HSCG80-16-R-P45F72
REVERSE OSMOSIS DESALINATION PLANT
210’ / 270’WMEC CUTTERS
8/2/2016
QUESTIONS AND RESPONSES
Question 1: The posting to www.fbo.gov shows this a “Presolicitation”. Is this correct?
| Response | 1: | Amendment | 00002 | will | be | issued | to | incorporate | the | change | for | Procurement | Type |
| from | Presolicitation | to | Solicitation. | | | | | | | | | | |
Question 2: Reference Factor #2: Past Performance: page 44 of 67, RFP HSCG80‐16‐R‐ P45F72.
| Please | clarify: | | | | | | | | | |
| Q2a. | Are | bidders | to | submit | Attachment | 3 | to | prior/present | Contracts |
| Point | of | Contact? | | | | | | |
| Response | 2a: | Yes, | Contractors | should | forward | attachment | 3 | to |
contract specialist, Magdalena Pitre at Magdalena.n.pitre@uscg.mil by the date of
| Q2b. | | Are | bidders | also | to | provide | the | selected | Past | Performance |
| references | with | the | proposal? | | | | | | | |
| Response | 2b: | Yes, | Contractors | POC | should | forward | attachment | 3 | to |
| contract | specialist, | Magdalena | Pitre | at | Magdalena.n.pitre@uscg.mil | | | | |
Question 3: What is the required delivery for the first 2 RO Desal Plants, ARO?
| Response | 3: | Two | (2) | Prototypes | will | be | done | in | FY | 2017, | See, | attachment | (2), | Schedule | of |
| Supplies | & | Svcs | for | 210 | 270 | RO | | | | | | | | | |
| Question | 4: | Do | you | plan | to | have | an | Industry | day | to | one | of | the | cutters, | preferably | to | a |
| 210 | WMEC? | | | | | | | | | | | | | | | | |
Response 4: No industry day planned or scheduled for any 210’ or 270’ cutter.
Question 5: If no Industry Day is planned, can we visit one of the 210 WMEC cutters?
| Response | 5: | Yes. | Due | to | cutter | schedules, | we | would | need | to | know | your | location | for | the | closest |
| asset | at | home | port | during | this | timeline. | | Contact | the | contract | specialist, | Magdalena | Pitre | at | | |
| Magdalena.pitre@uscg.mil | to | schedule | a | date | and | time. | | | | | | | | | | |
Question 6: Request the following Coast Guard Drawings:
| Coast | Guard | Drawing | 618 | WMEC | 167‐001, | Rev | M, | Schedule | of | Steel | Doors, | Hatches, |
| Scuttles | and | Manholes | | | | | | | | | | |
| Coast | Guard | Drawing | 618 | WMEC | 167‐054, | Rev‐, | Flat | Raised | Watertight | Hatches | | |
| Coast | Guard | Drawing | 618 | WMEC | 531‐006, | Rev | C, | VMC | RC5000 | Watermaker | Installation | |
Coast Guard Drawing 618 WMEC 531‐007, Rev A, RC5000 Watermaker with Media Filter
Coast Guard Drawing 618 WMEC 531‐008, Rev A, Foundation Installation Disconnect Switches
RC500Reverse Osmosis Unit
Coast Guard Drawing 618 WMEC 601‐003, Rev H, General Arrangement – Second & 3rd Decks
| Coast | Guard | Drawing | 627 | WMEC | 531‐001, | Rev | A, | Foundation | Installation | Disconnect |
| Switches | RC5000 | Reverse | Osmosis | Unit | | | | | | |
| Coast | Guard | Drawing | 627 | WMEC | 533‐007, | Rev | C, | Reverse | Osmosis | Desalinator |
| Arrangement | & | Details | | | | | | | | |
| Coast | Guard | Drawing | 627 | WMEC | 531‐008, | Rev | E, | VMC | RC5000 | Watermaker | Installation | |
| Coast | Guard | Drawing | 627 | WMEC | 531‐010, | Rev | A, | RC5000 | Watermaker | with | Media | Filter |
| Coast | Guard | Drawing | 627 | WMEC | 167‐001, | Rev | L, | Schedule | of | Steel | Doors, | Hatches, |
| Scuttles | and | Manholes | | | | | | | | | | |
Coast Guard Drawing 627 WMEC 601‐003, Rev B, General Arrangement – Second & 3rd Decks
Coast Guard Drawing 901 WMEC 167‐001, Rev R, List of Structural Closures
Coast Guard Drawing 901 WMEC 169‐001, Rev H, Watertight Sliding Door
Coast Guard Drawing 901 WMEC 185‐021, Rev C, Reverse Osmosis Plant Foundation
| Coast | Guard | Drawing | 901 | WMEC | 320‐043, | Rev | B, | Reverse | Osmosis | Plant | Power | Install |
| Coast | Guard | Drawing | 901 | WMEXC | 531‐009, | Rev | ‐, | Reverse | Osmosis | Install | | |
Diagram & Arrangement
Coast Guard Drawing 901 WMEC 531‐012, Rev B, Reverse Osmosis Plant A&D
| Coast | Guard | Drawing | 901 | WMEC | 531‐013, | Rev | B, | Reverse | Osmosis | Plant |
| Seawater | Modifications | | | | | | | | | |
| Coast | Guard | Drawing | 901 | WMEC | 531‐014, | Rev | A, | Reverse | Osmosis | Plant | Potable |
| Water | Modifications | | | | | | | | | | |
| Coast | Guard | Drawing | 901 | WMEC | 531‐015, | Rev | ‐, | Foundation | Installation | Disconnect |
| Switches, | RC7000 | Reverse | Osmosis | Unit | | | | | | |
| Coast | Guard | Drawing | 901 | WMEC | 531‐016, | Rev | ‐, | Electrical | Installation | LP | Pump |
| Disconnect | Switch | RC7000 | Reverse | Osmosis | Unit | | | | | | |
Coast Guard Drawing 901 WMEC 531‐017, Rev ‐, Reverse Osmosis Titanium Y Pipe Assembly
Coast Guard Drawing 901 WMEC 801‐006, Rev L, General Arrangement Pt Platform
Coast Guard Drawing 905 WMEC 167‐001, Rev L, List of Structural Closures
Coast Guard Drawing 905 WMEC 169‐001, Rev B, Watertight Sliding Door
Coast Guard Drawing 905 WMEC 185‐020, Rev B, Reverse Osmosis Plant Foundation
Coast Guard Drawing 905 WMEC 320‐023, Rev C, Reverse Osmosis Plant Power Install
| Coast | Guard | Drawing | 905 | WMEC | 531‐008, | Rev | A, | Reverse | Osmosis | Plant | Install |
| Diagram | & | Arrangement | | | | | | | | | |
Coast Guard Drawing 905 WMEC 531‐009, Rev B, Reverse Osmosis Plant Seawater Modifications
| Coast | Guard | Drawing | 905 | WMEC | 531‐010, | Rev | A, | Reverse | Osmosis | Plant |
| Potable | Water | Modifications | | | | | | | | |
| Coast | Guard | Drawing | 905 | WMEC | 531‐013, | Rev | ‐, | Foundation | Installation | Disconnect |
| Switches, | RC7000 | Reverse | Osmosis | Unit | | | | | | |
| Coast | Guard | Drawing | 905 | WMEC | 531‐014, | Rev | ‐, | Electrical | Installation | LP | Pump |
| Disconnect | Switch | RC7000 | Reverse | Osmosis | Unit | | | | | | |
Coast Guard Drawing 905 WMEC 801‐006, Rev D, General Arrangement Pt Platform
| Response | 6: | A | CD | will | be | provided; | Vendors | shall | request | drawings | regarding | this | solicitation |
| shall | be | submitted | in | writing | to | the | Contract | Specialist. | | | | | |
Question 7: Request the following Coast Guard Publications
| Surface | Forces | Logistics | Center | (SFLC) | Specification | No. | D‐083‐0351, | 3 | Jan |
| 2000, | Data | for | Provisioning | | | | | | |
| Surface | Forces | Logistics | Center | Standard | Specification | 0000 | (SFLC | Std | Spec | 0000), |
| 2014, | General | Requirements | | | | | | | | |
| Surface | Forces | Logistics | Center | Standard | Specification | 0450, | (SFLC | Std | Spec |
| 0450), | 2014, | Electrical | Power | for | Contractor's | Tools | and | Equipment | |
| Surface | Forces | Logistics | Center | Standard | Specification | 0740, | (SFLC | Std | Spec | 0740), |
| 2014, | Welding | and | Allied | Processes | | | | | | |
| Surface | Forces | Logistics | Center | Standard | Specification | 0850 | (SFLC | Std | Spec | 0850), |
| 2014, | General | Requirements | for | Drawing | Preparation | | | | | |
| Surface | Forces | Logistics | Center | Standard | Specification | 5000 | (SFLC | Std | Spec |
| 5000), | 2014, | Auxiliary | Machinery | Systems | | | | | |
| Surface | Forces | Logistics | Center | Standard | Specification | 6310, | (SFLC | Std | Spec |
| 6310), | 2014, | Requirements | for | Preservation | of | Ship | Structures | | |
| Response | 7: | | A | CD | will | be | provided; | Vendors | shall | request | drawings | regarding | this | solicitation |
| shall | be | submitted | in | writing | to | the | Contract | Specialist. | | | | | | |
Question 8: Are the Reverse Osmosis systems GFE and you are looking for a bid to install them??
| Response | 8: | No. | The | SOW | is | for | a | company | to | provide | an | R/O | IAW | the | SOW, | remove | the |
| existing | R/O | and | install | and | test | the | newly | installed | R/O | along | with | logistics | elements. | | | | |
Question 9: The presolicitation notice for the subject solicitation states:
| “Any | interested | firm | capable | of | providing | these | services | is | requested | to | respond | via | e‐mail | to |
| magdalena.n.pitre@uscg.mil | no | later | than | July | 22, | 2016 | at | 4:30 | PM | EST.” | | | | |
| Is | the | RESPONSE | noted | above | the | full | proposal | or | an | expression | of | interest | in | the | project | in |
| advance | of | a | change | from | presolicitation | to | actual | solicitation? | | | | | | | | |
| Response | 9: | An | amendment | to | this | solicitation | is | being | made | from | Pre‐solicitation | to | | | | |
| Solicitation, | See | Amendment | 0002. | | Responses | are | due | no | later | than | July | 22, | 2016 | at | 4:30 | pm |
EST.
| Question | 10: | Is | this | work | going | to | be | performed | in | a | ship | yard | or | pier | side? |
| Response | 10: | | This | work | is | to | be | performed | pier | side, | USCG | cutters | homeport. | | |
| Question | | 11: | For | the | base | year, | the | only | work | scheduled | is | for | submission | of | technical |
| documentation. | What | technical | documentation | is | to | be | submitted | in | the | base | year? | | | | |
| Response | 11: | As | listed | in | the | SOW, | 3.6, | 3.6.1. | | | | | | | |
| Question | | 12: | Four | ship | checks | are | required | in | the | specification. | Would | this | be | done | in | the | base |
| year? | There | is | no | line | item | to | provide | the | price | for | ship | checks. | Where | do | we | quote | this? |
| Response | 12: | Yes. | The | ship | check | is | required | and | a | ship | check | report | at | a | minimum | to | the |
| winning | bidder. | Prior | to | submitting | a | proposal | for | this | solicitation, | drawings | will | be | provided | | | | |
| for | review. | Ship | checks | prior | to | award | are | the | responsibility | of | the | vendor. | | | | | |
| Question | 13: | There | is | an | “A” | and | a | “B” | design | for | each | ship | class. | Can | you | add | to | the | list | 4.2 |
| which | ship | is | which | design | in | order | to | plan | the | ship | checks? | | | | | | | | | |
| Response | 13: | Yes. | | | | | | | | | | | | | | | | | | |
| WMEC‐210 | (A | Class | cutters | are | hull | numbers | 615 | thru | 619) | (B | Class | cutters | are | hull | numbers | | | | | |
| 620 | thru | 630). | | | | | | | | | | | | | | | | | | |
| WMEC‐270 | (A | Class | cutters | are | hull | numbers | 901 | thru | 904) | (B | Class | cutters | are | hull | numbers | | | | | |
| 905 | thru | 913). | | | | | | | | | | | | | | | | | | |
| Question | 14: | Can | you | provide | a | schedule | as | to | which | ships | will | be | done | in | each | option | year? |
| Response | 14: | | No | schedule, | cutters | will | be | scheduled | through | a | delivery | order. | | | | | |
| Question | 15: | When | will | the | option | be | exercised | for | each | year? | (For | reference | for | time | frame | | |
| to | begin | work) | | | | | | | | | | | | | | | |
| Response | 15: | A | letter | of | intent | to | exercise | the | Option | will | be | issued | 60 | days | prior | to | beginning |
| the | period | of | performance | for | that | specific | option | year. | | | | | | | | | |
| Question | | 16: | How | long | will | the | ships | be | in | port | to | proved | the | removal | and | installation | of | the |
| R/O | systems? | | | | | | | | | | | | | | | | | |
| Response | 16: | | Four | (4) | weeks. | | | | | | | | | | | | | |
| Question | 17: | There | is | no | line | item | in | the | schedule | to | quote | sea | trials. | Will | they | be | at | a |
| different | time | than | installation? | How | long | will | the | sea | trial | be? | Where | do | we | enter | this | pricing? | | |
| Response | 17: | Sea | trials | for | newly | installed | equipment | will | be | after | install | is | complete. | The | | | | |
| underway | portion | will | be | IAW | the | cutter | schedule | and | may | require | a | return | trip | to | the | cutter. | | |
| Sea | trial | timeline | requires | 8 | hours | of | operation | of | the | newly | installed | R/O | plant. | Due | to | cutter | | |
| constraints | for | R/O | operation | (i.e. | open | water), | plan | for | (2) | days. | | | | | | | | |
| Question | | 18: | There | is | a | request | for | welding | certifications. | What | certifications | are | required? | |
| Are | these | certifications | related | to | installation | only | or | also | to | the | manufacturing | of | the | R/O |
| system | frames? | | | | | | | | | | | | | |
| Response | 18: | Welding | certifications | will | be | IAW | SFLC | Standard | Specification | 0740 | for | Coast | | |
| Guard | ships | and | boats. | Any | required | welding | onboard | the | cutter | will | be | IAW | this | specification. |
| Question | | 19: | Is | there | a | requirement | for | NDT | on | welding | done | for | installation | or | for |
| manufacturing | of | the | R/O | frames? | | | | | | | | | | | |
| Response | 19: | Any | required | welding | onboard | the | cutter | will | be | IAW | this | specification | SFLC | | |
| Standard | Specification | 0740 | which | includes | NDE | under | 1.3.12. | Manufacturing | at | the | vendors | | | | |
facility
| Question | | 20: | Ref | 3.3.5 | interfaces: | What | new | services | must | be | provided | by | the | contractor | from | |
| the | ship | that | are | not | already | in | place? | For | example, | is | the | electrical | service | currently | sufficient | to |
| handle | the | specified | R/O | systems | and | in | good | repair? | Are | all | the | services | needed | currently | | |
| terminated | in | the | R/O | space | and | in | good | repair? | | | | | | | | |
| Response | 20: | My | SOW | lists | 3.3.5 | as | Interferences? | The | current | electrical | service | is | in | good | | |
| working | order | and | currently | sufficient | to | handle | the | existing | R/O | system. | All | services | needed | | | |
| are | currently | terminated | in | the | R/O | space. | | | | | | | | | | |
| Question | 21: | The | statement | of | work | under | 3.2.6 | states | all | membranes | and | pressure | vessels | | | | | | |
| must | be | 2 | 1/2" | x | 40" | in | length. | This | is | not | the | optimum | size | membrane | for | the | R/O | systems | for |
| WMEC270. | Are | 4" | x | 40" | membranes | allowable | on | WMEC | 270? | | | | | | | | | | |
| Response | 21: | If | need | be, | a | SOW | can | be | modified | for | a | better | system | solution, | however | this | | | |
| change | would | have | to | be | approved | and | any | new | R/O | system | installation’s | must | still | meet | our | | | | |
| requirements | for | system | function | and | size. | Please | review | SOW | section | 3.7. | | | | | | | | | |
| Question | 22: | Ref | 3.2.10.4 | "Salinity | dump | valve | adjustable | set | point | control | knob" | Please | | | | | |
| clarify | this | requirement. | Is | this | for | setting | the | max | salinity | acceptable, | over | which | the | water | will | | |
| go | to | waste? | As | the | systems | are | operated | by | PLC, | this | would | be | automatic | and | the | set | capability |
| would | be | a | programmable | function | on | the | PLC | screen | and | not | done | by | a | control | knob. | Is | this |
acceptable?
Response 22: Please review SOW section 3.7.
| Question | 23: | Ref | 3.2.10.7 | Does | this | refer | only | to | WMEC | 210 | because | per | note | at | 3.2.10.3 | the | | |
| R/O | controls | will | interface | direct | with | CGMCS | on | WMEC | 270? | | | | | | | | | |
| Response | 23: | 3.2.10.7 | refers | to | the | minimum | requirements | for | remote | alarms | and | controls | for | | | | | |
| both | WMEC‐210 | and | WMEC‐270. | 3.2.10.3 | refers | to | proper | connections | in | order | to | interface | with | | | | | |
| the | 270 | Class | cutter | engine | room | control | console. | As | far | as | remote | interface | with | the | 270 | | | |
| console, | this | may | be | obtainable | via | the | connections | listed | in | 3.2.10.3 | within | a | TLI | panel | located | | | |
| in | the | space | with | the | R/O. | At | a | minimum, | remote | panel | interface | control | connections | should | be | | | |
| supplied | with | the | new | R/O | for | the | WMEC | 270 | Class | cutters | IAW | the | SOW. | This | should | be | at | the |
| least | discussed | during | your | ship | check | and | or | if | additional | information | is | required, | please | | | | | |
| submit | an | e‐mail | to | the | Contract | Specialist. | Additional | recommendations | shall | be | included | IAW | | | | | | |
| SOW | section | 3.7. | | | | | | | | | | | | | | | | |
| Question | 24: | Please | reconfirm | that | electrical | enclosures | are | NEMA | 4 | rather | than | NEMA | 4X? | | | |
| Response | 24: | Please | review | SOW | section | 3.7. | NEMA | 4X | seems | to | be | more | corrosion | proof | and | |
| is | listed | for | shipboard | use. | The | subject | enclosures | will | be | utilized | inside | of | the | ship | and | not |
external.
| Question | 25: | May | Siemans | brand | PLC | be | used | for | the | R/O | systems | as | it | is | compatible | with | the |
| ships | control | systems? | | | | | | | | | | | | | | | |
| Response | 25: | Please | review | SOW | section | 3.7. | | | | | | | | | | | |
Question 26: Are Coast Guard drawings listed in reference portion of SOW available at this time?
| Response | 26: | Yes. | Vendors | shall | request | drawings | regarding | this | solicitation | shall | be | submitted |
| in | writing | to | the | Contract | Specialist | | | | | | | |
| Question | 27: | We | have | developed | a | list | of | questions | for | this | solicitation. | Do | we | just | email | these |
| to | you | or | to | another | contact? | | | | | | | | | | | |
| Response | 27: | | Any | questions | regarding | this | solicitation | to | should | be | directed | via | email | to | Ms. |
| Magdalena | Pitre | at | Magdalena.n.pitre@uscg.mil | | | | | | | | | | | | |
| Question | 28: | Ref | 3.2.3.1 | Pumps: | | Specified | here | is | a | cyclone | separator | to | be | provided | on | each | | |
| pump. | | Does | this | mean | the | high | pressure | pumps | (2) | and | the | feed | pump | (1)? | | A | cyclone | separator |
| removes | large | particles. | | If | required, | one | should | go | before | the | media | filter | as | part | of | the | | |
| prefiltration | package | to | service | both | HP | pumps, | not | in | front | of | the | pumps | after | the | 5 | micron | | |
| filter. | | Please | clarify. | | | | | | | | | | | | | | | |
| Response | 28: | Cyclone | separator | should | be | for | the | sea | feed | pump. | | | | | | | | |
| Question | 29: | The | work | program | requires | the | contractor | to | perform | a | disinfection | procedure | | | | | | |
| after | the | installation. | | Is | this | only | for | prior | to | the | potable | water | storage | tank | or | post | tank | also? |
| Is | there | a | dump | capability | to | grey | water | prior | to | the | potable | water | storage | tank | that | can | be | used |
| for | disinfection | 3.14? | Is | there | one | immediately | after? | | | | | | | | | | | |
| Response29: | Any | affected | piping | for | the | installation | of | the | new | R/0 | shall | be | disinfected | prior | to | | | |
| use. | Any | disinfecting | pipe | flushing | water | shall | be | disposed | of | by | the | vendor | IAW | all | State | and | | |
| Federal | regulations. | | | | | | | | | | | | | | | | | |
| Question | 30: | Ref | line | item | 0‐009 | and | 0‐0010 | Travel | per | diem | to | anywhere | within | Continental | | | | |
| US | for | support: | | Please | advise | how | this | NTE | to | be | determined | as | time | period, | length | of | stay, | and |
| number | of | trips | is | not | known? | What | is | the | period | of | performance | that | would | be | a | part | of | this |
solicitation?
| Response30: | | It | will | be | determined | through | a | separate | delivery | order | or | task | order | under | the | |
| contract. | Period | of | Performance | will | be | determined | specifically | on | cutters | schedule | and | will | be | | | |
| specified | on | the | delivery | order | or | task | order. | | The | period | of | performances | is | scheduled | to | start |
| on | or | about | 1 | September | 2016 | for | Base | Year | Performance | period | of | 1 | September | 2016 | – | 30 |
| August | 2017 | and | Four | One | Option | Years | (1 | September | 2017 | – | 30 | August | 2021, | if | exercised | by |
| the | government, | Ref | page | 2 | of | 67, | SF | 1449. | | | | | | | | |
| Question | 31: | | Ref. | Centrifugal | feed | pump | to | 998‐12 | standards: | Is | there | a | Naval | Vessel | Rules |
| with | Coast | Guard | amendment | that | these | must | comply | with? | | | | | | | |
| Response31: | | It | should | be | ASTM | F | 998‐12. | | | | | | | | |
| Question | 32: | | When | will | the | option | be | exercised | for | each | year? | (For | reference | for | time | frame | to |
| begin | work) | | | | | | | | | | | | | | | | |
| Response32: | Option | years | will | be | exercised | at | least | 30 | days | prior | to | the | start | of | the | Option | year |
| and | if | exercised | by | the | government. | | | | | | | | | | | | |
| Question | 33: | | Ref | strainer | basket: | what | mesh | is | required | for | the | strainer | basket? |
| Response33: | Perforation | diameter | 1/32. | | | | | | | | | | |
| Question | 34: | What | are | the | requirements | for | the | contractors | to | enter | the | bases | and | work? | Are |
| there | pre | approved | ship | repair | companies | for | each | base? | | | | | | | |
| Response34: | Once | a | specific | date | and | time | is | established | for | the | particular | cutter, | a | task | order |
| will | be | issued. | Work | will | be | performed | at | each | specific | cutters | homeport. | | | | |
| Question | 35: | Availability | of | custom | support/customer | service: | | This | appears | to | refer | to | ongoing | | | | | |
| maintenance | and | repair. | | How | is | this | to | be | quoted | as | the | location, | number | of | nature | and | trips | is |
| not | known? | What | is | the | time | period | of | performance | for | this | activity | for | this | solicitation? | An | | | |
| hourly | rate | can | be | quoted | but | quantity | would | be | unknown. | | | | | | | | | |
| Response35: | | The | SOW, | 3.6.7 | refers | to | the | vendor | support | availability | during | and | after | the |
| warranty | period. | | | | | | | | | | | | | |
| Question | 36: | Question | 18: | Ref | 3.2 | 3.2.b, | | “All | enclosures | shall | be | made | of | type | 304 | stainless |
| steel | conforming | to | NEMA | 250, | Type | 4X.” | | Is | this | specification | meant | to | be | in | paragraph | 3.2.10, |
| for | the | power | and | control | panels | (enclosures), | and | not | applicable | to | motors? | | | | | |
| Response36: | Yes. | | | | | | | | | | | | | | | |
| Question | 37: | In | Reference | to | Pump | Spec | in | 3.2.3.1, | is | it | acceptable | to | use | the | active | version |
| ASTM | F1510‐07 | (2013) | versus | ASTM | F1510‐98? | | | | | | | | | | | |
| Response37: | | Yes. | | | | | | | | | | | | | | |
| Question | 38: | Ref | 3.2.3.3 | a | | | | Materials | for | Duplex | Strainer: | | Duplex | as | it | pertains | to | the | material |
| (steel) | or | duplex | in | the | sense | of | redundancy? | IF | it | is | in | respect | to | redundancy | is | manual | | | |
| switching | okay? | | | | | | | | | | | | | | | | | | |
| Response38: | | Redundant, | yes. | Manual | switching, | yes. | | | | | | | | | | | | | |
| Question | 39: | Ref | 3.2.7 | Flush | Tank: | | If | a | flush | tank | is | used | for | both | flushing | and | for | chemical |
| cleaning | of | the | units, | does | the | flush | tank | required | to | fit | into | the | confines | of | 66 | fore/aft | x72 | |
| athwart | x66 | high | or | can | it | be | remotely | located? | | | | | | | | | | |
| Response39: | The | existing | R/O | utilizes | chemical | which | is | added | to | the | membrane | housing | and | | | | | |
| re‐circulated | via | the | HP | pump, | flushed | and | a | ph | water | test | is | performed. | A | separate | flush | tank | if | |
| required, | should | fit | in | the | same | confines | of | the | new | R/O | plant. | Please | refer | to | SOW | section | 3.7 | |
Question 40: Ref 3.2.9 Is the only one Brominator per plant? Can the Brominatior be remotely located?
| Response | 40: | Brominator | shall | be | redundant | like | the | R/O | plant, | one | per | side. |
| Remotely | located: | Preferably | not, | but | please | review | SOW | section | 3.7. | | | |
| Question | 41: | Ref | 3.1.1 | requires | redundancy | for | controls | at | R/O | unit | level | and | 3.2.10.3 | requires | | |
| a | Plant | Control | Station. | Please | confirm | that | control | panels | are | required | at | each | R/O | unit | and | also |
| at | Plant | level? | | | | | | | | | | | | | | |
| Response | 41: | The | control | panel | may | be | one | enclosure | for | both | redundant | sides, | or | one | control | |
| panel | enclosure | per | each | redundant | side. | Each | R/O | plant | shall | also | include | a | remote | panel | IAW | |
3.2.10.7.
| Question | 42: | Are | the | RO | installations | similar | between | the | respective | "A" | and | "B" | classes | (same | | | | | |
| general | location, | access, | interferences, | connections)? | | | | | | | | | | | | | | | |
| Response | 42: | For | the | WMEC | 270 | Class | cutters, | yes. | For | the | WMEC | 210 | Class | cutters, | the | R/O | is | | |
| in | the | same | location | area, | but | a | little | more | fore | or | aft | depending | on | cutter | class | ("A" | or | "B"). | The |
| 210 | "A" | Class | have | their | separate | media | filter | skid | in | front | of | the | R/O | and | the | 210 | "B" | Class | have |
| their | separate | media | filter | skid | after | the | R/O. | | | | | | | | | | | | |
| Question | 43: | During | our | review | of | the | reference | drawings | we | noted | that | some | of | the | drawings |
| that | were | provided | to | you | have | been | superseded. | | | | | | | | |
For example, dwg 627‐WMEC‐533‐010, sht 6 has been superseded by 627‐WMEC‐390‐001.
| Dwg | 618‐WMEC‐531‐007 | has | been | superseded | by | 618‐WMEC‐531‐007, | sht | 7 | has | been |
| superseded | by | 618‐WMEC‐390‐001. | | | | | | | | |
| These | later | drawings | were | not | included | in | the | set | of | drawings | provided | to | you | nor | were | they |
| listed | in | the | SOW. | | | | | | | | | | | | | |
| If | these | later | drawings | are | relevant | to | this | solicitation, | we | respectfully | request | that | you | provide | | |
| them | for | our | review. | | | | | | | | | | | | | |
| Response | 43: | Due | to | the | drawings | not | being | listed | as | a | reference | drawing | on | the | Statement | of |
| Work, | these | (2) | drawings | were | not | submitted | as | part | of | the | Coast | Guard | supplied | drawings | | |
(CD).
| Coast | Guard | Drawing | 618 | WMEC | 390‐001, | Rev‐, | RC5000 | Watermaker | with | Media | Filter |
| Electrical | Control | & | Schematic | Wiring | Diagram. | | | | | | |
| Coast | Guard | Drawing | 627 | WMEC | 390‐001, | Rev‐, | RC5000 | Watermaker | with | Media | Filter |
| Electrical | Control | & | Schematic | Wiring | Diagram. | | | | | | |
These two (2 ) new drawings will be emailed to vendor upon request to the Contract Specialist.
| Question | 44: | – | Ref | item | 45, | drawing | 618‐WMEC‐531‐007 | (Village | Marine | Media | Filter | and |
| Booster | Pump). | | | | | | | | | | | |
Is item 45 part of scope? Are all cutters equipped with such item?
| If | item | 45 | is | to | stay, | do | you | still | want | to | equip | each | R/O | unit | with | an | additional | Media | Filter | on |
| the | skid? | | | | | | | | | | | | | | | | | | | |
If not, is item 45 part of remove/dispose scope?
| If | is | to | be | removed, | what | are | dimensions, | wet | weight | and | media | type? | | | | | |
| Response | 44: | WMEC | 210 | “A” | and | “B” | Class | cutters | have | a | separate | media | filter | skid | that | was | |
| added | later, | after | the | R/O | installs. | They | do | have | the | micron | filters | which | are | part | of | the | R/O |
| skid. | WMEC | 270 | “A” | and | “B” | Class | cutters | do | not | have | media | filters, | just | the | normal | micron | |
| filters. | The | existing | media | filter | on | the | WMEC | 210 | “A” | and | “B” | Class | cutters | will | be | | |
| removed/scrapped | as | part | of | this | SOW | and | will | require | a | new | media | filter | for | the | new | R/O | |
| installation. | WMEC | 270 | cutters | do | not | have | the | media | filter, | but | it | was | included | in | the | SOW. | This |
| would | be | a | recommend, | not | recommend | for | the | 270 | Class | cutters | IAW | SOW | section | 3.7. | The | | |
| present | tank | type | media | filter | on | the | WMEC | 210 | Class | cutters | has | sand | in | the | bottom | portion | |
| and | a | type | of | rock | in | the | top | portion. | | | | | | | | | |
Question 45: ‐ Ref SOW 3.2.3.3.b and item 45, drawing 618‐WMEC‐531‐007.
| Is | media | filter | dedicated | for | each | RO | (1 | & | 2), | or | is | there | a | separate | media | filter | off | the | RO | plant? |
| Response | 45: | One | media | filter | per | R/O | plant. | The | present | WMEC | 210 | media | filter | is | on | a | | | | |
| separate | skid | since | it | was | added | years | after | the | R/O. | The | media | filter | skid | also | has | the | sea | feed | | |
| pump. | Each | R/O | plant | already | has | the | (2) | micron | filters | for | each | side | and | is | part | of | the | existing | | |
| R/O | skid. | | | | | | | | | | | | | | | | | | | |
| Question | 46: | | Ref | SOW | | 3.2.3.1 | | | cyclone | separator | before | the | media | filter, | is | that | on | or | off | the |
| RO | plant | envelope? | | Submitted | drawings | item | 45, | drawing | (618‐WMEC‐531‐007) | show | a | Media | | | | | | | | |
| Filter | off | the | RO | skid. | | | | | | | | | | | | | | | | |
| Response | 46: | WMEC | 210 | “A” | and | “B” | Class | cutters | have | a | separate | media | filter | skid | that | was | | | | |
| added | later, | after | the | R/O | installs. | They | do | have | the | micron | filters | which | are | part | of | the | R/O | | | |
| skid. | WMEC | 270 | “A” | and | “B” | Class | cutters | do | not | have | media | filters, | just | the | normal | micron | | | | |
| filters. | The | existing | media | filter | on | the | WMEC | 210 | “A” | and | “B” | Class | cutters | will | be | | | | | |
| removed/scrapped | as | part | of | this | SOW | and | will | require | a | new | media | filter | for | the | new | R/O | | | | |
| installation. | WMEC | 270 | cutters | do | not | have | the | media | filter, | but | it | was | included | in | the | SOW. | This | | | |
| would | be | a | recommend, | not | recommend | for | the | 270 | Class | cutters | IAW | SOW | section | 3.7. | A | media | | | | |
| filter | as | part | of | the | new | R/O | skid | would | be | preferred | depending | on | ease | of | maintenance. | | | | | |
| Question | 47: | ‐ | Ref | SOW | 3.2.3.3 | does | multimedia | filter | need | to | have | auto | backwash | triggered | by | | | |
| DP | or | time, | or | can | it | be | that | an | operator | be | alerted | to | take | necessary | measures | once | DP | is |
exceeded.
| Response | 47: | The | existing | tank | type | media | filter | is | backwashed | manually | by | an | operator | on | the | | | | |
| WMEC | 210 | Class | cutters | and | it | is | IAW | DP. | WMEC | 270 | Class | cutters | do | not | have | an | installed | | |
| “tank | type” | media | filter. | Both | 210 | and | 270 | Class | cutters | have | the | 5 | and | 20 | micron | bag | type | | |
| filters | on | the | R/O | skid. | Potable | water | flush | of | the | tank | type | media | filter | is | completed | when | | | |
| differential | pressure | is | exceeded | on | a | gauge. | Tank | type | media | filter | on | the | WMEC | 210 | Class | | | | |
| cutters | is | a | sand | type | with | sand | in | the | bottom | portion | and | a | type | of | rock | in | the | top | portion. |
| Question | 48: | | | Ref. | SOW | | 3.2.7 | and | 618 | WMEC | 531‐007 | drawing, | there | is | 16KW | Heater. | How | | |
| often | do | you | use | the | heaters? | | Is | the | heater | used | for | Clean | In | Place, | or | for | operation | mode. | Why |
| is | this | not | written | into | the | specification? | | | | | | | | | | | | | |
| Response | 48: | The | 16KW | heater | was | never | installed | even | though | it | may | show | up | in | a | drawing. | | |
| None | of | our | existing | WMEC | 270 | and | WMEC | 210 | Class | cutters | utilize | a | heater | and | is | not | required. | | |
Question 49: Ref SOW 3.7.
| How | should | we | submit | design | changes/improvements | with | our | proposal? | | | | | |
| Is | there | a | preferred | format? | | | | | | | | | |
| Is | there | a | SFLC | Standard | Specification | for | Engineering | Change | Request | or | Request | for | Deviation? |
| Response | 49: | No | preferred | format, | the | USCG | email | server | cannot | accept | attachments | that | are |
| 10MB | or | greater. | | | | | | | | | | | |
| Question | 50: | | Are | all | 27 | cutters, | covered | under | this | solicitation, | equipped | with | R/O | Desal | Plant |
| or | are | any | still | equipped | with | Evaporators? | | | | | | | | | |
| Response | 50: | All | cutters | listed | for | this | SOW | currently | have | an | R/O | plant. | No | evaporators | exist |
| on | these | 27 | cutters. | | | | | | | | | | | | |
| Question | 51: | | Ref | SOW | 3.4.2.7. | Please | clarify…”Renew | the | raw | water | pump | and | associated |
| isolation | globe | valve.” | | | | | | | | | | | |
What is it, Replace or Rebuild?
If renew means rebuild, who is the pump and valve manufacturer, what is the model/part number?
Response 51: The raw water pump will be replaced with a new pump along with any associated valves.
Question 52: (Clarification Request): This solicitation was posted on www.fbo.gov <https://urldefense.proofpoint.com/v2/url?u=http‐ 3A__www.fbo.gov&d=CwMFAg&c=0NKfg44GVknAU‐ XkWXjNxQ&r=mNKrT0De22BqNMAqFuDRju‐ 9x1Wok4iU1lx4pefRf6U&m=D1mdQZXiIqrnWRY_2Ih4eVWT3QdcNf9cmos4pDZTY1w&s=Tz8N
| eGsngA_H3aBNy241qlXiEvFFFWctEmj9nbfCPYc&e=> | | as | “Notice | Type: | Presolicitation”. | | | | | | | | |
| However | the | solicitation | language | along | with | action | dates | makes | it | sound | other | than | a |
| Presolicitation. | Please | confirm | if | this | is | the | final | solicitation | for | this | acquisition. | | |
| Response | 52: | Unfortunately | FEDBIZOPPS | database | does | not | permit | the | correction | from | Pre‐ | | |
| Solicitation | to | Solicitation. | | However, | Amendment | 00002 | corrects | the | notice | FROM | Pre‐ | | |
| Solicitation | TO | Solicitation. | | | | | | | | | | | |
| Question | 53: | Because | the | answers, | clarifications | and | requested | references | won’t | be | available | | | | |
| until | after | the | due | date | for | questions/concerns | has | past, | a | 30‐day | extension | to | the | solicitation | is |
requested.
Response 53: Solicitation has been extended to August 8, 2016, as noted on Amendment 00003.
| Question | 54: | Ref: | Solicitation | document | page | 43 | (45) | para. | 5.c.b. | states | “Can | the | R/O | plant | be |
| installed | without | major | disassembly, | i.e. | hand | tools.” | Please | clarify | what | the | Government | | | | |
| considers | “ | major | disassembly” | | | | | | | | | | | | |
| Response | 54: | Modular | and | fairly | simple | to | disassemble | if | needed | for | maintenance | or | | | |
| component | replacement. | | | | | | | | | | | | | | |
| Question | 55: | Are | there | any | restrictions, | safety, | training | or | policies | which | would | precluded | | | | | |
| Contractor | to | use | own | personnel | to | do | the | removal | and | install | at | any | own | port? | | | |
| Response | 55: | I | take | it | you | meant | to | say | Homeport? | If | so, | contractor | personnel | can | be | used | for |
| removal/install. | Any | restrictions, | safety, | policies, | etc… | would | be | for | the | cutter | homeport | | | | | | |
| location | i.e. | Coast | Guard | Base | or | Naval | Base. | | | | | | | | | | |
| Question | 56: | Ref: | Solicitation | document | page | 38 | (40), | Proposal | Submission. | Can | the | | | | | |
| Government | accept | proposal | in | compressed/zipped | files | format? | | | | | | | | | | |
| Response | 56: | | Yes, | the | USCG | email | server | cannot | accept | attachments | that | are | 10MB | or | greater | . |
| Question | 57: | Can | proposal | be | submit | in | multiple | emails, | i.e. | marked | “proposal | Part | I”, | Proposal |
| Part | II”…? | | | | | | | | | | | | | |
| Response | 57: | Yes, | the | USCG | email | server | cannot | accept | attachments | that | are | 10MB | or | greater. |
| Question | 58: Regarding | Attachment | 2, | Schedule | of | Supplies | and | Services: | | | | | | | | | | |
| In | Items | 0‐2007 | through | 0‐2010, | there | are | values | filled | in | and | also | for | the | same | line | item | for | the |
| other | option | years. | | Is | this | correct? | | | | | | | | | | | | |
Are these fixed by the solicitation or do we change them to our numbers?
| In | item | 0‐1006a | and | 0‐1006b | and | the | same | line | item | for | the | other | option | years, | there | are | a | fixed |
| quantity | of | hours | designated. | | Do | we | just | quote | for | this | number | of | hours | as | shown? | | | |
| Response | 58: | | Yes | this | is | correct. | They | are | a | Not | to | Exceed | amount | (NTE), | that | were | factored | in |
| since | cutter | location | is | not | yet | determined | and | will | be | submitted | as | a | proposed | amount | once | the | | |
| homeport | is | determined | under | individual | task | order. | Do | not | change | the | numbers | or | total | | | | | |
| amount | noted. | | | | | | | | | | | | | | | | | |
| Yes, | quote | should | be | for | the | number | of | hours | shown. | | | | | | | | | |
| Question | 59: | RFP | Attachment | 2 | Schedule | of | Supplies | and | Services | Lines#005a | and | #005b | | | | | | | |
| Should | the | contract | total | for | Depot | Level | Spare | Parts | be | 1 | each, | | and | the | total | for | On | Board | |
| Repair | pats | Kit | be | 27 | each | (1 | for | each | Cutter)? | | | | | | | | | | |
| Response | 59: | | Yes, | as | listed | in | the | SOW | 3.6.4. | The | Depot | Level | spare | parts | will | be | shelf | stock | for |
| the | R/O | units | recommended | by | the | manufacturer | whether | it | be | one | or | multiple | of | each | item | | | | |
| recommended. | As | mentioned | in | the | SOW | these | shelf | stock | parts/components | for | the | R/O | are | | | | | | |
| defined | as | a | lead | time | over | 45 | days | and | or | manufacturer | designated | critical | items. | Preferably | | | | | |
| best | if | both | WMEC | 270 | and | WMEC | 210 | R/O’s | could | utilize | the | same | parts/components. | Onboard | | | | | |
| repair | parts | kits | will | be | provided | to | each | cutter | by | the | install | activity | after | installation | of | the | | | |
| new | R/O | as | mentioned | in | SOW3.6.5. | | | | | | | | | | | | | | |
| Question | 60: | During | our | review | of | the | reference | drawings | we | noted | that | some | of | the | drawings |
| that | were | provided | to | you | have | been | superseded. | | | | | | | | |
For example, dwg 627‐WMEC‐533‐010, sht 6 has been superseded by 627‐WMEC‐390‐001.
| Dwg | 618‐WMEC‐531‐007 | has | been | superseded | by | 618‐WMEC‐531‐007, | sht | 7 | has | been |
| superseded | by | 618‐WMEC‐390‐001. | | | | | | | | |
| These | later | drawings | were | not | included | in | the | set | of | drawings | provided | to | you | nor | were | they |
| listed | in | the | SOW. | | | | | | | | | | | | | |
| If | these | later | drawings | are | relevant | to | this | solicitation, | we | respectfully | request | that | you | provide |
| them | for | our | review. | | | | | | | | | | | |
| Response | 60: | Drawings | are | to | be | requested | via | email | to | the | Contract | Specialist | at | |
Magdalena.n.pitre@uscg.mil
| Coast | Guard | Drawing | 618 | WMEC | 390‐001, | Rev‐, | RC5000 | Watermaker | with | Media | Filter |
| Electrical | Control | & | Schematic | Wiring | Diagram. | | | | | | |
| Coast | Guard | Drawing | 627 | WMEC | 390‐001, | Rev‐, | RC5000 | Watermaker | with | Media | Filter |
| Electrical | Control | & | Schematic | Wiring | Diagram. | | | | | | |
These drawings will be forwarded to you upon your request for a CD from the contract specialist.
| NOTE: | Any | questions | concerning | a | “Ship | Check” | shall | be | submitted | through | the | contract |
| specialist | via | e‐mail | Magdalena.n.pitre@uscg.mil. | | | | | | | | | |
| Question | 61: | Can | this | ever | be | a | GFE | on | the | RO's | ??,,or | can | you | give | me | some | model | numbers | on |
| the | RO's | the | Govt. | wants | to | see, | or | what | is | the | existing | units? | | | | | | | |
| Response | 61: | | Please | review | the | Statement | of | Work | which | explains | what | we | currently | have. | No | | | | |
| particular | new | R/O | is | specified | as | long | as | it | meets | the | requirements | in | the | Statement | of | Work. | | | |
| Question | 62: | Is | there | one | each | strainer | and | feed | water | pump | per | ship | therefore | no | redundancy | | |
| or | is | there | to | be | 2 | each | per | ship? | | | | | | | | | |
| Response | 62: | Please | review | Statement | of | Work | section | 3.1.1 | Capacity, | which | explains | the | | | | | |
| redundant | components. | At | present, | the | existing | R/O | plants | have | a | sea | feed | pump, | low | pressure | | | |
| pump | and | high | pressure | pumps. | For | the | WMEC | 210 | Class | cutters, | the | sea | feed | pump | is | on | the |
| media | filter | skid. | | | | | | | | | | | | | | | |
| Question | 63: | Is | there | one | each | brominator | per | ship | (no | redundancy) | or | if | there | is | to | be | 2 | each |
| per | ship | with | one | on | the | permeate | outlet | coming | from | each | the | redundant | membrane/pressure | | | | | |
| vessels? | | Amendment | and | earlier | question | 40 | are | in | conflict | | | | | | | | | |
| Response | 63: | The | present | installation | has | a | redundant | borminator. | The | new | R/O | would | | | | | | |
| preferably | have | the | brominator’s | located | on | the | R/O | skid. | If | there | is | a | recommended | change | for | | | |
| this | setup, | please | review | SOW | section | 3.7. | | | | | | | | | | | | |
| Question | 64: | | Should | each | ship | have | one | each | media | filter | or | 2 | each | media | filters | (redundant)? |
| Response | 64: | One | each | media | filter. | | | | | | | | | | | |
| Question | 65: | Should | each | ship | should | have | one | each | 2 | stage | prefiltration | system | or | redundant | | | |
| two | each | prefiltration | system? | | | | | | | | | | | | | | |
| Response | 65: | Existing | unit | has | a | 5 | and | 20 | micron | pre‐filters | located | on | the | R/O | skid | that | is |
| redundant | for | either | side | of | the | R/O. | | | | | | | | | | | |
| Question | 66: | Ref | 3.2.3.1 | in | reference | to | cyclone | separator: | | The | amendment | still | reads | to | put | a | | | | |
| cyclone | separator | before | each | High | Pressure | pump | however | question | 28 | confirms | it | should | be | | | | | | | |
| before | the | media | filter. | | Is | this | to | go | before | the | media | filter | and | if | there | is | to | be | one | cyclone |
| separator | for | each | ship | (non | redundant) | or | if | there | is | to | be | 2 | (redundant)? | | | | | | | |
| Response | 66: | The | Statement | of | Work | section | 3.2.3.1 | states | that | all | necessary | feed | and | high | | | | | | |
| pressure | pumps | shall | be | provided. | It | does | not | specify | that | a | cyclone | separator | is | needed | on | the | | | | |
| High | Pressure | pumps | and | is | a | generic | pump | statement. | Cyclone | separators | would | be | for | the | sea | | | | | |
| feed | pump. | For | the | WMEC | 210’s | the | present | installation | has | the | sea | feed | pump | located | on | the | | | | |
| media | filter | skid. | | | | | | | | | | | | | | | | | | |
| Question | 67: | | Ref. | SOW | 3.2.3.1(cyclone | separator) | and | 3.2.3.3 | (media | filter) | ‐ | Space | on | the | 210 | | |
| cutter | is | limited. | | Height | restrictions | further | make | it | challenging | regarding | sizing | media | filters | | | | |
| for | the | RO’s. | | We | would | like | to | clarify | that | USCG | wants | duplicate, | redundant | Media | Filters | for | the |
| RO | Plant, | along | with | duplicate | cyclone | separators. | | The | system | we | are | replacing | had | media | filter | | |
| off | of | skid. | | | | | | | | | | | | | | | |
| Response | 67: | As | per | the | current | install, | (1) | media | filter | for | the | raw | water | being | supplied | to | the |
| R/O | to | include | the | typical | redundant | (a | set | for | each | side) | 5 | and | 20 | micron | filters | that | are |
| currently | on | the | R/O | skid. | For | the | WMEC | 210’s | the | present | installation | has | the | sea | feed | pump | |
| located | on | the | media | filter | skid. | | | | | | | | | | | | |
| Question | 68: | Ref. | Question/Response | 46 | “…This | would | be | a | recommend, | not | recommend | for |
| 270 | Class | Cutters…” | | | | | | | | | | |
a) Why does this only apply to 270 and not 210 cutters?
b) Why the media filter skid was added later?
c) Are the R/O plants operated only on blue waters for both 210 and 270?
| Question | 69: | Ref. | Question/Response: | | In | light | of | the | correction | needed | to | 3.2.3.2 | from | |
| Question | 36, | will | you | please | respond | by | re‐writing | your | specification | for | 3.2.3.2 | b | as | you |
| intended | to | evaluate | compliance? | | | | | | | | | | | |
| Response | 69: | | | | | | | | | | | | | |
| a) The | current | 270 | RC7000 | Watermaker | did | not | require | a | separate | media | filter. | The | SOW | | | |
| leaves | this | as | a | requirement | for | the | 270 | Class | cutters | and | as | mentioned | may | or | may | not |
| be | needed. | This | will | be | determined | after | award. | | | | | | | | | |
| b) The | media | filter | was | added | for | the | 210’s | after | numerous | High | pressure | pump | failures. | It |
| was | determined | that | the | incoming | raw | water | was | not | clean | enough. | The | failures | were | |
| evidently | not | concurrent | for | the | 270’s | as | for | the | 210’s. | | | | | |
| c) The | standard | operating | procedure | the | cutters | should | be | going | by | and | should | be | part | of |
| the | Engineering | Standing | Orders | is | from | NSTM | 533: | | | | | | | |
| 533‐2.4.2 | POLLUTED | WATER. | Unless | determined | otherwise, | water | in | harbors, | rivers, | | | | | |
| inlets, | bays, | landlocked | waters, | and | the | open | sea | within | 12 | miles | of | the | entrance | to |
| these | waterways, | shall | be | considered | to | be | polluted. | Other | areas | may | be | declared | to | be |
| polluted | by | Navy | medical | specialists. | The | desalting | of | polluted | harbor | water | or | seawater | | |
| for | human | consumption | shall | be | avoided | except | in | emergencies. | | | | | | |
| Question | 70: | Specification | 3.2.3.1 | as | it | is | written | “The | feed | pump | shall | be | suitable | for | remote | | |
| location | and | capable | of | a | 35 | foot | head | pressure | loss | in | the | suction | from | a | seas | chest | while |
| maintaining | the | required | raw | water | inlet | pressure | and | flow” | has | been | confusing | for | some | of | the | | |
| senior | pump | application | resources | from | major | pump | providers. | | The | problem | is | how | the | spec | | | |
| states | a | “35 | foot | pressure | loss | in | suction…” | | | | | | | | | | |
| The | pump | providers | need | to | know | NPSH, | and | in | order | to | do | so | the | spec | should | have | details | of |
| where | the | waterline | of | the | ship | is | relative | to | the | feed | pump. | | Calculations | then | can | be | made | to |
| determine | whether | a | given | pump | can | overcome | a | 35 | foot | pressure | loss | in | suction, | if | the | | | |
| waterline | feeding | into | the | sea | chest | is | sufficiently | elevated | above. | | | | | | | | | |
| Unless | the | specification | is | clarified | in | a | way | that | our | pump | OEM | representative | can | determine | | | |
| NPSH, | they | have | to | assume | USCG | is | requesting | a | pump | with | suction | greater | than | what | is | | |
| possible. | A | representative | from | a | major | pump | manufacturer | has | said | more | than | once, | that | there | | | |
| are | no | pumps | he | knows | of, | with | 35 | ft. | suction. | He | said | the | drawings | provided | are | not | detailed |
| enough | regarding | the | water | line | locations | for | them | to | feel | comfortable | with | a | recommendation | | | | |
| Would | you | please | clarify | your | previous | specification | by | declaring | the | waterline | location | relative |
| to | the | intended | pump | location? | | | | | | | | |
| Response | 70: | | | | | | | | | | | |
| 1. For | the | 270 | Class | cutters, | remote | location | meaning | one | compartment | below, | present |
| pump | location | is | in | the | bilge | area. | | | | | |
| 2. Actual | pump | location | is | below | the | waterline | 6 | to | 7 | feet. | R/O | location | is | approximately | 4 |
| ft | above | the | waterline. | | | | | | | | | | | | |
| 3. The | only | other | hurdle | would | be | required | pressure | to | push | through | a | media | filter | and |
| the | 5 | and | 20 | micron | pre‐filters | and | still | provide | adequate | pressure | for | the | R/O. | |