SF300002DRUMMONDDD.doc

DOC document 43 KB Posted

Attached to
USCGC DRUMMOND (WPB-1323) 10 DRYDOCK REPAIRS
Solicitation number
HSCG80-10-Q-PHMG99
Issued by

About this file

Amendment 0002 to solicitation number HSCG80-10-Q-PHMG99 Drydock and Repairs to USCGC DRUMMOND (WPB-1323).

View the file

Other files

File Type Posted
SF300003DRUMMONDDD.doc DOC document
RFQ DRUMMOND DD 04-13-10.doc DOC document
SF300001DRUMMONDDD.doc DOC document
RFQ DRUMMOND DD 04-13-10.doc DOC document
DRUMMOND_DD_MSL_10R0.pdf PDF
DRUMMOND_(WPB_110B)_DD_MSL_10ER0_BLANK_ESTIMATE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

DO-A3

PAGE

OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

07 MAY 2010

4. REQUISITION/PURCHASE REQ. NO.

21-10-800PHMG99

5. PROJECT NO.

CGC DRUMMOND DRY DOCK

6. ISSUED BY CODE: CPD-C&P1-PBPL

SURFACE FORCES LOGISTICS CENTER

300 E. MAIN STREET, SUITE 600

NORFOLK, VA 23510-9102

POC: MR. LOUIS ROMANO (757) 628-4651

E-mail: Louis.J.Romano@uscg.mil

7. ADMINISTERED BY CODE:

8. NAME AND ADDRESS OF CONTRACTOR (No, street, county, state and Zip Code)

CODE: FACILITY CODE:

X
9a. AMENDMENT OF SOLICITATION NO.

HSCG80-10-Q-PHMG99_____________

9b. DATED (SEE ITEM 11)

22 APRIL 10 ________________________

10a. MODIFICATION OF CONTRACT NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers XX IS NOT extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning one copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (IF REQUIRED)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to: (Specify authority) The changes set forth in Item 14 are made in the contract order no in item 10A.

B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data, etc.) set forth in Item 14 pursuant to the authority of FAR 43.103(b).

C. This supplemental agreement is entered into in pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor ( is not, ( is required to sign this document and return _1____ copies to the issuing office.

14. Description of amendment/modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

HSCG80-10-Q-PHMG99

DRYDOCK REPAIRS, USCGC DRUMMOND (WPB-1323)

Subject solicitation is amended as follows:

1. The following information is provided as clarification to questions submitted regarding work items in this requirement: a. Paragraph 3.1.1 of work item 22 lists “Restore Hull Structural Integrity” and “Preserve Skeg TopPlating” as separate work items relating to work item 22. These items ARE NOT included in the requirement and should be deleted.

b. On work item 68, the correct size of the T-Bar is 1” x 3” as shown in the title on page 179. As to the web and flange material thickness and the grade of steel required, British steel 4360, 2.45 pound plate or a suitable substitute can be used. The quantity to be priced out is 10 units at 1 linear foot each, for a total of 10 linear feet.

c. On work item 54, the Contractor shall use castellated nuts with cotter pins as shown in the incorporated photo. There is NO insulation in the overhead as per the provided photo. There is no reference to the EC 110-C-148 in the incorporated drawing; the work to be accomplished is stated in the requirements section.

d. In response to a query on blasting and recoating the steel substrate in the compartments cited in work item 55, refer to paragraph 3.2.2 on page 143 of the specification for clarification.

2. All other terms and conditions remain unchanged. The due date for offers remains unchanged at May 13, 2010 at 2:00PM, EST.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type/Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type/Print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

BY_LR_________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

05/07/10___________

STANDARD FORM 30

File details come from the government source that posted it. Updated .