Attachment 2 DAVIT CLIN.doc

DOC document 112 KB Posted

Attached to
DUAL POINT DAVIT
Solicitation number
HSCG40-12-R-30010
Issued by

About this file

Attachment 2 CLIN-HSCG40-12-R-30010

View the file

Other files

File Type Posted
DAVIT Q A's.pdf PDF
Drawings.zip ZIP file
Attachment 1 DAVIT SPEC.pdf PDF
DAVIT SOLICITATION-4 20 12.pdf PDF
Attachment 3 D-084-0481_Equipment_Unit_Preservation_Packaging_and_Marking_042012.doc DOC document
Attachment 1 DAVIT SPEC.pdf PDF
DAVIT SOLICITATION-4 12 12.pdf PDF
SF1449 HSCG40-12-R-30010 Davit.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

HSCG40-12-R-30010

SCHEDULE OF SUPPLIES/SERVICES

BASE YEAR

CLIN 0001 TRAINING PLANS, FOR APPROVAL. The Contractor shall provide a training plan, including training materials, for approval in accordance with Section 3.8 of Specification

Number P-583-0628, dated 03/16/12 (Attachment 1).

1 Each @ $____________ = $_______________

Delivery Schedule – 180 days after Delivery Order

CLIN 0002 DESIGN AND INTERFACE REPORT Contractor shall provide a complete Design and Interface report as required in accordance with Section 3.7.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Required = Not Separately Priced

Delivery Schedule – 90 days after Delivery Order

CLIN 0003 FIRST ARTICLE TESTING Contractor shall provide First Article Testing in accordance with Section 4.2.2 and 4.2.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

* Assumes CLIN 0003 already approved

Delivery Schedule – 240 days after Delivery Order

CLIN 0004 FIRST ARTICLE TESTING REPORT Contractor shall provide First Article Testing Report in accordance with Section 4.2.1, 4.2.2 and 4.2.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1). This report can be e-mailed to the COTR. COTR is Mr. Tim Robinson at timothy.m.robinson@uscg.mil

Delivery Schedule – within 30 days of CLIN 0004 CLIN 0005 LICENSED SOFTWARE The Contractor shall provide a licensed copy of the software for programmable hardware sufficient for the government to reconstruct or recompile the equipment operating instructions for operation and to make adjustments to parameters and settings in accordance with Section 3.7.6.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1). Licensed software shall be mailed to the COTR Mr. Tim Robinson at the United States Coast Guard Surface Forces Logistics Center, Baltimore, MD 21226

CLIN 0006 DRAWINGS The Contractor shall provide Drawings in accordance with Section 3.7.7 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 0007 CALCULATIONS The Contractor shall provide calculations in accordance with Section 3.3.14 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Order – within 30 days of calculation determination

CLIN 0008 ON BOARD SPARE PARTS RECOMMENDATION The contractor shall identify manufacturer’s onboard spare parts list in accordance with Section 3.7.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 0009 TECHNICAL PUBLICATION DRAFTS (with revisions) The Contractor shall provide Technical Publications in accordance with Section 3.7.5 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

Delivery Schedule Draft – 180 days after Delivery order

CLIN 0010 WARRANTY The Contractor shall provide the Original Equipment Manufacturer Standard warranty in accordance with Section 3.9.1 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

Standard Warranty Required = Not Separately Priced

Non- Standard Warranty = Est. 1 Year @ $__________ = $__________ Delivery Schedule Draft – within 10 days after Delivery order

CLIN 0011 Warranty Response The Contractor shall provide technical support for warranty investigation and corrective actions in accordance with Section 3.9 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – As required CLIN 0012 DATA FOR PROVISIONING The Contractor shall provide data for Provisioning for Davit components in accordance with Section 3.7.3 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

Delivery Schedule – 150 days after Delivery Order

CLIN 0013 TECHNICAL PUBLICATION FINAL The Contractor shall provide Technical Publications in accordance with Section 3.7.5 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

Delivery Schedule Final – Concurrent with CLIN 0014 CLIN 0014 DUAL POINT DAVIT SYSTEM including DAVIT, CONTROLS, HYDRAULICS and PAINTER BOOM SYSTEM Dual Point Davit System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Est. 1 Each @ $__________ = $__________

CLIN 0015 ON BOARD SPARE PARTS KIT Spare parts kit shall be packaged with each Davit System per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Spare Parts Place keeper. Spare Part price will be based on Data for Provisioning

CLIN 0016 Technical Representative Qualifications ReporT The Contractor shall provide a list of warranted Technical Support Services Representatives in accordance with Section 3.9.2 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

Est. Each @ $_____________ = $___________

Delivery Schedule – As Required

CLIN 0017 Technical Representative Day Rate Price Proposal The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

Delivery Schedule – Once CLIN 0018 Non Warranty Technical Support - Base Year The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

LOADED LABOR RATE - STRAIGHT TIME: ____________________

LOADED LABOR RATE - OVERTIME: _______________________

Delivery Schedule – within 72 hours of Casualty

Delivery Schedule – at least 14days of routine scheduled Support Services

CLIN 0019 Commissioning Services. The Contractor may be requested to provide Commissioning services in accordance with Section 3.9.6 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – Upon completion of Installation

CLIN 0020 TRAINING SERVICES (INPORT). The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

Est. 1 Jobs @ $__________ = $__________

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 0021 TRAINING SERVICES (UNDERWAY). The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 0022 PRESERVATION, MARKING, PACKING AND STORAGE. Dual Point Davit System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – As required for Delivery CLIN 0023 OPERATION SOFTWARE UPGRADES. The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the boat Davit for each Davit delivered in accordance with Section 3.7.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 0024 QUALITY ASSURANCE PLAN. The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – 30 days after Delivery Order

CLIN 0025 INSPECTION AND TEST REPORTS (ON-SITE RECORDS). The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – A copy of all test reports shall be electronically forwarded to the Contracting Officers Technical Representative within 7 days of being issued.

CLIN 0026 ABS STATEMENT OF FACT. The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – within 30 days of ABS Certification

CLIN 0027 CALIBRATION RECORDS. The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 0028 UPDATED TEST PLAN (prior to testing). The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 0029 DEPOT LEVEL REPAIR PARTS. The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Est. 1 Each @ $___________ = $___________

CLIN 0030 PRODUCTION TEST REPORT. The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 0031 CARGO CONTAINER. If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 5.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

FIRST OPTION YEAR

CLIN 1001 TECHNICAL DATA UPDATES The first Dual Point Davit System delivered shall establish a configuration model. The Contractor shall provide Data for Provisioning, Spare Parts recommendations and pricing, Technical Publication updates, Revised Drawings, Software back-up files, and all other technical necessary technical data changes for all subsequent changes to the configuration model

CLIN 1010 WARRANTY The Contractor shall provide the Original Equipment Manufacturer Standard warranty in accordance with Section 3.9.1 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

CLIN 1011 Warranty Response The Contractor shall provide technical support for warranty investigation and corrective actions in accordance with Section 3.9 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1014 DUAL POINT DAVIT SYSTEM including DAVIT, CONTROLS, HYDRAULICS and PAINTER BOOM SYSTEM Dual Point Davit System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1015 ON BOARD SPARE PARTS KIT Spare parts kit shall be packaged with each Davit System per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1016 Technical Representative Qualifications Report The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

CLIN 1017 Technical Representative Day Rate Price Proposal The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

CLIN 1018 Non Warranty Technical Support - Base Year The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

Delivery Schedule – at least 14 days of routine scheduled Support Services

CLIN 1019 Commissioning Services The Contractor may be requested to provide Commissioning services in accordance with Section 4.2.4 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1020 TRAINING SERVICES (INPORT) The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 1021 TRAINING SERVICES (UNDERWAY) The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 1022 PRESERVATION, MARKING, PACKING AND STORAGE Dual Point Davit System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1023 OPERATION SOFTWARE UPGRADES The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the davit for each davit delivered in accordance with Section 3.7.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – 21 days after Software Approval CLIN 1024 QUALITY ASSURANCE PLAN The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1025 INSPECTION AND TEST REPORTS (ON-SITE RECORDS) The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1026 ABS STATEMENT OF FACT The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1027 CALIBRATION RECORDS The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1028 UPDATED TEST PLAN (prior to testing) The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1029 DEPOT LEVEL REPAIR PARTS The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1030 PRODUCTION TEST REPORT The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 1031 CARGO CONTAINER If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – 30 days prior to the delivery of CLIN 1014

SECOND OPTION YEAR

CLIN 2001 TECHNICAL DATA UPDATES The first Dual Point Davit System delivered shall establish a configuration model. The Contractor shall provide Data for Provisioning, Spare Parts recommendations and pricing, Technical Publication updates, Revised Drawings, Software back-up files, and all other technical necessary technical data changes for all subsequent changes to the configuration model

CLIN 2010 WARRANTY. The Contractor shall provide the Original Equipment Manufacturer Standard warranty in accordance with Section 3.9.1 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

CLIN 2011 Warranty Response The Contractor shall provide technical support for warranty investigation and corrective actions in accordance with Section 3.9 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2014 DUAL POINT DAVIT SYSTEM including DAVIT, CONTROLS, HYDRAULICS and PAINTER BOOM SYSTEM Dual Point Davit System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2015 ON BOARD SPARE PARTS KIT Spare parts kit shall be packaged with each Davit System per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2016 Technical Representative Qualifications Report The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

CLIN 2017 Technical Representative Day Rate Price Proposal The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

CLIN 2018 Non Warranty Technical Support - Base Year The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

Delivery Schedule – at least 14 days of routine scheduled Support Services

CLIN 2019 Commissioning Services. The Contractor may be requested to provide Commissioning services in accordance with Section 4.2.4 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2020 TRAINING SERVICES (INPORT). The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 2021 TRAINING SERVICES (UNDERWAY). The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 2022 PRESERVATION, MARKING, PACKING AND STORAGE. Dual Point Davit System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2023 OPERATION SOFTWARE UPGRADES. The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the davit for each davit delivered in accordance with Section 3.7.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2024 QUALITY ASSURANCE PLAN. The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2025 INSPECTION AND TEST REPORTS (ON-SITE RECORDS) The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2026 ABS STATEMENT OF FACT The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2027 CALIBRATION RECORDS The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2028 UPDATED TEST PLAN (prior to testing) The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2029 DEPOT LEVEL REPAIR PARTS The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2030 PRODUCTION TEST REPORT The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 2031 CARGO CONTAINER If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – 30 days prior to the delivery of CLIN 2014

THIRD OPTION YEAR

CLIN 3001 TECHNICAL DATA UPDATES. The first Dual Point Davit System delivered shall establish a configuration model. The Contractor shall provide Data for Provisioning, Spare Parts recommendations and pricing, Technical Publication updates, Revised Drawings, Software back-up files, and all other technical necessary technical data changes for all subsequent changes to the configuration model

CLIN 3010 WARRANTY The Contractor shall provide the Original Equipment Manufacturer Standard warranty in accordance with Section 3.9.1 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

CLIN 3011 Warranty Response The Contractor shall provide technical support for warranty investigation and corrective actions in accordance with Section 3.9 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3014 DUAL POINT DAVIT SYSTEM including DAVIT, CONTROLS, HYDRAULICS and PAINTER BOOM SYSTEM Dual Point Davit System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3015 ON BOARD SPARE PARTS KIT Spare parts kit shall be packaged with each Davit System per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3016 Technical Representative Qualifications Report The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

CLIN 3017 Technical Representative Day Rate Price Proposal. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

CLIN 3018 Non Warranty Technical Support - Base Year. The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

Delivery Schedule – at least 14 days of routine scheduled Support Services

CLIN 3019 Commissioning Services. The Contractor may be requested to provide Commissioning services in accordance with Section 4.2.4 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3020 TRAINING SERVICES (INPORT) The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 3021 TRAINING SERVICES (UNDERWAY) The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 3022 PRESERVATION, MARKING, PACKING AND STORAGE Dual Point Davit System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3023 OPERATION SOFTWARE UPGRADES The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the davit for each davit delivered in accordance with Section 3.7.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3024 QUALITY ASSURANCE PLAN The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3025 INSPECTION AND TEST REPORTS (ON-SITE RECORDS) The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3026 ABS STATEMENT OF FACT The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3027 CALIBRATION RECORDS The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3028 UPDATED TEST PLAN (prior to testing) The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3029 DEPOT LEVEL REPAIR PARTS The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3030 PRODUCTION TEST REPORT The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 3031 CARGO CONTAINER If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – 30 days prior to the delivery of CLIN 3014

FOURTH OPTION YEAR

CLIN 4001 TECHNICAL DATA UPDATES The first Dual Point Davit System delivered shall establish a configuration model. The Contractor shall provide Data for Provisioning, Spare Parts recommendations and pricing, Technical Publication updates, Revised Drawings, Software back-up files, and all other technical necessary technical data changes for all subsequent changes to the configuration model

CLIN 4010 WARRANTY The Contractor shall provide the Original Equipment Manufacturer Standard warranty in accordance with Section 3.9.1 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

CLIN 4011 Warranty Response The Contractor shall provide technical support for warranty investigation and corrective actions in accordance with Section 3.9 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4014 DUAL POINT DAVIT SYSTEM including DAVIT, CONTROLS, HYDRAULICS and PAINTER BOOM SYSTEM Dual Point Davit System, Part Number shall be manufactured, tested, inspected, preserved, packaged, marked and delivered in accordance with Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4015 ON BOARD SPARE PARTS KIT Spare parts kit shall be packaged with each Davit System per asset under this contract in accordance with Section 3.7.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4016 Technical Representative Qualifications Report. The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

CLIN 4017 Technical Representative Day Rate Price Proposal The Contractor shall provide Technical Support Services as listed below in accordance with Section 3.9.2 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

FLAT RATE PER DAY: __________________________

CLIN 4018 Non Warranty Technical Support - Base Year The Contractor may be requested to provide non-warranty support services in accordance with Section 3.9.4 of Specification P-583-0628, dated 03/16/12 (Attachment 1)

Delivery Schedule – at least 14 days of routine scheduled Support Services

CLIN 4019 Commissioning Services The Contractor may be requested to provide Commissioning services in accordance with Section 4.2.4 of Specification P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4020 TRAINING SERVICES (INPORT) The Contractor may be requested to provide Pier Side Operational and Maintenance Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 4021 TRAINING SERVICES (UNDERWAY) The Contractor may be requested to provide Underway Operational Training Services in accordance with Section 3.8 of Specification P-583-0628, dated 03/16/12 (Attachment 1). A qualified Technical Representative shall conduct an onboard training course in accordance with an approved Training Plan (CLIN 0001) for all the ship’s crew members involved in boat lowering. Training will take place while the cutter is underway and involve actual lowering and raising of the boat. Ships' personnel is estimated at 10 people. Student Guides and other course materials shall be provided by the Contractor. Training is estimated at two (2) days.

· The costs for transportation, lodging, meals and incidental expenses incurred by the contractors personnel while performing underway training under the resultant contract shall be reimbursed in accordance with Federal Acquisition Regulation Subpart 31.205-46 and OGA Official Travel Guide (NOTE: Per Diem Rate shall be provided at the time training is requested).

CLIN 4022 PRESERVATION, MARKING, PACKING AND STORAGE Dual Point Davit System shall be preserved, packaged, and marked in accordance with Section 5 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4023 OPERATION SOFTWARE UPGRADES The Contractor shall provide a backup version of any software for operation of any/all programmable hardware on the davit for each davit delivered in accordance with Section 3.7.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4024 QUALITY ASSURANCE PLAN The Contractor shall maintain an inspection system which shall insure each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with Section 4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4025 INSPECTION AND TEST REPORTS (ON-SITE RECORDS) The Contractor shall maintain records of all inspections and test in accordance with Section 4.1.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4026 ABS STATEMENT OF FACT The Contractor shall provide a statement of fact in accordance with Section 3.1.6 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4027 CALIBRATION RECORDS The Contractor, as well as any subcontractors, shall be required to maintain a test calibration program in accordance with Section 4.1.4 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4028 UPDATED TEST PLAN (prior to testing) The Contractor shall provide an updated test plan prior to testing in accordance with Section 3.7.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4029 DEPOT LEVEL REPAIR PARTS The government will have an option to execute Depot Level Repair Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4030 PRODUCTION TEST REPORT The contractor shall provide production test report in accordance with Section 4.2.3 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

CLIN 4031 CARGO CONTAINER If an ISO Freight Container is required, the contractor shall may be required provide Parts in accordance with Section 3.7.4.2 of Specification Number P-583-0628, dated 03/16/12 (Attachment 1).

Delivery Schedule – 30 days prior to the delivery of CLIN 4014

File details come from the government source that posted it. Updated .