Attachment 2 CLIN Listing Folding Boom Cranes.doc

DOC document 140 KB Posted

Attached to
FOLDING BOOM CRANES WITH HYDRAULIC POWER UNITS AND CONTROL STATIONS
Solicitation number
HSCG40-12-R-30011
Issued by

About this file

Attachment 2-CLIN Listing

View the file

Other files

File Type Posted
Q A 2.doc DOC document
Attachment 1 Crane Spec.doc DOC document
CRANE Q A_s.pdf PDF
750-WMSL_583_1_1_-_B1.dwf DWF file
6212_85_A.pdf PDF
SF1449 HSCG40-12-R-30011 Crane.pdf PDF
Attachment 3 D-084-0481_Equipment_Unit_Preservation_Packaging_and_Marking_042012.doc DOC document
Attachment 1 Crane Spec.doc DOC document
CRANE SOLICITATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

FOLDING BOOM CRANE HSCG40-12-R-30011

SCHEDULE OF SUPPLIES/SERVICES/DELIVERY

BASE YEAR

CLIN 0001 TRAINING PLANS, FOR APPROVAL. The Contractor shall provide a training plan, including training materials, for approval in accordance with Section 3.8 of Specification

Number P-583-0627, dated 03/14/12 (Attachment 1).

1 Each @ $____________ = $_______________

Delivery Schedule – 180 days after Delivery Order

CLIN 0002 MAINTENANCE ANALYSIS. Contractor shall provide a complete Maintenance Analysis of all required Scheduled and Maintenance conducted on the Cranes and its support equipment as required in accordance with Section 3.7.5 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

1 Each @ $____________ = $_______________ Delivery Schedule – 120 days after Delivery Order

CLIN 0003 DESIGN AND INTERFACE REPORT Contractor shall provide a complete Design and Interface report as required in accordance with Section 3.7.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1)

Required = Not Separately Priced Delivery Schedule – 90 days after Delivery Order

CLIN 0004 FIRST ARTICLE TESTING Contractor shall provide First Article Testing in accordance with Section 4.2.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1)

* Assumes CLIN 0003 already approved

Delivery Schedule – 240 days after Delivery Order

CLIN 0005 FIRST ARTICLE TESTING REPORT. Contractor shall provide First Article Testing Report in accordance with Section 4.2.1 and 4.2.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1). This report can be e-mailed to the COTR. COTR is Mr. Tim Robinson at timothy.m.robinson@uscg.mil

Delivery Schedule – within 30 days of CLIN 0004

CLIN 0006 LICENSED SOFTWARE. The Contractor shall provide a licensed copy of the software for programmable hardware sufficient for the government to reconstruct or recompile the equipment operating instructions for operation and to make adjustments to parameters and settings in accordance with Section 3.7.6.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1). Licensed software shall be mailed to the COTR Mr. Tim Robinson at the United States Coast Guard Surface Forces Logistics Center, Baltimore, MD 21226

CLIN 0007 DRAWINGS. The Contractor shall provide Drawings in accordance with Section 3.7.7 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0008 CALCULATIONS. The Contractor shall provide calculations in accordance with Section 3.7.8 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Order – within 30 days of calculation determination

CLIN 0009 ON BOARD SPARE PARTS RECOMMENDATION. The contractor shall identify manufacturer’s onboard spare parts list in accordance with Section 3.7.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Est. 1 Each @ $__________ = $__________

CLIN 0010 TECHNICAL PUBLICATION DRAFTS (with revisions). The Contractor shall provide Technical Publications in accordance with Section 3.7.5 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

Delivery Schedule Draft – 180 days after Delivery order

CLIN 0011 WARRANTY. The Contractor shall provide its company warranty in accordance with Section 3.9.1 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

Delivery Schedule Draft – within 10 days after Delivery order

CLIN 0012 Warranty Response. The Contractor shall provide technical support for warranty investigation and corrective actions in accordance with Section 3.9 of Specification P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – As required

NOTE: CLIN 0001 through CLIN 0012 are required for the base year only!

CLIN 0013 TECHNICAL PUBLICATION FINAL. The Contractor shall provide Technical Publications in accordance with Section 3.7.5 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

Delivery Schedule Final – 21 days after Approval of CLIN 0010 CLIN 0014 AFT BOAT HANDLING SYSTEM. Aft Boat Handling System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0015 DATA FOR PROVISIONING. The Contractor shall provide data for Provisioning for Crane components in accordance with Section 3.7.3 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

Delivery Schedule – 150 days after Delivery Order CLIN 0016 ON BOARD SPARE PARTS KIT. Spare parts kit shall be packaged with each Crane Set per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0017 Technical Representative Qualifications Report. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

Est. Each @ $_____________ = $___________

Delivery Schedule – As Required CLIN 0018 Technical Representative Day Rate Price Proposal. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

Delivery Schedule – Once CLIN 0019 Non Warranty Technical Support - Base Year. The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

LOADED LABOR RATE - STRAIGHT TIME: ____________________

LOADED LABOR RATE - OVERTIME: _______________________

Delivery Schedule – within 72 hours of Casualty

Delivery Schedule – at least 14days of routine scheduled Support Services

CLIN 0020 Commissioning Services. The Contractor may be requested to provide Commissioning services in accordance with Section 4.2.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – Upon completion of Installation CLIN 0021 TRAINING SERVICES (INPORT). The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

Est. 1 Jobs @ $__________ = $__________

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 0022 TRAINING SERVICES (UNDERWAY). The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 0023 PRESERVATION, MARKING, PACKING AND STORAGE. Aft Boat Handling System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – As required for Delivery CLIN 0024 OPERATION SOFTWARE UPGRADES. The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the boat crane for each crane delivered in accordance with Section 3.7.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – 21 days after Software Approval CLIN 0025 QUALITY ASSURANCE PLAN. The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – 30 days after Delivery Order CLIN 0026 INSPECTION AND TEST REPORTS (ON-SITE RECORDS). The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0027 ABS STATEMENT OF FACT. The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – within 30 days of ABS Certification CLIN 0028 CALIBRATION RECORDS. The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0029 UPDATED TEST PLAN (prior to testing). The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0030 OBJECTIVE BOAT HANDLING DEVICES (SS3 STBD). The contractor may be required to provide objective boat handling devices in accordance with Section 3.1.4.4 and 3.3.9 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Est. 1 Each @ $___________ = $___________ CLIN 0031 DEPOT LEVEL REPAIR PARTS. The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0032 PRODUCTION TEST REPORT. The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0033 CARGO CONTAINER. If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

FIRST OPTION YEAR

CLIN 1013 TECHNICAL PUBLICATION (with revisions). The Contractor shall provide Technical Publications revisions in accordance with Section 3.7.5 of Specification P-583-0627, dated 03/14/12 (Attachment 1). If no changes required; the Contractor shall provide statement stating no revisions from original Technical Publication

CLIN 1014 AFT BOAT HANDLING SYSTEM. Aft Boat Handling System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1015 DATA FOR PROVISIONING. The Contractor shall provide data for Provisioning for Crane components in accordance with Section 3.7.3 of Specification P-583-627, dated 03/14/12 (Attachment 1)

CLIN 1016 ON BOARD SPARE PARTS KIT. Spare parts kit shall be packaged with each Crane Set per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1017 Technical Representative Qualifications Report. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

CLIN 1018 Technical Representative Day Rate Price Proposal. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

CLIN 1019 Non Warranty Technical Support - Base Year. The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

Delivery Schedule – at least 14days of routine scheduled Support Services

CLIN 1020 Commissioning Services. The Contractor may be requested to provide Commissioning services in accordance with Section 4.2.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1021 TRAINING SERVICES (INPORT). The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 1022 TRAINING SERVICES (UNDERWAY). The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 1023 PRESERVATION, MARKING, PACKING AND STORAGE. Aft Boat Handling System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1024 OPERATION SOFTWARE UPGRADES. The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the boat crane for each crane delivered in accordance with Section 3.7.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1025 QUALITY ASSURANCE PLAN. The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1026 INSPECTION AND TEST REPORTS (ON-SITE RECORDS). The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1027 ABS STATEMENT OF FACT. The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1028 CALIBRATION RECORDS. The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1029 UPDATED TEST PLAN (prior to testing). The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1030 OBJECTIVE BOAT HANDLING DEVICES (SS3 STBD). The contractor may be required to provide objective boat handling devices in accordance with Section 3.1.4.4 and 3.3.9 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1031 DEPOT LEVEL REPAIR PARTS. The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 1032 PRODUCTION TEST REPORT. The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0133 CARGO CONTAINER. If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – 30 days prior to the delivery of CLIN 0014

SECOND OPTION YEAR

CLIN 2013 TECHNICAL PUBLICATION (with revisions). The Contractor shall provide Technical Publications revisions in accordance with Section 3.7.5 of Specification P-583-0627, dated 03/14/12 (Attachment 1). If no changes required; the Contractor shall provide statement stating no revisions from original Technical Publication

CLIN 2014 AFT BOAT HANDLING SYSTEM. Aft Boat Handling System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2015 DATA FOR PROVISIONING. The Contractor shall provide data for Provisioning for Crane components in accordance with Section 3.7.3 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

CLIN 2016 ON BOARD SPARE PARTS KIT. Spare parts kit shall be packaged with each Crane Set per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2017 Technical Representative Qualifications Report. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

CLIN 2018 Technical Representative Day Rate Price Proposal. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

CLIN 2019 Non Warranty Technical Support - Base Year. The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

Delivery Schedule – at least 14days of routine scheduled Support Services

CLIN 2020 Commissioning Services. The Contractor may be requested to provide Commissioning services in accordance with Section 4.2.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2021 TRAINING SERVICES (INPORT). The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 2022 TRAINING SERVICES (UNDERWAY). The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 2023 PRESERVATION, MARKING, PACKING AND STORAGE. Aft Boat Handling System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2024 OPERATION SOFTWARE UPGRADES. The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the boat crane for each crane delivered in accordance with Section 3.7.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2025 QUALITY ASSURANCE PLAN. The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2026 INSPECTION AND TEST REPORTS (ON-SITE RECORDS). The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2027 ABS STATEMENT OF FACT. The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 0228 CALIBRATION RECORDS. The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2029 UPDATED TEST PLAN (prior to testing). The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2030OBJECTIVE BOAT HANDLING DEVICES (SS3 STBD). The contractor may be required to provide objective boat handling devices in accordance with Section 3.1.4.4 and 3.3.9 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – Delivered with CLIN 0214 CLIN 2031 DEPOT LEVEL REPAIR PARTS. The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2032 PRODUCTION TEST REPORT. The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 2033 CARGO CONTAINER. If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

THIRD OPTION YEAR

CLIN 3013 TECHNICAL PUBLICATION (with revisions). The Contractor shall provide Technical Publications revisions in accordance with Section 3.7.5 of Specification P-583-0627, dated 03/14/12 (Attachment 1). If no changes required; the Contractor shall provide statement stating no revisions from original Technical Publication

CLIN 3014 AFT BOAT HANDLING SYSTEM. Aft Boat Handling System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3015 DATA FOR PROVISIONING. The Contractor shall provide data for Provisioning for Crane components in accordance with Section 3.7.3 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

CLIN 3016 ON BOARD SPARE PARTS KIT. Spare parts kit shall be packaged with each Crane Set per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3017 Technical Representative Qualifications Report. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

CLIN 3018 Technical Representative Day Rate Price Proposal. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

CLIN 3019 Non Warranty Technical Support - Base Year. The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

Delivery Schedule – at least 14days of routine scheduled Support Services

CLIN 3020 Commissioning Services. The Contractor may be requested to provide Commissioning services in accordance with Section 4.2.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3021 TRAINING SERVICES (INPORT). The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 3022 TRAINING SERVICES (UNDERWAY). The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 3023 PRESERVATION, MARKING, PACKING AND STORAGE. Aft Boat Handling System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3024 OPERATION SOFTWARE UPGRADES. The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the boat crane for each crane delivered in accordance with Section 3.7.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3025 QUALITY ASSURANCE PLAN. The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3026 INSPECTION AND TEST REPORTS (ON-SITE RECORDS). The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3027 ABS STATEMENT OF FACT. The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3028 CALIBRATION RECORDS. The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3029 UPDATED TEST PLAN (prior to testing). The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3030 OBJECTIVE BOAT HANDLING DEVICES (SS3 STBD). The contractor may be required to provide objective boat handling devices in accordance with Section 3.1.4.4 and 3.3.9 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – Delivery with CLIN 0314 CLIN 3031 DEPOT LEVEL REPAIR PARTS. The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3032 PRODUCTION TEST REPORT. The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 3033 CARGO CONTAINER. If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

FOURTH OPTION YEAR

CLIN 4013 TECHNICAL PUBLICATION (with revisions). The Contractor shall provide Technical Publications revisions in accordance with Section 3.7.5 of Specification P-583-0627, dated 03/14/12 (Attachment 1). If no changes required; the Contractor shall provide statement stating no revisions from original Technical Publication

CLIN 4014 AFT BOAT HANDLING SYSTEM. Aft Boat Handling System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4015 DATA FOR PROVISIONING. The Contractor shall provide data for Provisioning for Crane components in accordance with Section 3.7.3 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

CLIN 4016 ON BOARD SPARE PARTS KIT. Spare parts kit shall be packaged with each Crane Set per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4017 Technical Representative Qualifications Report. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

CLIN 4018 Technical Representative Day Rate Price Proposal. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

CLIN 4019 Non Warranty Technical Support - Base Year. The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1)

Delivery Schedule – at least 14days of routine scheduled Support Services

CLIN 4020 Commissioning Services. The Contractor may be requested to provide Commissioning services in accordance with Section 4.2.4 of Specification P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4021 TRAINING SERVICES (INPORT). The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 4022 TRAINING SERVICES (UNDERWAY). The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0627, dated 03/14/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN4023 PRESERVATION, MARKING, PACKING AND STORAGE. Aft Boat Handling System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4024 OPERATION SOFTWARE UPGRADES. The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the boat crane for each crane delivered in accordance with Section 3.7.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4025 QUALITY ASSURANCE PLAN. The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4026 INSPECTION AND TEST REPORTS (ON-SITE RECORDS). The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4027 ABS STATEMENT OF FACT. The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4028 CALIBRATION RECORDS. The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4029 UPDATED TEST PLAN (prior to testing). The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN4030OBJECTIVE BOAT HANDLING DEVICES (SS3 STBD). The contractor may be required to provide objective boat handling devices in accordance with Section .3.1.4.4 and 3.3.9 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

Delivery Schedule – Delivered with CLIN 0414 CLIN 4031 DEPOT LEVEL REPAIR PARTS. The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4032 PRODUCTION TEST REPORT. The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

CLIN 4033 CARGO CONTAINER. If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0627, dated 03/14/12 (Attachment 1).

File details come from the government source that posted it. Updated .