QUESTIONS AND ANSWERS FROM CONTRACTORS

View the file

Other files

File Type Posted
SF30 Amendment 01 SOL FOR SEA DRAGONdf.pdf PDF
Sea Dragon_BLANK.xls XLS spreadsheet
SOLICITATION FOR SEA DRAGON.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC SEA DRAGON Solicitation No. HSCG80-11-Q-PA2003 Questions

· Are the removals listed through-out the work items known requirements or possible requirements?

· If “(D)” the Definite

· If “(O)” the Option

· Work item 37 contains a Government furnished property list with no * designations. Please advise.

· Items will be supplied by Govt. as GFE

· Work item 3 requires 8 linear feet of eroded weld repair. What are the smallest increments or number of expected locations?

· None expected, but possibility of findings during inspections. In the past we have encountered welds that were in need of repair or replacement, due to rust or cracking.

· The profile drawing 87WPB 131-002 sheet 1 and 2 of the peak tank have a section cut 28-A to detail the required floor frames forward of frame 1. The detail 28-A is not contained within the referenced drawings. Please provide that section depicting intermediate floor frames forward of frame one.

-Do not understand what the question is here. There are no frames FWD of Frame one

· If existing surface profiles are encountered with depths beyond acceptable values, will the cost of repairs to those areas be the responsibility of the Government?

· Responsibility of the Govt.. If this is found a CFR needs to be submitted to COTR

· Is the contractor responsible for petroleum product storage and refueling or simply disposal?

· Disposal upon arrival and refueling upon re-floating of vessel

· There are numerous cases where the drawings supplied on the CD-ROM are later revisions than those referenced within the items. Is this a problem? Yes, Most recent DWGs are needed. Need to know what DWGs are not correct.