DRUMMOND_(WPB_110B)_DD_MSL_10ER0_BLANK_ESTIMATE.pdf

PDF 15 KB Posted

Attached to
USCGC DRUMMOND (WPB-1323) 10 DRYDOCK REPAIRS
Solicitation number
HSCG80-10-Q-PHMG99
Issued by

About this file

SCHEDULE OF SUPPLIES/SERVICES FOR USCGC DRUMMOND

View the file

Other files

File Type Posted
SF300003DRUMMONDDD.doc DOC document
SF300002DRUMMONDDD.doc DOC document
RFQ DRUMMOND DD 04-13-10.doc DOC document
SF300001DRUMMONDDD.doc DOC document
RFQ DRUMMOND DD 04-13-10.doc DOC document
DRUMMOND_DD_MSL_10R0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLIES/SERVICES AND PRICES/COSTS FOR:

USCGC DRUMMOND (WPB-1323) DRYDOCK AVAILABILITY 2010

ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE

1-D Routine Drydocking JOB 1

2-D Provide Temporary Logistics JOB 1

3-D Clean and Inspect Fuel Service Tanks JOB 1

4-D Clean and Inspect Fuel Stowage and Overflow Tanks JOB 1

5-D Clean and Inspect Oil and Oily Waste Tanks JOB 1

6-D Clean and Inspect Sewage Collection and Holding Tanks JOB 1

7-D Clean and Inspect Grey Water Collection and Holding Tanks JOB 1

8-D Perform Air Test of Interior Compartments JOB 1

9-D Clean Sewage Piping System JOB 1

10-D Clean Grey Water Piping System JOB 1

11-D Clean and Disinfect Potable Water Tanks JOB 1

12-D Preserve and Disinfect Potable Water Tanks - 100% JOB 1

13-D Preserve Sewage Collection and Holding Tanks - 100% JOB 1

14-D Preserve Grey Water Collection and Holding Tanks - 100% JOB 1

15-D Preserve Oil and Oily Water Tanks – 100% JOB 1

16-D Inspect MDE Exhaust System JOB 1

17-D Remove, Inspect, and Reinstall Propellers JOB 1

18-O Repair Propeller Root Erosion CUIN 60

19-D Remove, Inspect, and Reinstall Propeller Shafts JOB 1

20-D Overhaul Mechanical Shaft Seal Assemblies JOB 1

21-D Renew Water-Lubricated Propeller Shaft Bearings JOB 1

22-D Clean and Inspect Heat Exchangers JOB 1

23-D Overhaul and Renew Sea Valves JOB 1

24-D Overhaul and Renew Firemain Valves JOB 1

25-D Overhaul and Renew Bilge and Ballast Valves JOB 1

26-D Overhaul Duplex Sea Strainers JOB 1

27-D Overhaul Stabilizing Fins JOB 1

28-D Overhaul Steering Gear Components JOB 1

29-D Remove, Inspect and Reinstall Rudder Assemblies JOB 1

30-D Inspect and Maintain Cathodic Protection System JOB 1

(4/13/2010)

ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE

31-O Renew CAPAC Anode Assembly EA 2

32-O Renew Depth Indicating Transducer JOB 1

33-O Preserve Underwater Body – “Partial” JOB 1 NSP

34-O Preserve Underwater Body – “100%” JOB 1

35-O Preserve Stern Tubes JOB 1

36-D Perform Ultrasonic Thickness Measurements Shots 10

37-O Perform Aluminum Hull and Structural Repairs - 1/4" Plate 4 SQFT 50

38-O Perform Aluminum Hull and Structural Repairs - 3/16" Plate 4 SQFT 25

39-O Perform Aluminum Hull and Structural Repairs - 5/16" Plate 4 SQFT 25

40-O Perform Hull and Structural Plating Repairs -Crack (Aluminum) 1 LF 50

41-O Perform Hull and Structural Plating Repairs - Eroded Weld (Aluminum) 1 LF 50

42-O Perform Hull and Structural Plating Repairs - Overlay Welding (Aluminum) 6 SQIN 100

43-O Perform Steel Hull and Structural Plating Repairs (5-Pound) 4 SQFT 50

44-O Perform Steel Hull and Structural Plating Repairs (7.5-Pound or 7.65-Pound) 4 SQFT 50

45-O Perform Hull and Structural Plating Repairs - Crack (Steel) 1 LF 50

46-O Perform Hull and Structural Plating Repairs - Eroded Welds (Steel) 1 LF 50

47-O Perform Hull and Structural Plating Repairs - Overlay Welding (Steel) 8 SQIN 100

48-D Preserve Battery Space JOB 1

49-D Preserve Surfaces in Forward Auxiliary Machinery Space JOB 1

50-D Preserve Forward Peak Compartment JOB 1

51-D Preserve Freeboard - 100% JOB 1

52-D Renew Shower Stalls JOB 1

53-D Renew Deck Covering System(s) JOB 1

54-D Modify Exhaust Hangers <EC 110-C-148> JOB 1

55-D Renew Insulation in Various Compartments JOB 1

ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE

56-D Preserve Engine Room Bilge Surfaces In Various Locations JOB 1

57-D Renew Floating Deck System in Aft Berthing JOB 1

58-D Renew Floating Deck System in Galley and Mess Deck JOB 1

59-D Renew Structural Closures JOB 1

60-D Renew Speed Doppler, Spool Piece, Waster Piece and Overhaul Doppler Valve JOB 1

61-D Renew Various Deck Fittings JOB 1

62-D Repair Superstructure Wasted Metal JOB 1

63-D Install Main Diesel Engine Duplex Sea Strainers (EC 110-B-133 AMEND 1) JOB 1

64-D Install New Grey Water Pumps and Piping (EC 110-C-140) JOB 1

65-O Renew Capastic Fairing JOB 2

66-O Perform Hull and Structural Plating Repairs -Corrugated Plate (4.0-Pound) 4 SQFT 10

67-O Perform Hull and Structural Plating Repairs (10.2-Pound) 4 SQFT 10

68-O Perform Steel Structural Member Repairs -1” x 3” Steel T-Bar Framing 1 LF 10

A-O Composite Labor Rate hour 730

B-D GFP Report NSP EA 1 NSP

Z-O Laydays Day 5

Total Price of Definite Items

Total Price of Option Items

Total Price of Definite and Optional Items

SOS&S

File details come from the government source that posted it. Updated .