CRANE Q A_s.pdf

PDF 19 KB Posted

Attached to
FOLDING BOOM CRANES WITH HYDRAULIC POWER UNITS AND CONTROL STATIONS
Solicitation number
HSCG40-12-R-30011
Issued by

View the file

Other files

File Type Posted
Q A 2.doc DOC document
Attachment 1 Crane Spec.doc DOC document
750-WMSL_583_1_1_-_B1.dwf DWF file
6212_85_A.pdf PDF
SF1449 HSCG40-12-R-30011 Crane.pdf PDF
Attachment 2 CLIN Listing Folding Boom Cranes.doc DOC document
Attachment 3 D-084-0481_Equipment_Unit_Preservation_Packaging_and_Marking_042012.doc DOC document
Attachment 1 Crane Spec.doc DOC document
CRANE SOLICITATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers to CRANE Solicitation-HSCG40-12-R-30011

Q: We are evaluating the HSCG40-12-R-30011 Folding Boom Crane RFP and need the following USCG documents identified in P-583-0627 Page 6:

- elc-d-083-0351

- elc-d-086-0483

- USCG Tech Pub 7443 A: See attachment

Q: CLIN 0002 on Attachment 2 requires a Maintenance Analysis IAW Section 3.7.5 of the specification. That section of the spec deals with the technical publication.

Referenced ELC Spec D-086-0483 for technical manuals makes mention of what preventive maintenance is to be included the technical manual, but does not refer to a maintenance analysis.

Question:

Exactly what type of maintenance analysis is the Coast Guard looking for?

Maintenance Procedure Cards? A Reliability Centered Maintenance Analysis?

Something else?

A: CLIN 0002 is a Government Optional CLIN and as such is priced separately. In CLIN 0002, we request a complete RCM Analysis of the proposed Units with all recommended maintenance required.

File details come from the government source that posted it. Updated .