AA1484_RFQ_Amend_0001.pdf
PDF 8 KB Posted
- Attached to
- Indoor Firing Range Cleaning and Maintenance
- Solicitation number
- HSCG84-16-Q-AA1484
About this file
AA1484 Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AA1484_Price_Evaluation_Form.xls | XLS spreadsheet | |
| AA1484_SF30_AMEND_0002.pdf | ||
| AA1484_RFQ_final.pdf | ||
| Price_Evaluation_Form.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED Page 14 of 63
RFQ# HSCG84-16-Q-AA1484
NAME OF OFFEROR OR CONTRACTOR
test methods. The arrestance shall be 90% to 92%. The filter shall be listed by Underwriters Laboratories as UL 900 Class 2. The initial resistance at 2,000 CFM shall not exceed 0.27-inch water gauge (WG). The recommended final pressure drop for the element is 1.0-inch WG. Media support is diamond-shaped expanded metal. Filters frames are piece, die-cut, moisture-resistant carrier board (cardboard).
5.4.3. HEPA Filters
a. The HEPA filters shall be compatible with the existing Cambridge Side Lock Housing (Model SA-B-D-60-60). Each Side Lock Housing holds nine filters (24”x24”x11.5”) contained in a 16 GA., galvanized steel frame.
b. The filters shall be High Volume HEPA Filters with the following minimum requirements: flow rate 2400 cfm, efficiency 99.97%, 430 sf media area, and UL 900 Class 2. The pressure drops at rated air flow shall not exceed 1" w.g. initial and 2.4" w.g. final. The filter frame shall be constructed of anodized aluminum.
The gaskets shall be standard 0.75-inch x 0.25-inch closed-cell neoprene for installation of either the upstream, downstream, or both sides of the filter.
Performance shall meet the requirements of IES RP-1 Type A.
5.5. Spills and Releases
The Contractor shall take measures to prevent spills of hazardous materials. For the purpose of this section, spill is defined as an uncontrolled release of federal or state regulated materials, including oils.
5.5.1. Container Storage
The Contractor shall manage all material and waste containers in a manner intended to prevent leaking, spilling, or tipping as described throughout this section.
5.5.2. Equipment Maintenance
The contractor shall not perform equipment maintenance on site except to make repairs to leaking equipment. Leaking equipment shall be repaired immediately upon discovery. In no instance shall routine maintenance of personal or company provided vehicles occur on site.
File details come from the government source that posted it. Updated .