$0
D-15RE-TUBE NUMBER 2 BOILER"400$0$0
D-16SEA VALVE (>2.5 INCHES) OVERHAUL"400$0$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL"400$0$0
D-18STEERING SYSTEM REPAIRS"400$0$0
D-19RUDDER REMOVE, INSPECT & REINSTALL"400$0$0
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES"400$0$0
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR"400$0$0
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR"400$0$0
D-2315-TON AND 3-TON CRANES TEST AND INSPECT"400$0$0
D-24CHAIN LOCKERS PRESERVE"400$0$0
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)"400$0$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL"400$0$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE"400$0$0
D-28DRYDOCKING ACCOMPLISH"400$0$0
Totals1,1200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0016 Pln DS Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS"400$0$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING"400$0$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS"400$0$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT"400$0$0
D-06ELECTRIC METER CALIBRATION"400$0$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN"400$0$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO"400$0$0
D-09FLIGHT DECK PRESERVE"400$0$0
D-10PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING"400$0$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL"400$0$0
D-12NO. 2B MDE TURBOCHARGER MODIFICATION"400$0$0
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY"400$0$0
Totals5200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0017 Exe DD Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE71$150$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL732$10,790$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST102$575$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL764$4,216$150
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,813$19,898$54,800
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,874$13,698$39,668
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION3,731$31,615$35,370
D-08PROPULSION SHAFT SEAL RENEWAL541$14,730$225
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD488$32,330$8,000
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT488$32,330$8,000
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE532$32,330$8,000
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES675$1,200$0
D-13ELECTRIC METER CALIBRATION64$9,860$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN158$2,100$0
D-15RE-TUBE NUMBER 2 BOILER2,974$77,780$4,650
D-16SEA VALVE (>2.5 INCHES) OVERHAUL2,300$9,845$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL167$8,950$0
D-18STEERING SYSTEM REPAIRS543$5,090$21,700
D-19RUDDER REMOVE, INSPECT & REINSTALL1,676$6,400$9,050
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES304$700$4,200
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR867$12,365$150
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR836$14,690$20,100
D-2315-TON AND 3-TON CRANES TEST AND INSPECT176$3,000$7,000
D-24CHAIN LOCKERS PRESERVE326$1,600$300
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)2,911$82,760$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL628$17,930$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE4,278$61,480$10,000
D-28DRYDOCKING ACCOMPLISH999$251,632$10,300
Totals37,018$760,044$241,663

&L&12DTCG85-03-R-625936

&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0018 Exe DS Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE53$250$1,500
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS90$330$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING1,711$10,975$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS792$1,890$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT119$1,200$300
D-06ELECTRIC METER CALIBRATION47$24,395$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN282$1,550$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO139$2,580$0
D-09FLIGHT DECK PRESERVE1,657$24,805$0
D-10PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING1,709$7,140$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL7,431$44,265$152,000
D-12NO. 2B MDE TURBOCHARGER MODIFICATION492$13,810$12,500
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY744$159,245$3,500
Totals15,266$292,435$169,800

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0019 Pln DS Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS"400$0$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING"400$0$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS"400$0$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT"400$0$0
D-06ELECTRIC METER CALIBRATION"400$0$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN"400$0$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO"400$0$0
D-09FLIGHT DECK PRESERVE"400$0$0
D-10PROPULSION SYSTEM AIR COOLERS CLEAINING, INSPECTION AND TESTING"400$0$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL"400$0$0
D-12NO. 2B MDE TURBOCHARGER MODIFICATION"400$0$0
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY"400$0$0
Totals5200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0020 Pln DD Est

ItemDescriptionPlanning ObjectiveST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDESee below *400$0$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL"400$0$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST"400$0$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL"400$0$0
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION"400$0$0
D-08PROPULSION SHAFT SEAL RENEWAL"400$0$0
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD"400$0$0
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT"400$0$0
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE"400$0$0
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES"400$0$0
D-13ELECTRIC METER CALIBRATION"400$0$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN"400$0$0
D-15RE-TUBE NUMBER 2 BOILER"400$0$0
D-16SEA VALVE (>2.5 INCHES) OVERHAUL"400$0$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL"400$0$0
D-18STEERING SYSTEM REPAIRS"400$0$0
D-19RUDDER REMOVE, INSPECT & REINSTALL"400$0$0
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES"400$0$0
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR"400$0$0
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR"400$0$0
D-2315-TON AND 3-TON CRANES TEST AND INSPECT"400$0$0
D-24CHAIN LOCKERS PRESERVE"400$0$0
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)"400$0$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL"400$0$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE"400$0$0
D-28DRYDOCKING ACCOMPLISH"400$0$0
Totals1,1200$0$0
* Accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist item in accordance with the listed references and Table C-1

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DD Approved Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0021 Exe DS Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE53$250$1,500
D-02WATERTIGHT, WEATHERTIGHT DOOR & HATCH RENEWALS90$330$0
D-03SHIP SERVICE & MAIN PROPULSION GENERATOR CLEANING1,711$10,975$0
D-04FORWARD LABYRINTH SEAL RENEWALS ON #1, #2, AND #3 REDUCTION GEARS792$1,890$0
D-05TANKS (HYDRAULIC OIL STORAGE & SERVICE) CLEAN AND INSPECT119$1,200$300
D-06ELECTRIC METER CALIBRATION47$24,395$0
D-07VENT DUCTS (GALLEY & PANTRY) COMMERCIAL CLEAN282$1,550$0
D-08COMPRESSED AIR RECEIVERS (ALL) CLEAN, INSPECT AND HYDRO139$2,580$0
D-09FLIGHT DECK PRESERVE1,657$24,805$0
D-10PROPULSION SYSTEM AIR COOLERS CLEANING, INSPECTION AND TESTING1,709$7,140$0
D-11NO. 2B MAIN DIESEL ENGINE BLOCK REPLACEMENT AND CENTER SECTION OVERHAUL7,431$44,265$152,000
D-12NO. 2B MDE TURBOCHARGER MODIFICATION492$13,810$12,500
D-13TEMPORARY SERVICES, DOCKSIDE, CONTRACTOR FACIILITY744$159,245$3,500
Totals15,266$292,435$169,800

&L&12HSCG85-08-R-6BX415

&A&C&12Notional DS Repair and Alteration Worklist&R&12&F &C&A - &P

CLIN 0022 Exe DD Est

ItemDescriptionST M/HOT M/HMATL COSTSUBC COST
D-01PRODUCTION CONTROL, GANTT BAR CHART PROVIDE71$150$0
D-02APPENDAGES (UNDERWATER) PRESERVE, INTERNAL732$10,790$0
D-03APPENDAGES (UNDERWATER)/VOIDS (NON-ACCESSIBLE) LEAK TEST102$575$0
D-04STARBOARD SHAFT DISCONNECT COUPLING RENEWAL764$4,216$150
D-05CENTERLINE PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,813$19,898$54,800
D-06PORT PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION4,874$13,698$39,668
D-07STBD PROPULSION SHAFTING AND PROPELLER REMOVAL AND REINSTALLATION3,731$31,615$35,370
D-08PROPULSION SHAFT SEAL RENEWAL541$14,730$225
D-09PROPULSION SHAFT BEARING LANDS – REPAIRS – STBD488$32,330$8,000
D-10PROPULSION SHAFT BEARING LANDS – REPAIRS – PORT488$32,330$8,000
D-11PROPULSION SHAFT BEARING LANDS – REPAIRS – CENTERLINE532$32,330$8,000
D-12PROPULSION SHAFT STERN TUBE BEARINGS CHECK CLEARANCES675$1,200$0
D-13ELECTRIC METER CALIBRATION64$9,860$0
D-14VENT DUCTS (ENGINE & MOTOR ROOM, ALL) COMMERCIAL CLEAN158$2,100$0
D-15RE-TUBE NUMBER 2 BOILER2,974$77,780$4,650
D-16SEA VALVE (>2.5 INCHES) OVERHAUL2,300$9,845$0
D-17SEA VALVE (<=2.5 INCHES) RENEWAL167$8,950$0
D-18STEERING SYSTEM REPAIRS543$5,090$21,700
D-19RUDDER REMOVE, INSPECT & REINSTALL1,676$6,400$9,050
D-20RUDDER STOCK BEARINGS CHECK CLEARANCES304$700$4,200
D-21ANCHOR CHAIN AND GROUND TACKLE INSPECT AND REPAIR867$12,365$150
D-22ANCHOR HANDLING GEAR LEVEL 2 INSPECT AND REPAIR836$14,690$20,100
D-2315-TON AND 3-TON CRANES TEST AND INSPECT176$3,000$7,000
D-24CHAIN LOCKERS PRESERVE326$1,600$300
D-25HULL PLATING, UNDERWATER BODY PRESERVE (WAGB 399)2,911$82,760$0
D-26CATHODIC PROTECTION, ZINC ANODE RENEWAL628$17,930$0
D-27TEMPORARY SERVICES, DRYDOCK PROVIDE4,278$61,480$10,000
D-28DRYDOCKING ACCOMPLISH999$251,632$10,300
Totals37,018$760,044$241,663

&L&12DTCG85-03-R-625936

&A&C&12Notional DD Repair and Alteration Worklist&R&12&F &C&A - &P

File details come from the government source that posted it. Updated .