R-245-0155-Hub Spec.pdf

PDF 179 KB Posted

Attached to
Escher Wyss Hub Repair
Solicitation number
HSCG40-10-Q-30088
Issued by

View the file

Other files

File Type Posted
HSCG40-10-R-30088 Section B.xlsx XLSX spreadsheet
AMEND 0002.docx DOCX document
AMEND 0001.pdf PDF
R-245-0419_A.doc DOC document
HSCG40-10-R-30088.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISION No. E . CHANGE No. .

TITLE

CONTROLLABLE PITCH PROPELLER HUB

STANDARD OVERHAUL SPECIFICATON

R-245-0155

ORGINATED BY CWO DAVID L. HEISEY CODE 4342 DATE 03/95 .

ORGINATOR’S COMMAND SURFACE FORCES LOGISTICS CENTER (SFLC)

PLATFORM / SECTION LRE-ENG-SES1.

INTERNAL REVIEWER S. Hardsock DATE 05/10 .

SOWRB APPROVAL DATE ..

USCG - SFLC

DATE - 03/95

R-245-0155

REVISION E - 05/10

CONTROLLABLE PITCH PROPELLER HUB

STANDARD OVERHAUL SPECIFICATION

1.0 SCOPE

1.1 This Standard Overhaul Specification outlines the general requirements for the receipt, arrival inspection, overhaul, acceptance testing, preservation, packaging, packing, and marking of U.S. Coast Guard controllable pitch propeller (CPP) hubs.

1.2 CLASSIFICATION

1.2.1 Types - CPP Hub Assemblies

a. Type 1 - (OEM - Escher-Wyss) 378 WHEC (Hulls 719-726)

b. Type 2 - (OEM - PSI) 378 WHEC (Hulls 715-718)

c. Type 3 - (OEM - Escher-Wyss) 270 WMEC (Hulls 901-913)

d. Type 4 - (OEM - Rolls-Royce) 225 WLB (Hulls 201-216)

e. Type 5 - (OEM - PSI) 210 WMEC (Hulls 615-619)

f. Type 6 - (OEM - Rolls-Royce) 210 WMEC (Hulls 620-630)

1.2.2 Styles - CPP Hub Assemblies

a. Style A - Starboard, Left Hand (counter clockwise rotation)

b. Style B - Port, Right Hand (clockwise rotation)

1.3 GOVERNMENT FURNISHED PROPERTY (GFP)

1.3.1 CPP Hubs, controlled by the USCG Surface Forces Logistics

Center, Baltimore, MD by NSN's.

a. Type 1, Style A - 2010-12-307-6892

b. Type 1, Style B - 2010-12-307-6891

c. Type 2, Style A - 2010-01-268-5698

d. Type 2, Style B - 2010-01-268-5697

e. Type 3, Style A - 2010-01-119-5469

f. Type 3, Style B - 2010-01-118-8538

g. Type 4, Style B - 2010-01-421-3952

h. Type 5, Style A - 2010-01-143-5217

i. Type 5, Style B - 2010-01-141-3494

j. Type 6, Style A - 2010-01-092-0440

k. Type 6, Style B - 2010-01-091-5056

l. Tool Kit, Hub Mod., 5180-01-F10-1745

R-245-0155

1.4 GOVERNMENT FURNISHED MATERIAL (GFM) - The following GFM will be released as needed to the Contractor with the release of a delivery order.

1.4.1 Seal, Piston Rod, 5330-01-549-5698, 2 each.

1.4.2 Blade Seal Base Ring, 2010-01-439-8009, 4 each.

2.0 APPLICABLE DOCUMENTS

2.1 GENERAL - The documents listed in this section are specified in sections 3, 4, or 5 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to insure the completeness of this list, document users are cautioned that they must meet all specified requirements of the documents cited in section 3, 4, or 5 of this specification, whether or not they are listed here.

2.2 DOCUMENT AVAILABILITY - To obtain the referenced documents see section 6.1.

2.3 GOVERNMENT DOCUMENTS - The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the documents listed here by number and date shall be those in the Department of Defense Single Stock Point of Specifications and Standards (DODSSP) and supplements thereto.

2.3.1 SPECIFICATIONS

a. MIL-DTL-2845E (SH), Dated 18 August 99, Propulsion Systems, Boat and Ship; Main Shafting, Propellers, Bearings, Gauges, Special Tools, And Associated Repair Parts; Preservation, Packaging, Packing and Storage Of.

b. MIL-H-17672D, Dated 16 March 1987, Hydraulic Fluid, Petroleum, Inhibited.

c. DOD-P-24562A (SH), Dated 01 November 1982, Propellers, Ship, Controllable Pitch (Metric).

d. DoD 4140.01-M-1, Dated 07 September 2007; Compliance for Defense Packaging: Phytosanitary Requirements for Wood Packaging Material (WPM).

R-245-0155

2.3.2 STANDARDS

a. MIL-STD-167-1A (SHIPS), Dated 02 November 2005, Mechanical

Vibrations of Shipboard Equipment.

b. MIL-STD-2035A, Dated 15 May 1995, Nondestructive Testing

Acceptance Criteria.

2.4 OTHER GOVERNMENT DOCUMENTS - The following documents form a part of this specification to the extent specified herein. The documents listed shall be by title and effective date, unless otherwise documented.

2.4.1 DRAWINGS

a. USCG Drawing 627-WMEC-245-021, Dated 8/15/06, 210B WMEC

CPP HUB MODIFICATION DETAILS

2.4.2 COAST GUARD SPECIFICATIONS

a. USCG-SFLC SPECIFICATION D-000-0100, Dated 10/91 REV G 02/06, Bar Coding for USCG Surface Forces Logistics Center Procured Material.

b. USCG-SFLC SPECIFICATION R-245-0419, Dated 07/01 REV A

06/04, Controllable Pitch Propeller Hub Repair Specification Thermal Spray Restoration Of Blade Port Area For 210B WMEC.

2.4.3 TECHNICAL PUBLICATIONS

a. T9074-AS-GIB-010/271, Dated 16 February 1999, Requirements for Nondestructive Testing Methods.

2.5 COMMERCIAL DOCUMENTS - The following documents form a part of this specification to the extent specified herein. The documents shall be the version listed by number and date from the referenced industry organization. Commercial documents may also be listed in Department of Defense Single Stock Point of Specifications and Standards (DODSSP).

2.5.1 American National Standards Institute (ANSI)/ National Conference of Standards Laboratories (NCSL)

a. NCSL Z540.3 Dated 03 August 2006, Requirements for the Calibration of Measuring and Test Equipment.

R-245-0155

2.5.2 American Society For Quality (ASQ)

a. American Society for Quality (ASQ) – ASQ Q9001-2008, Dated 01 January 2008, Quality Management Systems – Requirements

2.6 ORDER OF PRECEDENCE - In the event of a conflict between the text of this specification and the references cited herein, this specification shall take precedence.

3.0 REQUIREMENTS

3.1 GENERAL - Overhaul is defined as the labor and materials required to restore all classifications of hubs listed herein to the operational parameters and performance characteristics of new controllable pitch propeller hubs.

3.1.1 This shall include the inspection and testing required confirming the same.

3.2 GOVERNMENT FURNISHED PROPERTY (GFP) – The Contractor shall provide protective storage for the GFP when not in use, and safe handling when in use.

3.2.1 The storage area shall, at a minimum, be closed on all sides, dry, and locked when the equipment is not in use.

3.3 TEST & INSPECTION PLANS - The Contractor shall submit test and inspection plans to the Contracting Officer for approval. Each plan shall include the specific inspections and tests specified herein, and all tests and inspections made by the Contractor to verify conformance to every requirement and tolerance as specified in the OEM's drawings, specifications, and technical publications.

3.3.1 DISASSEMBLY/RECEIVING INSPECTION REPORT - Each hub

assembly received by the Contractor shall be disassembled and inspected upon receipt. All parts shall be dimensionally inspected.

A report outlining all replacement parts and repairs is required along with pricing shall be submitted to the Contracting Officer for approval. No further work is authorized until the submitted report is approved.

a. This report shall include the following items along with all tests and inspections made by the Contractor.

1. Date of inspection.

R-245-0155

2. Inspector's name.

3. Identification of units by serial number, part number, and stock number.

4. Condition of the shipping crate and any cost of repair.

5. Separate cost breakdowns for each CPP hub, broken down by each part therein.

(a) Measurement of all critical dimensions and applicable overhaul tolerances for each part.

(b) Each part determined to be beyond economical repair shall be so indicated, and the submitted pricing shall be for new parts.

(c) Any parts beyond economical repair (scrap) shall be set aside for Coast Guard inspection, see section 4.8.

(d) Total cost of overhaul for each hub inspected.

6. Comments, if any, pertaining to unusual observances during inspection and testing.

7. Any recommended upgrades or modifications and their associated costs.

8. Non-destructive testing on all parts tested by the Contractor.

(a) Non-destructive testing shall be performed in accordance with T9074-AS-GIB-010/271.

3.4 OVERHAULS - Overhaul of the CPP hubs shall be performed using criteria set forth in the OEM drawings, specifications, and technical publications.

3.4.1 Reconditioning of Parts - It is acceptable to recondition certain parts provided the final dimensions are within OEM repair standards.

(i.e. trunnion OD’s can be ground undersize and match machined to undersize bearings and slide guides can be machine ground oversize and fitted with oversize slide blocks.)

R-245-0155

3.4.2 Replacement Parts - All replacement parts shall be new OEM parts.

a. With each delivery order, the Contractor shall submit certification that all replacement parts are new OEM parts.

b. The government reserves the option to supply any replacement parts needed as GFM.

3.5 CLEANING & FINISHING - The Contractor shall clean and polish all machined surfaces as necessary to remove any etching, scoring, or other imperfections that would be detrimental to the operation of the hub.

3.5.1 Each hub body shall be cleaned to remove grease, dirt, and marine growth to aid in any required NDT inspection requirements.

3.6 CLEANLINESS - The area in which hub assembly, testing, and inspections are performed shall be kept free of any accumulation of dust, dirt, metal shavings, or contaminated fluids, and shall be separate from the manufacturing and machining area.

3.7 NDT INSPECTIONS - The Contractor shall perform a dye penetrant inspection of each blade seal port and periphery area in accordance with T9074-AS-GIB-010/271. The acceptance criteria of MIL-STD-2035A, Table IV shall be used for evaluations.

3.8 THERMAL SPRAY REPAIR - Thermal spray repair of the blade port seal areas of the Type 6 hubs shall be required if the bore diameters exceed

15.812 inches with a tolerance of plus 0.002”, minus 0.000”. Repairs to these seal bores shall be in accordance with section 2.4.2.b of this specification.

3.9 BLADE SEAL MODIFICATION - Modification of the blade seal base rings of the Type 6 hubs shall be required in accordance with section 2.4.1.a of this specification. SFLC supplied special tooling shall be used to modify the blade seal base rings. This special tooling will be supplied to the Contractor. As part of this modification, upgraded piston rod seals, Phelps part no. 10708, shall be installed. The piston rod seals as described in Detail 7 of drawing 627-WMEC-245-021 and the blade seal base rings will be supplied as GFM.

3.10 MASS TOLERANCE - The mass tolerance of all similar internal components arranged axisymmetrically shall be in accordance with DOD-P-24562A, paragraph 3.18.4.

R-245-0155

3.10.1 The Government reserves the option to verify the mass tolerance of the internal hub components. The Contractor shall notify the Contracting Officer prior to hub reassembly in accordance with section 3.20.

3.11 BALANCING - If any machining is required to major hub components (i.e.

hub body, hub cap, crosshead, and piston) due to erosion or wear, each complete hub assembly, less blades, shall be dynamically balanced on a rotating balancing machine. The maximum allowable out-of-balance force shall be calculated in accordance with MIL-STD-167-lA paragraph 5.2.

3.11.1 The Contractor shall balance the hubs in the presence of the Coast

Guard Quality Assurance Representative.

3.12 HUB TESTING, OPERATING, AND PRESERVATION OIL - The following is the required hub type and normal system operating hydraulic fluids combination. Each specified oil type shall be used for the required testing and preservation of each hub type as specified in section 1.2.1.

3.12.1 HUB TYPES AND REQUIRED OIL – See Appendix A

3.13 HUB ACTUATION TESTING - Each hub assembly shall be hydraulically actuated to the full ahead and full astern positions. Observations shall be made and documented to assure smooth movement to each position with no binding or obstruction of movement. The Contractor shall document the size of the hydraulic power unit used to conduct the actuation test along with the elapsed time it took to actuate to each position.

3.14 HUB CAVITY PRESSURE TESTING - The following procedures shall be required to conduct the cavity pressure test of each type of hub.

3.14.1 Prior to any testing, each hub assembly shall be filled completely with the required hydraulic oil as required in section 3.12.1 of this specification. It shall be verified that each hub is full of oil and that no air is present

3.15 HUB TYPES 4 AND 6 - The Contractor shall conduct a pressure test of the hub cavity by applying and maintaining a constant pressure for the duration of the testing period.

3.15.1 A visual inspection shall be conducted for the duration of the test checking for leaks. Acceptance shall be based on zero leakage for the duration of the testing.

R-245-0155

3.16 HUB TYPES 1, 2, 3, AND 5 – The Contractor shall conduct a pressure test of the hub cavity by applying the required pressure, secure the pressure source, then monitor the pressure gauge for any drop in pressure.

3.16.1 Acceptance shall be based on a zero pressure drop for the duration of the testing.

3.17 HUB TYPES AND REQUIRED TESTING – The following listed pressures and duration times shall be the minimum parameters used to conduct the hub cavity testing as required in sections 3.14, 3.15 and 3.16 of this

3.17.1 Type 1 – 65 psi for a duration of 30 minutes.

3.17.2 Type 2 – 25 psi for a duration of 60 minutes.

3.17.3 Type 3 – 300 psi for a duration of 30 minutes.

3.17.4 Type 4 – 60 psi for a duration of 30 minutes.

3.17.5 Type 5 – 25 psi for a duration of 30 minutes.

3.17.6 Type 6 – 40 psi for a duration of 60 minutes.

3.18 FINAL ACCEPTANCE OPERATIONAL INSPECTION/TEST REPORT

a. This report shall include the following items along with any others needed to verify all requirements.

1. Date of inspection.

2. Inspector's name.

3. Identification of units by serial number, part number, and stock number.

4. Complete final measurement report of all critical dimensions and applicable overhaul tolerances for each part to include clearances and thrust measurements.

5. A final operational test of each completely assembled hub using hydraulic pressure to actuate the hub from the full ahead to the full astern position. The measured actuation time and hydraulic supply parameters shall be documented on the report.

R-245-0155

6. A cavity pressure test of each completely assembled hub to assure that no leaks occur. The hydraulic pressures and duration times used to conduct this test shall be documented on the report.

7. A complete listing of all test equipment to be used with a current calibration date for each piece of test equipment. The test equipment shall include pressure gauges, hoses, hydraulic power unit, and tools.

8. A complete description of each test and inspection including step by step procedures for all tests and inspections, in chronological order, with pass/fail criteria.

9. Mass tolerance documentation of internal hub components in accordance with DOD-P-24562A.

10. Dynamic balance in accordance with MIL-STD-167-1A, if applicable.

3.18.1 No tests or inspections required herein are intended to supplant any controls, examinations, inspections, or tests normally employed by the Contractor to ensure the quality of the equipment overhauled.

3.18.2 No hub shall be delivered until the final operational acceptance and pressure test results are approved by the Contracting Officer.

3.19 HUB MARKINGS - If the markings on the hub assemblies are unreadable each hub shall be re-stamped. The stampings shall be at least ¼” high of legible printing.

3.19.1 The stampings shall include, at the minimum, the following information.

a. STOCK NUMBER - See section 5.4.2.

b. PART NUMBER – See section 5.4.2.

c. SERIAL NUMBER – See section 5.4.2.

d. STARBOARD, L.H. (OR PORT. R.H.)

e. TYPE OF MATERIAL

R-245-0155

3.20 NOTIFICATIONS & INSPECTIONS - The Contractor shall be responsible for notifying the Contracting Officer at least ten (10) calendar days prior to said Contractor being ready for any inspections testing, or balancing required herein.

4.0 QUALITY ASSURANCE (QA)

4.1 GENERAL - The Contractor shall provide and maintain an inspection system, which shall ensure each item offered to the Government for acceptance conforms to the contract requirements. The inspection system shall be documented and meet the requirements of ASQ Q9001-2008.

4.2 RESPONSIBILITY FOR INSPECTION - The Contractor is responsible for the performance of all inspection requirements as specified herein. The Contractor may use his own or any other facilities for the performance of the inspections and tests, unless disapproved by the Government. The Government reserves the right to perform or witness any of the inspections and tests set forth in this specification at any time.

4.3 RESPONSIBILITY FOR COMPLIANCE - All items shall meet the

requirements of this specification. The inspections set forth in this specification shall become part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.

4.4 NONCOMPLIANCE - Shall mean any single failure of any individual part or subsystem during final inspection/testing.

4.4.1 The Contractor shall replace the failed part(s) with new and restart the testing from the beginning.

4.5 INSPECTIONS/TESTS - The inspections and tests required herein are the minimum necessary and are not intended to replace any controls, examinations or tests normally employed by the Contractor to assure the quality of the product. The following are required and shall be monitored by a Government Quality Assurance Representative.

4.5.1 Mass tolerance inspection in accordance with section 3.10 of this

R-245-0155

4.5.2 Balancing inspection in accordance with section 3.11 of this specification, if applicable.

4.5.3 Hub actuation testing inspection in accordance with section 3.13 of this specification.

4.5.4 Hub cavity pressure testing in accordance with sections 3.14, 3.15, 3.16, and 3.17 of this specification.

4.5.5 Hub marking inspection in accordance with section 3.19 of this

4.5.6 Preservation, Packing, and Marking in accordance with section 5.0 of this specification.

4.6 TEST AND INSPECTION REPORTS - One copy of any inspection/test report approved for use from submittals in 3.3 shall be sent to the Contracting Officer for approval.

4.6.1 A copy of all test and inspection reports shall be given to the Coast

Guard Quality Assurance Representative upon arrival at the Contractor’s Plant.

4.6.2 A copy of all test and inspection reports generated while the Coast

Guard Quality Assurance Representative is in plant shall be provided to the Quality Assurance Representative prior to exiting.

4.6.3 Any inspection, test or tolerance check report submitted shall have all out of tolerance readings circled or indicated.

4.6.4 All out of tolerance readings on any inspection, test or tolerance check report submitted to any Coast Guard representative shall be easily identified through highlighting, color coding, shading, circling or other prominent marking.

4.7 CALIBRATION SYSTEM - The Contractor as well as any subcontractors shall be required to maintain a test equipment calibration program in compliance with NCSL Z540.3-2006. The Contractor shall have a copy of the calibration program on hand during the term of this contract for review by any Coast Guard representative when requested.

4.7.1 The calibration system records shall be maintained for inspection for the duration of any contract referencing this specification.

R-245-0155

4.8 DISCARDED/SCRAP PARTS - Any scrap parts identified during the arrival inspection and or later testing shall be segregated for inspection by a Coast Guard Representative for condition verification.

4.8.1 Scrap parts shall be returned to the Coast Guard by the Contractor or disposed of at the Contractor’s facility as directed by the Contacting Officer.

4.9 PACKING INSPECTION - The Contracting Officer shall be notified prior to the preservation, packaging, and marking of the completed units in accordance with section 3.20.

5.0 PRESERVATION, PACKING, AND MARKING

5.1 PRESERVATION - All Hub Assemblies shall be preserved in accordance with MIL-DTL-2845E Level A, paragraphs 3.8.1 and 3.16.1.

5.2 PACKING - All Hub Assemblies shall be packed and crated in accordance with MIL-DTL-2845E paragraph 3.16.3, Figure 17.

5.3 WPM Requirements – All packing and packaging material shall meet the

Phytosanitary Requirements for Wood Packaging Material (WPM) IAW DoD 4140.01-M-1, Compliance for Defense Packaging Ref. 2.3.1.d. paragraph C2.1. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames and cleats.

5.3.1 All new purchases of WPM shall be constructed from heat treated (treated to 56° C. core temperature for 30 minutes) lumber and certified by an accredited agency recognized by the American Lumber Standard Committee (ALSC) in accordance with Ref.

2.3.1.d.

5.3.2 For existing crating and / or skid, the Contractor shall determine if the requirements listed in 5.3 are met. If the requirements are not met, the Contractor shall determine if the crating and / or skid can be brought to meet the requirements or needs to be replaced.

5.3.3 All crating and /or skids shall have the appropriate markings in accordance with Ref. 2.3.1.d.

R-245-0155

5.4 MARKING - Each preserved, packed, and packaged item shall be marked in the upper left-hand side of the two longest sides, (two opposite sides if square) of each box, carton, package, etc. The lettering shall be black painted stencil and permanently affixed to each container. The lettering shall be at least 1” high, and be applied on a highly contrasting white painted background.

5.4.1 This marking shall consist of the STOCK NUMBER, ITEM NAME, PART NUMBER, SERIAL NUMBER, CONTRACT NUMBER, SHIPPING WEIGHT (in lbs.), CONDITION CODE, i.e. CONDITION A, UNIT OF ISSUE with QUANTITY (1-EA) and the words COAST

GUARD SFLC MATERIAL CONDITION "A" REUSABLE

CONTAINER, DO NOT DESTROY, REMOVE BOLTS, LIFT

CRATE FROM SKID.

5.4.2 See below for marking layout.

a. HUB TYPE 1, STYLE A

STOCK NUMBER 2010-12-307-6892

ITEM NAME Hub Assembly, Propeller, LH

PART NUMBER 8345940-LH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

DESTROY, REMOVE BOLTS, LIFT

R-245-0155

b. HUB TYPE 1, STYLE B

STOCK NUMBER 2010-12-307-6891

ITEM NAME Hub Assembly, Propeller, RH

PART NUMBER 8345940-00RH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

c. HUB TYPE 2, STYLE A

STOCK NUMBER 2010-01-268-5698

PART NUMBER 14485-D-LH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

R-245-0155

d. HUB TYPE 2, STYLE B

STOCK NUMBER 2010-01-268-5697

PART NUMBER 14485-D-RH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

e. HUB TYPE 3, STYLE A

STOCK NUMBER 2010-01-119-5469

PART NUMBER 901-WMEC-245-003-LH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

R-245-0155

f. HUB TYPE 3, STYLE B

STOCK NUMBER 2010-01-118-8538

PART NUMBER 901-WMEC-245-003-RH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

g. HUB TYPE 4, STYLE B

STOCK NUMBER 2010-01-421-3952

PART NUMBER 110252110

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

R-245-0155

h. HUB TYPE 5, STYLE A

STOCK NUMBER 2010-01-143-5217

PART NUMBER 13337-D-LH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

i. HUB TYPE 5, STYLE B

STOCK NUMBER 2010-01-141-3494

PART NUMBER 13337-D-RH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

R-245-0155

j. HUB TYPE 6, STYLE A

STOCK NUMBER 2010-01-092-0440

PART NUMBER D066LA02000 REVISION B LH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

k. HUB TYPE 6, STYLE B

STOCK NUMBER 2010-01-091-5056

PART NUMBER D066RA02000 RH

SERIAL NUMBER As recorded from Hub Assembly CONTRACT NUMBER (See Contract) SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1 - EA

CONDITION CODE CONDITION A

OTHER DATA AS

DIRECTED COAST GUARD SFLC

MATERIAL

REUSABLE CONTAINER, DO NOT

5.5 BAR CODING - Bar code labels shall be supplied on all CLIN's except for those that require data submissions only.

5.5.1 All bar coded labels shall be in accordance with SFLC specification

D-000-100.

1. The actual labels shall be Type "V", Grade "A", Style "2", Composition "b" with plastic laminate.

2. Each label shall contain encoded data for the Stock Number.

R-245-0155

6.0 NOTES

6.1 DOCUMENT SOURCES

6.1.1 GOVERNMENT DOCUMENT SOURCES

a. Department of Defense Single Stock Point (DODSSP) Building 4, Section D 700 Robbins Avenue Philadelphia, PA 19111-5094 215-697-2667/2179

FAX 215-697-1462

a. DOD & Navy Publications & Forms (Other Than DODSSP) Naval Publication and Forms Center 5801 Tabor Ave.

Philadelphia, PA 19120 215-697-2000

6.1.2 COMMERICAL DOCUMNET SOURCES

a. American National Standards Institute (ANSI) 25 West 43rd Street (Between 5th and 6th Avenues) 4th Floor

New York, New York 10036 212-642-4900

FAX 212-398-0023

www.ansi.org

b. American Society For Quality Control (ASQC) 611 East Wisconsin Avenue Milwaukee, Wisconsin 53202 414-272-8575 Fax 414-272-1734

6.1.3 OTHER GOVERNMENT DOCUMENTS

a. USCG Surface Forces Logistics Center Mail Stop #026 BLDG 3 2nd Floor 2401 Hawkins Point Road Baltimore, MD 21226-5000 Attn: Toni Cheek http://www.ansi.org/

APPENDIX A

For the testing, preservation, and storage purposes only, the six (6) hub types listed in section

1.2.1 of this specification either 2110 TH, 2135 TH oils can be used interchangeably. SAE 10W, SAE 10W-30, and any ISO VG 46 may be used also, if it can be certified that the particular oil to be used meets the following characteristics:

TABLE 1

Emulsion Test IAW ASTM D1401, after 30 minutes

Oil Layer 40 mL Water Layer ≥37 mL

Lacy Cuff ≤3 mL Copper Strip Corrosion IAW ASTM D130 1B Max Rust Preventative Characteristics IAW ASTM D665 PASS Oxidation Test IAW ASTM D943 ≥1000 hrs

Total Sludge ≤100 mg

The above table applies to only 10W, 10W-30, and ISO VG46 oils and should be readily available from the manufacturer. Table 2 is a list on known oils that meet the requirements of Table 1. With the use of any of these oils, there should not be any compatibility issues when mixed in small amounts (i.e the hub is drained prior in installation on a ship).

TABLE 2

Company Hydraulic Oil Trade Name Company Product Code/Number

British Petroleum Bartran HV 46 P3284 Castrol Blue Hydraulic Plus 4024 Castrol Paradene AW 46 4031 Chevron Clarity AW 46 230341 Chevron Rando 46 40926 Chevron Regal R&O 46 40701 Chevron Rykon AW 46 229002 Chevron Rykon Premium 46 255679 Gulf Harmony AWT 46 Gulf Harmony HVI 46 Houghton Hydro Drive AW 46 Mobil DTE 15M Mobil DTE 25M Petrobrás Marbrax TR-46 2728 Petrobrás Lubrax Industrial HR-46-EP 2873 Shell Tellus 46 5061286 Shell Tellus Premium 46 5061291 Texaco AW46 227308 Texaco Regal R&O 46 220701 Valvoline Hydraulic AW 46 VV042

TITLE
R-245-0155