Sea Dragon_BLANK.xls

XLS spreadsheet 33 KB Posted

Attached to
CGC SEA DRAGON DRYDOCK Federal contract opportunity
Solicitation number
HSCG80-11-Q-PA2003
Issued by
Department of Homeland Security US Coast Guard

About this file

SCHEDULE OF SUPPLIES/SERVICES FOR CGC SEA DRAGON

View the file

Other files for this federal contract opportunity

Other files attached to CGC SEA DRAGON DRYDOCK, newest first.
File Type Posted
CONTRACTOR QUESTIONS FOR USCGC SEA DRAGON.docx DOCX document
SF30 Amendment 01 SOL FOR SEA DRAGONdf.pdf PDF
SOLICITATION FOR SEA DRAGON.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC SEA DRAGON (WPB-87367) DRYDOCK AVAILABILITY 2011
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
1-DPerform Ultrasonic Thickness Measurements (D)250 SHOTS1
2-OPerform Ultrasonic Thickness Measurements (O)25 SHOTS10
3-OPerform Hull and Structural Plating Repairs in Various Compartments – Eroded Welds (Steel) (O)8 LF2
4-DClean and Inspect Dirty Oil Tank (D)JOB1
5-DClean and Inspect Oily Water Tank (D)JOB1
6-DClean and Inspect Fuel Service Tanks (D)JOB1
7-DClean and Inspect Grey Water Tank (D)JOB1
8-DClean and Inspect Sewage Tank (D)JOB1
9-DClean Grey Water Piping System (D)JOB1
10-DClean Sewage Piping System (D)JOB1
11-DInspect Pilothouse Deck (D)JOB1
12-DInspect RHIB Notch Skid Pads (D)JOB1
13-ORenew RHIB Notch Skid Pad Studs (O)10 STUDS5
14-ORealign Main Engine/Reduction Gear (O)EA2
15-DRemove, Inspect, and Reinstall Propeller Shafts (D)JOB1
16-ORepair Shaft (O)EA2
17-OStraighten Shaft (O)EA2
18-ORenew Intermediate Water-Lubricated Shaft Bearing (O)EA2
19-ORenew Aft Water-Lubricated Shaft Bearing (O)EA2
20-ORenew Intermediate Bearing Carrier (O)EA2
21-ORenew Aft Bearing Carrier (O)EA2
22-DRemove, Inspect, and Reinstall Propellers (D)JOB1
23-OPerform Minor Repair and Recondition of Propeller (O)EA2
24-DRenew Depth Indicating Transducer (D)JOB1
25-DRenew Sea Valves and Inspect Associated Piping and Strainers (D)JOB1
26-DRemove, Inspect, and Reinstall Rudder Assemblies (D)JOB1
27-DRemove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D)JOB1
28-OPreserve Underwater Body – “Partial” (O)JOB1NSP
29-OPreserve Underwater Body – “100%” (O)JOB1
30-OPreserve Stern Tubes (O)JOB1
31-DModify and Renew Cathodic Protection System (D)JOB1
32-ORenew Transducer Fairing (O)EA2
33-DRoutine Drydocking (D)JOB1
34-DProvide Temporary Logistics (D)JOB1
35-DRenew Various Main Deck Steel Appendages (D)JOB1
36-DModify and Preserve the Forepeak (EC 087-A-033) (D)JOB1
37-DInstall Dirty Oil Tank Level Indicator (EC 087-B-039) (D)JOB1
38-OPreserve Mast (O)JOB1
39-OPreserve Superstructure – 100% (O)JOB1
40-OPreserve Freeboard – 100% (O)JOB1
41-DInstall AFFF Bilge Sprinkler System (EC 087-A-024) (D)JOB1
42-DRenew Sounding Tube Caps (D)JOB1
A-OComposite Labor RateHour200
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(&D)

Page &P of &N

File details come from the government source that posted it. Updated .