AttJ.1a_Pln_DD_DS_Pkg(08R6BX415).doc

DOC document 39 KB Posted

Attached to
POLAR CLASS ICEBREAKER MULTI-SHIP MULTI-OPTION MAINTENANCE CONTRACT Federal contract opportunity
Solicitation number
HSCG85-08-R-6BX415
Issued by
Department of Homeland Security US Coast Guard

About this file

04 Attachment J.1a Planning Specification

View the file

Other files for this federal contract opportunity

Other files attached to POLAR CLASS ICEBREAKER MULTI-SHIP MULTI-OPTION MAINTENANCE CONTRACT, newest first.
File Type Posted
Amendment0005.doc DOC document
Amendment0004.doc DOC document
Amendment0003.pdf PDF
Amendment0002.doc DOC document
AttJ.4_Clarification_Form(08R6BX415)(Amd 0002).doc DOC document
Amendment0001.pdf PDF
AttJ.4_Clarification_Form(08R6BX415).doc DOC document
AttJ.1_Exe_DS_Spec(08R6BX415).pdf PDF
Solicitation_Sched_A-M(08R6BX415).doc DOC document
AttJ.3_Tech_Eval_Criteria(08R6BX415).doc DOC document
AttJ.2_KR_Raw_Cost_Element_Breakdown(08R6BX415).xls XLS spreadsheet
AttJ.1_Exe_DD_Spec(08R6BX415).pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG85-08-R-6BX415

Attachment J.1a

Notional Specification for Planning Contract Line Items 0001, 0004, 0007, 0008, 0011, 0012, 0015, 0016, 0019, 0020 Scope:

For the respective availability (dockside or drydocking), accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist items in accordance with the listed references and Table C-1.

Such requirements include, but are not limited to the following CLIN 0001 obligations:

GFI review (ex. CSMP, drawings)

Discharging contractor’s onsite A-Team commitments (2 meetings) Performing shipchecks on available cutter Material/Equipment research

Procurement, receipt inspection and storage of CFM/GFM Recommendations for prefabrication or early assembly

Subcontractor source selection Providing engineering/design services for some work items

Generation of no more than 50 Condition Found Reports Generation of draft specification Incorporation of MLC recommendations in specification

Generation of final specification

Generation of production schedule

Generation of performance management baseline

Generation of cost proposal

File details come from the government source that posted it. Updated .