REVISION NO. 12 .

Doppler Speed Log

PROCUREMENT SPECIFICATION

ORIGINATED BY: ETCM Donahue DATE: 12/14/2015

ORIGINATOR’S COMMAND: US Coast Guard C3CEN

DEPARTMENT / DIVISION Core Technology CT-N2

REVIEWER: ETCM Donahue DATE: 10/19/2016 REVISION: 12 BY: LCDR Kempe DATE: 11-Aug -2016

USCG C3CEN – Doppler Speed Log System

Table of Contents

1 SCOPE

1.1 Hardware, software and component items

2 APPLICABLE DOCUMENTS

2.1 Government Documents

2.2 Other Government Documents

2.3 Commercial Documents

2.4 Order of Precedence

3 REQUIREMENTS

3.1 General

3.2 Equipment Compliance

3.3 System Performance Requirements

3.4 Environmental Characteristics

3.5 Display Units

3.6 Electronics or Transceiver Unit

3.7 Transducer

3.8 Interface Requirements

3.9 Speed Measurement Performance

3.10 Depth measuring Performance

3.11 Identification and Labeling

3.12 Data Requirements

3.13 Onboard Repair Parts Listing

3.14 System Stock Parts

3.15 Provisioning Quality Control .......................................................... Error! Bookmark not defined.

3.16 Warranty

4 QUALITY ASSURANCE

4.1 General

4.2 International Maritime Organization (IMO) testing

4.3 Responsibility for Compliance

1 SCOPE

This Specification describes the procurement requirements for the replacement of the SRD-421S, SRD-331 and SRD-500, DSN-450, Naviknot 400, EML 500, EML 2000 speed log systems deployed in the Coast Guard on different cutter classes. The replacement Doppler Speed Log (DSL) system shall interface with the existing shipboard equipment as referenced herein, and retain the full functional characteristics and performance as the original system(s).

The DSL system may be installed on up to 218 vessels over the next five years as the Coast Guard standard speed measuring system. Currently projected Platform potential:

Platform Number

420 WAGB 2

378’ WHEC 4

295’ WIX 1

270’ WMEC 13

210’ WMEC 14

110’ WPB 14

WMSL 8

WLM 14

WLB 16

FRC 58

WPB-87 73

TOTAL 218

1.1 Hardware, software and component items

The items (per ship set) covered by this Specification are as follows:

1.1.1 One (1) display unit and associated equipment necessary to satisfy this specification

1.1.2 Electronics unit and or Transceiver Unit(s)

1.1.3 Transducer Unit

1.1.4 Gate Valve

1.1.5 Remote Display(s), depending on platform requirements

1.1.6 Operator and technical manuals associated with equipment

1.1.7 Technical Data

1.1.8 Detailed maintenance parts lists and a recommended sparing list for all component(s)

1.1.9 Installation cabling

2 APPLICABLE DOCUMENTS

The following documents form a part of this Specification to the extent specified herein. The documents listed are by title and effective date, unless otherwise documented. Commercial documents may be listed in the Department of Defense Index of Specifications and Standards

(DODISS).

2.1 Government Documents

2.1.1 Specifications, Military

2.1.1.1 MIL-DTL-15024F, Detail Specification: Plates, Tags and Bands for Identification of Equipment, General Specification for 1997

2.1.2 Standards, Military

2.1.2.1 MIL-STD-1399, Section 300B, Electric Power, Alternating Current

2.2 Other Government Documents

2.2.1 USCG Surface Forces Logistics Center (SFLC) Documents

2.2.1.1 D-084-0481 REV A, Preservation, Packaging, and Marking

2.2.1.2 D-086-0508, 2008, Technical Documentation Specifications

2.2.1.3 SFLC TS 0860, TS 086, SFLC Standards specification 086, Technical Publications

(TP)

2.3 Commercial Documents

2.3.1 Marine Equipment Directive 96/98

2.3.2 American National Standards Institute (ANSI) / American Society of Quality Control (ASQC)

2.3.2.1 ANSI/ASQC 9001-2008, Quality Management Systems – Model for Quality Assurance in Design, Development, Production, Installation, and Servicing Requirements

2.3.3 International Electrotechnical Commission (IEC)

2.3.3.1 ANSI/ISO/IEC 61023: 2007, Marine speed and distance measuring equipment (SDME) – Performance requirements – Methods of testing and required test results

2.3.3.2 ANSI/ISO/IEC 60945: 2002, Maritime navigation and radio communication equipment and systems – General requirements – Methods of testing and required test results

2.3.3.3 ANSI/ISO/IEC 61162-1: 2010, Maritime navigation and radio communication equipment and systems – Digital interfaces – Part 1: Single talker and multiple listeners

2.3.3.4 ANSI/ISO/IEC 61162-450:2011, Maritime navigation and radio communication equipment and systems – Digital interfaces – Part 1: Single talker and multiple listeners

2.3.3.5 ANSI-Z1.4 -Sampling Procedures and Tables for Inspection by Attributes. (DoD adopted).

2.3.3.6 ANSI/ISO/IEC 61162-450 Maritime navigation and radio communication equipment and systems – Digital interfaces – Part 450: Multiple talkers and multiple listeners – Ethernet interconnection

2.3.4 National Conference of Standards Laboratories (NCSL)

2.3.4.1 ANSI/NCSL Z540.3-2006, Requirements for the Calibration of Measuring and Test Equipment

2.3.5 Society of Naval Architects and Marine Engineers (SNAME)

2.3.5.1 T&R Bulletin 3-47, Guide for Sea Trials

2.3.5.2 T&R Bulletin 3-39, Guide for Shop and Installation Tests

2.3.6 International Maritime Organization (IMO)

2.3.6.1 Resolution MSC.334 (90)

2.3.6.2 Resolution MSC.96 (72)

2.3.6.3 Resolution A.824 (19)

2.4 Order of Precedence

In the event of a conflict between the text of this Specification and the references cited herein, this Specification takes precedence. The Vendor must notify the Contracting Officer (KO) in writing for a resolution of any ambiguity or conflict found in these Specifications prior to proceeding with any work.

3 REQUIREMENTS

The DSL system specifications contain requirements identified as “Objective.” These requirements are the preferred system capabilities and will be evaluated based on degree of benefit provided. All other specifications contained herein are the minimum required specifications.

3.1 General

3.1.1 The dual-axis speed log system shall consist of a master display unit, electronics or transceiver unit, dual-axis transducer assembly, sea chest valve, display adapter plate, mating connectors and any other hardware or software components to make a complete system. An optional remote display shall be available for purchase.

3.1.2 The DSL system shall use Doppler technology as the means to provide speed through the water. The speed log shall not utilize rotating or moving parts.

3.1.3 The DSL system shall be capable of measuring and displaying fore/aft and port/starboard SOG (Speed Over Ground), STW (Speed Through Water), distance traveled, and depth.

3.1.4 The Vendor shall provide a reliability prediction and service life with their proposal to ensure the design of the speed log system is adequate to meet USCG needs. The speed log reliability shall be presented in terms of Mean Time between Failures (MTBF). The system shall maintain 95% operational availability.

3.1.5 Compliance with specification requirements shall be supported with datasheets, catalog brochures, installation or operators manuals in the proposal.

3.1.6 Shall have selectable display for depth in feet, fathom or meters.

3.1.7 Shall have selectable display for speed in knots, meters per second or feet per second.

3.1.8 Vendor may provide any information not show by default on the master display on a vendor supplied external display, such as depth and soundings record.

3.2 Equipment Compliance

3.2.1 Objective: The DSL system shall be compliant with the Marine Equipment Directive 96/98 and labeled with the “Wheel Mark.” Certificate shall be submitted with proposal.

3.2.2 The DSL system shall comply with IMO Res. A.824 (19) as amended by Res. MSC.96 (72).

3.2.3 Objective: The DSL system shall comply with IMO Res. MSC.334 (90).

3.2.4 The DSL system components shall comply with IEC 60945.

3.2.5 The DSL system shall comply with at least the minimum performance, test methods and results of IEC 61023.

3.2.6 The DSL system shall comply with the IEC 61162-1 standard.

3.2.7 A declaration of conformity shall be submitted with proposal showing equipment compliances.

3.2.8 Display units shall meet IEC 60529 Ingress Protection (IP) 55.

3.3 System Performance Requirements

3.3.1 Speed Through the Water (STW). The system shall determine and display fore, aft, and athwart ships STW.

3.3.2 Speed Over Ground (SOG). The system shall determine and display fore, aft, and athwart ships SOG.

3.3.3 Objective: The system shall display nautical Miles traveled.

3.4 Environmental Characteristics

3.4.1 Operating environment

3.4.1.1 Seas: up to 2.5 to 4 meters, 8 ft 2 in to 13 ft 1, Sea State V.

3.4.1.2 Air Temperature: 5 (min) to 155 (max) degrees Fahrenheit

3.4.1.3 Pitch: +/- 5 degrees

3.4.1.4 Roll: +/- 10 degrees

3.4.2 Waterproof:

3.4.2.1 Display units shall meet IEC 60529 Ingress Protection (IP) 55.

3.5 Display Units

3.5.1 The vendor shall provide a master display unit.

3.5.2 The speed log system shall be capable of having remote display(s) to accommodate viewing data elsewhere on bridge.

3.5.3 All system displays shall be viewable while wearing glasses/sunglasses with polarized lenses.

3.5.4 All system displays must be viewable in direct sunlight. If backlit technology is used, backlight shall be greater than or equal to 1000 NITS (cd/m2).

3.5.5 All system displays shall be dimmable from 0 – 100 percent to prevent loss of night vision.

3.5.5.1 If backlit technology is used, backlit shall be mechanically dimmable to 0.5 NIT (cd/m2)

3.5.5.2 Dimming shall be accomplished through the use of tactile knobs or buttons.

3.5.6 The system shall display total distance travelled in nautical miles.

3.5.7 The settings for range scale and preset depth alarm shall be recognized in all light conditions.

3.5.8 The depth presentation shall display immediate depth and visible record of soundings.

3.5.9 Objective: The displayed record must show the most recent 15 minutes of soundings.

3.5.10 The depth display must have a day & night color selection.

3.5.11 The system shall conform to IEC 61023 (3rd edition, 2007) paragraph 4.2 methods of presentation for display guidance.

3.5.12 Physical Characteristics:

3.5.12.1 The master display unit shall be console mounted with the option for bulkhead mount.

3.5.12.2 Objective: The existing master display measures as per below. The master display unit shall not exceed measurements below:

Height: 273 mm (10.75 in) maximum

Width: 356 mm (14.0 in) maximum

Depth: 255 mm (10.0 in) maximum

Weight: 4.5 kg / (10 Lbs) maximum

3.5.13 Display Power Supply:

3.5.13.1 The display unit shall be capable of normal operation from Type I, 115VAC, 60Hz, ungrounded power source characteristics as defined in MIL-STD-1399, section 300B revision B 24 Apr 2008.

3.5.13.2 The display should be grounded with a case or chassis grounding stud.

3.5.13.3 Power consumption for the display shall be less than 100VA.

3.6 Electronics or Transceiver Unit

3.6.1 The vendor shall provide an electronics and/or transceiver unit.

3.6.2 Objective: The electronics/transceiver unit shall not exceed each dimension listed below:

Height: 380 mm (15.0 in) Maximum

Width: 455 mm (18.0 in) Maximum

Depth: 203 mm (8.0 in) Maximum

Weight: 15 kg (33 lbs) Maximum

3.6.3 Electronics Power Supply

3.6.3.1 The system shall be capable of normal operation from type I, 115VAC, 60Hz, ungrounded power source characteristics as defined in MIL-STD-1399, section 300B.

3.6.4 The system shall be chassis grounded with a metal stud.

3.6.5 Power consumption for the system shall be less than 100VA.

3.7 Transducer and Seachest Valve

3.7.1 The vendor shall provide replacement dual axis transducers to determine STW, SOG and depth.

3.7.2 Transducers shall be replaceable from the inside the ship while waterborne.

3.7.3 Transducers shall have a single gate valve per installation.

3.7.4 Objective: The transducer gate valve shall be of a compact designed to allow for installation onboard both small and large assets.

3.8 Interface Requirements

3.8.1 Data Exchanges

3.8.1.1 The DSL system shall accommodate isolated inputs and outputs as required by IEC 61162-1.

3.8.1.2 The DSL system shall be natively capable of IEC 61162-1 or IEC 61162-450. If speed log system is not natively capable of IEC 61162-1, then the vendor must provide necessary equipment to allow existing IEC 61162-1 devices to receive data.

3.8.1.3 The outputs shall be capable of variable output rate, ranging from 4800 to 38,400 baud.

3.8.1.4 The DSL system shall provide two independent serial output connection using IEC 61162-1 sentences that include at least the following messages: VLW, VBW, DPT.

3.8.1.5 All components of the system including the components that comprise the backbone (i.e. cables, T connectors, etc.) shall be IEC 61162-1 or IEC 61162-450 compliant.

3.9 Speed Measurement Performance

3.9.1 The system shall conform to IEC 61023:2007 paragraphs 4.3, 4.4 and 4.5 for minimum performance requirements.

3.9.2 Objective: 2hz update of speed data to external outputs.

3.9.3 The system shall update speed data (STW) at a minimum rate of 1hz.

3.9.4 The system shall update speed data (SOG) at a minimum rate of 1hz in depth when SOG can be determined.

3.9.5 The system shall update speed date (SOG) at minimum rate of 2 Hz in depths when SOG can be determined.

3.10 Depth measuring Performance

3.10.1 Range

3.10.1.1 System shall have selectable range scales with the capability of auto range function.

3.10.1.2 System shall display depth in 0-20 m and 0-200 m range scales.

3.10.1.3 Objective: System shall provide depth to 150 meters.

3.10.2 Shall provide data at a minimum rate of 1 Hz

3.10.3 System must meet minimum pulse repetition rates:

3.10.3.1 36 pulses per minute on shallow range (0-20m)

3.10.3.2 12 pulses per minute on deep range (0-200m)

3.10.4 System must meet the greater of the following tolerances:

3.10.4.1 +/- 0.5 m on 0-20m range scale

3.10.4.2 +/- 5m on 0-200m range scale

3.10.4.3 +/- 2.5% of indicated depth (any range scale)

3.10.5 Transducer offset

3.10.5.1 System shall have ability to enter transducer offset.

3.10.5.2 Transducer offset data entry shall be secured by a password protected menu or other method to prevent inadvertent change.

3.10.6 Alarms

3.10.6.1 System shall have user defined alarm thresholds for minimum and maximum depth.

3.10.6.2 System shall have audible alarms (silenced by acknowledgement) for alarm conditions (below defined minimum, above defined maximum)

3.10.6.3 System shall have visual alarms for alarm conditions (below defined minimum, above defined maximum).

3.11 Identification and Labeling

3.11.1 Equipment shall be identified and labeled as per attachment 2 packaging and marking instructions.

3.12 Data Requirements

3.12.1 Technical Data (TD): This section defines the requirements for the Vendor to provide TD necessary to integrate the Vendor’s equipment into the design of Coast Guard Cutters.

3.12.2 The Vendor’s TD must include the following per ship class:

3.12.2.1 A unique assembly part number, nomenclature, and original equipment manufacturer Commercial and Government Entity Code (CAGE) Code for each component of the system.

3.12.2.2 General arrangement drawings detailing overall dimensions; required maintenance area dimensions; locations, size and type of all mechanical, electrical, electronic, and other shipboard installation and operating interface requirements.

3.12.2.3 Documented overall component and system weight

3.12.2.4 Electrical schematic of each power and data circuit

3.12.2.5 Manual, technical publication, and/or catalogue data detailing the installation requirements for each piece of equipment

3.12.2.6 Operator’s Manual

3.12.2.7 Software Manual

3.12.2.8 Recommended preventative maintenance periodicity and procedures at the Operational (field) level

3.12.2.9 Technical Manuals/Publications must:

3.12.2.9.1 Completely describe the end item, end item’s equipment and/or piece parts as well as material, mechanical, electrical, dimensional characteristics, location, and their function within the assembly.

3.12.2.9.2 Include theory of operation, equipment and component set points and related technical information.

3.12.2.9.3 Include the following procedures to be carried out at the Operational (field) level:

disassembly, lay-up procedures, component repair and maintenance instructions, troubleshooting guide.

3.12.2.9.4 Include parts schematic/line diagrams, and complete drawings and diagrams.

3.12.2.9.5 Be in accordance with TS 086, SFLC Standards specification 0860 (Attachment 3).

3.13 Objective: Illustrated Parts Breakdown- Identify parts associated with the equipment. An exploded illustrated parts breakdown must show the location of the parts. The parts list must identify the piece part of the illustration, quantity installed, nomenclature, designation, original manufacturer and manufacturer’s part number. Part numbers are not required for common hardware available from multiple sources, if adequate descriptive data is provided. Parts data listed in the technical manual must be the same as listed on the hierarchical listing. If metric system components are provided, they must be so noted.

3.13.1.1 The system parts stock list per section 3.14

3.13.1.2 All special tools and test equipment required to maintain the end item.

3.13.1.3 A list of all software/licenses needed to accomplish diagnostic testing.

3.13.2 Data Submission Format: Drawings must be submitted as electronic media. Electronic media must be in AutoCAD and at least Version 2009 or later. Where electronic media is submitted, it must be with the manufacturer’s permission to use the data on Coast Guard drawings. Text files must be provided in MICROSOFT WORD. Spreadsheets must be provided in MICROSOFT EXCEL. Documentation supplied as electronic media must be one (1) copy.

3.13.3 Any changes to components or subassembly part numbers must be accompanied by all necessary version change documentation to the COR within 60 days of the component change. All TD requirements outlined in 3.12.2 must be met by the revised documentation.

3.14 Onboard Repair Parts Listing

3.14.1 To allow the Government the opportunity to procure Onboard Repair Parts for the Speed Log System, the Vendor must provide a recommended onboard repair parts (OBRP) list.

OBRP consist of all items required to conduct 1 year’s worth of OEM recommended maintenance that unit personnel can perform without additional special tools or technical support. Typical onboard spare parts include filters, bulbs, belts, and other general consumable items.

3.14.2 The Vendor must supply the following for each item in the OBRP list: the OEM part number, CAGE Code, part description, National Stock Numbers for parts already identified in the Federal Stock System, shelf life, special material/operating requirements, quantity, estimated retail cost.

3.15 System Stock Parts

3.15.1 The Vendor must provide a recommended system stock parts list spreadsheet. System stock parts are defined as material with delivery lead times over 45 days and manufacturer designated critical items. The system stock parts list must be provided after contract award and must include the OEM part number, CAGE Code, part description, National Stock Numbers for parts already identified in the Federal Stock System, shelf life, special material/operating requirements, quantity, individual part retail cost and complete list cost. The Government reserves the right to order part quantities less than or greater than the Vendor provided parts list.

3.16 Provisioning Quality Control

3.16.1 The Vendor is responsible for the completeness and accuracy of all items provided under this Contract. The Government reserves the right to implement provisioning quality control which may include, but not be limited to physical validation of installed components and equipments nameplate characteristics data against Vendor purchase orders, construction or equipment drawings, labels and markings of equipments or components validated.

4 QUALITY ASSURANCE

4.1 General

The Vendor must maintain an inspection system which must ensure that each item offered to the

Coast Guard for acceptance or approval conforms to the contract requirements. The inspection system must be documented and available for review by the Coast Guard upon request.

4.2 International Maritime Organization (IMO) testing

4.2.1 The vendor shall provide certification of International Maritime Organization (IMO) standards.

4.3 Responsibility for Compliance

The tests and inspections identified herein must become part of the Vendor’s overall inspection system or quality program. The absence of any test or inspection requirement in the Specification will not relieve the Vendor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.

=
1 SCOPE
1.1 Hardware, software and component items
1.1.1 One (1) display unit and associated equipment necessary to satisfy this specification
1.1.2 Electronics unit and or Transceiver Unit(s)
1.1.3 Transducer Unit
1.1.4 Gate Valve
1.1.5 Remote Display(s), depending on platform requirements
1.1.6 Operator and technical manuals associated with equipment
1.1.7 Technical Data
1.1.8 Detailed maintenance parts lists and a recommended sparing list for all component(s)
1.1.9 Installation cabling
2 APPLICABLE DOCUMENTS
2.1 Government Documents
2.1.1 Specifications, Military
2.1.1.1 MIL-DTL-15024F, Detail Specification: Plates, Tags and Bands for Identification of Equipment, General Specification for 1997
2.1.2 Standards, Military
2.1.2.1 MIL-STD-1399, Section 300B, Electric Power, Alternating Current
2.2 Other Government Documents
2.2.1 USCG Surface Forces Logistics Center (SFLC) Documents
2.2.1.1 D-084-0481 REV A, Preservation, Packaging, and Marking
2.2.1.2 D-086-0508, 2008, Technical Documentation Specifications
2.2.1.3 SFLC TS 0860, TS 086, SFLC Standards specification 086, Technical Publications (TP)
2.3 Commercial Documents
2.3.1 Marine Equipment Directive 96/98
2.3.2 American National Standards Institute (ANSI) / American Society of Quality Control (ASQC)
2.3.2.1 ANSI/ASQC 9001-2008, Quality Management Systems – Model for Quality Assurance in Design, Development, Production, Installation, and Servicing Requirements
2.3.3 International Electrotechnical Commission (IEC)
2.3.3.1 ANSI/ISO/IEC 61023: 2007, Marine speed and distance measuring equipment (SDME) – Performance requirements – Methods of testing and required test results
2.3.3.2 ANSI/ISO/IEC 60945: 2002, Maritime navigation and radio communication equipment and systems – General requirements – Methods of testing and required test results
2.3.3.3 ANSI/ISO/IEC 61162-1: 2010, Maritime navigation and radio communication equipment and systems – Digital interfaces – Part 1: Single talker and multiple listeners
2.3.3.4 ANSI/ISO/IEC 61162-450:2011, Maritime navigation and radio communication equipment and systems – Digital interfaces – Part 1: Single talker and multiple listeners
2.3.3.5 ANSI-Z1.4 -Sampling Procedures and Tables for Inspection by Attributes. (DoD adopted).
2.3.3.6 ANSI/ISO/IEC 61162-450 Maritime navigation and radio communication equipment and systems – Digital interfaces – Part 450: Multiple talkers and multiple listeners – Ethernet interconnection
2.3.4 National Conference of Standards Laboratories (NCSL)
2.3.4.1 ANSI/NCSL Z540.3-2006, Requirements for the Calibration of Measuring and Test Equipment
2.3.5 Society of Naval Architects and Marine Engineers (SNAME)
2.3.5.1 T&R Bulletin 3-47, Guide for Sea Trials
2.3.5.2 T&R Bulletin 3-39, Guide for Shop and Installation Tests
2.3.6 International Maritime Organization (IMO)
2.3.6.1 Resolution MSC.334 (90)
2.3.6.2 Resolution MSC.96 (72)
2.3.6.3 Resolution A.824 (19)
2.4 Order of Precedence
In the event of a conflict between the text of this Specification and the references cited herein, this Specification takes precedence. The Vendor must notify the Contracting Officer (KO) in writing for a resolution of any ambiguity or conflict found ...
3 REQUIREMENTS
3.1 General
3.1.1 The dual-axis speed log system shall consist of a master display unit, electronics or transceiver unit, dual-axis transducer assembly, sea chest valve, display adapter plate, mating connectors and any other hardware or software components to mak...
3.1.2 The DSL system shall use Doppler technology as the means to provide speed through the water. The speed log shall not utilize rotating or moving parts.
3.1.3 The DSL system shall be capable of measuring and displaying fore/aft and port/starboard SOG (Speed Over Ground), STW (Speed Through Water), distance traveled, and depth.
3.1.4 The Vendor shall provide a reliability prediction and service life with their proposal to ensure the design of the speed log system is adequate to meet USCG needs. The speed log reliability shall be presented in terms of Mean Time between Failu...
3.1.5 Compliance with specification requirements shall be supported with datasheets, catalog brochures, installation or operators manuals in the proposal.
3.1.6 Shall have selectable display for depth in feet, fathom or meters.
3.1.7 Shall have selectable display for speed in knots, meters per second or feet per second.
3.1.8 Vendor may provide any information not show by default on the master display on a vendor supplied external display, such as depth and soundings record.
3.2 Equipment Compliance
3.2.1 Objective: The DSL system shall be compliant with the Marine Equipment Directive 96/98 and labeled with the “Wheel Mark.” Certificate shall be submitted with proposal.
3.2.2 The DSL system shall comply with IMO Res. A.824 (19) as amended by Res. MSC.96 (72).
3.2.3 Objective: The DSL system shall comply with IMO Res. MSC.334 (90).
3.2.4 The DSL system components shall comply with IEC 60945.
3.2.5 The DSL system shall comply with at least the minimum performance, test methods and results of IEC 61023.
3.2.6 The DSL system shall comply with the IEC 61162-1 standard.
3.2.7 A declaration of conformity shall be submitted with proposal showing equipment compliances.
3.2.8 Display units shall meet IEC 60529 Ingress Protection (IP) 55.
3.3 System Performance Requirements
3.3.1 Speed Through the Water (STW). The system shall determine and display fore, aft, and athwart ships STW.
3.3.2 Speed Over Ground (SOG). The system shall determine and display fore, aft, and athwart ships SOG.
3.3.3 Objective: The system shall display nautical Miles traveled.
3.4 Environmental Characteristics
3.4.1 Operating environment
3.4.1.1 Seas: up to 2.5 to 4 meters, 8 ft 2 in to 13 ft 1, Sea State V.
3.4.1.2 Air Temperature: 5 (min) to 155 (max) degrees Fahrenheit
3.4.1.3 Pitch: +/- 5 degrees
3.4.1.4 Roll: +/- 10 degrees
3.4.2 Waterproof:
3.4.2.1 Display units shall meet IEC 60529 Ingress Protection (IP) 55.
3.5 Display Units
3.5.1 The vendor shall provide a master display unit.
3.5.2 The speed log system shall be capable of having remote display(s) to accommodate viewing data elsewhere on bridge.
3.5.3 All system displays shall be viewable while wearing glasses/sunglasses with polarized lenses.
3.5.4 All system displays must be viewable in direct sunlight. If backlit technology is used, backlight shall be greater than or equal to 1000 NITS (cd/m2).
3.5.5 All system displays shall be dimmable from 0 – 100 percent to prevent loss of night vision.
3.5.5.1 If backlit technology is used, backlit shall be mechanically dimmable to 0.5 NIT (cd/m2)
3.5.5.2 Dimming shall be accomplished through the use of tactile knobs or buttons.
3.5.6 The system shall display total distance travelled in nautical miles.
3.5.7 The settings for range scale and preset depth alarm shall be recognized in all light conditions.
3.5.8 The depth presentation shall display immediate depth and visible record of soundings.
3.5.9 Objective: The displayed record must show the most recent 15 minutes of soundings.
3.5.10 The depth display must have a day & night color selection.
3.5.11 The system shall conform to IEC 61023 (3rd edition, 2007) paragraph 4.2 methods of presentation for display guidance.
3.5.12 Physical Characteristics:
3.5.12.1 The master display unit shall be console mounted with the option for bulkhead mount.
3.5.12.2 Objective: The existing master display measures as per below. The master display unit shall not exceed measurements below:
3.5.13 Display Power Supply:
3.5.13.1 The display unit shall be capable of normal operation from Type I, 115VAC, 60Hz, ungrounded power source characteristics as defined in MIL-STD-1399, section 300B revision B 24 Apr 2008.
3.5.13.2 The display should be grounded with a case or chassis grounding stud.
3.5.13.3 Power consumption for the display shall be less than 100VA.
3.6 Electronics or Transceiver Unit
3.6.1 The vendor shall provide an electronics and/or transceiver unit.
3.6.2 Objective: The electronics/transceiver unit shall not exceed each dimension listed below:
3.6.3 Electronics Power Supply
3.6.3.1 The system shall be capable of normal operation from type I, 115VAC, 60Hz, ungrounded power source characteristics as defined in MIL-STD-1399, section 300B.
3.6.4 The system shall be chassis grounded with a metal stud.
3.6.5 Power consumption for the system shall be less than 100VA.
3.7 Transducer and Seachest Valve
3.7.1 The vendor shall provide replacement dual axis transducers to determine STW, SOG and depth.
3.7.2 Transducers shall be replaceable from the inside the ship while waterborne.
3.7.3 Transducers shall have a single gate valve per installation.
3.7.4 Objective: The transducer gate valve shall be of a compact designed to allow for installation onboard both small and large assets.
3.8 Interface Requirements
3.8.1 Data Exchanges
3.8.1.1 The DSL system shall accommodate isolated inputs and outputs as required by IEC 61162-1.
3.8.1.2 The DSL system shall be natively capable of IEC 61162-1 or IEC 61162-450. If speed log system is not natively capable of IEC 61162-1, then the vendor must provide necessary equipment to allow existing IEC 61162-1 devices to receive data.
3.8.1.3 The outputs shall be capable of variable output rate, ranging from 4800 to 38,400 baud.
3.8.1.4 The DSL system shall provide two independent serial output connection using IEC 61162-1 sentences that include at least the following messages: VLW, VBW, DPT.
3.8.1.5 All components of the system including the components that comprise the backbone (i.e. cables, T connectors, etc.) shall be IEC 61162-1 or IEC 61162-450 compliant.
3.9 Speed Measurement Performance
3.9.1 The system shall conform to IEC 61023:2007 paragraphs 4.3, 4.4 and 4.5 for minimum performance requirements.
3.9.2 Objective: 2hz update of speed data to external outputs.
3.9.3 The system shall update speed data (STW) at a minimum rate of 1hz.
3.9.4 The system shall update speed data (SOG) at a minimum rate of 1hz in depth when SOG can be determined.
3.9.5 The system shall update speed date (SOG) at minimum rate of 2 Hz in depths when SOG can be determined.
3.10 Depth measuring Performance
3.10.1 Range
3.10.1.1 System shall have selectable range scales with the capability of auto range function.
3.10.1.2 System shall display depth in 0-20 m and 0-200 m range scales.
3.10.1.3 Objective: System shall provide depth to 150 meters.
3.10.2 Shall provide data at a minimum rate of 1 Hz
3.10.3 System must meet minimum pulse repetition rates:
3.10.3.1 36 pulses per minute on shallow range (0-20m)
3.10.3.2 12 pulses per minute on deep range (0-200m)
3.10.4 System must meet the greater of the following tolerances:
3.10.4.1 +/- 0.5 m on 0-20m range scale
3.10.4.2 +/- 5m on 0-200m range scale
3.10.4.3 +/- 2.5% of indicated depth (any range scale)
3.10.5 Transducer offset
3.10.5.1 System shall have ability to enter transducer offset.
3.10.5.2 Transducer offset data entry shall be secured by a password protected menu or other method to prevent inadvertent change.
3.10.6 Alarms
3.10.6.1 System shall have user defined alarm thresholds for minimum and maximum depth.
3.10.6.2 System shall have audible alarms (silenced by acknowledgement) for alarm conditions (below defined minimum, above defined maximum)
3.10.6.3 System shall have visual alarms for alarm conditions (below defined minimum, above defined maximum).
3.11 Identification and Labeling
3.12 Data Requirements
3.12.1 Technical Data (TD): This section defines the requirements for the Vendor to provide TD necessary to integrate the Vendor’s equipment into the design of Coast Guard Cutters.
3.12.2 The Vendor’s TD must include the following per ship class:
3.12.2.1 A unique assembly part number, nomenclature, and original equipment manufacturer Commercial and Government Entity Code (CAGE) Code for each component of the system.
3.12.2.2 General arrangement drawings detailing overall dimensions; required maintenance area dimensions; locations, size and type of all mechanical, electrical, electronic, and other shipboard installation and operating interface requirements.
3.12.2.3 Documented overall component and system weight
3.12.2.4 Electrical schematic of each power and data circuit
3.12.2.5 Manual, technical publication, and/or catalogue data detailing the installation requirements for each piece of equipment
3.12.2.6 Operator’s Manual
3.12.2.7 Software Manual
3.12.2.8 Recommended preventative maintenance periodicity and procedures at the Operational (field) level
3.12.2.9 Technical Manuals/Publications must:
3.12.2.9.1 Completely describe the end item, end item’s equipment and/or piece parts as well as material, mechanical, electrical, dimensional characteristics, location, and their function within the assembly.
3.12.2.9.2 Include theory of operation, equipment and component set points and related technical information.
3.12.2.9.3 Include the following procedures to be carried out at the Operational (field) level: disassembly, lay-up procedures, component repair and maintenance instructions, troubleshooting guide.
3.12.2.9.4 Include parts schematic/line diagrams, and complete drawings and diagrams.
3.12.2.9.5 Be in accordance with TS 086, SFLC Standards specification 0860 (Attachment 3).
3.13 Objective: Illustrated Parts Breakdown- Identify parts associated with the equipment. An exploded illustrated parts breakdown must show the location of the parts. The parts list must identify the piece part of the illustration, quantity install...
3.13.1.1 The system parts stock list per section 3.14
3.13.1.2 All special tools and test equipment required to maintain the end item.
3.13.1.3 A list of all software/licenses needed to accomplish diagnostic testing.
3.13.2 Data Submission Format: Drawings must be submitted as electronic media. Electronic media must be in AutoCAD and at least Version 2009 or later. Where electronic media is submitted, it must be with the manufacturer’s permission to use the data...
3.13.3 Any changes to components or subassembly part numbers must be accompanied by all necessary version change documentation to the COR within 60 days of the component change. All TD requirements outlined in 3.12.2 must be met by the revised documen...
3.14 Onboard Repair Parts Listing
3.14.1 To allow the Government the opportunity to procure Onboard Repair Parts for the Speed Log System, the Vendor must provide a recommended onboard repair parts (OBRP) list. OBRP consist of all items required to conduct 1 year’s worth of OEM recom...
3.14.2 The Vendor must supply the following for each item in the OBRP list: the OEM part number, CAGE Code, part description, National Stock Numbers for parts already identified in the Federal Stock System, shelf life, special material/operating requi...
3.15 System Stock Parts
3.15.1 The Vendor must provide a recommended system stock parts list spreadsheet. System stock parts are defined as material with delivery lead times over 45 days and manufacturer designated critical items. The system stock parts list must be provid...
3.16 Provisioning Quality Control
3.16.1 The Vendor is responsible for the completeness and accuracy of all items provided under this Contract. The Government reserves the right to implement provisioning quality control which may include, but not be limited to physical validation of ...
4 QUALITY ASSURANCE
4.1 General
4.2 International Maritime Organization (IMO) testing
4.2.1 The vendor shall provide certification of International Maritime Organization (IMO) standards.
4.3 Responsibility for Compliance
The tests and inspections identified herein must become part of the Vendor’s overall inspection system or quality program. The absence of any test or inspection requirement in the Specification will not relieve the Vendor of the responsibility of as...