DRUMMOND_(WPB_110B)_DD_MSL_10ER0_BLANK_ESTIMATE.pdf
PDF 15 KB Posted
- Attached to
- USCGC DRUMMOND (WPB-1323) 10 DRYDOCK REPAIRS
- Solicitation number
- HSCG80-10-Q-PHMG99
About this file
SCHEDULE OF SUPPLIES/SERVICES FOR USCGC DRUMMOND
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF300003DRUMMONDDD.doc | DOC document | |
| SF300002DRUMMONDDD.doc | DOC document | |
| RFQ DRUMMOND DD 04-13-10.doc | DOC document | |
| SF300001DRUMMONDDD.doc | DOC document | |
| RFQ DRUMMOND DD 04-13-10.doc | DOC document | |
| DRUMMOND_DD_MSL_10R0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC DRUMMOND (WPB-1323) DRYDOCK AVAILABILITY 2010
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
1-D Routine Drydocking JOB 1
2-D Provide Temporary Logistics JOB 1
3-D Clean and Inspect Fuel Service Tanks JOB 1
4-D Clean and Inspect Fuel Stowage and Overflow Tanks JOB 1
5-D Clean and Inspect Oil and Oily Waste Tanks JOB 1
6-D Clean and Inspect Sewage Collection and Holding Tanks JOB 1
7-D Clean and Inspect Grey Water Collection and Holding Tanks JOB 1
8-D Perform Air Test of Interior Compartments JOB 1
9-D Clean Sewage Piping System JOB 1
10-D Clean Grey Water Piping System JOB 1
11-D Clean and Disinfect Potable Water Tanks JOB 1
12-D Preserve and Disinfect Potable Water Tanks - 100% JOB 1
13-D Preserve Sewage Collection and Holding Tanks - 100% JOB 1
14-D Preserve Grey Water Collection and Holding Tanks - 100% JOB 1
15-D Preserve Oil and Oily Water Tanks – 100% JOB 1
16-D Inspect MDE Exhaust System JOB 1
17-D Remove, Inspect, and Reinstall Propellers JOB 1
18-O Repair Propeller Root Erosion CUIN 60
19-D Remove, Inspect, and Reinstall Propeller Shafts JOB 1
20-D Overhaul Mechanical Shaft Seal Assemblies JOB 1
21-D Renew Water-Lubricated Propeller Shaft Bearings JOB 1
22-D Clean and Inspect Heat Exchangers JOB 1
23-D Overhaul and Renew Sea Valves JOB 1
24-D Overhaul and Renew Firemain Valves JOB 1
25-D Overhaul and Renew Bilge and Ballast Valves JOB 1
26-D Overhaul Duplex Sea Strainers JOB 1
27-D Overhaul Stabilizing Fins JOB 1
28-D Overhaul Steering Gear Components JOB 1
29-D Remove, Inspect and Reinstall Rudder Assemblies JOB 1
30-D Inspect and Maintain Cathodic Protection System JOB 1
(4/13/2010)
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
31-O Renew CAPAC Anode Assembly EA 2
32-O Renew Depth Indicating Transducer JOB 1
33-O Preserve Underwater Body – “Partial” JOB 1 NSP
34-O Preserve Underwater Body – “100%” JOB 1
35-O Preserve Stern Tubes JOB 1
36-D Perform Ultrasonic Thickness Measurements Shots 10
37-O Perform Aluminum Hull and Structural Repairs - 1/4" Plate 4 SQFT 50
38-O Perform Aluminum Hull and Structural Repairs - 3/16" Plate 4 SQFT 25
39-O Perform Aluminum Hull and Structural Repairs - 5/16" Plate 4 SQFT 25
40-O Perform Hull and Structural Plating Repairs -Crack (Aluminum) 1 LF 50
41-O Perform Hull and Structural Plating Repairs - Eroded Weld (Aluminum) 1 LF 50
42-O Perform Hull and Structural Plating Repairs - Overlay Welding (Aluminum) 6 SQIN 100
43-O Perform Steel Hull and Structural Plating Repairs (5-Pound) 4 SQFT 50
44-O Perform Steel Hull and Structural Plating Repairs (7.5-Pound or 7.65-Pound) 4 SQFT 50
45-O Perform Hull and Structural Plating Repairs - Crack (Steel) 1 LF 50
46-O Perform Hull and Structural Plating Repairs - Eroded Welds (Steel) 1 LF 50
47-O Perform Hull and Structural Plating Repairs - Overlay Welding (Steel) 8 SQIN 100
48-D Preserve Battery Space JOB 1
49-D Preserve Surfaces in Forward Auxiliary Machinery Space JOB 1
50-D Preserve Forward Peak Compartment JOB 1
51-D Preserve Freeboard - 100% JOB 1
52-D Renew Shower Stalls JOB 1
53-D Renew Deck Covering System(s) JOB 1
54-D Modify Exhaust Hangers <EC 110-C-148> JOB 1
55-D Renew Insulation in Various Compartments JOB 1
ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE
56-D Preserve Engine Room Bilge Surfaces In Various Locations JOB 1
57-D Renew Floating Deck System in Aft Berthing JOB 1
58-D Renew Floating Deck System in Galley and Mess Deck JOB 1
59-D Renew Structural Closures JOB 1
60-D Renew Speed Doppler, Spool Piece, Waster Piece and Overhaul Doppler Valve JOB 1
61-D Renew Various Deck Fittings JOB 1
62-D Repair Superstructure Wasted Metal JOB 1
63-D Install Main Diesel Engine Duplex Sea Strainers (EC 110-B-133 AMEND 1) JOB 1
64-D Install New Grey Water Pumps and Piping (EC 110-C-140) JOB 1
65-O Renew Capastic Fairing JOB 2
66-O Perform Hull and Structural Plating Repairs -Corrugated Plate (4.0-Pound) 4 SQFT 10
67-O Perform Hull and Structural Plating Repairs (10.2-Pound) 4 SQFT 10
68-O Perform Steel Structural Member Repairs -1” x 3” Steel T-Bar Framing 1 LF 10
A-O Composite Labor Rate hour 730
B-D GFP Report NSP EA 1 NSP
Z-O Laydays Day 5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
SOS&S
File details come from the government source that posted it. Updated .