HSCG80-16-R-P45F72

REVERSE OSMOSIS DESALINATION PLANT

210’ / 270’WMEC CUTTERS

8/2/2016

QUESTIONS AND RESPONSES

Question 1: The posting to www.fbo.gov shows this a “Presolicitation”. Is this correct?

Response1:Amendment00002willbeissuedtoincorporatethechangeforProcurementType
fromPresolicitationtoSolicitation.

Question 2: Reference Factor #2: Past Performance: page 44 of 67, RFP HSCG80‐16‐R‐ P45F72.

Pleaseclarify:
Q2a.ArebidderstosubmitAttachment3toprior/presentContracts
PointofContact?
Response2a:Yes,Contractorsshouldforwardattachment3to

contract specialist, Magdalena Pitre at Magdalena.n.pitre@uscg.mil by the date of

Q2b.ArebiddersalsotoprovidetheselectedPastPerformance
referenceswiththeproposal?
Response2b:Yes,ContractorsPOCshouldforwardattachment3to
contractspecialist,MagdalenaPitreatMagdalena.n.pitre@uscg.mil

Question 3: What is the required delivery for the first 2 RO Desal Plants, ARO?

Response3:Two(2)PrototypeswillbedoneinFY2017,See,attachment(2),Scheduleof
Supplies&Svcsfor210270RO
Question4:DoyouplantohaveanIndustrydaytooneofthecutters,preferablytoa
210WMEC?

Response 4: No industry day planned or scheduled for any 210’ or 270’ cutter.

Question 5: If no Industry Day is planned, can we visit one of the 210 WMEC cutters?

Response5:Yes.Duetocutterschedules,wewouldneedtoknowyourlocationfortheclosest
assetathomeportduringthistimeline.Contactthecontractspecialist,MagdalenaPitreat
Magdalena.pitre@uscg.miltoscheduleadateandtime.

Question 6: Request the following Coast Guard Drawings:

CoastGuardDrawing618WMEC167‐001,RevM,ScheduleofSteelDoors,Hatches,
ScuttlesandManholes
CoastGuardDrawing618WMEC167‐054,Rev‐,FlatRaisedWatertightHatches
CoastGuardDrawing618WMEC531‐006,RevC,VMCRC5000WatermakerInstallation

Coast Guard Drawing 618 WMEC 531‐007, Rev A, RC5000 Watermaker with Media Filter

Coast Guard Drawing 618 WMEC 531‐008, Rev A, Foundation Installation Disconnect Switches

RC500Reverse Osmosis Unit

Coast Guard Drawing 618 WMEC 601‐003, Rev H, General Arrangement – Second & 3rd Decks

CoastGuardDrawing627WMEC531‐001,RevA,FoundationInstallationDisconnect
SwitchesRC5000ReverseOsmosisUnit
CoastGuardDrawing627WMEC533‐007,RevC,ReverseOsmosisDesalinator
Arrangement&Details
CoastGuardDrawing627WMEC531‐008,RevE,VMCRC5000WatermakerInstallation
CoastGuardDrawing627WMEC531‐010,RevA,RC5000WatermakerwithMediaFilter
CoastGuardDrawing627WMEC167‐001,RevL,ScheduleofSteelDoors,Hatches,
ScuttlesandManholes

Coast Guard Drawing 627 WMEC 601‐003, Rev B, General Arrangement – Second & 3rd Decks

Coast Guard Drawing 901 WMEC 167‐001, Rev R, List of Structural Closures

Coast Guard Drawing 901 WMEC 169‐001, Rev H, Watertight Sliding Door

Coast Guard Drawing 901 WMEC 185‐021, Rev C, Reverse Osmosis Plant Foundation

CoastGuardDrawing901WMEC320‐043,RevB,ReverseOsmosisPlantPowerInstall
CoastGuardDrawing901WMEXC531‐009,Rev‐,ReverseOsmosisInstall

Diagram & Arrangement

Coast Guard Drawing 901 WMEC 531‐012, Rev B, Reverse Osmosis Plant A&D

CoastGuardDrawing901WMEC531‐013,RevB,ReverseOsmosisPlant
SeawaterModifications
CoastGuardDrawing901WMEC531‐014,RevA,ReverseOsmosisPlantPotable
WaterModifications
CoastGuardDrawing901WMEC531‐015,Rev‐,FoundationInstallationDisconnect
Switches,RC7000ReverseOsmosisUnit
CoastGuardDrawing901WMEC531‐016,Rev‐,ElectricalInstallationLPPump
DisconnectSwitchRC7000ReverseOsmosisUnit

Coast Guard Drawing 901 WMEC 531‐017, Rev ‐, Reverse Osmosis Titanium Y Pipe Assembly

Coast Guard Drawing 901 WMEC 801‐006, Rev L, General Arrangement Pt Platform

Coast Guard Drawing 905 WMEC 167‐001, Rev L, List of Structural Closures

Coast Guard Drawing 905 WMEC 169‐001, Rev B, Watertight Sliding Door

Coast Guard Drawing 905 WMEC 185‐020, Rev B, Reverse Osmosis Plant Foundation

Coast Guard Drawing 905 WMEC 320‐023, Rev C, Reverse Osmosis Plant Power Install

CoastGuardDrawing905WMEC531‐008,RevA,ReverseOsmosisPlantInstall
Diagram&Arrangement

Coast Guard Drawing 905 WMEC 531‐009, Rev B, Reverse Osmosis Plant Seawater Modifications

CoastGuardDrawing905WMEC531‐010,RevA,ReverseOsmosisPlant
PotableWaterModifications
CoastGuardDrawing905WMEC531‐013,Rev‐,FoundationInstallationDisconnect
Switches,RC7000ReverseOsmosisUnit
CoastGuardDrawing905WMEC531‐014,Rev‐,ElectricalInstallationLPPump
DisconnectSwitchRC7000ReverseOsmosisUnit

Coast Guard Drawing 905 WMEC 801‐006, Rev D, General Arrangement Pt Platform

Response6:ACDwillbeprovided;Vendorsshallrequestdrawingsregardingthissolicitation
shallbesubmittedinwritingtotheContractSpecialist.

Question 7: Request the following Coast Guard Publications

SurfaceForcesLogisticsCenter(SFLC)SpecificationNo.D‐083‐0351,3Jan
2000,DataforProvisioning
SurfaceForcesLogisticsCenterStandardSpecification0000(SFLCStdSpec0000),
2014,GeneralRequirements
SurfaceForcesLogisticsCenterStandardSpecification0450,(SFLCStdSpec
0450),2014,ElectricalPowerforContractor'sToolsandEquipment
SurfaceForcesLogisticsCenterStandardSpecification0740,(SFLCStdSpec0740),
2014,WeldingandAlliedProcesses
SurfaceForcesLogisticsCenterStandardSpecification0850(SFLCStdSpec0850),
2014,GeneralRequirementsforDrawingPreparation
SurfaceForcesLogisticsCenterStandardSpecification5000(SFLCStdSpec
5000),2014,AuxiliaryMachinerySystems
SurfaceForcesLogisticsCenterStandardSpecification6310,(SFLCStdSpec
6310),2014,RequirementsforPreservationofShipStructures
Response7:ACDwillbeprovided;Vendorsshallrequestdrawingsregardingthissolicitation
shallbesubmittedinwritingtotheContractSpecialist.

Question 8: Are the Reverse Osmosis systems GFE and you are looking for a bid to install them??

Response8:No.TheSOWisforacompanytoprovideanR/OIAWtheSOW,removethe
existingR/OandinstallandtestthenewlyinstalledR/Oalongwithlogisticselements.

Question 9: The presolicitation notice for the subject solicitation states:

“Anyinterestedfirmcapableofprovidingtheseservicesisrequestedtorespondviae‐mailto
magdalena.n.pitre@uscg.milnolaterthanJuly22,2016at4:30PMEST.”
IstheRESPONSEnotedabovethefullproposaloranexpressionofinterestintheprojectin
advanceofachangefrompresolicitationtoactualsolicitation?
Response9:AnamendmenttothissolicitationisbeingmadefromPre‐solicitationto
Solicitation,SeeAmendment0002.ResponsesareduenolaterthanJuly22,2016at4:30pm

EST.

Question10:Isthisworkgoingtobeperformedinashipyardorpierside?
Response10:Thisworkistobeperformedpierside,USCGcuttershomeport.
Question11:Forthebaseyear,theonlyworkscheduledisforsubmissionoftechnical
documentation.Whattechnicaldocumentationistobesubmittedinthebaseyear?
Response11:AslistedintheSOW,3.6,3.6.1.
Question12:Fourshipchecksarerequiredinthespecification.Wouldthisbedoneinthebase
year?Thereisnolineitemtoprovidethepriceforshipchecks.Wheredowequotethis?
Response12:Yes.Theshipcheckisrequiredandashipcheckreportataminimumtothe
winningbidder.Priortosubmittingaproposalforthissolicitation,drawingswillbeprovided
forreview.Shipcheckspriortoawardaretheresponsibilityofthevendor.
Question13:Thereisan“A”anda“B”designforeachshipclass.Canyouaddtothelist4.2
whichshipiswhichdesigninordertoplantheshipchecks?
Response13:Yes.
WMEC‐210(AClasscuttersarehullnumbers615thru619)(BClasscuttersarehullnumbers
620thru630).
WMEC‐270(AClasscuttersarehullnumbers901thru904)(BClasscuttersarehullnumbers
905thru913).
Question14:Canyouprovideascheduleastowhichshipswillbedoneineachoptionyear?
Response14:Noschedule,cutterswillbescheduledthroughadeliveryorder.
Question15:Whenwilltheoptionbeexercisedforeachyear?(Forreferencefortimeframe
tobeginwork)
Response15:AletterofintenttoexercisetheOptionwillbeissued60dayspriortobeginning
theperiodofperformanceforthatspecificoptionyear.
Question16:Howlongwilltheshipsbeinporttoprovedtheremovalandinstallationofthe
R/Osystems?
Response16:Four(4)weeks.
Question17:Thereisnolineiteminthescheduletoquoteseatrials.Willtheybeata
differenttimethaninstallation?Howlongwilltheseatrialbe?Wheredoweenterthispricing?
Response17:Seatrialsfornewlyinstalledequipmentwillbeafterinstalliscomplete.The
underwayportionwillbeIAWthecutterscheduleandmayrequireareturntriptothecutter.
Seatrialtimelinerequires8hoursofoperationofthenewlyinstalledR/Oplant.Duetocutter
constraintsforR/Ooperation(i.e.openwater),planfor(2)days.
Question18:Thereisarequestforweldingcertifications.Whatcertificationsarerequired?
ArethesecertificationsrelatedtoinstallationonlyoralsotothemanufacturingoftheR/O
systemframes?
Response18:WeldingcertificationswillbeIAWSFLCStandardSpecification0740forCoast
Guardshipsandboats.AnyrequiredweldingonboardthecutterwillbeIAWthisspecification.
Question19:IstherearequirementforNDTonweldingdoneforinstallationorfor
manufacturingoftheR/Oframes?
Response19:AnyrequiredweldingonboardthecutterwillbeIAWthisspecificationSFLC
StandardSpecification0740whichincludesNDEunder1.3.12.Manufacturingatthevendors

facility

Question20:Ref3.3.5interfaces:Whatnewservicesmustbeprovidedbythecontractorfrom
theshipthatarenotalreadyinplace?Forexample,istheelectricalservicecurrentlysufficientto
handlethespecifiedR/Osystemsandingoodrepair?Arealltheservicesneededcurrently
terminatedintheR/Ospaceandingoodrepair?
Response20:MySOWlists3.3.5asInterferences?Thecurrentelectricalserviceisingood
workingorderandcurrentlysufficienttohandletheexistingR/Osystem.Allservicesneeded
arecurrentlyterminatedintheR/Ospace.
Question21:Thestatementofworkunder3.2.6statesallmembranesandpressurevessels
mustbe21/2"x40"inlength.ThisisnottheoptimumsizemembranefortheR/Osystemsfor
WMEC270.Are4"x40"membranesallowableonWMEC270?
Response21:Ifneedbe,aSOWcanbemodifiedforabettersystemsolution,howeverthis
changewouldhavetobeapprovedandanynewR/Osysteminstallation’smuststillmeetour
requirementsforsystemfunctionandsize.PleasereviewSOWsection3.7.
Question22:Ref3.2.10.4"Salinitydumpvalveadjustablesetpointcontrolknob"Please
clarifythisrequirement.Isthisforsettingthemaxsalinityacceptable,overwhichthewaterwill
gotowaste?AsthesystemsareoperatedbyPLC,thiswouldbeautomaticandthesetcapability
wouldbeaprogrammablefunctiononthePLCscreenandnotdonebyacontrolknob.Isthis

acceptable?

Response 22: Please review SOW section 3.7.

Question23:Ref3.2.10.7DoesthisreferonlytoWMEC210becausepernoteat3.2.10.3the
R/OcontrolswillinterfacedirectwithCGMCSonWMEC270?
Response23:3.2.10.7referstotheminimumrequirementsforremotealarmsandcontrolsfor
bothWMEC‐210andWMEC‐270.3.2.10.3referstoproperconnectionsinordertointerfacewith
the270Classcutterengineroomcontrolconsole.Asfarasremoteinterfacewiththe270
console,thismaybeobtainableviatheconnectionslistedin3.2.10.3withinaTLIpanellocated
inthespacewiththeR/O.Ataminimum,remotepanelinterfacecontrolconnectionsshouldbe
suppliedwiththenewR/OfortheWMEC270ClasscuttersIAWtheSOW.Thisshouldbeatthe
leastdiscussedduringyourshipcheckandorifadditionalinformationisrequired,please
submitane‐mailtotheContractSpecialist.AdditionalrecommendationsshallbeincludedIAW
SOWsection3.7.
Question24:PleasereconfirmthatelectricalenclosuresareNEMA4ratherthanNEMA4X?
Response24:PleasereviewSOWsection3.7.NEMA4Xseemstobemorecorrosionproofand
islistedforshipboarduse.Thesubjectenclosureswillbeutilizedinsideoftheshipandnot

external.

Question25:MaySiemansbrandPLCbeusedfortheR/Osystemsasitiscompatiblewiththe
shipscontrolsystems?
Response25:PleasereviewSOWsection3.7.

Question 26: Are Coast Guard drawings listed in reference portion of SOW available at this time?

Response26:Yes.Vendorsshallrequestdrawingsregardingthissolicitationshallbesubmitted
inwritingtotheContractSpecialist
Question27:Wehavedevelopedalistofquestionsforthissolicitation.Dowejustemailthese
toyouortoanothercontact?
Response27:AnyquestionsregardingthissolicitationtoshouldbedirectedviaemailtoMs.
MagdalenaPitreatMagdalena.n.pitre@uscg.mil
Question28:Ref3.2.3.1Pumps:Specifiedhereisacycloneseparatortobeprovidedoneach
pump.Doesthismeanthehighpressurepumps(2)andthefeedpump(1)?Acycloneseparator
removeslargeparticles.Ifrequired,oneshouldgobeforethemediafilteraspartofthe
prefiltrationpackagetoservicebothHPpumps,notinfrontofthepumpsafterthe5micron
filter.Pleaseclarify.
Response28:Cycloneseparatorshouldbefortheseafeedpump.
Question29:Theworkprogramrequiresthecontractortoperformadisinfectionprocedure
aftertheinstallation.Isthisonlyforpriortothepotablewaterstoragetankorposttankalso?
Isthereadumpcapabilitytogreywaterpriortothepotablewaterstoragetankthatcanbeused
fordisinfection3.14?Isthereoneimmediatelyafter?
Response29:AnyaffectedpipingfortheinstallationofthenewR/0shallbedisinfectedpriorto
use.AnydisinfectingpipeflushingwatershallbedisposedofbythevendorIAWallStateand
Federalregulations.
Question30:Reflineitem0‐009and0‐0010TravelperdiemtoanywherewithinContinental
USforsupport:PleaseadvisehowthisNTEtobedeterminedastimeperiod,lengthofstay,and
numberoftripsisnotknown?Whatistheperiodofperformancethatwouldbeapartofthis

solicitation?

Response30:Itwillbedeterminedthroughaseparatedeliveryorderortaskorderunderthe
contract.PeriodofPerformancewillbedeterminedspecificallyoncuttersscheduleandwillbe
specifiedonthedeliveryorderortaskorder.Theperiodofperformancesisscheduledtostart
onorabout1September2016forBaseYearPerformanceperiodof1September2016–30
August2017andFourOneOptionYears(1September2017–30August2021,ifexercisedby
thegovernment,Refpage2of67,SF1449.
Question31:Ref.Centrifugalfeedpumpto998‐12standards:IsthereaNavalVesselRules
withCoastGuardamendmentthatthesemustcomplywith?
Response31:ItshouldbeASTMF998‐12.
Question32:Whenwilltheoptionbeexercisedforeachyear?(Forreferencefortimeframeto
beginwork)
Response32:Optionyearswillbeexercisedatleast30dayspriortothestartoftheOptionyear
andifexercisedbythegovernment.
Question33:Refstrainerbasket:whatmeshisrequiredforthestrainerbasket?
Response33:Perforationdiameter1/32.
Question34:Whataretherequirementsforthecontractorstoenterthebasesandwork?Are
therepreapprovedshiprepaircompaniesforeachbase?
Response34:Onceaspecificdateandtimeisestablishedfortheparticularcutter,ataskorder
willbeissued.Workwillbeperformedateachspecificcuttershomeport.
Question35:Availabilityofcustomsupport/customerservice:Thisappearstorefertoongoing
maintenanceandrepair.Howisthistobequotedasthelocation,numberofnatureandtripsis
notknown?Whatisthetimeperiodofperformanceforthisactivityforthissolicitation?An
hourlyratecanbequotedbutquantitywouldbeunknown.
Response35:TheSOW,3.6.7referstothevendorsupportavailabilityduringandafterthe
warrantyperiod.
Question36:Question18:Ref3.23.2.b,“Allenclosuresshallbemadeoftype304stainless
steelconformingtoNEMA250,Type4X.”Isthisspecificationmeanttobeinparagraph3.2.10,
forthepowerandcontrolpanels(enclosures),andnotapplicabletomotors?
Response36:Yes.
Question37:InReferencetoPumpSpecin3.2.3.1,isitacceptabletousetheactiveversion
ASTMF1510‐07(2013)versusASTMF1510‐98?
Response37:Yes.
Question38:Ref3.2.3.3aMaterialsforDuplexStrainer:Duplexasitpertainstothematerial
(steel)orduplexinthesenseofredundancy?IFitisinrespecttoredundancyismanual
switchingokay?
Response38:Redundant,yes.Manualswitching,yes.
Question39:Ref3.2.7FlushTank:Ifaflushtankisusedforbothflushingandforchemical
cleaningoftheunits,doestheflushtankrequiredtofitintotheconfinesof66fore/aftx72
athwartx66highorcanitberemotelylocated?
Response39:TheexistingR/Outilizeschemicalwhichisaddedtothemembranehousingand
re‐circulatedviatheHPpump,flushedandaphwatertestisperformed.Aseparateflushtankif
required,shouldfitinthesameconfinesofthenewR/Oplant.PleaserefertoSOWsection3.7

Question 40: Ref 3.2.9 Is the only one Brominator per plant? Can the Brominatior be remotely located?

Response40:BrominatorshallberedundantliketheR/Oplant,oneperside.
Remotelylocated:Preferablynot,butpleasereviewSOWsection3.7.
Question41:Ref3.1.1requiresredundancyforcontrolsatR/Ounitleveland3.2.10.3requires
aPlantControlStation.PleaseconfirmthatcontrolpanelsarerequiredateachR/Ounitandalso
atPlantlevel?
Response41:Thecontrolpanelmaybeoneenclosureforbothredundantsides,oronecontrol
panelenclosurepereachredundantside.EachR/OplantshallalsoincludearemotepanelIAW

3.2.10.7.

Question42:AretheROinstallationssimilarbetweentherespective"A"and"B"classes(same
generallocation,access,interferences,connections)?
Response42:FortheWMEC270Classcutters,yes.FortheWMEC210Classcutters,theR/Ois
inthesamelocationarea,butalittlemoreforeoraftdependingoncutterclass("A"or"B").The
210"A"ClasshavetheirseparatemediafilterskidinfrontoftheR/Oandthe210"B"Classhave
theirseparatemediafilterskidaftertheR/O.
Question43:Duringourreviewofthereferencedrawingswenotedthatsomeofthedrawings
thatwereprovidedtoyouhavebeensuperseded.

For example, dwg 627‐WMEC‐533‐010, sht 6 has been superseded by 627‐WMEC‐390‐001.

Dwg618‐WMEC‐531‐007hasbeensupersededby618‐WMEC‐531‐007,sht7hasbeen
supersededby618‐WMEC‐390‐001.
Theselaterdrawingswerenotincludedinthesetofdrawingsprovidedtoyounorwerethey
listedintheSOW.
Iftheselaterdrawingsarerelevanttothissolicitation,werespectfullyrequestthatyouprovide
themforourreview.
Response43:DuetothedrawingsnotbeinglistedasareferencedrawingontheStatementof
Work,these(2)drawingswerenotsubmittedaspartoftheCoastGuardsupplieddrawings

(CD).

CoastGuardDrawing618WMEC390‐001,Rev‐,RC5000WatermakerwithMediaFilter
ElectricalControl&SchematicWiringDiagram.
CoastGuardDrawing627WMEC390‐001,Rev‐,RC5000WatermakerwithMediaFilter
ElectricalControl&SchematicWiringDiagram.

These two (2 ) new drawings will be emailed to vendor upon request to the Contract Specialist.

Question44:–Refitem45,drawing618‐WMEC‐531‐007(VillageMarineMediaFilterand
BoosterPump).

Is item 45 part of scope? Are all cutters equipped with such item?

Ifitem45istostay,doyoustillwanttoequipeachR/OunitwithanadditionalMediaFilteron
theskid?

If not, is item 45 part of remove/dispose scope?

Ifistoberemoved,whataredimensions,wetweightandmediatype?
Response44:WMEC210“A”and“B”Classcuttershaveaseparatemediafilterskidthatwas
addedlater,aftertheR/Oinstalls.TheydohavethemicronfilterswhicharepartoftheR/O
skid.WMEC270“A”and“B”Classcuttersdonothavemediafilters,justthenormalmicron
filters.TheexistingmediafilterontheWMEC210“A”and“B”Classcutterswillbe
removed/scrappedaspartofthisSOWandwillrequireanewmediafilterforthenewR/O
installation.WMEC270cuttersdonothavethemediafilter,butitwasincludedintheSOW.This
wouldbearecommend,notrecommendforthe270ClasscuttersIAWSOWsection3.7.The
presenttanktypemediafilterontheWMEC210Classcuttershassandinthebottomportion
andatypeofrockinthetopportion.

Question 45: ‐ Ref SOW 3.2.3.3.b and item 45, drawing 618‐WMEC‐531‐007.

IsmediafilterdedicatedforeachRO(1&2),oristhereaseparatemediafilterofftheROplant?
Response45:OnemediafilterperR/Oplant.ThepresentWMEC210mediafilterisona
separateskidsinceitwasaddedyearsaftertheR/O.Themediafilterskidalsohastheseafeed
pump.EachR/Oplantalreadyhasthe(2)micronfiltersforeachsideandispartoftheexisting
R/Oskid.
Question46:RefSOW3.2.3.1cycloneseparatorbeforethemediafilter,isthatonoroffthe
ROplantenvelope?Submitteddrawingsitem45,drawing(618‐WMEC‐531‐007)showaMedia
FilterofftheROskid.
Response46:WMEC210“A”and“B”Classcuttershaveaseparatemediafilterskidthatwas
addedlater,aftertheR/Oinstalls.TheydohavethemicronfilterswhicharepartoftheR/O
skid.WMEC270“A”and“B”Classcuttersdonothavemediafilters,justthenormalmicron
filters.TheexistingmediafilterontheWMEC210“A”and“B”Classcutterswillbe
removed/scrappedaspartofthisSOWandwillrequireanewmediafilterforthenewR/O
installation.WMEC270cuttersdonothavethemediafilter,butitwasincludedintheSOW.This
wouldbearecommend,notrecommendforthe270ClasscuttersIAWSOWsection3.7.Amedia
filteraspartofthenewR/Oskidwouldbepreferreddependingoneaseofmaintenance.
Question47:‐RefSOW3.2.3.3doesmultimediafilterneedtohaveautobackwashtriggeredby
DPortime,orcanitbethatanoperatorbealertedtotakenecessarymeasuresonceDPis

exceeded.

Response47:Theexistingtanktypemediafilterisbackwashedmanuallybyanoperatoronthe
WMEC210ClasscuttersanditisIAWDP.WMEC270Classcuttersdonothaveaninstalled
“tanktype”mediafilter.Both210and270Classcuttershavethe5and20micronbagtype
filtersontheR/Oskid.Potablewaterflushofthetanktypemediafilteriscompletedwhen
differentialpressureisexceededonagauge.TanktypemediafilterontheWMEC210Class
cuttersisasandtypewithsandinthebottomportionandatypeofrockinthetopportion.
Question48:Ref.SOW3.2.7and618WMEC531‐007drawing,thereis16KWHeater.How
oftendoyouusetheheaters?IstheheaterusedforCleanInPlace,orforoperationmode.Why
isthisnotwrittenintothespecification?
Response48:The16KWheaterwasneverinstalledeventhoughitmayshowupinadrawing.
NoneofourexistingWMEC270andWMEC210Classcuttersutilizeaheaterandisnotrequired.

Question 49: Ref SOW 3.7.

Howshouldwesubmitdesignchanges/improvementswithourproposal?
Isthereapreferredformat?
IsthereaSFLCStandardSpecificationforEngineeringChangeRequestorRequestforDeviation?
Response49:Nopreferredformat,theUSCGemailservercannotacceptattachmentsthatare
10MBorgreater.
Question50:Areall27cutters,coveredunderthissolicitation,equippedwithR/ODesalPlant
orareanystillequippedwithEvaporators?
Response50:AllcutterslistedforthisSOWcurrentlyhaveanR/Oplant.Noevaporatorsexist
onthese27cutters.
Question51:RefSOW3.4.2.7.Pleaseclarify…”Renewtherawwaterpumpandassociated
isolationglobevalve.”

What is it, Replace or Rebuild?

If renew means rebuild, who is the pump and valve manufacturer, what is the model/part number?

Response 51: The raw water pump will be replaced with a new pump along with any associated valves.

Question 52: (Clarification Request): This solicitation was posted on www.fbo.gov <https://urldefense.proofpoint.com/v2/url?u=http‐ 3A__www.fbo.gov&d=CwMFAg&c=0NKfg44GVknAU‐ XkWXjNxQ&r=mNKrT0De22BqNMAqFuDRju‐ 9x1Wok4iU1lx4pefRf6U&m=D1mdQZXiIqrnWRY_2Ih4eVWT3QdcNf9cmos4pDZTY1w&s=Tz8N

eGsngA_H3aBNy241qlXiEvFFFWctEmj9nbfCPYc&e=>as“NoticeType:Presolicitation”.
Howeverthesolicitationlanguagealongwithactiondatesmakesitsoundotherthana
Presolicitation.Pleaseconfirmifthisisthefinalsolicitationforthisacquisition.
Response52:UnfortunatelyFEDBIZOPPSdatabasedoesnotpermitthecorrectionfromPre‐
SolicitationtoSolicitation.However,Amendment00002correctsthenoticeFROMPre‐
SolicitationTOSolicitation.
Question53:Becausetheanswers,clarificationsandrequestedreferenceswon’tbeavailable
untilaftertheduedateforquestions/concernshaspast,a30‐dayextensiontothesolicitationis

requested.

Response 53: Solicitation has been extended to August 8, 2016, as noted on Amendment 00003.

Question54:Ref:Solicitationdocumentpage43(45)para.5.c.b.states“CantheR/Oplantbe
installedwithoutmajordisassembly,i.e.handtools.”PleaseclarifywhattheGovernment
considers“majordisassembly”
Response54:Modularandfairlysimpletodisassembleifneededformaintenanceor
componentreplacement.
Question55:Arethereanyrestrictions,safety,trainingorpolicieswhichwouldprecluded
Contractortouseownpersonneltodotheremovalandinstallatanyownport?
Response55:ItakeityoumeanttosayHomeport?Ifso,contractorpersonnelcanbeusedfor
removal/install.Anyrestrictions,safety,policies,etc…wouldbeforthecutterhomeport
locationi.e.CoastGuardBaseorNavalBase.
Question56:Ref:Solicitationdocumentpage38(40),ProposalSubmission.Canthe
Governmentacceptproposalincompressed/zippedfilesformat?
Response56:Yes,theUSCGemailservercannotacceptattachmentsthatare10MBorgreater.
Question57:Canproposalbesubmitinmultipleemails,i.e.marked“proposalPartI”,Proposal
PartII”…?
Response57:Yes,theUSCGemailservercannotacceptattachmentsthatare10MBorgreater.
Question58: RegardingAttachment2,ScheduleofSuppliesandServices:
InItems0‐2007through0‐2010,therearevaluesfilledinandalsoforthesamelineitemforthe
otheroptionyears.Isthiscorrect?

Are these fixed by the solicitation or do we change them to our numbers?

Initem0‐1006aand0‐1006bandthesamelineitemfortheotheroptionyears,thereareafixed
quantityofhoursdesignated.Dowejustquoteforthisnumberofhoursasshown?
Response58:Yesthisiscorrect.TheyareaNottoExceedamount(NTE),thatwerefactoredin
sincecutterlocationisnotyetdeterminedandwillbesubmittedasaproposedamountoncethe
homeportisdeterminedunderindividualtaskorder.Donotchangethenumbersortotal
amountnoted.
Yes,quoteshouldbeforthenumberofhoursshown.
Question59:RFPAttachment2ScheduleofSuppliesandServicesLines#005aand#005b
ShouldthecontracttotalforDepotLevelSparePartsbe1each,andthetotalforOnBoard
RepairpatsKitbe27each(1foreachCutter)?
Response59:Yes,aslistedintheSOW3.6.4.TheDepotLevelsparepartswillbeshelfstockfor
theR/Ounitsrecommendedbythemanufacturerwhetheritbeoneormultipleofeachitem
recommended.AsmentionedintheSOWtheseshelfstockparts/componentsfortheR/Oare
definedasaleadtimeover45daysandormanufacturerdesignatedcriticalitems.Preferably
bestifbothWMEC270andWMEC210R/O’scouldutilizethesameparts/components.Onboard
repairpartskitswillbeprovidedtoeachcutterbytheinstallactivityafterinstallationofthe
newR/OasmentionedinSOW3.6.5.
Question60:Duringourreviewofthereferencedrawingswenotedthatsomeofthedrawings
thatwereprovidedtoyouhavebeensuperseded.

For example, dwg 627‐WMEC‐533‐010, sht 6 has been superseded by 627‐WMEC‐390‐001.

Dwg618‐WMEC‐531‐007hasbeensupersededby618‐WMEC‐531‐007,sht7hasbeen
supersededby618‐WMEC‐390‐001.
Theselaterdrawingswerenotincludedinthesetofdrawingsprovidedtoyounorwerethey
listedintheSOW.
Iftheselaterdrawingsarerelevanttothissolicitation,werespectfullyrequestthatyouprovide
themforourreview.
Response60:DrawingsaretoberequestedviaemailtotheContractSpecialistat

Magdalena.n.pitre@uscg.mil

CoastGuardDrawing618WMEC390‐001,Rev‐,RC5000WatermakerwithMediaFilter
ElectricalControl&SchematicWiringDiagram.
CoastGuardDrawing627WMEC390‐001,Rev‐,RC5000WatermakerwithMediaFilter
ElectricalControl&SchematicWiringDiagram.

These drawings will be forwarded to you upon your request for a CD from the contract specialist.

NOTE:Anyquestionsconcerninga“ShipCheck”shallbesubmittedthroughthecontract
specialistviae‐mailMagdalena.n.pitre@uscg.mil.
Question61:CanthiseverbeaGFEontheRO's??,,orcanyougivemesomemodelnumberson
theRO'stheGovt.wantstosee,orwhatistheexistingunits?
Response61:PleasereviewtheStatementofWorkwhichexplainswhatwecurrentlyhave.No
particularnewR/OisspecifiedaslongasitmeetstherequirementsintheStatementofWork.
Question62:Isthereoneeachstrainerandfeedwaterpumppershipthereforenoredundancy
oristheretobe2eachpership?
Response62:PleasereviewStatementofWorksection3.1.1Capacity,whichexplainsthe
redundantcomponents.Atpresent,theexistingR/Oplantshaveaseafeedpump,lowpressure
pumpandhighpressurepumps.FortheWMEC210Classcutters,theseafeedpumpisonthe
mediafilterskid.
Question63:Isthereoneeachbrominatorpership(noredundancy)orifthereistobe2each
pershipwithoneonthepermeateoutletcomingfromeachtheredundantmembrane/pressure
vessels?Amendmentandearlierquestion40areinconflict
Response63:Thepresentinstallationhasaredundantborminator.ThenewR/Owould
preferablyhavethebrominator’slocatedontheR/Oskid.Ifthereisarecommendedchangefor
thissetup,pleasereviewSOWsection3.7.
Question64:Shouldeachshiphaveoneeachmediafilteror2eachmediafilters(redundant)?
Response64:Oneeachmediafilter.
Question65:Shouldeachshipshouldhaveoneeach2stageprefiltrationsystemorredundant
twoeachprefiltrationsystem?
Response65:Existingunithasa5and20micronpre‐filterslocatedontheR/Oskidthatis
redundantforeithersideoftheR/O.
Question66:Ref3.2.3.1inreferencetocycloneseparator:Theamendmentstillreadstoputa
cycloneseparatorbeforeeachHighPressurepumphoweverquestion28confirmsitshouldbe
beforethemediafilter.Isthistogobeforethemediafilterandifthereistobeonecyclone
separatorforeachship(nonredundant)orifthereistobe2(redundant)?
Response66:TheStatementofWorksection3.2.3.1statesthatallnecessaryfeedandhigh
pressurepumpsshallbeprovided.Itdoesnotspecifythatacycloneseparatorisneededonthe
HighPressurepumpsandisagenericpumpstatement.Cycloneseparatorswouldbeforthesea
feedpump.FortheWMEC210’sthepresentinstallationhastheseafeedpumplocatedonthe
mediafilterskid.
Question67:Ref.SOW3.2.3.1(cycloneseparator)and3.2.3.3(mediafilter)‐Spaceonthe210
cutterislimited.Heightrestrictionsfurthermakeitchallengingregardingsizingmediafilters
fortheRO’s.WewouldliketoclarifythatUSCGwantsduplicate,redundantMediaFiltersforthe
ROPlant,alongwithduplicatecycloneseparators.Thesystemwearereplacinghadmediafilter
offofskid.
Response67:Asperthecurrentinstall,(1)mediafilterfortherawwaterbeingsuppliedtothe
R/Otoincludethetypicalredundant(asetforeachside)5and20micronfiltersthatare
currentlyontheR/Oskid.FortheWMEC210’sthepresentinstallationhastheseafeedpump
locatedonthemediafilterskid.
Question68:Ref.Question/Response46“…Thiswouldbearecommend,notrecommendfor
270ClassCutters…”

a) Why does this only apply to 270 and not 210 cutters?

b) Why the media filter skid was added later?

c) Are the R/O plants operated only on blue waters for both 210 and 270?

Question69:Ref.Question/Response:Inlightofthecorrectionneededto3.2.3.2from
Question36,willyoupleaserespondbyre‐writingyourspecificationfor3.2.3.2basyou
intendedtoevaluatecompliance?
Response69:
a) Thecurrent270RC7000Watermakerdidnotrequireaseparatemediafilter.TheSOW
leavesthisasarequirementforthe270Classcuttersandasmentionedmayormaynot
beneeded.Thiswillbedeterminedafteraward.
b) Themediafilterwasaddedforthe210’safternumerousHighpressurepumpfailures.It
wasdeterminedthattheincomingrawwaterwasnotcleanenough.Thefailureswere
evidentlynotconcurrentforthe270’sasforthe210’s.
c) Thestandardoperatingprocedurethecuttersshouldbegoingbyandshouldbepartof
theEngineeringStandingOrdersisfromNSTM533:
533‐2.4.2POLLUTEDWATER.Unlessdeterminedotherwise,waterinharbors,rivers,
inlets,bays,landlockedwaters,andtheopenseawithin12milesoftheentranceto
thesewaterways,shallbeconsideredtobepolluted.Otherareasmaybedeclaredtobe
pollutedbyNavymedicalspecialists.Thedesaltingofpollutedharborwaterorseawater
forhumanconsumptionshallbeavoidedexceptinemergencies.
Question70:Specification3.2.3.1asitiswritten“Thefeedpumpshallbesuitableforremote
locationandcapableofa35footheadpressurelossinthesuctionfromaseaschestwhile
maintainingtherequiredrawwaterinletpressureandflow”hasbeenconfusingforsomeofthe
seniorpumpapplicationresourcesfrommajorpumpproviders.Theproblemishowthespec
statesa“35footpressurelossinsuction…”
ThepumpprovidersneedtoknowNPSH,andinordertodosothespecshouldhavedetailsof
wherethewaterlineoftheshipisrelativetothefeedpump.Calculationsthencanbemadeto
determinewhetheragivenpumpcanovercomea35footpressurelossinsuction,ifthe
waterlinefeedingintotheseachestissufficientlyelevatedabove.
UnlessthespecificationisclarifiedinawaythatourpumpOEMrepresentativecandetermine
NPSH,theyhavetoassumeUSCGisrequestingapumpwithsuctiongreaterthanwhatis
possible.Arepresentativefromamajorpumpmanufacturerhassaidmorethanonce,thatthere
arenopumpsheknowsof,with35ft.suction.Hesaidthedrawingsprovidedarenotdetailed
enoughregardingthewaterlinelocationsforthemtofeelcomfortablewitharecommendation
Wouldyoupleaseclarifyyourpreviousspecificationbydeclaringthewaterlinelocationrelative
totheintendedpumplocation?
Response70:
1. Forthe270Classcutters,remotelocationmeaningonecompartmentbelow,present
pumplocationisinthebilgearea.
2. Actualpumplocationisbelowthewaterline6to7feet.R/Olocationisapproximately4
ftabovethewaterline.
3. Theonlyotherhurdlewouldberequiredpressuretopushthroughamediafilterand
the5and20micronpre‐filtersandstillprovideadequatepressurefortheR/O.